ML17178A076
ML17178A076 | |
Person / Time | |
---|---|
Site: | Braidwood |
Issue date: | 06/26/2017 |
From: | Marchionda-Palmer M Exelon Generation Co |
To: | Document Control Desk, Office of Nuclear Material Safety and Safeguards, Office of Nuclear Reactor Regulation |
References | |
BW170060 | |
Download: ML17178A076 (2) | |
Similar Documents at Braidwood | |
---|---|
Category:Letter
MONTHYEARRS-24-098, Units 1 and 2 - Supplement to License Amendment Request to Revise Technical Specifications 3.7.15, Spent Fuel Pool Boron Concentration, 3.7.16, Spent Fuel Assembly Storage, 4.3.1, Fuel Storage, Criticality2024-10-23023 October 2024
[Table view]Units 1 and 2 - Supplement to License Amendment Request to Revise Technical Specifications 3.7.15, Spent Fuel Pool Boron Concentration, 3.7.16, Spent Fuel Assembly Storage, 4.3.1, Fuel Storage, Criticality ML24291A0012024-10-17017 October 2024 Submittal of Core Operating Limits Report, Cycle 25 RS-24-095, Relief Request I4R-19 and I4R-26, Associated with the Fourth and Fifth Inservice Inspection Intervals2024-10-10010 October 2024 Relief Request I4R-19 and I4R-26, Associated with the Fourth and Fifth Inservice Inspection Intervals RS-24-093, Response to Request for Additional Information - Alternative Request to Utilize Code Case OMN-32, Alternative Requirements for Range and Accuracy of Pressure, Flow, and Differential Pressure Instruments Used in Pump Tests2024-10-10010 October 2024 Response to Request for Additional Information - Alternative Request to Utilize Code Case OMN-32, Alternative Requirements for Range and Accuracy of Pressure, Flow, and Differential Pressure Instruments Used in Pump Tests ML24275A2442024-10-0303 October 2024 Reassignment of the U.S. Nuclear Regulatory Commission Branch Chief, Division of Operating Reactor Licensing ML24263A1272024-09-23023 September 2024 – Request for Additional Information (EPID 2023-LLA-0136) - Non-Proprietary IR 05000456/20240112024-09-12012 September 2024 Biennial Problem Identification and Resolution Inspection Report 05000456/2024011 and 05000457/2024011 ML24164A0032024-09-10010 September 2024 Issuance of Amendment Nos. 235 and 235 Revision of Technical Specifications for the Ultimate Heat Sink IR 05000456/20240052024-08-29029 August 2024 Updated Inspection Plan and Assessment Follow-Up Letter for Braidwood Station, Units 1 and 2 (Report 05000456/2024005 and 05000457/2024005) ML24227A0522024-08-29029 August 2024 Audit Plan for LAR to Remove ATWS Mtc Limit ML24225A1112024-08-13013 August 2024 Notification of NRC Fire Protection Team Inspection Request for Information ML24222A6772024-08-0909 August 2024 Response to Request for Additional Information for Application to Revise Technical Specifications to Adopt TSTF-591-A, Revise Risk Informed Completion Time (RICT) Program Revision 0 and Revise 10 CFR 50.69 License Condition IR 05000456/20240022024-08-0808 August 2024 Integrated Inspection Report 05000456/2024002 and 05000457/2024002 ML24172A1252024-07-26026 July 2024 Environmental Assessment and Finding of No Significant Impact Related to a Requested Increase in Ultimate Heat Sink Temperature (EPID L-2024-LLA-0075) - Transmittal Letter ML24179A3262024-07-23023 July 2024 LTR - Constellation - SG Welds and Nozzles (L-2023-LLR-0053, L-2023-LLR-0054, L-2023-LLR-0055, L-2023-LLR-0056) ML24163A3922024-06-25025 June 2024 Individual Notice of Consideration of Issuance of Amendments to Renewed Facility Operating Licenses, Proposed No Significant Hazards Consideration Determination, & Opportunity for a Hearing (EPID L-2024-LLA-0075)- Letter RS-24-061, Constellation Energy Generation, LLC, Response to NRC Regulatory Issue Summary 2024-01, Preparation and Scheduling of Operator Licensing Examinations2024-06-14014 June 2024 Constellation Energy Generation, LLC, Response to NRC Regulatory Issue Summary 2024-01, Preparation and Scheduling of Operator Licensing Examinations ML24164A2132024-06-13013 June 2024 Information Request to Support Upcoming Problem Identification and Resolution (Pi&R) Inspection at Braidwood Nuclear Plant RS-24-057, License Amendment