IR 05000348/2017403

From kanterella
(Redirected from ML17132A136)
Jump to navigation Jump to search
U.S. Nuclear Regulatory Commission Physical Security Inspection Report 05000348/2017403 and 05000364/2017403 - OUO Removed
ML17132A136
Person / Time
Site: Farley  Southern Nuclear icon.png
Issue date: 05/08/2017
From: James Shehee
NRC/RGN-II/DRS/PSB2
To: Mcgavin S
Southern Nuclear Operating Co
References
IR 2017403
Download: ML17132A136 (4)


Text

UNITED STATES NUCLEAR REGULATORY COMMISSION

REGION II

245 PEACHTREE CENTER AVENUE NE, SUITE 1200 ATLANTA, GEORGIA 30303-1257 May 8, 2017 Mr. Stephen Fleet Security Director Southern Nuclear Operating Co., Inc.

Joseph M. Farley Nuclear Plant 40 Inverness Center Parkway (Bin B042)

Birmingham, AL 35242 SUBJECT: JOSEPH M. FARLEY NUCLEAR PLANT - U.S. NUCLEAR REGULATORY COMMISSION PHYSICAL SECURITY INSPECTION REPORT 05000348/2017403 AND 05000364/2017403

Dear Mr. McGavin:

On March 30, 2017, the U.S. Nuclear Regulatory Commission (NRC) completed a security inspection at your Farley Nuclear Plant, Units 1 and 2, and discussed the results of this inspection with Mr. D. Madison and members of your staff. The results of this inspection are documented in the enclosed report.

The NRC inspectors did not identify any finding or violation of more than minor significance.

This letter will be made available for public inspection and copying at https://www.nrc.gov/reading-rm/adams.html and at the NRC Public Document Room in accordance with 10 CFR 2.390, Public Inspections, Exemptions, Requests for Withholding.

However, the enclosed report contains Security-Related Information, so the enclosed report will not be made publically available in accordance with 10 CFR 2.390(d)(1). If you choose to provide a response that contains Security-Related Information, please mark your entire response Security-Related Information-Withhold from public disclosure under 10 CFR 2.390 in accordance with 10 CFR 2.390(d)(1) and follow the instructions for withholding in 10 CFR 2.390(b)(1). The NRC is waiving the affidavit requirements for your response in accordance with 10 CFR 2.390(b)(1)(ii).

Sincerely,

/RA: Jon H. Wallo FOR/

James C. Shehee, Acting Chief Plant Support Branch 2 Division of Reactor Safety Docket Nos. 50-348 and 50-364 License Nos. NPF-2 and NPF-8 Enclosure:

NRC IR 05000348/2017403 and 05000364/2017403 w/Attachment:

Supplemental Info (OUO)

cc: (See page 3) cc:

David P. Burford Fleet Cyber Security Manager Southern Nuclear Operating Co., Inc.

40 Inverness Center Parkway (Bin B042)

Birmingham, AL 35242 Steven M. Shipman Fleet Security Project Manager Southern Nuclear Operating Co., Inc.

40 Inverness Center Parkway (Bin B042)

Birmingham, AL 35242 Michael P. Long Fleet Nuclear Security Operations Manager Southern Nuclear Operating Co, Inc.

40 Inverness Center Parkway (Bin B042)

Birmingham, AL 35242 ML SUNSI REVIEW COMPLETE FORM 665 ATTACHED OFFICE RII:DRS/PSB2 RII:DRS/PSB2 RII:DRP/BR2 RII:DRS/PSB2 SIGNATURE * JDG RLP via email * SRS * JSC NAME D. Golden R. Patterson S. Sandal J. Shehee DATE 5/ 5 /2017 5/ 4 /2017 5/ 8 /2017 5/ 3 /2017 E-MAIL COPY YES NO YES NO YES NO YES NO