RAIO-0418-59545 April 13, 2018 Docket No.52-048 U.S. Nuclear Regulatory Commission ATTN: Document Control Desk One White Flint North 11555 Rockville Pike Rockville, MD 20852-2738

SUBJECT:

NuScale Power, LLC Supplemental Response to NRC Request for Additional Information No. 64 (eRAI No. 8863) on the NuScale Design Certification Application

REFERENCES:

1. U.S. Nuclear Regulatory Commission, "Request for Additional Information No. 64 (eRAI No. 8863)," dated June 20, 2017
2. NuScale Power, LLC Response to NRC "Request for Additional Information No. 64 (eRAI No.8863)," dated August 21, 2017 The purpose of this letter is to provide the NuScale Power, LLC (NuScale) supplemental

response to the referenced NRC Request for Additional Information (RAI).

The Enclosure to this letter contains NuScale's supplemental response to the following RAI

Question from NRC eRAI No. 8863:

06.02.04-4 This letter and the enclosed response make no new regulatory commitments and no revisions to

any existing regulatory commitments.

If you have any questions on this response, please contact Marty Bryan at 541-452-7172 or at

mbryan@nuscalepower.com.

Sincerely, Zackary W. Rad Di t Regulatory Director, R l t Aff i Affairs NuScale Power, LLC Distribution: Omid Tabatabai, NRC, OWFN-8G9A Samuel Lee, NRC, OWFN-8G9A Prosanta Chowdhury NRC, OWFN-8G9A : NuScale Supplemental Response to NRC Request for Additional Information eRAI No. 8863 NuScale Power, LLC 1100 NE Circle Blvd., Suite 200 Corvalis, Oregon 97330, Office: 541.360.0500, Fax: 541.207.3928 www.nuscalepower.com

RAIO-0418-59545 :

NuScale Supplemental Response to NRC Request for Additional Information eRAI No. 8863 NuScale Power, LLC 1100 NE Circle Blvd., Suite 200 Corvalis, Oregon 97330, Office: 541.360.0500, Fax: 541.207.3928 www.nuscalepower.com

Response to Request for Additional Information Docket No.52-048 eRAI No.: 8863 Date of RAI Issue: 06/20/2017 NRC Question No.: 06.02.04-4 10 CFR 50.34(f)(2)(xiv) part (D) requires that an applicant provide containment isolation

systems that utilize a containment set point pressure for initiating containment isolation as low

as is compatible with normal operation (additional background information can be found in

DSRS 6.2.4 and NUREG-0737). NuScales pressure set point is determined by taking the

analytical limit and subtracting total loop uncertainty (see NuScales setpoint methodology

Technical Report: TR-0616-49121-P Rev. 0). Applying NuScales setpoint methodology results

in a set point that is based off the analytical limit and does not consider normal operation as

required by the TMI regulation cited above. Therefore, based on the regulation and staff

guidance, the NRC staff requests that the NuScale design certification applicant provide

information that addresses the TMI regulation related to containment pressure set point given

that NuScales set point methodology does not explicitly require or account for the TMI

requirement. As part of the response, provide a mark-up of the FSAR, as appropriate.

In addition, NuScale utilizes a temperature set point (under the bioshield) to initiate containment

isolation. In a similar manner as discussed above for the pressure set point, NuScales

temperature set point is determined by taking the analytical limit and subtracting total loop

uncertainty (see NuScales setpoint methodology Technical Report: TR-0616-49121-P Rev. 0).

For the temperature setpoint, the NRC staff request that the NuScale design certification

applicant provide information on how NuScale arrives at a minimum containment isolation

temperature set point that is in keeping with the approach used to determine the containment

isolation pressure set point (as low as is compatible with normal operation). As part of the

response, provide a mark-up of the FSAR, as appropriate.

NuScale Response:

The response to eRAI 8863, Question 06.02.04-4, transmited by NuScale letter RAIO-0817-55516, dated August 17, 2017 addressed the high containment pressure containment isolation signal setpoint and the high under the bioshield temperature containment isolation signal setpoint. This supplemental response replaces the high containment pressure containment isolation setpoint discussion in RAIO-0817-55516. The response to Question NuScale Nonproprietary

06.02.04-4 in RAIO-0817-55516 continues to address the high under the bioshield temeprature containment isolation setpoint.

