ML18095A277

From kanterella
Jump to navigation Jump to search
Monthly Operating Rept for May 1990 for Salem Unit 2. W/900612 Ltr
ML18095A277
Person / Time
Site: Salem PSEG icon.png
Issue date: 05/31/1990
From: Miller L, Morroni M, Orticelle A
Public Service Enterprise Group
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
NUDOCS 9006190045
Download: ML18095A277 (9)


Text

f

.. r OPS~G' Public Service Electric and Gas Company P.O. Box E Hancocks Bridge, New Jersey 08038 Salem Generating Station June 12, 1990 U.S. Nuclear Regulatory Commission Document Control Desk Washington, DC 20555

Dear Sir:

MONTHLY OPERATING REPORT SALEM NO. 2 DOCKET NO. 50-311 In compliance with Section 6.9.1.6, Reporting Requirements for the Salem Technical Specifications, the original copy of the monthly operating reports for the month of May 1990 are being sent to you.

Average Daily Unit Power Level Operating Data Report Unit Shutdowns and Power Reductions Safety Related Maintenance Major Plant Modifications Operating Summary Refueling Information Sincerely yours, L. K. Miller General Manager -

Salem Operations RH:pc cc: Mr. Thomas T. Martin Regional Admini~trator USNRC Region I 631 Park Avenue King of Prussia, PA 19046 Enclosures

-~--.~i~1i561 *:i(~)045--.~,Oei5::.:1 8-1-7.R4 PDR ADOCK 05000311 R PDC The Energy People 95-2189 (11M)12-84

AVERAGE DAILY UNIT POWER LEVEL Docket No. =5=0_-=3=1=1~~~~~-

Unit Name Salem # 2 Date =0=6_-=1=0_-~9=0~~~~-

Completed by Art Orticelle Telephone 609-339-2122 Month MAY, 1990 Day Average Daily Power Level Day Average Daily Power Level (MWe-NET) (MWe-NET) 1 0 17 0 2 0 18 0 3 0 19 0 4 0 20 0 5 0 21 0 6 0 22 0 7 0 23 0 8 0 24 0 9 0 25 0 10 0 26 0 11 0 27 0 12 0 28 0 13 0 29 0 14 0 30 0 15 0 31 0 16 0 P. 8.1-7 Rl

CORRECTED OPERATING DATA REPORT Docket No: 50-311 Date: 06-10-90 Completed by: Art Orticelle Telephone: 609-339-2122 Operating Status

1. Unit Name Salem No. 2 Notes
2. Reporting Period MAY, 1990
3. Licensed Thermal Power (MWt) 3411
4. Nameplate Rating (Gross MWe) 1170
5. Design Electrical Rating (Net MWe) 1115
6. Maximum Dependable Capacity(Gross MWe) 1149
7. Maximum Dependable Capacity (Net MWe) 1106
8. If Changes Occur in Capacity Ratings ( i terns 3 through 7) since Last Report, Give Reason N/A
9. Power Level to Which Restricted, if any (Net MWe) N/A
10. Reasons for Restrictions, if any N/A This Month Year to Date Cumulative
11. Hours in Reporting Period 744 3623 75672
12. No. of Hrs. Reactor was Critical 0 1993.8 47999.7
13. Reactor Reserve Shutdown Hrs. 0 0 0
14. Hours Generator On-Line 0 1974.1 46519.3
15. Unit Reserve Shutdown Hours 0 0 0
16. Gross Thermal Energy Generated (MWH) 0 6555801.6 95607541.0
17. Gross Elec. Energy Generated (MWH) 0 2237880 48284932
18. Net Elec. Energy Generated (MWH) -2413 2140493 45940399
19. Unit Service Factor 0 54.5 61.5
20. Unit Availability Factor 0 54.5 61.5
21. Unit Capacity Factor (using MDC Net) 0 53.4 54.9
22. Unit Capacity Factor (using DER Net) 0 52.9 54.4
23. Unit Forced Outage Rate 0 7.6 25.4
24. Shutdowns scheduled over next 6 months (type, date and duration of each)

None

25. If shutdown at end of Report Period, Estimated Date of Startup:

Unit 2 estimated startup date of June 14, 1990.

8-1-7.R2 I

I

UNIT SHUI'OOWN AND KlWER REDUCTIOOS OOCKEr NO. : -=5c-=-0--=3=11'°-----

REPORr MJN'IH =MA=Y_,__,-=1~99'-"0_ _ __ UNIT NAME: Salem #2 DATE: 06-10-90 CDIPIEI'ED BY: Art Orticelle TELEPHONE: 339-2122 MEI'HOD OF SHUTI'ING l.JCENSE DUR!\.TIOO OOWN EVEN!' SYSTEM Cil1PONENT CAUSE AND CDRRECTIVE ACTIOO NO. DATE 'IYPE i (HOORS) RFAroN 2 RFACIDR REPORr # CDDE 4 CDDE 0 'IO PREVENT RFruRRENCE 0050 05/01/90 s 744 c 4 ---- RC FUELXX Rm.JELING v

