Category:MONTHLY OPERATING ANALYSIS REPORT
MONTHYEARL-99-221, Monthly Operating Repts for Sept 1999 for Turkey Point,Units 3 & 4.With1999-09-30030 September 1999 Monthly Operating Repts for Sept 1999 for Turkey Point,Units 3 & 4.With L-99-202, Monthly Operating Repts for Aug 1999 for Turkey Point,Units 3 & 4.With1999-08-31031 August 1999 Monthly Operating Repts for Aug 1999 for Turkey Point,Units 3 & 4.With L-99-179, Monthly Operating Repts for July 1999 for Turkey Point,Units 3 & 4.With1999-07-31031 July 1999 Monthly Operating Repts for July 1999 for Turkey Point,Units 3 & 4.With L-99-163, Monthly Operating Repts for June 1999 for Turkey Point,Units 3 & 4.With1999-06-30030 June 1999 Monthly Operating Repts for June 1999 for Turkey Point,Units 3 & 4.With L-99-134, Monthly Operating Repts for May 1999 for Turkey Point,Units 3 & 4.With1999-05-31031 May 1999 Monthly Operating Repts for May 1999 for Turkey Point,Units 3 & 4.With L-99-087, Monthly Operating Repts for Mar 1999 for Turkey Point,Units 3 & 4.With1999-03-31031 March 1999 Monthly Operating Repts for Mar 1999 for Turkey Point,Units 3 & 4.With L-99-063, Monthly Operating Repts for Feb 1999 for Turkey Point Nuclear Power Plant,Units 3 & 4.With1999-02-28028 February 1999 Monthly Operating Repts for Feb 1999 for Turkey Point Nuclear Power Plant,Units 3 & 4.With L-99-033, Monthly Operating Repts for Jan 1999 for Turkey Point,Units 3 & 4.With1999-01-31031 January 1999 Monthly Operating Repts for Jan 1999 for Turkey Point,Units 3 & 4.With L-99-004, Monthly Operating Repts for Dec 1998 for Turkey Point,Units 3 & 4.With1998-12-31031 December 1998 Monthly Operating Repts for Dec 1998 for Turkey Point,Units 3 & 4.With L-98-297, Monthly Operating Repts for Nov 1998 for Turkey Point,Units 3 & 4.With1998-11-30030 November 1998 Monthly Operating Repts for Nov 1998 for Turkey Point,Units 3 & 4.With L-98-281, Monthly Operating Repts for Oct 1998 for Turkey Point,Units 3 & 4.With1998-10-31031 October 1998 Monthly Operating Repts for Oct 1998 for Turkey Point,Units 3 & 4.With L-98-262, Monthly Operating Repts for Sept 1998 for Turkey Point Unit 3 & 4.With1998-09-30030 September 1998 Monthly Operating Repts for Sept 1998 for Turkey Point Unit 3 & 4.With L-98-236, Monthly Operating Repts for Aug 1998 for Turkey Points,Units 3 & 4.With1998-08-31031 August 1998 Monthly Operating Repts for Aug 1998 for Turkey Points,Units 3 & 4.With L-98-206, Monthly Operating Repts for July 1998 for Turkey Point,Units 3 & 41998-07-31031 July 1998 Monthly Operating Repts for July 1998 for Turkey Point,Units 3 & 4 L-98-187, Monthly Operating Repts for June 1998 for Turkey Point,Units 3 & 41998-06-30030 June 1998 Monthly Operating Repts for June 1998 for Turkey Point,Units 3 & 4 L-98-163, Monthly Operating Repts for Turkey Point,Units 3 & 41998-05-31031 May 1998 Monthly Operating Repts for Turkey Point,Units 3 & 4 L-98-128, Monthly Operating Repts for Apr 1998 for Turkey Point,Units 3 & 41998-04-30030 April 1998 Monthly Operating Repts for Apr 1998 for Turkey Point,Units 3 & 4 L-98-095, Monthly Operating Repts for Mar 1998 for Turkey Point,Units 3 & 41998-03-31031 March 1998 Monthly Operating Repts for Mar 1998 for Turkey Point,Units 3 & 4 L-98-070, Monthly Operating Repts for Feb 1998 for Turkey Point,Units 3 & 41998-02-28028 February 1998 Monthly Operating Repts for Feb 1998 for Turkey Point,Units 3 & 4 L-98-024, Monthly Operating Repts for Jan 1998 for Turkey Point,Units 3 & 41998-01-31031 January 1998 Monthly Operating Repts for Jan 1998 for Turkey Point,Units 3 & 4 L-98-002, Monthly Operating Repts for Dec 1997 for Turkey Point,Unit 3 & 41997-12-31031 December 1997 Monthly Operating Repts for Dec 1997 for Turkey Point,Unit 3 & 4 L-97-305, Monthly Operating Repts for Nov 1997 for Turkey Point,Units 3 & 41997-11-30030 November 1997 Monthly Operating Repts for Nov 1997 for Turkey Point,Units 3 & 4 L-97-284, Monthly