NUREG-0737 - Item II.E.4.2 provides additional guidance to 10CFR50.34(f)(2)(xiv)(D). In the section marked "Clarification,", item (6) states:

The containment pressure history during normal operation should be used as a basis for arriving at an appropriate minimum pressure setpoint for initiating containment isolation.

The pressure setpoint selected should be far enough above the maximum observed (or expected) pressure inside containment during normal operation so that inadvertent containment isolation does not occur during normal operation from instrument drift or fluctuations due to the accuracy of the pressure sensor. A margin of 1 psi above the maximum expected containment pressure should be adequate to account for instrument error. Any proposed values greater than 1 psi will require detailed justification. Applicants for an operating license and operating plant licensees that have operated less than one year should use pressure history data from similar plants that have operated more than one year, if possible, to arrive at a minimum containment setpoint pressure.

The NuScale design has no relevant operating history to base a lower containment setpoint below the high containment pressure analytical limit upon. Therefore, it is impossible to select a setpoint far enough above the observed (or expected) pressure inside containment during normal operation, that accounts for instrument drift or fluctuations, due to the pressure sensor accuracy. Additionally, the NuScale containment operates under vacuum conditions, and the high containment pressure analytical limit is also subatmospheric, therefore, there is no need to develop an isolation setpoint 1 psi above the normal operating pressure, to prevent a release to the environs. Therefore, 10 CFR 50.34(f)(2)(xiv)(D) is not technically relevant to the NuScale design. FSAR Table 1.9-2 is revised accordingly.

Impact on DCA:

Table 1.9-5 has been revised as described in the response above and as shown in the markup provided in this response.

NuScale Nonproprietary

Tier 2 NuScale Final Safety Analysis Report RAI 06.02.04-4S1, RAI 06.02.04-7S1, RAI 06.02.04-9, RAI 06.02.04-9S1, RAI 08.01-1, RAI 08.02-4, RAI 08.02-6, RAI 08.03.02-1, RAI 09.02.06-1 Table 1.9-5: Conformance with TMI Requirements (10 CFR 50.34(f)) and Generic Issues (NUREG-0933)

Item Regulation Description / Title Conformance Comments Section Status 50.34(f)(1)(i) Perform a plant/site-specific probabilistic Partially Design certification will address reliability of core 19.0 risk assessment, the aim of which is to seek Conforms and containment heat removal systems, with an 19.1 such improvements in the reliability of core update required by COL applicant to reflect site- 19.2 and containment heat removal systems as specific conditions.

are significant and practical and do not impact excessively on the plant (II.B.8) 50.34(f)(1)(ii) Perform an evaluation of the proposed Not Applicable This rule requires an evaluation of proposed Not Applicable auxiliary feedwater system (II.E.1.1) PWR auxiliary feedwater (AFW) systems. The NuScale plant design does have an AFW system like a typical LWR. Neither the literal language nor the intent of this rule applies to the NuScale design.

50.34(f)(1)(iii) Perform an evaluation of the potential for Not Applicable The NuScale reactor design differs from large Not Applicable and impact of reactor coolant pump seal PWRs because the NuScale design does not 1.9-234 damage following small-break LOCA require or include reactor coolant pumps.

(II.K.2.16 and II.K.3.25) Rather, the NuScale design uses passive natural circulation of the primary coolant, eliminating the need for reactor coolant pumps.

50.34(f)(1)(iv) Perform an analysis of the probability of a Not Applicable This guidance is applicable only to PWRs that are Not Applicable small-break LOCA caused by a stuck-open designed with power-operated pressurizer relief power-operated relief valve (PORV) (II.K.3.2) valves. The NuScale design does not use power-operated relief valves.

50.34(f)(1)(v) Perform an evaluation of the safety Not Applicable This requirement applies only to BWRs. Not Applicable effectiveness of providing for separation of Conformance with Regulatory Criteria high pressure coolant injection and reactor core isolation cooling system initiation levels (II.K.3.13) 50.34(f)(1)(vi) Perform a study to identify practicable Not Applicable This requirement applies only to BWRs. Not Applicable system modifications that would reduce Regardless, the issue contemplated by this challenges and failures of relief valves requirement was related to power-operated (II.K.3.16) relief valves. The NuScale design does not use Draft Revision 2 power-operated relief valves.

