Withdraws 831027 & 840801 Proposed Radiological Effluent Tech Spec Change Request from NRC Review & Approval Based on Listed Reasons.Proposed Tech Spec Amend Will Be Provided
ML18030B233
Person / Time
Site: Browns Ferry  Tennessee Valley Authority icon.png
Issue date: 04/04/1986
From: Gridley R
TENNESSEE VALLEY AUTHORITY
To: Muller D
Office of Nuclear Reactor Regulation
References
TAC-63022, TAC-63023, TAC-63024, NUDOCS 8604090184
Download: ML18030B233 (6)


Text

(

ACCESSION NBR:

F*CIL:50-259 50-2hO 50-296 AUTH. NAME GRIDLEYi R.

REC IP. NAME MULLERiD. R.

REGULATORY QRMATION DISTRIBUTIQN SY (RIDS) 8604090184 DOC. DATE: 8b/04/04 NQTARIZED:

NO Browns Ferry Nuclear Power Stationi Unit ii Tennessee Browns Ferry Nuclear Power Stationi Unit 2i Tennessee Browns Ferry Nuclear Power Stationi Unit 3i Tennessee AUTHOR *FFILIATION Tennessee Valley Authority RECIPIENT AFFILIATION BWR ProJect Directorate 2

DOCKET ¹ 05000259 05000260 05000296

SUBJECT:

Withdraws 831027 5 840801 proposed radi olog ical effluent Tech Spec change request from NRC review 5 approval based on listed reasons. Proposed Tech Spec amend will be provided.

DISTRIBUTION CODE:

A009D COPIES RECEIVED: LTR 1

ENCL Q.

SIZE TITLE: QR/Licensing Submittal:

  • ppendi x I NOTES: NMSS/FCAF icy.

icy NMSS/FCAF/PM.

OI'* ice.

M GROTENHUIS icy.

NMSS/FC*F 1 c g.

1c g NMSS/FCAF/PM.

OIA ic g.

M GROTENHUIS icy.

NMSS/FCAF icy. icj NMSS/FCAP/PM.

QIA icy.

M GROTENHUIS icy.

/

05000259 05000260 05000296 RECIPIENT ID CODE/NAME BWR *DTS BWR EICSB BWR PD2 PD 01 BWR PSB INTERNAL:

ACRS 11 ELD/HDS4 19 NRR PWR-A ADTS NRR/TAMB RGN2 COPIES LTTR ENCL 3

1 1

1 1

1 RECIPIENT ID CODE/NAME BWR EB BWR FOB CLARKi R BWR RSB ADM/LFMB NRR BWR ADTS ADTS REG FILE 04 COPIES LTTR ENCL EXTERNAL: 24X NRC PDR NOTES:

02 1

1 1

1 LPDR NSIC 03 05 TOTAL NUMBER OF COPIES REQUIRED:

LTTR 32 ENCL

PPVP IF ~,,

1'. llkl j1>,t C'"I <<

If I Q I

, l-I')f,w *8 P

IV

~

jj'7',F3

~,

pe vg lt, I,Fj+

Ktll(fI llf I'1

~

p I<< lt

$ 01 l Ukt,.j~ ",j

>a

<..~ "IL cvv<<

'FF OFF I $

lt >") 'v<<t:,tvr +I N

I t

I >Pre.

I 1,

I P

r

~ ~

)Q I

',t

/PI!$

JI IBII t,"P>/VI I', III rt tip Ir

'I IP

~,

I jF;jg f'I't P

TENNESSEE VALLEYAUTHORITY 5N 157B Lookout Place April 4, 1986 Director of Nuclear Reactor Regulation Attention:

Mr. D. R. Muller, Project Director BWR Project Directorate No.

2 Division of Boiling Water Reactor Licensing U.S. Nuclear Regulatory Commission Washington, D.C.

20555

Dear Mr. Muller:

In the Matter of the Tennessee Valley Authority Docket Nos.

50-259 50-260 50-296 By letters from L. M. Mills to H. R. Denton dated October 27, 1983 and August 1,

1984, we submitted proposed radiological effluent technical specifications for the Browns Ferry Nuclear Plant (BFN).

By this letter we hereby withdraw the subject, technical specification change request (TVA BFNP TS 192 and TS 192 Supplement

1) from NRC review and approval.

Our request is supported by the following discussion.

By J.

A. Domer's letter to D. B. Vassallo dated July 3, 1985, we requested that final approval of the specifications be delayed.

Justification for our request presented in that letter was based on BFN's record of successfully limiting radiological effluent releases and also on the NRC Commissioners's statements concerning and expected results of the Technical Specification Improvement Project (TSIP).

By letter from D. B. Vassallo to H.

G. Parris dated August 9, 1985 our request was denied.

The reason given in that letter was that it is the staff's position not to delay any pending licensing actions on the basis of possible TSIP recommendations, since the implementation is in the future.

We acknowledge your reason for denial of our request, but continue to believe that the TSIP will result in these radiological effluent specifications being removed from technical specifications and to add them now is not an efficient, use of NRC staff or utility resources.

Subsequent to NRC's letter to TVA dated August 9, 1985, the TSIP developed a set, of objective criteria for determining which specifications would be removed and placed in supplemental documents and which would remain in technical specifications.

These criteria are presented in SECY-86-10, January 13, 1986.

Application of these criteria to radiological effluent specifications results in their removal from technical specifications as was illustrated by TSIP's split of the Wolf Creek and Limerick technical specifications.

TVA is in complete agreement with the requirements that are contained in TS 192 and in TS 192 Supplement 1.

We do not intend to reduce those requirements nor extend the schedule for implementing them.

We plan to 8604090184 860404.l PDR ADOCK 05000259 P

PDRQ An Equal Opportunity Employer II'o

I

Director of Nuclear Reactor Regulation April 4, 1986 replace TS 192 and supplement with a proposed technical specification amendment containing limitations on radiological effluents, as required by 10 CFR 50.36a supplemented by a program containing the balance of the TS 192 requirements, The proposed technical specifications and supplemental program will be submitted for NRC review.

We wish to meet with the NRC staff to discuss this approach, if needed, to obtain NRC acceptance.

Please get in touch with us through the BFN Project Manager with respect to your dispositioning of this letter.

Very truly yours, TENNESSEE VALLEY AUTHORITY

~

~

R. Gridley Manager of Licensing cc:

Mr. R. J. Clark U.S. Nuclear Regulatory Commission Browns Ferry Project Manager 7920 Norfolk Avenue

Bethesda, Maryland 20814 U.S. Nuclear Regulatory Commission Region II ATTN:

Dr. J. Nelson Grace, Regional Administrator 101 Marietta Street, NW, Suite 2900 Atlanta, Georgia 30323