Operating Repts for Oct 1997 for Turkey Point,Units 3 & 41997-10-31031 October 1997 Monthly Operating Repts for Oct 1997 for Turkey Point,Units 3 & 4 L-97-254, Monthly Operating Repts for Sept 1997 for Turkey Point,Units 3 & 41997-09-30030 September 1997 Monthly Operating Repts for Sept 1997 for Turkey Point,Units 3 & 4 L-97-230, Monthly Operating Repts for Aug 1997 for Turkey Point1997-08-31031 August 1997 Monthly Operating Repts for Aug 1997 for Turkey Point L-97-211, Monthly Operating Repts for July 1997 for Tps1997-07-31031 July 1997 Monthly Operating Repts for July 1997 for Tps L-97-176, Monthly Operating Repts for June 1997 for Turkey Point,Units 1 & 21997-06-30030 June 1997 Monthly Operating Repts for June 1997 for Turkey Point,Units 1 & 2 L-97-152, Monthly Operating Repts for May 1997 for Turkey Point Units 3 & 41997-05-31031 May 1997 Monthly Operating Repts for May 1997 for Turkey Point Units 3 & 4 L-97-127, Monthly Operating Repts for April 1997 for Tps1997-04-30030 April 1997 Monthly Operating Repts for April 1997 for Tps L-97-092, Monthly Operating Repts for Mar 1997 for Turkey Point Units 3 & 41997-03-31031 March 1997 Monthly Operating Repts for Mar 1997 for Turkey Point Units 3 & 4 L-97-062, Monthly Operating Rept for Feb 1997 for Turkey Point,Units 3 & 41997-02-28028 February 1997 Monthly Operating Rept for Feb 1997 for Turkey Point,Units 3 & 4 ML17354A4131997-01-31031 January 1997 Monthly Operating Repts for Jan 1997 for Turkey Point,Units 3 & 4 ML17354A3851996-12-31031 December 1996 Monthly Operating Repts for Dec 1996 for Turkey Points Units 3 & 4 L-96-322, Monthly Operating Repts for Nov 1996 for Turkey Point Units 3 & 41996-11-30030 November 1996 Monthly Operating Repts for Nov 1996 for Turkey Point Units 3 & 4 L-96-306, Monthly Operating Repts for Oct 1996 for Turkey Point,Units 1 & 21996-10-31031 October 1996 Monthly Operating Repts for Oct 1996 for Turkey Point,Units 1 & 2 L-96-266, Monthly Operating Repts for Sept 1996 for Turkey Point Units 3 & 41996-09-30030 September 1996 Monthly Operating Repts for Sept 1996 for Turkey Point Units 3 & 4 L-96-229, Monthly Operating Repts for Aug 1996 for Turkey Point Units 3 & 41996-08-31031 August 1996 Monthly Operating Repts for Aug 1996 for Turkey Point Units 3 & 4 L-96-203, Monthly Operating Repts for July 1996 for Turkey Point Plant Units 3 & 41996-07-31031 July 1996 Monthly Operating Repts for July 1996 for Turkey Point Plant Units 3 & 4 L-96-181, Monthly Operating Repts for June 1996 for Turkey Point Units 3 & 41996-06-30030 June 1996 Monthly Operating Repts for June 1996 for Turkey Point Units 3 & 4 L-96-153, Monthly Operating Repts for May 1996 for Turkey Point Units 3 & 41996-05-31031 May 1996 Monthly Operating Repts for May 1996 for Turkey Point Units 3 & 4 L-96-126, Monthly Operating Repts for Apr 1996 for Turkey Point Units 3 & 41996-04-30030 April 1996 Monthly Operating Repts for Apr 1996 for Turkey Point Units 3 & 4 L-96-092, Monthly Operating Repts for Mar 1996 for Turkey Point Units 1 & 21996-03-31031 March 1996 Monthly Operating Repts for Mar 1996 for Turkey Point Units 1 & 2 L-96-067, Monthly Operating Repts for Feb 1996 for Turkey Point Units 3 & 41996-02-29029 February 1996 Monthly Operating Repts for Feb 1996 for Turkey Point Units 3 & 4 L-96-030, Monthly Operating Repts for Jan 1996 for Turkey Points 3 & 41996-01-31031 January 1996 Monthly Operating Repts for Jan 1996 for Turkey Points 3 & 4 L-96-001, Monthly Operating Repts for Dec 1995 for Turkey Point Units 3 & 41995-12-31031 December 1995 Monthly Operating Repts for Dec 1995 for Turkey Point Units 3 & 4 L-95-330, Monthly Operating Repts for Nov 1995 for Turkey Point Units 3 & 4.W/undated Ltr1995-11-30030 November 1995 Monthly Operating Repts for Nov 1995 for Turkey Point Units 3 & 4.W/undated Ltr L-95-302, Monthly Operating Repts for Oct 1995 for Turkey Point Units 3 & 41995-10-31031 