|
---|
Category:License-Operator
MONTHYEARIR 05000373/20243012024-10-31031 October 2024 Initial License Examination Report 05000373/2024301 05000374/2024301 ML24260A0492024-09-16016 September 2024 Operator Licensing Examination Approval - Lasalle County Station, Unit 1 and 2, September 2024 ML24024A1332024-01-24024 January 2024 Confirmation of Initial License Examination ML23193A8602023-07-12012 July 2023 Form 5.1-1 Post Examination Check Sheet (LaSalle 2023) RS-23-077, Response to NRC Regulatory Issue Summary 2023-01, Preparation and Scheduling of Operator Licensing Examinations2023-06-16016 June 2023 Response to NRC Regulatory Issue Summary 2023-01, Preparation and Scheduling of Operator Licensing Examinations ML23171A9562023-06-12012 June 2023 Post Exam Ltr ML23171A9522023-06-12012 June 2023 Form 1.3-1 Exam Security Agreement ML23171A9542023-06-12012 June 2023 Form 2.1-1 Examination Preparation Checklist (LaSalle 2023) ML23107A1822023-04-18018 April 2023 Operator Licensing Examination Approval Lasalle County Station, May 2023 ML23067A0552023-03-0808 March 2023 Form 2.3-2 Operating Test Quality Checklist (LCS 2023) - Final ML23067A0562023-03-0808 March 2023 Form 2.3-4 Written Exam Quality Checklist (LCS 2023) - Final RA23-014, 75-Day Exam Submittal Letter2023-02-15015 February 2023 75-Day Exam Submittal Letter ML23065A0472022-12-28028 December 2022 Form 2.3-1 Examination Outline - Op Test ML23065A0442022-12-28028 December 2022 Form 2.3-1 Examination Outline - Written (LCS 2023) ML23065A0542022-12-28028 December 2022 Form 3.4-1 Events and Evolutions Checklist (LCS 2023) RA22-066, 150 Day Submittal Cover Letter2022-12-0202 December 2022 150 Day Submittal Cover Letter ML22251A0732022-09-14014 September 2022 Confirmation of Initial License Examination RS-22-045, Constellation Energy Generation, LLC, Response to NRC Regulatory Issue Summary 2022-01, Preparation and Scheduling of Operator Licensing Examinations2022-03-25025 March 2022 Constellation Energy Generation, LLC, Response to NRC Regulatory Issue Summary 2022-01, Preparation and Scheduling of Operator Licensing Examinations IR 05000373/20203012020-12-17017 December 2020 NRC Initial License Examination Report 05000373/2020301; 05000374/2020301 RA20-058, Licensee Post Exam Submittal Letter2020-12-0202 December 2020 Licensee Post Exam Submittal Letter ML21004A2312020-12-0101 December 2020 County, ES-301-3 ML21005A0202020-12-0101 December 2020 ES-301-1 RO ML21004A2322020-12-0101 December 2020 County, ES-301-4 ML21005A0432020-12-0101 December 2020 ES-201-2 ML21005A0802020-12-0101 December 2020 RO Admin JPM ML21005A0402020-12-0101 December 2020 Scenario D-1 ML21005A1012020-12-0101 December 2020 In Plant JPM ML21005A0392020-12-0101 December 2020 2020_401-1 and 401-3 ML21005A0982020-12-0101 December 2020 SRO Admin JPM ML21004A2242020-12-0101 December 2020 County, RO Admin JPMs ML21004A2192020-12-0101 December 2020 County, ES-401-6 ML21005A3722020-12-0101 December 2020 ES-401-9 ML21005A3692020-12-0101 December 2020 ES-401-4 ML21005A2402020-12-0101 December 2020 SRO Ile (Answer Key) ML21005A2382020-12-0101 December 2020 RO Ile (Answer Key) ML21005A3652020-12-0101 December 2020 ES-301-7 ML21005A0922020-12-0101 December 2020 Sim JPM ML21005A3832020-12-0101 December 2020 ES-201-3 ML21004A2252020-12-0101 December 2020 County, Scenarios ML21004A2222020-12-0101 December 2020 County, Inplant JPMs ML21005A0222020-12-0101 December 2020 ES-301-1 SRO ML21004A2272020-12-0101 December 2020 County, Sim JPMs ML21005A0882020-12-0101 December 2020 Scenarios ML21005A3842020-12-0101 December 2020 ES-403-1 ML21004A2302020-12-0101 December 2020 County, Written Exam ML21005A0232020-12-0101 December 2020 ES-301-2 RO ML21005A0462020-12-0101 December 2020 ES-301-5 ML21004A2332020-12-0101 December 2020 County, ES-301-6 ML21004A2282020-12-0101 December 2020 County, SRO Admin JPMs ML21005A0262020-12-0101 December 2020 ES-301-2 SRO 2024-09-16
[Table view] Category:Part 55 Examination Related Material