to Technical Specification 3.7.9, Ultimate Heat Sink2024-06-0404 June 2024 License Amendment to Technical Specification 3.7.9, Ultimate Heat Sink IR 05000456/20240102024-05-31031 May 2024 License Renewal Phase 1 Report 05000456/2024010 RS-24-044, License Amendment to Transition to Framatome Gaia Fuel and Exemptions to 10 CFR 50.46 and 10 CFR 50 Appendix K. Attachments 1 to 11 Enclosed2024-05-28028 May 2024 License Amendment to Transition to Framatome Gaia Fuel and Exemptions to 10 CFR 50.46 and 10 CFR 50 Appendix K. Attachments 1 to 11 Enclosed RS-24-043, Application to Remove Power Distribution Monitoring System (Pdms) Details from Technical Specifications2024-05-24024 May 2024 Application to Remove Power Distribution Monitoring System (Pdms) Details from Technical Specifications ML24079A0762024-05-23023 May 2024 Issuance of Amendments to Adopt TSTF 264 ML24142A3352024-05-21021 May 2024 Quad Cities—Information Request to Support the NRC Annual Baseline Emergency Action Level and Emergency Plan Changes RS-24-055, 2023 Corporate Regulatory Commitment Change Summary Report2024-05-17017 May 2024 2023 Corporate Regulatory Commitment Change Summary Report ML24136A0132024-05-15015 May 2024 2023 Annual Radiological Environmental Operating Report ML24136A2452024-05-15015 May 2024 Notification of NRC Baseline Inspection and Request for Information; Inspection Report 05000457/2024004 ML24128A1212024-05-0707 May 2024 Response to Braidwood and Dresden FOF Dates Change Request (2025) ML24122A6522024-05-0101 May 2024 Submittal of 2023 Annual Radioactive Effluent Release Report RS-24-041, Alternative Request to Utilize Code Case OMN-32, Alternative Requirements for Range and Accuracy of Pressure, Flow, and Differential Pressure Instruments Used in Pump Tests2024-04-30030 April 2024 Alternative Request to Utilize Code Case OMN-32, Alternative Requirements for Range and Accuracy of Pressure, Flow, and Differential Pressure Instruments Used in Pump Tests IR 05000456/20243012024-04-29029 April 2024 NRC Initial License Examination Report 05000456/2024301; 05000457/2024301 RS-24-026, License Amendment to Braidwood Station, Units 1 and 2, and Byron Station, Units 1 and 2, Technical Specifications 5.6.5, Core Operating Limits Report (COLR)2024-04-25025 April 2024 License Amendment to Braidwood Station, Units 1 and 2, and Byron Station, Units 1 and 2, Technical Specifications 5.6.5, Core Operating Limits Report (COLR) ML24116A0052024-04-25025 April 2024 Transmittal of Braidwood Station, Unit 1, Core Operating Limits Report, Braidwood Unit 1 Cycle 25 IR 05000456/20240012024-04-24024 April 2024 Integrated Inspection Report 05000456/2024001 and 05000457/2024001 ML24113A1272024-04-22022 April 2024 Audit Plan in Support of Review of LAR Revision of TS 3.7.15, 3.7.16, and 4.3.1 (EPID: L-2023-LLA-0136) (Non-Proprietary) IR 05000457/20240902024-04-19019 April 2024 Final Significance Determination for 2b Auxiliary Feedwater Pump Diesel Engine Fuel Oil Dilution Issue - NRC Inspection Report 05000457/2024090 ML24103A2042024-04-12012 April 2024 Constellation Energy Generation, LLC, Application to Revise Technical Specifications to Adopt TSTF-591-A, Revise Risk Informed Completion Time (RICT) Program Revision 0 and Revise 10 CFR 50.69 License Condition RS-24-034, Annual 10 CFR 50.46 Report of Emergency Core Cooling System Evaluation Model Changes and Errors2024-04-10010 April 2024 Annual 10 CFR 50.46 Report of Emergency Core Cooling System Evaluation Model Changes and Errors ML24094A2692024-04-0303 April 2024 Notification of Deviation from Pressurized Water Reactor Owners Group (PWROG) Report, WCAP-17451-P, Revision 2, Reactor Internals Guide Tube Wear Westinghouse Domestic Fleet Operational Projections RS-24-002, Constellation Energy Generation, LLC - Annual Property Insurance Status Report2024-04-0101 April 2024 Constellation Energy Generation, LLC - Annual Property Insurance Status Report ML24057A0372024-03-26026 March 2024 Proposed Alternative from Certain Requirements Contained in the American Society of Mechanical Engineers Boiler and Pressure Vessel Code, Section