October 1995 Monthly Operating Repts for Oct 1995 for Turkey Point Units 3 & 4 L-95-281, Monthly Operating Repts for Sept 1995 for Turkey Point Units 3 & 41995-09-30030 September 1995 Monthly Operating Repts for Sept 1995 for Turkey Point Units 3 & 4 L-95-255, Monthly Operating Repts for Aug 1995 for Turkey Point Units 3 & 41995-08-31031 August 1995 Monthly Operating Repts for Aug 1995 for Turkey Point Units 3 & 4 L-95-229, Monthly Operating Repts for Jul 1995 for Turkey Point Units 1 & 21995-07-31031 July 1995 Monthly Operating Repts for Jul 1995 for Turkey Point Units 1 & 2 1999-09-30
[Table view] Category:TEXT-SAFETY REPORT
MONTHYEARML20217L9371999-10-20020 October 1999 Safety Evaluation Supporting Licensee Proposed Alternative from Certain Requirements of ASME Code,Section XI for First 10-Yr Interval Request for Relief for Containment Inservice Insp Program L-99-221, Monthly Operating Repts for Sept 1999 for Turkey Point,Units 3 & 4.With1999-09-30030 September 1999 Monthly Operating Repts for Sept 1999 for Turkey Point,Units 3 & 4.With L-99-202, Monthly Operating Repts for Aug 1999 for Turkey Point,Units 3 & 4.With1999-08-31031 August 1999 Monthly Operating Repts for Aug 1999 for Turkey Point,Units 3 & 4.With L-99-179, Monthly Operating Repts for July 1999 for Turkey Point,Units 3 & 4.With1999-07-31031 July 1999 Monthly Operating Repts for July 1999 for Turkey Point,Units 3 & 4.With 05000250/LER-1999-001-02, :on 990623,manual RT from 100% Power Following Multiple Control Rod Drops Was Noted.Caused by Manual Action Taken by Reactor Control Operator.Inspected & Repaired Stationary Gripper Regulating Cards.With1999-07-20020 July 1999
- on 990623,manual RT from 100% Power Following Multiple Control Rod Drops Was Noted.Caused by Manual Action Taken by Reactor Control Operator.Inspected & Repaired Stationary Gripper Regulating Cards.With
L-99-163, Monthly Operating Repts for June 1999 for Turkey Point,Units 3 & 4.With1999-06-30030 June 1999 Monthly Operating Repts for June 1999 for Turkey Point,Units 3 & 4.With ML17355A3681999-06-30030 June 1999 Revised Update to Topical QA Rept, Dtd June 1999 ML17355A3611999-06-30030 June 1999 Refueling Outage ISI Rept L-99-134, Monthly Operating Repts for May 1999 for Turkey Point,Units 3 & 4.With1999-05-31031 May 1999 Monthly Operating Repts for May 1999 for Turkey Point,Units 3 & 4.With ML17355A3291999-05-0505 May 1999 Revised SE Supporting Evaluation for Certain Fire Zones in Tubine Building at Plant,Units 3 & 4 & Granting Licensee Request for Exemption from Technical Requirements of Section III.G.2a ML17355A3221999-05-0505 May 1999 Safety Evaluation Supporting Amends 200 & 194 to Licenses DPR-31 & DPR-41,respectively ML20217B9871999-04-0808 April 1999 Changes,Tests & Experiments Made as Allowed by 10CFR50.59 for Period Covering 971014-990408 ML17355A2881999-04-0505 April 1999 COLR for Turkey Point Unit 4 Cycle 18 L-99-087, Monthly Operating Repts for Mar 1999 for Turkey Point,Units 3 & 4.With1999-03-31031 March 1999 Monthly Operating Repts for Mar 1999 for Turkey Point,Units 3 & 4.With ML17355A2791999-03-26026 March 1999 Safety Evaluation Concluding That No Outstanding Ampacity Derating Issues as Identified in GL 92-08 for Plants L-99-063, Monthly Operating Repts for Feb 1999 for Turkey Point Nuclear Power Plant,Units 3 & 4.With1999-02-28028 February 1999 Monthly Operating Repts for Feb 1999 for Turkey Point Nuclear Power Plant,Units 3 & 4.With ML17355A2161999-02-0303 February 1999 Safety Evaluation Supporting Amends 199 & 193 to Licenses DPR-31 & DPR-41,respectively L-99-033, Monthly Operating Repts for Jan 1999 for Turkey Point,Units 3 & 4.With1999-01-31031 January 1999 Monthly Operating Repts for Jan 1999 for Turkey Point,Units 3 & 4.With ML17355A2201999-01-20020 January 1999 Refueling Outage ISI Rept L-99-004, Monthly Operating Repts for Dec 1998 for Turkey Point,Units 3 & 4.With1998-12-31031 December 1998 Monthly Operating Repts for Dec 1998 for Turkey Point,Units 3 & 4.With L-98-297, Monthly Operating Repts for Nov 1998 for Turkey Point,Units 3 & 4.With1998-11-30030 November 1998 Monthly Operating Repts for Nov 1998 for Turkey Point,Units 3 & 4.With 05000250/LER-1998-007-02, :on 981020,containment Purge Supply,Valve Opened Wider than TS Limit.Caused by Improper Setting of Mechanical Stops.Incorporated Improved Standard Method of Measuring Angular Valve Position Into Sp.With1998-11-18018 November 1998