MONTHYEARIR 05000373/20243012024-10-31031 October 2024 Initial License Examination Report 05000373/2024301 05000374/2024301 ML24260A0492024-09-16016 September 2024 Operator Licensing Examination Approval - Lasalle County Station, Unit 1 and 2, September 2024 ML24024A1332024-01-24024 January 2024 Confirmation of Initial License Examination ML23193A8602023-07-12012 July 2023 Form 5.1-1 Post Examination Check Sheet (LaSalle 2023) RS-23-077, Response to NRC Regulatory Issue Summary 2023-01, Preparation and Scheduling of Operator Licensing Examinations2023-06-16016 June 2023 Response to NRC Regulatory Issue Summary 2023-01, Preparation and Scheduling of Operator Licensing Examinations ML23171A9542023-06-12012 June 2023 Form 2.1-1 Examination Preparation Checklist (LaSalle 2023) ML23171A9522023-06-12012 June 2023 Form 1.3-1 Exam Security Agreement ML23171A9562023-06-12012 June 2023 Post Exam Ltr ML23107A1822023-04-18018 April 2023 Operator Licensing Examination Approval Lasalle County Station, May 2023 ML23067A0562023-03-0808 March 2023 Form 2.3-4 Written Exam Quality Checklist (LCS 2023) - Final ML23067A0552023-03-0808 March 2023 Form 2.3-2 Operating Test Quality Checklist (LCS 2023) - Final RA23-014, 75-Day Exam Submittal Letter2023-02-15015 February 2023 75-Day Exam Submittal Letter ML23065A0542022-12-28028 December 2022 Form 3.4-1 Events and Evolutions Checklist (LCS 2023) ML23065A0442022-12-28028 December 2022 Form 2.3-1 Examination Outline - Written (LCS 2023) ML23065A0472022-12-28028 December 2022 Form 2.3-1 Examination Outline - Op Test RA22-066, 150 Day Submittal Cover Letter2022-12-0202 December 2022 150 Day Submittal Cover Letter ML22251A0732022-09-14014 September 2022 Confirmation of Initial License Examination RS-22-045, Constellation Energy Generation, LLC, Response to NRC Regulatory Issue Summary 2022-01, Preparation and Scheduling of Operator Licensing Examinations2022-03-25025 March 2022 Constellation Energy Generation, LLC, Response to NRC Regulatory Issue Summary 2022-01, Preparation and Scheduling of Operator Licensing Examinations IR 05000373/20203012020-12-17017 December 2020 NRC Initial License Examination Report 05000373/2020301; 05000374/2020301 RA20-058, Licensee Post Exam Submittal Letter2020-12-0202 December 2020 Licensee Post Exam Submittal Letter ML21005A3692020-12-0101 December 2020 ES-401-4 ML21005A3722020-12-0101 December 2020 ES-401-9 ML21005A2382020-12-0101 December 2020 RO Ile (Answer Key) ML21005A1012020-12-0101 December 2020 In Plant JPM ML21004A2242020-12-0101 December 2020 County, RO Admin JPMs ML21005A2402020-12-0101 December 2020 SRO Ile (Answer Key) ML21005A0982020-12-0101 December 2020 SRO Admin JPM ML21005A0402020-12-0101 December 2020 Scenario D-1 ML21005A0232020-12-0101 December 2020 ES-301-2 RO ML21005A0262020-12-0101 December 2020 ES-301-2 SRO ML21005A0392020-12-0101 December 2020 2020_401-1 and 401-3 ML21004A2272020-12-0101 December 2020 County, Sim JPMs ML21004A2302020-12-0101 December 2020 County, Written Exam ML21004A2252020-12-0101 December 2020 County, Scenarios ML21005A0802020-12-0101 December 2020 RO Admin JPM ML21005A0882020-12-0101 December 2020 Scenarios ML21005A0922020-12-0101 December 2020 Sim JPM ML21005A3652020-12-0101 December 2020 ES-301-7 ML21004A2312020-12-0101 December 2020 County, ES-301-3 ML21004A2322020-12-0101 December 2020 County, ES-301-4 ML21004A2332020-12-0101 December 2020 County, ES-301-6 ML21005A0462020-12-0101 December 2020 ES-301-5 ML21005A0202020-12-0101 December 2020 ES-301-1 RO ML21004A2222020-12-0101 December 2020 County, Inplant JPMs ML21004A2282020-12-0101 December 2020 County, SRO Admin JPMs ML21004A2192020-12-0101 December 2020 County, ES-401-6 ML21005A3802020-12-0101 December 2020 ES-201-1 ML21005A0432020-12-0101 December 2020 ES-201-2 ML21005A3832020-12-0101 December 2020 ES-201-3 ML21005A3842020-12-0101 December 2020 ES-403-1 2024-09-16
[Table view] |
Text
ES-301 Administrative Topics Outline Form ES-301-1 Facility: LaSalle Date of Examination: 10/17/16 Examination Level: RO SRO Operating Test Number: NRC 15-1 Administrative Topic Type Code* Describe activity to be performed (See Note)
Interpret Core Thermal Limits (A-RO-06) 2.1.19 - (3.9) Ability to use plant computers to evaluate system Conduct of Operations D, R or component status.
