MONTHYEARML24024A1332024-01-24024 January 2024 Confirmation of Initial License Examination IR 05000373/20233012023-09-15015 September 2023 Errata to NRC Initial License Examination Report 05000373/2023301; 05000374/2023301 ML23193A8602023-07-12012 July 2023 Form 5.1-1 Post Examination Check Sheet (LaSalle 2023) RS-23-077, Response to NRC Regulatory Issue Summary 2023-01, Preparation and Scheduling of Operator Licensing Examinations2023-06-16016 June 2023 Response to NRC Regulatory Issue Summary 2023-01, Preparation and Scheduling of Operator Licensing Examinations ML23171A9562023-06-12012 June 2023 Post Exam Ltr ML23171A9522023-06-12012 June 2023 Form 1.3-1 Exam Security Agreement ML23171A9542023-06-12012 June 2023 Form 2.1-1 Examination Preparation Checklist (LaSalle 2023) ML23107A1822023-04-18018 April 2023 Operator Licensing Examination Approval Lasalle County Station, May 2023 ML23067A0552023-03-0808 March 2023 Form 2.3-2 Operating Test Quality Checklist (LCS 2023) - Final ML23067A0562023-03-0808 March 2023 Form 2.3-4 Written Exam Quality Checklist (LCS 2023) - Final RA23-014, 75-Day Exam Submittal Letter2023-02-15015 February 2023 75-Day Exam Submittal Letter ML23065A0472022-12-28028 December 2022 Form 2.3-1 Examination Outline - Op Test ML23065A0442022-12-28028 December 2022 Form 2.3-1 Examination Outline - Written (LCS 2023) ML23065A0542022-12-28028 December 2022 Form 3.4-1 Events and Evolutions Checklist (LCS 2023) RA22-066, 150 Day Submittal Cover Letter2022-12-0202 December 2022 150 Day Submittal Cover Letter ML22251A0732022-09-14014 September 2022 Confirmation of Initial License Examination RS-22-045, Constellation Energy Generation, LLC, Response to NRC Regulatory Issue Summary 2022-01, Preparation and Scheduling of Operator Licensing Examinations2022-03-25025 March 2022 Constellation Energy Generation, LLC, Response to NRC Regulatory Issue Summary 2022-01, Preparation and Scheduling of Operator Licensing Examinations IR 05000373/20203012020-12-17017 December 2020 NRC Initial License Examination Report 05000373/2020301; 05000374/2020301 RA20-058, Licensee Post Exam Submittal Letter2020-12-0202 December 2020 Licensee Post Exam Submittal Letter ML21005A3722020-12-0101 December 2020 ES-401-9 ML21005A0432020-12-0101 December 2020 ES-201-2 ML21005A0802020-12-0101 December 2020 RO Admin JPM ML21005A0402020-12-0101 December 2020 Scenario D-1 ML21005A0392020-12-0101 December 2020 2020_401-1 and 401-3 ML21004A2332020-12-0101 December 2020 County, ES-301-6 ML21004A2242020-12-0101 December 2020 County, RO Admin JPMs ML21005A0202020-12-0101 December 2020 ES-301-1 RO ML21005A0982020-12-0101 December 2020 SRO Admin JPM ML21005A3692020-12-0101 December 2020 ES-401-4 ML21004A2312020-12-0101 December 2020 County, ES-301-3 ML21005A2402020-12-0101 December 2020 SRO Ile (Answer Key) ML21005A3652020-12-0101 December 2020 ES-301-7 ML21005A2382020-12-0101 December 2020 RO Ile (Answer Key) ML21005A0922020-12-0101 December 2020 Sim JPM ML21004A2192020-12-0101 December 2020 County, ES-401-6 ML21004A2222020-12-0101 December 2020 County, Inplant JPMs ML21004A2302020-12-0101 December 2020 County, Written Exam ML21005A0222020-12-0101 December 2020 ES-301-1 SRO ML21004A2272020-12-0101 December 2020 County, Sim JPMs ML21004A2252020-12-0101 December 2020 County, Scenarios