- on 981020,containment Purge Supply,Valve Opened Wider than TS Limit.Caused by Improper Setting of Mechanical Stops.Incorporated Improved Standard Method of Measuring Angular Valve Position Into Sp.With
ML17354B1891998-11-0909 November 1998 Simulatory Certification Update 2 L-98-281, Monthly Operating Repts for Oct 1998 for Turkey Point,Units 3 & 4.With1998-10-31031 October 1998 Monthly Operating Repts for Oct 1998 for Turkey Point,Units 3 & 4.With 05000250/LER-1998-006-02, :on 981006,unescorted Access Was Granted to Contractor Employee Who Falsified Background Info.Caused by Individual Who Knowingly Provided False Info.Denied Access to Individual on 981006.With1998-10-27027 October 1998
- on 981006,unescorted Access Was Granted to Contractor Employee Who Falsified Background Info.Caused by Individual Who Knowingly Provided False Info.Denied Access to Individual on 981006.With
ML17354B1591998-10-23023 October 1998 COLR for Turkey Point Unit 3 Cycle 17 05000250/LER-1998-005-02, :on 980924,suspended Safeguards During Severe Weather Due to Personnel Safety.Caused by Severe Weather Associated with Effects of Hurricane Georges.Fully Instituted Compensatory Measure.With1998-10-16016 October 1998
- on 980924,suspended Safeguards During Severe Weather Due to Personnel Safety.Caused by Severe Weather Associated with Effects of Hurricane Georges.Fully Instituted Compensatory Measure.With
05000250/LER-1998-004-02, :on 980921,automatic Reactor Trip Occurred. Caused by Inadequate re-correlation of Intermediate Range Neutron Flux Instrumentation Reactor Trip Bistable. Enhanced Applicable Plant Procedures.With1998-10-16016 October 1998
- on 980921,automatic Reactor Trip Occurred. Caused by Inadequate re-correlation of Intermediate Range Neutron Flux Instrumentation Reactor Trip Bistable. Enhanced Applicable Plant Procedures.With
L-98-262, Monthly Operating Repts for Sept 1998 for Turkey Point Unit 3 & 4.With1998-09-30030 September 1998 Monthly Operating Repts for Sept 1998 for Turkey Point Unit 3 & 4.With ML17354B1021998-09-14014 September 1998 Correction to SER Page 5 of SE & Page 6 of Ineel Technical Ltr Rept to Reflect Change of Word Then with Also, Submitted on 980817 in Response to Util 980409 Request Relief from Certain Requirements of ASME Code,Section XI ML17354B0971998-09-0909 September 1998 Part 21 Rept Re Possible Machining Defect in Certain One Inch Stainless Steel Swagelok Front Ferrules,Part Number SS-1613-1.Caused by Tubing Slipping Out of Fitting at Three Times Working Pressure of Tubing.Notified Affected Utils L-98-236, Monthly Operating Repts for Aug 1998 for Turkey Points,Units 3 & 4.With1998-08-31031 August 1998 Monthly Operating Repts for Aug 1998 for Turkey Points,Units 3 & 4.With ML17354B0901998-08-17017 August 1998 SER Accepting Revised Requests for Relief Numbers 11 & 18 for Turkey Point,Units 3 & 4 L-98-206, Monthly Operating Repts for July 1998 for Turkey Point,Units 3 & 41998-07-31031 July 1998 Monthly Operating Repts for July 1998 for Turkey Point,Units 3 & 4 ML17354B0541998-07-16016 July 1998 SER Accepting Alternative Proposed by Licensee in That Revising FSAR 6 Months After Refueling Outages for Each Unit Not Necessary to Achieve Underlying Purpose of Rule (10CFR50.71(e)(4)) 05000250/LER-1998-003-02, :on 980619,discovered That Auxiliary Feedwater Sys Was Inoperable Due to Inadequate Inservice Testing of Valves.Caused by Misunderstanding of Testing Criteria.Util Revised Procedures & Verified Operability of Valves1998-07-15015 July 1998