I I

1 2 3 4 5 F: Forced Reason: Method: Exhibit G - Instructions. Exhibit'l - Same S: Scheduled A-Fquiµnent Failure (&'Plain) 1-Manual for Preparation of Data Source B-Maintenance or Test* 2-Manual Scram Entry Sheets for Licensee C-Refueling 3-Autariatic Scram Event Report (LER) File D-Regulatory Restriction 4--COntinuation of (NURID-0161)

E--Operator Training &License Examination Previous Outage F-Administrative 5-lnad Reduction

  • G--Operational Error (&'Plain) 9--0ther
    • ""'l-1. - ' . , ....._. , .. ! *- \

SAFETY RELATED MAINTENANCE DOCKET NO: 50-311 MONTH: - MAY 1990 UNIT NAME: SALEM 2 DATE: JUNE 10, 1990 COMPLETED BY: M. MORRONI TELEPHONE: (609) 339-2068 WO NO UNIT EQUIPMENT IDENTIFICATION 880328131 2 22 SAFETY INJECTION PUMP FAILURE DESCRIPTION: MECHANICAL SEALS LEAK - REPLACE SEALS 880423030 2 VALVE 2CV69 FAILURE DESCRIPTION: REPLACE TORQUE SWITCH, PERFORM WIRING CHANGE AND MOVATS TESTING 880423031 2 VALVE 2CV116 FAILURE DESCRIPTION: REPLACE TORQUE SWITCH, PERFORM WIRING CHANGE AND MOVATS TESTING 880428025 2 VALVE 2CC118 FAILURE DESCRIPTION: REPLACE TORQUE SWITCH, PERFORM WIRING CHANGE AND MOVATS TESTING 880429007 2 VALVE 2CC136 FAILURE DESCRIPTION: REPLACE TORQUE SWITCH, PERFORM WIRING CHANGE AND MOVATS TESTING 880505015 2 VALVE 2CV68 FAILURE DESCRIPTION: REPLACE TORQUE SWITCH, PERFORM WIRING CHANGE AND MOVATS TESTING

SAFETY RELATED MAINTENANCE DOCKET NO: 50-311 MONTH: - MAY 1990 UNIT NAME: SALEM 2 DATE: JUNE 10, 1990 COMPLETED BY: M. MORRONI TELEPHONE: (609) 339-2068 WO NO UNIT EQUIPMENT IDENTIFICATION 880516002 2 VALVE 2CC131 FAILURE DESCRIPTION: REPLACE LIMIT SWITCH AND SHAFT KEY AND PERFORM MOVATS TESTING 890119095 2 2B DIESEL GENERATOR GEAR DRIVEN LUBE OIL PUMP FAILURE DESCRIPTION: REPLACE GEAR DRIVEN LUBE OIL PUMP 880303112 2 21 SAFETY INJECTION PUMP FAILURE DESCRIPTION: MECHANICAL SEALS LEAK - REPLACE SEALS 890914164 2 21 COMPONENT COOLING HEAT EXCHANGER FAILURE DESCRIPTION: REPLACE SERVICE WATER PIPE, HANGERS, AND INSTRUMENTATION 890920115 2 2B VITAL BUS FAILURE DESCRIPTION: RESOLDER FAULTY CONNECTION 900413081 2 VALVE 21SW17 FAILURE DESCRIPTION: REPLACE MOTOR SHAFT PINION KEY 900507148 2 REACTOR CORE BARREL FAILURE DESCRIPTION: INVESTIGATE REACTOR CORE BARREL INDICATIONS

MAJOR PLANT MODIFICATIONS DOCKET NO: 50-311 MONTH: - MAY 1990 UNIT NAME: SALEM 2 DATE: JUNE 10, 1990 COMPLETED BY: M. MORRON!

TELEPHONE: (609) 339-2068

  • DCR PRINCIPAL SYSTEM DESCRIPTION None for the period.
  • DCR - Design Change Request

SALEM GENERATING STATION MONTHLY OPERATING

SUMMARY

- UNIT 2 MAY 1990 SALEM UNIT NO. 2 The Unit remained shutdown throughout the period for a refueling outag*e.

REFUELING INFORMATION DOCKET NO: 50-311 MONTH: - MAY 1990 UNIT NAME: SALEM 2 DATE: JUNE 10, 1990 COMPLETED BY: M. MORRONI TELEPHONE: (609) 339-2068 MONTH MAY 1990

1. Refueling information has changed from last month:

YES x NO

2. Scheduled date for next refueling: March 31, 1990
3. Scheduled date for restart following refueling: June 14, 1990
4. a) Will Technical Specification changes or other license amendments be required?:

YES NO x NOT DETERMINED TO DATE bl Has the reload fuel design been reviewed by the Station Operating Review Committee?:

YES x NO If no, when is it scheduled?:

5. Scheduled date(s) for submitting proposed licensing action:

N/ P..

6. Important licensing considerations associated with refueling:
7. Number of Fuel Assemblies:
a. Incore 193
b. In Spent Fuel Storage 316
8. Present licensed spent fuel storage capacity: 1170 Future spent fuel storage capacity: 1170
9. Date of last refueling that can be discharged to the spent fuel pool assuming the present licensed capacity: March 2003 8-1-7.R4