XI RS-24-024, Response to Request for Additional Information Regarding Proposed Alternative for Examination of Pressurizer Circumferential and Longitudinal Shell-to-Head Welds and Nozzle-to-Vessel Welds2024-03-22022 March 2024 Response to Request for Additional Information Regarding Proposed Alternative for Examination of Pressurizer Circumferential and Longitudinal Shell-to-Head Welds and Nozzle-to-Vessel Welds ML24067A3252024-03-0707 March 2024 U.S. Department of Energy, Office of Legacy Management, 2023 Annual Site Inspection and Monitoring Report for Uranium Mill Tailings Radiation Control Act Title I Disposal Sites ML24066A0122024-03-0606 March 2024 Operator Licensing Examination Approval Braidwood Station, Units 1 and 2, March 2024 IR 05000456/20244012024-03-0505 March 2024 Cyber Security Inspection Report 05000456/2024401 and 05000457/2024401 (Public) IR 05000456/20230062024-02-28028 February 2024 Annual Assessment Letter for Braidwood Station, Units 1 and 2 (Report 05000456/2023006 and 05000457/2023006) ML24057A3022024-02-26026 February 2024 Regulatory Conference Supplemental Information ML24047A2382024-02-20020 February 2024 Regulatory Conference to Discuss Risk Associated with 2b Auxiliary Feedwater Pump Diesel Engine Fuel Oil Leak RS-24-013, Response to Request for Additional Information Regarding Proposed Alternative to Distribution Requirements of ASME Code Table IWC-2411-1 for the Steam Generators2024-02-13013 February 2024 Response to Request for Additional Information Regarding Proposed Alternative to Distribution Requirements of ASME Code Table IWC-2411-1 for the Steam Generators IR 05000456/20230042024-02-0202 February 2024 Integrated Inspection Report 05000456/2023004 and 05000457/2023004 2024-09-23 Category:Response to Request for Additional Information (RAI) MONTHYEARRS-24-093, Response to Request for Additional Information - Alternative Request to Utilize Code Case OMN-32, Alternative Requirements for Range and Accuracy of Pressure, Flow, and Differential Pressure Instruments Used in Pump Tests2024-10-10010 October 2024
[Table view]Response to Request for Additional Information - Alternative Request to Utilize Code Case OMN-32, Alternative Requirements for Range and Accuracy of Pressure, Flow, and Differential Pressure Instruments Used in Pump Tests ML24222A6772024-08-0909 August 2024 Response to Request for Additional Information for Application to Revise Technical Specifications to Adopt TSTF-591-A, Revise Risk Informed Completion Time (RICT) Program Revision 0 and Revise 10 CFR 50.69 License Condition RS-24-024, Response to Request for Additional Information Regarding Proposed Alternative for Examination of Pressurizer Circumferential and Longitudinal Shell-to-Head Welds and Nozzle-to-Vessel Welds2024-03-22022 March 2024 Response to Request for Additional Information Regarding Proposed Alternative for Examination of Pressurizer Circumferential and Longitudinal Shell-to-Head Welds and Nozzle-to-Vessel Welds RS-24-013, Response to Request for Additional Information Regarding Proposed Alternative to Distribution Requirements of ASME Code Table IWC-2411-1 for the Steam Generators2024-02-13013 February 2024 Response to Request for Additional Information Regarding Proposed Alternative to Distribution Requirements of ASME Code Table IWC-2411-1 for the Steam Generators RS-23-118, Supplemental Information Letter for Part 73 Exemption Request - Responses to Request for Confirmatory Information2023-11-10010 November 2023 Supplemental Information Letter for Part 73 Exemption Request - Responses to Request for Confirmatory Information RS-23-056, Response to Request for Additional Information to Braidwood Station, Unit 1, and Byron Station, Unit 1, for Steam Generator License Renewal Response to Commitment 102023-04-20020 April 2023 Response to Request for Additional Information to Braidwood Station, Unit 1, and Byron Station, Unit 1, for Steam Generator License Renewal Response to Commitment 10 RS-22-123, Response to Request for Additional Information Regarding Application to Revise Technical Specifications to