- on 980619,discovered That Auxiliary Feedwater Sys Was Inoperable Due to Inadequate Inservice Testing of Valves.Caused by Misunderstanding of Testing Criteria.Util Revised Procedures & Verified Operability of Valves
ML17354B0421998-07-0909 July 1998 Safety Evaluation Supporting Amends 198 & 192 to Licenses DPR-31 & DPR-41,respectively L-98-187, Monthly Operating Repts for June 1998 for Turkey Point,Units 3 & 41998-06-30030 June 1998 Monthly Operating Repts for June 1998 for Turkey Point,Units 3 & 4 ML17354B0171998-06-29029 June 1998 Rev 1 to PTN-FPER-97-013, Evaluation of Turbine Lube Oil Fire 05000250/LER-1997-007, :on 970730,automatic Reactor Trip Occurred Due to Closure of B Msiv.Caused by Failed BFD22S Relay.Six Relays on 3A,3B & 3C MSIVs Were Replaced & Implemented Plant Change to Disable Electronic Trip Function on 3 AFW Pumps1998-06-18018 June 1998
- on 970730,automatic Reactor Trip Occurred Due to Closure of B Msiv.Caused by Failed BFD22S Relay.Six Relays on 3A,3B & 3C MSIVs Were Replaced & Implemented Plant Change to Disable Electronic Trip Function on 3 AFW Pumps
ML17354A9651998-06-0909 June 1998 Safety Evaluation Supporting Amends 197 & 191 to Licenses DPR-31 & DPR-41,respectively 05000250/LER-1998-002-02, :on 980513,discovered Potential LOCA-initiated Electrical Fault Which Places ECCS Outside Design Basis. Caused by Inadequate Review of Effect on non-safety Circuit failures.Re-powered PC-*-600A Relays1998-06-0909 June 1998
- on 980513,discovered Potential LOCA-initiated Electrical Fault Which Places ECCS Outside Design Basis. Caused by Inadequate Review of Effect on non-safety Circuit failures.Re-powered PC-*-600A Relays
L-98-163, Monthly Operating Repts for Turkey Point,Units 3 & 41998-05-31031 May 1998 Monthly Operating Repts for Turkey Point,Units 3 & 4 ML20248F7441998-05-31031 May 1998 Reactor Vessel Working Group,Response to RAI Regarding Reactor Pressure Vessel Integrity ML17354A9351998-05-12012 May 1998 Safety Evaluation Supporting Amends 196 & 190 to Licenses DPR-31 & DPR-41,respectively L-98-128, Monthly Operating Repts for Apr 1998 for Turkey Point,Units 3 & 41998-04-30030 April 1998 Monthly Operating Repts for Apr 1998 for Turkey Point,Units 3 & 4 L-98-095, Monthly Operating Repts for Mar 1998 for Turkey Point,Units 3 & 41998-03-31031 March 1998 Monthly Operating Repts for Mar 1998 for Turkey Point,Units 3 & 4 05000250/LER-1997-009, :on 971114,discovered That CR Console Switch for 3B SGFP Was Not in Start Position.Caused by Inadequate Procedural Guidance.Revised Procedures 3/4-OP-074,informed Personnel of Event & Performed Walkdown of CR1998-03-24024 March 1998
- on 971114,discovered That CR Console Switch for 3B SGFP Was Not in Start Position.Caused by Inadequate Procedural Guidance.Revised Procedures 3/4-OP-074,informed Personnel of Event & Performed Walkdown of CR
ML17354B0001998-03-18018 March 1998 Florida Power & Light Topical Quality Asurance Rept, Dtd June 1998 05000250/LER-1998-001-02, :on 980216,manual Reactor Trip Occurred Due to Loss of Turbine Control Oil Pressure W/Steam Leak in Auxiliary Feedwater Steam Supply Piping.Auxiliary Governor Maint Instructions Will Be Revised1998-03-18018 March 1998
- on 980216,manual Reactor Trip Occurred Due to Loss of Turbine Control Oil Pressure W/Steam Leak in Auxiliary Feedwater Steam Supply Piping.Auxiliary Governor Maint Instructions Will Be Revised
1999-09-30
[Table view] |
Text
A.CCEI.ERATF~ DOCUMENT DIST UTION SYSTEM REGULAT~ INFORMATION DISTRIBUTIO STEM (RIDS)
ACCESSION NBR:9212210032 DOC.DATE: 92/ll/30 NOTARIZED: NO FACIL 50-'250 Turkey Point Plant, Unit 3, Florida Power and Light C 50-251 Turkey Point Plant, Unit 4, Florida Power and Light C AUTH.NAME AUTHOR AFFILIATION HERBENICK,G.D.