ML21005A3802020-12-0101 December 2020 ES-201-1 ML21005A0882020-12-0101 December 2020 Scenarios ML21005A0232020-12-0101 December 2020 ES-301-2 RO ML21005A1012020-12-0101 December 2020 in Plant JPM ML21005A3842020-12-0101 December 2020 ES-403-1 ML21004A2282020-12-0101 December 2020 County, SRO Admin JPMs ML21005A3832020-12-0101 December 2020 ES-201-3 ML21005A0262020-12-0101 December 2020 ES-301-2 SRO ML21005A0462020-12-0101 December 2020 ES-301-5 ML21004A2322020-12-0101 December 2020 County, ES-301-4 2024-01-24
[Table view] Category:Part 55 Examination Related Material
MONTHYEARML24024A1332024-01-24024 January 2024 Confirmation of Initial License Examination IR 05000373/20233012023-09-15015 September 2023 Errata to NRC Initial License Examination Report 05000373/2023301; 05000374/2023301 ML23193A8602023-07-12012 July 2023 Form 5.1-1 Post Examination Check Sheet (LaSalle 2023) RS-23-077, Response to NRC Regulatory Issue Summary 2023-01, Preparation and Scheduling of Operator Licensing Examinations2023-06-16016 June 2023 Response to NRC Regulatory Issue Summary 2023-01, Preparation and Scheduling of Operator Licensing Examinations ML23171A9522023-06-12012 June 2023 Form 1.3-1 Exam Security Agreement ML23171A9562023-06-12012 June 2023 Post Exam Ltr ML23171A9542023-06-12012 June 2023 Form 2.1-1 Examination Preparation Checklist (LaSalle 2023) ML23107A1822023-04-18018 April 2023 Operator Licensing Examination Approval Lasalle County Station, May 2023 ML23067A0562023-03-0808 March 2023 Form 2.3-4 Written Exam Quality Checklist (LCS 2023) - Final ML23067A0552023-03-0808 March 2023 Form 2.3-2 Operating Test Quality Checklist (LCS 2023) - Final RA23-014, 75-Day Exam Submittal Letter2023-02-15015 February 2023 75-Day Exam Submittal Letter ML23065A0472022-12-28028 December 2022 Form 2.3-1 Examination Outline - Op Test ML23065A0542022-12-28028 December 2022 Form 3.4-1 Events and Evolutions Checklist (LCS 2023) ML23065A0442022-12-28028 December 2022 Form 2.3-1 Examination Outline - Written (LCS 2023) RA22-066, 150 Day Submittal Cover Letter2022-12-0202 December 2022 150 Day Submittal Cover Letter ML22251A0732022-09-14014 September 2022 Confirmation of Initial License Examination RS-22-045, Constellation Energy Generation, LLC, Response to NRC Regulatory Issue Summary 2022-01, Preparation and Scheduling of Operator Licensing Examinations2022-03-25025 March 2022 Constellation Energy Generation, LLC, Response to NRC Regulatory Issue Summary 2022-01, Preparation and Scheduling of Operator Licensing Examinations IR 05000373/20203012020-12-17017 December 2020 NRC Initial License Examination Report 05000373/2020301; 05000374/2020301 RA20-058, Licensee Post Exam Submittal Letter2020-12-0202 December 2020 Licensee Post Exam Submittal Letter ML21005A3722020-12-0101 December 2020 ES-401-9 ML21005A2382020-12-0101 December 2020 RO Ile (Answer Key) ML21005A3692020-12-0101 December 2020 ES-401-4 ML21005A0982020-12-0101 December 2020 SRO Admin JPM ML21004A2242020-12-0101 December 2020 County, RO Admin JPMs ML21005A2402020-12-0101 December 2020 SRO Ile (Answer Key) ML21005A0402020-12-0101 December 2020 Scenario D-1 ML21005A0232020-12-0101 December 2020 ES-301-2 RO ML21005A0262020-12-0101 December 2020 ES-301-2 SRO ML21005A0392020-12-0101 December 2020 2020_401-1 and 401-3 ML21005A1012020-12-0101 December 