Adopt TSTF-577, Revised Frequencies for Steam Generator2022-12-0707 December 2022 Response to Request for Additional Information Regarding Application to Revise Technical Specifications to Adopt TSTF-577, Revised Frequencies for Steam Generator RS-22-084, Response to Request for Additional Information Proposed Alternative for Examinations of Examination Categories B-B, B-D, and C-A Steam Generator .2022-06-17017 June 2022 Response to Request for Additional Information Proposed Alternative for Examinations of Examination Categories B-B, B-D, and C-A Steam Generator . RS-22-072, Response to Request for Additional Information Regarding License Amendment to Revise Braidwood Station, Units 1 and 2, Technical Specification 3.7.9, Ultimate Heat Sink2022-06-0606 June 2022 Response to Request for Additional Information Regarding License Amendment to Revise Braidwood Station, Units 1 and 2, Technical Specification 3.7.9, Ultimate Heat Sink RS-22-074, Response to Request for Additional Information - Proposed Alternative for Examinations of Examination Category C-B Steam Generator Nozzle-to-Shell Welds .2022-05-20020 May 2022 Response to Request for Additional Information - Proposed Alternative for Examinations of Examination Category C-B Steam Generator Nozzle-to-Shell Welds . RS-22-027, Constellation, Response to Request for Additional Information Regarding Application to Revise Technical Specifications to Adopt TSTF-541 Revision 2, Add Exceptions to Surveillance Requirements for Valves and Dampers Locked in the Actuated2022-02-23023 February 2022 Constellation, Response to Request for Additional Information Regarding Application to Revise Technical Specifications to Adopt TSTF-541 Revision 2, Add Exceptions to Surveillance Requirements for Valves and Dampers Locked in the Actuated P ML21320A2422021-11-16016 November 2021 Stations - Response to Request for Additional Information - Proposed Alternative for Examination of Pressurizer Circumferential and Longitudinal Shell-to-Head Welds and Nozzle-to-Vessel Welds JAFP-21-0087, Response to Request for Additional Information Regarding Request for Approval of Transfer of Licenses and Conforming Amendments2021-09-16016 September 2021 Response to Request for Additional Information Regarding Request for Approval of Transfer of Licenses and Conforming Amendments ML21225A0062021-08-13013 August 2021 Response to Request for Additional Information Regarding License Amendment Request to Address the Issues Identified in Westinghouse Documents NSAL-09-5, Rev.1 and NSAL-15-1, Rev. 0 NMP2L2773, Company - Response to Request for Additional Information2021-06-30030 June 2021 Company - Response to Request for Additional Information JAFP-21-0044, Response to Request for Additional Information Regarding Request for Approval of Transfer of Licenses and Conforming Amendments2021-06-11011 June 2021 Response to Request for Additional Information Regarding Request for Approval of Transfer of Licenses and Conforming Amendments JAFP-21-0032, Response to Request for Additional Information - Proposed Alternative Concerning ASME Section XI Repair/Replacement Documentation for Replacement of Pressure Retaining Bolting2021-04-20020 April 2021 Response to Request for Additional Information - Proposed Alternative Concerning ASME Section XI Repair/Replacement Documentation for Replacement of Pressure Retaining Bolting RS-21-015, Response to Request for Additional Information Related to Relief Request for Braidwood I4R-11 and Byron I4R-182021-02-10010 February 2021 Response to Request for Additional Information Related to Relief Request for Braidwood I4R-11 and Byron I4R-18 RS-21-019, Response to Request for Additional Information Regarding Application for Revision to TS 5.5.9, Steam Generator (SG) Program, for a One-Time Deferral of Steam Generator Tube Inspections2021-02-0909 February 2021 Response to Request for Additional Information Regarding Application for Revision to TS 5.5.9, Steam Generator (SG) Program, for a One-Time Deferral of Steam Generator Tube Inspections RS-20-017, Response to Request for Additional Information - Proposed Alternative to Utilize Code Case N-8852021-02-0101 February 2021 Response to Request for Additional Information - Proposed Alternative to Utilize Code Case N-885 RS-20-147, Response to Request for Additional Information Related to Exemption from Part 26 Requirements2020-11-23023 November 2020 Response to Request for Additional Information Related to Exemption from Part 26 Requirements RS-20-143, Response to Request for Additional Information Regarding Application to Revise Technical Specifications 3.8.1, AC Sources- Operating2020-11-20020 November 2020 Response to Request for Additional Information Regarding Application to Revise Technical Specifications 3.8.1, AC Sources- Operating ML20188A2642020-07-0606 July 2020 Clinton Power Station, R.E. Ginna Station, Limerick Station, Nine Mile Point Station & Peach Bottom Station - Proposed Alternative to Utilize Code Case OMN-26 - Response to Request for Additional Information RS-20-057, Response to Request for Additional Information Regarding Emergency License Amendment Request for a One-Time Extension of the Steam Generator Tube Inspections2020-04-13013 April 2020 Response to Request for Additional Information Regarding Emergency License Amendment Request for a One-Time Extension of the Steam Generator Tube Inspections RS-20-012, Response to Request for Additional Information Regarding Relief Request Associated with the Third Ten-Year Inservice Inspection Program Interval2020-01-29029 January 2020 Response to Request for Additional Information Regarding Relief Request Associated with the Third Ten-Year Inservice Inspection Program Interval NMP2L2711, Byron Station; Calvert Cliffs; Clinton Power Station; LaSalle County Station; Limerick Generating Station; and Nine Mile Point Nuclear Station - Proposed Alternative to Utilize Code Case N-8792019-10-16016 October 2019 Byron Station; Calvert Cliffs; Clinton Power Station; LaSalle County Station; Limerick Generating Station; and Nine Mile Point Nuclear Station - Proposed Alternative to Utilize Code Case N-879 RS-19-100, Response to Request for Additional Information Regarding Application to Revise Technical Specifications to Adopt Risk Informed Completion Times TSTF-505, Revision 2, Provide Risk-Informed Extended.2019-10-0707 October 2019 Response to Request for Additional Information Regarding Application to Revise Technical Specifications to Adopt Risk Informed Completion Times TSTF-505, Revision 2, Provide Risk-Informed Extended. RS-19-088, Response to Request for Additional Information Regarding Application to Revise Braidwood Station and Byron Station Technical Specifications to Adopt Risk Informed...2019-09-0505 September 2019 Response to Request for Additional Information Regarding Application to Revise Braidwood Station and Byron Station Technical Specifications to Adopt Risk Informed... JAFP-19-0057, Response to Request for Additional Information - Proposed Alternative to Utilize Code Cases N-878 and N-8802019-06-0404 June 2019 Response to Request for Additional Information - Proposed Alternative to Utilize Code Cases N-878 and N-880 RS-19-051, Response to Request for Additional Information for the License Amendment Request to Utilize Tvel TVS-K Lead Test Assemblies2019-05-30030 May 2019 Response to Request for Additional Information for the License Amendment Request to Utilize Tvel TVS-K Lead Test Assemblies NMP1L3279, Response to Request for Additional Information - Proposed Alternatives to Utilize Code Cases N-878 and N-880 for Plants2019-05-0101 May 2019 Response to Request for Additional Information - Proposed Alternatives to Utilize Code Cases N-878 and N-880 for Plants JAFP-19-0006, Response to Request for Additional Information - Proposed Alternative to Utilize Code Cases N-878 and N-8802019-01-0808 January 2019 Response to Request for Additional Information - Proposed Alternative to Utilize Code Cases N-878 and N-880 RS-18-143, Supplemental Information Supporting License Amendment Requests for Approval of Changes to Emergency Plan Staffing Requirements2018-11-29029 November 2018 Supplemental Information Supporting