Florida Power
& Light Co.
PLUNKETT,T.F.
Florida Power
& Light Co.
RECIP.NAME RECIPIENT AFFILIATION DOCKET 05000250 05000251
SUBJECT:
Monthly operating repts for Nov 1992 for Turkey Point Units 3
& 4.W/921214 ltr.
DISTRIBUTION CODE:
IE24D COPIES RECEIVED:LTR 1
ENCL t
SIZE:
TITLE: Monthly Operating Report (per Tech Specs)
NOTES:NRR RAGHAVAN,L NRR RAGHAVANgL 05000250 05000251 RECIPIENT ID CODE/NAME PD2-2 LA AULUCKiR INTERNAL: AEOD/DOA NRR DLPQ LPEB10
~IL Ol EXTERNAL: EG&G BRYCEiJ.H NSIC NOTES:
I COPIES LTTR ENCL 3
3 1
1 1
1 1
1 1
1 1
1 1
1 1
1 RECIPIENT ID CODE/NAME PD2-2 PD AEOD/DSP/TPAB NRR/DOEA/OEAB RGN2 NRC PDR COPIES LTTR ENCL 1
1 1
1 1
1 1
1 1
1 D
NO'fE TO ALL"RIDS" RECIPIENTS:
PLEASE IIELP US TO REDUCE WASTE! CONTACT THE DOCUMENT CONTROL DESK, ROOM Pl-37 (E>'T. 504-2065) TO ELIMINATEYOUR NAME FROM DISTIKIBUTION LISTS FOR DOCUMENTS YOU DON'T NEED!
TOTAL NUMBER OF COPIES REQUIRED:
LTTR 15 ENCL 15
P.O. Box 029100, Miami, FL, 33102-9100 PPk DEI 14 1992 L-92-341 10 CFR 50.36 U. S. Nuclear Regulatory Commission Attn:
Document Control Desk Washington, D.
C.
20555 Gentlemen:
RE:
Turkey Point Units 3 and 4
Docket Nos.
50-250 and 50-251 Monthl 0 eratin Re ort In accordance with the requirements of Turkey Point Units 3 and 4
Technical Specification 6.9.1.5, and the guidance of NUREG-0020, attached are the November 1992 Operating Status and Summary of Operating Experience Reports for Turkey Point Units 3 and 4.
Very truly yours, T. F. Plunkett Vice President Turkey Point, Nuclear TFP/GDH/gh attachments CC:
Stewart D. Ebneter, Regional Administrator, Region II, USNRC Ross C. Butcher, Senior Resident Inspector, USNRC, Turkey Point Plant VataatoOSZ Sat>SO PDR ADOCK 05000250 R
PDR an FPL Group company 2i.0008
'\\
AVERAGE DAILY UNIT POWER LEVEL DOCKET N0.50-250 UNIT Turke Point 3
DATE December 10 1992 COMPLETED BY G.
D. Herbenick TELEPHONE 305 246-7112 MONTH November 1992 AVERAGE DAILY POWER (MWe-Net)
LEVEL 11/01/92 11/02/92 11/03/92 11/04/92 11/05/92 11/06/92 11/07/92 11/08/92 11/09/92 11/10/92 11/11/92 11/12/92 11/13/92 11/14/92 11/15/92 11/16/92 11/17/92 11/18/92 11/19/92 11/20/92 11/21/92 11/22/92 11/23/92 11/24/92 11/25/92 11/26/92 11/27/92 11/28/92 11/29/92 11/30/92 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0
I I
OPERATING STATUS OPERATING DATA REPORT DOCKET NO 50 250 DATE 12I 10(92 COMPLETED BY G. Herbenlck TELEPHONE 305I 24dl 7112 1.
UNIT NAME: TURKEY POINT UNIT 3 2.
REPORTING PERIOD:
NOVEMBER 1992 3.
LICENSED THERMAL POWER (MWT)t 2200 4.