656.010 - Given the proper procedure, perform the NSO shiftly surveillance, IAW station procedures.
Determine Suppression Chamber Average Water Temperature (A-RO-43) 2.1.20 - (4.6) Ability to interpret and execute procedure steps.
Conduct of Operations N, R 92.012 - Given Unit Supervisor authorization, determine Suppression Chamber average water temperature when normal indication is not available or water level is low, IAW station procedures.
Perform a Partial LOS-CM-M1 (A-RO-29) 2.2.4.4 - (4.2) Ability to interpret control room indications to verify the status and operation of a system and understand how operator actions and directives affect plant and system Equipment Control D, R, P conditions 92.020 - Given Unit Supervisor authorization, perform the Monthly Accident Monitoring Instrumentation check, IAW station procedures.
Calculate Stay Time and Determine if Dose Extension is Required (A-RO-44) 2.3.4 - (3.2) Knowledge of radiation exposure limits under Radiation Control N, R normal or emergency conditions 755.020 - During the performance of tasks, apply the administrative requirements of roles and responsibilities of On-Shift Personnel, IAW station procedures.
Emergency Plan N/A N/A NOTE: All items (5 total) are required for SROs. RO applicants require only 4 items unless they are retaking only the administrative topics (which would require all five items).
- Type Codes & Criteria: (C)ontrol room, (S)imulator, or Class(R)oom (D)irect from bank (< 3 for ROs; < 4 for SROs & RO retakes)
(N)ew or (M)odified from bank (> 1)
(P)revious 2 exams (< 1; randomly selected)
ES 301, Page 22 of 27
ES-301 Administrative Topics Outline Form ES-301-1 Facility: LaSalle Date of Examination: 10/17/16 Examination Level: RO SRO Operating Test Number: NRC 15-1 Administrative Topic Type Code* Describe activity to be performed (See Note)
Complete a Short Duration Timeclock Sheet (A-SRO-19) 2.1.18 - (3.8) Ability to make accurate, clear, and concise logs, records, status boards, and reports.
Conduct of Operations D, R, P 725.010 - Given the proper procedure, a personal computer with network access, and a filled-out surveillance package, prepare a surveillance including the following: review, authorize, prepare short duration timeclock tracking sheet, and determine availability requirements, IAW station procedures Determine Allowed EOOS Combinations (A-SRO-13) 2.1.25 - (4.2) Ability to interpret reference materials, such as graphs, curves, tables, etc.
Conduct of Operations D, R 201.011 - Given a set of plant conditions, identify and prepare the Technical Specification required actions, IAW Technical Specifications.
Apply a Protected Path Using the Protect System Barrier Tracker Program (A-SRO-61) 2.2.14 - (4.3) Knowledge of the process for controlling Equipment Control N, R, equipment configuration and status 747.010 During the performance of tasks, apply the administrative requirements of ON-LINE MAINTENANCE, IAW station procedures.
Identify ODCM Requirements for a Spurious Off Gas Isolation (A-SRO-53)
Radiation Control N, R 2.3.11 - (4.3) Ability to control radiation releases.
702.001 - Given an inoperable component, determine ODCM applicability and required actions, IAW station procedures.
Determine PARs for an Event(A-SRO-54) 2.4.44 - (4.4) Knowledge of emergency plan protective action Emergency Plan R, N recommendations.
711.001 - given a postulated E-Plan conditions, recommend Offsite Protective Actions, IAW station procedures.
NOTE: All items (5 total) are required for SROs. RO applicants require only 4 items unless they are retaking only the administrative topics (which would require all five items).
- Type Codes & Criteria: (C)ontrol room, (S)imulator, or Class(R)oom (D)irect from bank (< 3 for ROs; < 4 for SROs & RO retakes)
(N)ew or (M)odified from bank (> 1)
(P)revious 2 exams (< 1; randomly selected)
ES 301, Page 22 of 27