License Amendment Requests for Approval of Changes to Emergency Plan Staffing Requirements RS-18-094, Response to Request for Additional Information Regarding Braidwood Station Fourth Lnservice Inspection Interval Relief Request 14R-062018-07-31031 July 2018 Response to Request for Additional Information Regarding Braidwood Station Fourth Lnservice Inspection Interval Relief Request 14R-06 RS-18-095, Response to Request for Additional Information Regarding Braidwood Station Fourth Lnservice Inspection Interval Relief Request 14R-032018-07-31031 July 2018 Response to Request for Additional Information Regarding Braidwood Station Fourth Lnservice Inspection Interval Relief Request 14R-03 RS-18-097, Response to Request for Additional Information and Supplemental Information-License Amendment.2018-07-27027 July 2018 Response to Request for Additional Information and Supplemental Information-License Amendment. RS-18-084, Response to Request for Additional Information Regarding Braidwood TORMIS Amendment Request2018-07-0909 July 2018 Response to Request for Additional Information Regarding Braidwood TORMIS Amendment Request RS-18-083, Response to Request for Additional Information Regarding Braidwood Station Fourth Inservice Inspection Interval Relief Request 14R-052018-06-22022 June 2018 Response to Request for Additional Information Regarding Braidwood Station Fourth Inservice Inspection Interval Relief Request 14R-05 RS-18-072, Response to Request for Additional Information Regarding 50.69 Amendment2018-06-13013 June 2018 Response to Request for Additional Information Regarding 50.69 Amendment RS-18-061, Response to Request for Additional Information Regarding Decommissioning Funding Plans for Independent Spent Fuel Storage Installations (Isfsis)2018-05-0202 May 2018 Response to Request for Additional Information Regarding Decommissioning Funding Plans for Independent Spent Fuel Storage Installations (Isfsis) RS-18-041, Response to Request for Additional Information Regarding Request for Relief (I4R-07) for Extension of Examination Interval for Reactor Pressure Vessel Head Penetration Nozzles with Mitigated Alloy 600/82/182 Peened ...2018-04-12012 April 2018 Response to Request for Additional Information Regarding Request for Relief (I4R-07) for Extension of Examination Interval for Reactor Pressure Vessel Head Penetration Nozzles with Mitigated Alloy 600/82/182 Peened ... RS-17-138, Stations - Response to Request for Additional Information Related to License Amendment Request to Incorporate Changes Supported by TSTF-547, Clarification of Rod Position Requirements'2017-10-25025 October 2017 Stations - Response to Request for Additional Information Related to License Amendment Request to Incorporate Changes Supported by TSTF-547, Clarification of Rod Position Requirements' RS-17-084, Response to Request for Additional Information for Byron Station and Braidwood Station Post Peening Relief Requests2017-07-14014 July 2017 Response to Request for Additional Information for Byron Station and Braidwood Station Post Peening Relief Requests RS-17-085, Response to Request for Additional Information Regarding Amendments to Remove Obsolete License and Technical Specification Items2017-06-29029 June 2017 Response to Request for Additional Information Regarding Amendments to Remove Obsolete License and Technical Specification Items ML17178A0762017-06-26026 June 2017 Security Plan, Training and Qualification Plan, and Safeguards Contingency Plan, Revision 15; Supplemental Information Letter RS-17-044, Response to Request for Additional Information Regarding Proposed Alternative for the Use of Encoded Phased Array Ultrasonic Examination Techniques in Lieu of Radiography2017-03-13013 March 2017 Response to Request for Additional Information Regarding Proposed Alternative for the Use of Encoded Phased Array Ultrasonic Examination Techniques in Lieu of Radiography RS-16-213, Response to Request for Additional Information Regarding Relief Request 13R-17 to Extend the Reactor Pressure Vessel Inservice Inspection Interval2016-11-21021 November 2016 