NAMEPLATE RATING (GROSS MWE)t 7eo 5.
DESIGN ELECTRICAL RATING (NET MWE):
893 d
MAXIMIAIDEPENDABLE CAPACITY (GROSS MWE)t 599 7.
MAXIMUMDEPENDABLE CAPACITY (NET MWE):
ddd 8
IF CHANGES OCCUR IN CAPACITY RATINGS (ITEMS NINBER 3 THROUGH 7)
SINCE LAST REPORT, GIVE REASONS:
9.
POWER LEVEL TO WHICH RESTRICTED, IF ANY (NET MWE)
Io.
REASONS FOR RESTRICTIONS, IF ANY:
MONTHLY
-YTD COB)LATIVE 11.
HOURS IN REPORT PERIOD:
12.
NLBIBER OF HOURS REACTOR WAS CRITICAL 13.
REACTOR RESERVE SHUTDOWN HOURS 14.
HOURS GENERATOR ON LINE 15 UNIT RESERVE SHUTDOWN HOURS ld.
GROSS THERMAL ENERGY GENERATED (MWH) 17.
GROSS ELECTRICAL ENERGY GENERATED (IBM) td.
NET ELECTRICAL ENERGY GENERATED (MWH) 19.
UNIT SERVICE FACTOR 20= UNIT AVAILABILITYFACTOR 21 CAPACITY FACTOR (USING MDC NET) 22.
CAPACITY FACTOR (USING DER NET) 23 UNIT FORCED OUTAGE RATE 24.
SHUTDOWNS SCHEDULED OVER NEXT 5 MONTHS no shutdowns sre scheduled for the next 5
7200.0 0.0 0.0 0.0 0
0 4966 0.0 0.0 0.0 0.0 0.0 months.
8040 5298.7 0.0 5281. 8 0.0 10152700 3235870 3054012 es.7 es.7 57.0 54.8 17.2 175233.8 112024.0 844.4 110493.
1 121.8 228722768 73255255 69247098
- 83. 1
- 63. 1 eo.4 57.0 12.6 25.
IF SHUT DOWN AT END OF REPORT PERIOD, ESTIMATED DATE OF STARTUP:
12I3I92
UNIT SHUTDOWNS AND POWER REDUCTIONS DOCKET NO.
50-250 UNIT NAME:
TURKEY POINT UNIT 3 DATE:
DECEMBER 10 1992 COMPLETED BY: G.
HERBENICK TELEPHONE:
305 246-7112 REPORT MONTH NOVEMBER 1992 No Date Type Duration (Hours)
Reason>>
Yethod of Shutting Down Reactor'icensee Event ReportS Systen code'onponent Codes Cause
& Corrective Action to Prevent Recurrence 13 921001 720.0 N/A Rc Fueling Unit 3 Shutdown for Scheduled Refueling.
F Forced S Scheduled Reason A - Equipment Failure B Ymintenance or Test C - Refueling D Regulatory restriction E Operator Training 4 License Exanination F - Achainistrative G - Operational Error (Explain)
H - Other (Explain)
Yethod 1 Nanuai 2 manual Scran 3 - Autonatic Serac 4 Continued S Load Reduction 9 Other (Explain)
Exhibit G Instructions for Preparation of Data Entry Sheets Licensee Event Report (LER) File (NOREG-0161)
Exhibit 1 - Sane Source
SUMMARY
OF OPERATING EXPERIENCE DOCKET NO. 50-250 UNIT TURKEY POINT 3
DATE DECEMBER 10 1992 COMPLETED BY:G.HERBENICK TELEPHONE'05 246-7112 REPORT MONTH NOVEMBER 1992 During November of 1992, Unit 3 remained shutdown for its Cycle 13 Refueling and maintenance outage.
On November 27, 1992 with Unit 3 in Mode 6, (refueling)
PCV-3-456 cycled twice due to high Reactor Coolant System pressure as a result of starting the 3C Reactor Coolant Pump.
AVERAGE DAILY UNIT POWER LEVEL DOCKET N0.50-251 UNIT Turke Point 4
DATE December 10 1992 COMPLETED BY G.
D. Herbenick TELEPHONE 305 246-7112 MONTH November 1992 AVERAGE DAILY POWER (MWe-Net) 11/01/92 11/02/92 11/03/92 11/04/92 11/05/92 11/06/92 11/07/92 11/08/92 11/09/92 11/10/92 11/11/92 11/12/92 11/13/92 ll/14/92 11/15/92 11/16/92 11/17/92 11/18/92 11/19/92 11/20/92 11/21/92 11/22/92 11/23/92 11/24/92 11/25/92 11/26/92 11/27/92 11/28/92 11/29/92 11/30/92 LEVEL 675 675 664 615 655 655 655 655 660 661 539 603 652 490 143 319 665 665 663 659 656 667 672 671 668 668 667 670 678 686
OPERATING STATUS OPERATING DATA REPORT DOCKET NO 50 251 DATE 12/10/92 COMPLETED BY G. Heroenick TELEPHONE 305/246/7112 1.
