Discusses Survey Conducted on 960514 of Sf Practices,Sfcs Design & Current Licensing Basis for Plant Units 2 & 3. Confirmation Ltr Requested within 30 Days of Receipt of Dtd Ltr Re Projected Completion Dates for Each Stated Action
ML17187A502
Person / Time
Site: Dresden  
Issue date: 06/28/1996
From: Stang J
NRC (Affiliation Not Assigned)
To: Farrar D
COMMONWEALTH EDISON CO.
References
TAC-M88094, NUDOCS 9607030128
Download: ML17187A502 (3)


Text

UNITED STATES

  • NUCLEAR REGULATORY COMMISSION WASHINGTON, D.C. 20555-0001 June 28, 1996 Mr. D. L. Farrar Manager, Nuclear Regulatory Services Connonwealth Edison Company Executive Towers West III 1400 Opus Place, Suite 500 Downers Grove, IL 6051~

SUBJECT:

SPENT FUEL SURVEY COMMITMENTS FOR DRESDEN NUCLEAR POWER STATION, UNITS 2 AND 3 (TAC NO. 88094)

Dear.Mr. Farrar:

On March 5, 1996, I visited the Conunonwealth Edison Company (ComEd) corporate offices and on May 14, 1996, I visited the Dresden Nuclear Power Station to conduct a survey on the spent fuel practices, spent fuel cooling system design, and current licensing basis for Dresden Station, Units 2 and 3.

During the survey, in discussions with your staff, a statement was made that ComEd would.be modifying the Updated Final Safety Analysis Report (UFSAR) to clarify that a full core offload is the routine practic~ at.the plants during each refueling outage.

In addition, your staff indicated that changes would be made to the plant administrative procedures to reflect time restrictions placed on moving fuel from the reactor to the spent fuel pool following a reactor shutdown, as listed in the UFSAR, and administrative.procedures would be changed to contain requirements for aligning one shutdown cooling pump and heat exchanger to the spent fuel pool to provide required additional cooling capability as required by the UFSAR.

Accordingly, I am requesting that you provide a letter within 30 days of receipt of this letter that confirms.these convnitments and indicates the projected ~ompletion dates for each of these actions. These convnitments will then be included in future inspection reports and will be tracked by the.

regional office until completion.

5/J- :;_37 5'o -.J-lfj DFOI '/o 1°~}~7~go~2a 960620 l - PDR ADOCK 05000237

_ -~~--fl _

_, ________ ~ __ _

PDR __. ____.

I

.. - ~.

D. Farrar 2

If you have* any questi ans concerning these i terns, pl ease contact me at (301) 415-1~.45.

Docket Nos. 50-237, 5.0'-249 cc:

See next page Sincerely, Original signed by:

John F. Stang, Project Manager Project Directorate 111-2 Divistor:i of Reactor Projects - 111/IV Office of Nucle~r Reactor Regulation DOCUMENT NAME:

G: \\DR88,09~ ~ LJ~.

ox: *c~ = Copy without enclosures *E* = Copy with enclosures *N* = No copy OFFICE NAME DATE

D. L. Farrar Conunonwealth Edison Company cc:

Michael I. Miller, Esquire Sidley and Austin One First National Plaza Chicago, Illinois 60603

.Site Vice President Dresden* Nuclear Power Station 6500 North Dresden Road Morris, *Illinois 60450-9765 Station Manager Dresden Nuclear Power Station 6500 North Dresden Road Morris, Illinois 60450-9765 U.S. Nuclear Regulatory Conunission Re$ident Inspectors Office

.Dresden Station

  • 6500 North Dresden Road Morris~ Illinois 60450-9766 Regional Administrator U.S. NRC, Region III 801 Warrenville Road Lisle, Illinois 60532-4351

. Illinois Department of Nuclear Safety Office of Nuclear Facility Safety 1035 Outer Park Drive Springfield, Illinois 62704 Chairman Grundy County Board Administration Building 1320 Union Street Morris, Illinois 60450 Document Control Desk-Licensing Commonwealth Edison Company 1400 Opus Place, Suite'400 Downers Grove, Illinois 60515 Dresden Nuclear Power Station Unit Nos. 2 and 3