Table 1.9-5: Conformance with TMI Requirements (10 CFR 50.34(f)) and Generic Issues (NUREG-0933) (Continued)

Tier 2 NuScale Final Safety Analysis Report Item Regulation Description / Title Conformance Comments Section Status 50.34(f)(2)(xiv) Provide containment isolation systems that Departure The containment evacuation system has the 5.2.5 50.34(f)(2)(xiv)(A) (A) ensure all non-essential systems are potential for an open path from containment to 6.2.4 50.34(f)(2)(xiv)(B) isolated automatically; (B) ensure each non- the environs but is isolated upon a high 7.1.5 50.34(f)(2)(xiv)(C) essential penetration (except instrument containment vessel pressure signal, a low-low 7.2.13 50.34(f)(2)(xiv)(D) lines) have two isolation barriers in series; pressurizer level signal, a low alternating current 9.3.6 50.34(f)(2)(xiv)(E) (C) do not result in reopening of the voltage signal, or high under-the-bioshield 19.2 containment isolation valves on resetting of temperature. Additionally, the CES discharge is the isolation signal; (D) use a containment re-directed into the gaseous radioactive waste set point pressure for initiating system upon a high radiation signal.The NuScale containment isolation as low as is design conforms to 50.34(f)(2)(xiv)(A), (B), and compatible with normal operation; and (E) (C). The requirements of 50.34(f)(2)(xiv)(D) and include automatic closing on a high (E) are not technically relevant to the NuScale radiation signal for all systems that provide design. For 50.34(f)(2)(xiv)(D), NUREG 0737 - Item a path to the environs (II.E.4.2) II.E.4.2 provides additional guidance to 10 CFR 50.34(f)(2)(xiv)(D). Specifically, the clarification states the minimum containment pressure history during normal operation should be used 1.9-239 as a basis for an appropriate minimum pressure setpoint for initiating containment isolation. The NuScale design has no relevant operating history to base an isolation setpoint upon.

Furthermore, the containment high pressure analytical limit is subatmospheric, therefore, any pressure setpoint up to and including the analytical limit will prevent a release to the environs. For 50.34(f)(2)(xiv)(E), The NuScale Conformance with Regulatory Criteria design differs from that of a traditional large water reactor design of a TMI-era vintage because reactor core uncovery, and resulting core damage, cannot occur without reaching the low low pressurizer level containment isolation setpoint. The pressurizer is an integral part of the reactor vessel, located well above the reactor Draft Revision 2 core, and not connected to the reactor core by piping. Design basis events meet their thermal

Table 1.9-5: Conformance with TMI Requirements (10 CFR 50.34(f)) and Generic Issues (NUREG-0933) (Continued)

Tier 2 NuScale Final Safety Analysis Report Item Regulation Description / Title Conformance Comments Section Status and hydraulic acceptance criteria without reliance on isolating the CES in a high radiation signal. No design basis event results in degraded or damaged core conditions. Section 19.2 analyses demonstrate severe accident conditions, with resultant core damage, also result in generation of reliable containment isolation signals, without reliance on isolation on high containment radiation. An in-containment event resulting in core damage or degradation also results in containment isolation on low low pressurizer level and high containment pressure.

An event that leads to core damage or degradation also results in containment isolation on low low pressurizer level. These features provide a reliable alternative means to prevent radiological release from the CES to the environs.

1.9-240 50.34(f)(2)(xv) Capability for containment purging/venting Not Applicable The NuScale containment vessel is smaller than a Not Applicable designed to minimize the purging time typical containment building, does not contain consistent with as low as reasonably sub-compartments and does not does not achievable (ALARA) (II.E.4.4) require or incorporate a purge or venting system function as contemplated by this requirement.

Personnel access during reactor operation is not needed. In addition, the NuScale ECCS design does not include pumps, and does not involve a typical PWR ECCS recirculation mode where Conformance with Regulatory Criteria ECCS pump performance relies on containment pressure. Thus purge or vent capability as prescribed by 10 CFR 50.34(f)(2)(xv) is neither required nor included in the NuScale design. This requirement is not technically relevant to the NuScale design.