UNIT NAME: TURKEY POINT UNIT 4 2.
REPORTING PERIOD:
NOVEMBER 1992 3.
LICENSED THERMAL POWER (MWT):
2200 4.
NAMEPLATE RATING (GROSS MWE):
760 5.
DESIGN ELECTRICAL RATING (NET MWE):
693 6.
MAXIMUM DEPENDABLE CAPACITY (GROSS MWE):
699 7.
MAXIMUM DEPENDABLE CAPACITY (NET MWE):
666 8.
IF CHANGES OCCUR IN CAPACITY RATINGS (ITEMS NUMBER 3 THROUGH 7)
SINCE LAST REPORI',
GIVE REASONS:
9.
POWER LEVEL TO WHICH RESTRICTED, IF ANY (NET MWE) 10.
REASONS FOR RESTRICTIONS
~ IF ANY:
MONTHLY
-YTO-CUMULATIVE 1 l.
HOURS IN REPORT PERIOD:
12.
NUMBER OF HOURS REACTOR WAS CRITICAL 13.
REACTOR RESERVE SHUTDOWN HOURS 14.
HOURS GENERATOR ON-LINE 15.
UNIT RESERVE SHUTDOWN HOURS 16.
GROSS THERMAL ENERGY GENERATED (MWH) 17.
GROSS ELECTRICAL ENERGY GENERATED (MWH) 18.
NET ELECTRICAL ENERGY GENERATEO (MWH) 19.
UNIT SERVICE FACTOR 20.
UNIT AVAILABILITYFACTOR 21.
CAPACITY FACTOR (USING MDC NET) 2=.
CAPACITY FA'CIOR (USING DER NET) 23.
UNIT FORCED OUTAGE RATE 24.
SHUTDOWNS SCHEDULED OVER NEXT 6 MONTHS Unit 4 is scheduled for a refueling outage 720 720.0 0.0 720.0 0.0 1497803 471555 448121 100. 0 100. 0 93.5 89.8 0.0 8040 6482.2 0.0 6398.0 545.2 13621240 4351140 4126016 86.4 79.6 77.1 74.1
- 14. 6 on 04/ 10/93 168965.0 109094.7 166.6 105301. 4 577.3 221935577 70823450 66977778 62.7 62.3 60.6 57.2 12.0 25.
1F SHUT DOWN AT END OF REPORT PER100
~
ESTIMATED DATE OF STARTUP:
UNIT SHUTDOWNS AND POWER REDUCTIONS DOCKET NO.
UNIT NAME:
DATE COMPLETED BY:
TELEPHONE'0-251 TURKEY POINT UNIT 4 DECEMBER 10 1992 G.
HERBENICK 305 246-7112 REPORT MONTH NOVEMBER 1992 No.
Date Type Duration (Hours)
Reason>>
Method of Shutting Down Reactor>>
Licensee Event Roport4 System Code'omponent Cods'ause 4 Corrective Action to Prevent Recurrencs 12 921114 44.1-N/A SB Generator High Sodium in the Steam Generator.
F Forced S Scheduled Reason A - Equipment Failure B - Maintenance or Test C - Refueling D Regulatory restriction E - Operator Training 6 License Examination F - Administrative G - Operational Error (Explain)
H - Other (Explain)
Method 1 - Manual 2 Manual Scram 3 Automatic Scram 4 - Continued S - Load Reduction 9 Other (Explain)
Exhibit G Instructions for Preparation of Data Entry Sheets Licenses Event Report (LER) File (NUREG-0161)
Exhibit 1 Same Source
jg
SUMMARY
OF OPERATING EXPERIENCE DOCKET NO. 50-251 UNIT Turke Point 4
DATE December 10 1992 COMPLETED BY:G. Herbenick TELEPHONE:
305 246-7112 REPORT MONTH November 1992 On November 11th, Unit 4 reduced power to 60% due to a turbine runback caused by the tripping of the 4B feedwater pump. Unit 4 returned to 100% power the same day.
Due to high sodium levels in the steam generator, on November 14th, Unit 4 reduced power to 73% and continued to reduce power through November 15th to 30%
This was caused by a check valve failure which introduced component cooling water containing sodium into the demineralized water storage tank.
On November 17th, Unit 4 returned to 100% power and maintained that level for the remainder of the month.