Response to Request for Additional Information Regarding Relief Request 13R-17 to Extend the Reactor Pressure Vessel Inservice Inspection Interval RS-16-231, Revised Response to Request for Additional Information for License Amendment Request for a One-Time Extension of the Essential Service Water (SX) Train Completion Time to Support 2A SX Pump Repair2016-11-14014 November 2016 Revised Response to Request for Additional Information for License Amendment Request for a One-Time Extension of the Essential Service Water (SX) Train Completion Time to Support 2A SX Pump Repair RS-16-222, Response to Request for Additional Information Related to License Amendment Request for a One-Time Extension of the Essential Service Water (SX) Train Completion Time to Support 2A SX Pump Repair2016-10-28028 October 2016 Response to Request for Additional Information Related to License Amendment Request for a One-Time Extension of the Essential Service Water (SX) Train Completion Time to Support 2A SX Pump Repair RS-16-218, Response to Request for Additional Information License Amendment Request for a One-Time Extension of the Essential Service Water Train Completion Time to Support 2A SX Pump Repair2016-10-26026 October 2016 Response to Request for Additional Information License Amendment Request for a One-Time Extension of the Essential Service Water Train Completion Time to Support 2A SX Pump Repair 2024-08-09 |
Text
351 00 South Route 84 IL 60407-9619 www,exeloncorp,com June 26, 2017 10 CFR 50.54(p )(2)
BW170060 10 CFR 50.4(b)(4)
U. S. Nuclear Regulatory Commission ATTN: Document Control Desk Washington, DC 20555-0001 Braidwood Station, Units 1 and 2 Renewed Facility Operating License Nos. NPF-72 and NPF-77 NRC Docket Nos. STN 50-456, STN 50-457 and 72-73
Subject:
Braidwood Station Security Plan, Training and Qualification Plan, and Safeguards Contingency Plan, Revision 15; Supplemental Information Letter
Reference:
Letter from M. Marchionda-Palmer (Exelon Generation Company, LLC) to U.S.
NRC, "Braidwood Station Security Plan, Training and Qualification Plan, and Safeguards Contingency Plan, Revision 15," dated February 13, 2017.
In accordance with 10 CFR 50.54, "Conditions of licenses," paragraph (p)(2), Exelon Generation Company, LLC (EGC) submitted Revision 15 to the Braidwood Station Security Plan. The submittal of the Braidwood Station Security Plan revision is the subject of the referenced letter.
Subsequently, the NRC requested additional information regarding weapons related changes described in Attachment 3, "Braidwood Generation Station Supplemental Information Supporting the Site Security Plan, Revision 15," of the referenced letter. In response to this request, EGC submitted supplemental information to the NRC on April 18, 2017.
This correspondence is to inform you that, in accordance with 10 CFR 50.54, "Conditions of licenses," paragraph (p)(2), EGC submitted the Supplemental Information Letter to the Braidwood Station Security Plan, Revision 15 on April 18, 2017. The Supplemental Information Letter addressed the additional information requested by the NRC in regards to the weapons related changes associated with the Braidwood Station Security Plan, Training and Qualification Plan.
The Supplemental Information Letter contained Safeguards Information and, as such, the submittal included the statement that the information be protected in accordance with 10 CFR 73.21, "Protection of Safeguards Information: Performance Requirements," and 10 CFR 73.22, "Protection of Safeguards Information: Specific Requirements."
EGC has concluded that the changes do not decrease the safeguards effectiveness of the Braidwood Station Security Plan, Training and Qualification Plan, and Safeguards Contingency Plan.
U.S. Nuclear Regulatory Commission June 26, 2017 Page 2 There are no regulatory commitments in this letter.
Should you have any questions concerning this letter, please contact Mr. Brian Finlay, Security Manager, at (815) 417-2900.
Respectfully, Marri Marchionda-Palmer Site Vice President Braidwood Station cc: Regional Administrator - NRG Region Ill