2020 in Plant JPM ML21004A2272020-12-0101 December 2020 County, Sim JPMs ML21004A2282020-12-0101 December 2020 County, SRO Admin JPMs ML21005A0802020-12-0101 December 2020 RO Admin JPM ML21005A0882020-12-0101 December 2020 Scenarios ML21005A0922020-12-0101 December 2020 Sim JPM ML21005A3652020-12-0101 December 2020 ES-301-7 ML21004A2312020-12-0101 December 2020 County, ES-301-3 ML21004A2322020-12-0101 December 2020 County, ES-301-4 ML21004A2332020-12-0101 December 2020 County, ES-301-6 ML21005A0462020-12-0101 December 2020 ES-301-5 ML21005A0202020-12-0101 December 2020 ES-301-1 RO ML21004A2222020-12-0101 December 2020 County, Inplant JPMs ML21004A2302020-12-0101 December 2020 County, Written Exam ML21004A2192020-12-0101 December 2020 County, ES-401-6 ML21005A3802020-12-0101 December 2020 ES-201-1 ML21005A0432020-12-0101 December 2020 ES-201-2 ML21005A3832020-12-0101 December 2020 ES-201-3 ML21005A3842020-12-0101 December 2020 ES-403-1 ML21004A2252020-12-0101 December 2020 County, Scenarios ML21005A0222020-12-0101 December 2020 ES-301-1 SRO 2024-01-24
[Table view] |
Text
ES-301 Control Room/In-Plant Systems Outline Form ES-301-2 Facility: LaSalle Date of Examination: 10/17/16 Exam Level: RO SRO-I SRO-U Operating Test No.: NRC 15-1 Control Room Systems: *8 for RO; 7 for SRO-I; 2 or 3 for SRO-U Type Safety System / JPM Title Code* Function
- a. 286000 / Starting Service Water Pumps to Maintain Fire Header Pressure D, P, S 8 (S-FP-01)
- b. 201006 / Substitute a Control Rod Position IAW LOP-RM-02 N, S 7
- c. 295036 / Establish One Loop of Suppression Pool Cooling with Discharge A, EN, N, S 5 Piping Rupture (S-RH-28)
- d. 201003 / Respond to an Uncoupled Control Rod (S-NR-12) A, L, N, S 1
- e. 261000 / Manually Initiate SBGT in Response to Irradiated Fuel Assembly D, S 9 Damage (S-VG-01)
- f. 264000 / 1A DG Fast Start Loading with High Cooling Water A, D, S 6 Temperature (S-DG-12)
- g. 217000 / Startup RCIC for Surveillance Testing with High Turbine A, N, S 4 Exhaust Pressure and Failure to Isolate (S-RI-13)
- h. 209002 / Startup HPCS with an Overcurrent Alarm (S-HP-06) A, D, S 2 In-Plant Systems * (3 for RO); (3 for SRO-I); (3 or 2 for SRO-U)
- i. 295012 / Defeat Isolations per LGA-VP-01 (P-VP-04) D, E, P, R 5
- j. 295031 / Perform In-Plant Actions to Lineup CY to B LPCI (P-CY-02) D, E, R 2
- k. 239002 / Respond to a Stuck OPEN SRV IAW LOA-SRV-101 (P-NB-01) D, E, R 3
- All RO and SRO-I control room (and in-plant) systems must be different and serve different safety functions; all five SRO-U systems must serve different safety functions; in-plant systems and functions may overlap those tested in the control room.
- Type Codes Criteria for RO / SRO-I / SRO-U (A)lternate path 4-6 / 4-6 / 2-3 (C)ontrol room (D)irect from bank <9 / <8 / <4 (E)mergency or abnormal in-plant >1 / >1 / >1 (EN)gineered safety feature > 1 / > 1 / > 1 (control room system)
(L)ow-Power / Shutdown >1 / >1 / >1 (N)ew or (M)odified from bank including 1(A) >2 / >2 / >1 (P)revious 2 exams < 3 / < 3 / < 2 (randomly selected)
(R)CA >1 / >1 / >1 (S)imulator ES-301, Page 23 of 27
ES-301 Control Room/In-Plant Systems Outline Form ES-301-2 Facility: LaSalle Date of Examination: 10/17/16 Exam Level: RO SRO-I SRO-U Operating Test No.: NRC 15-1 Control Room Systems: *8 for RO; 7 for SRO-I; 2 or 3 for SRO-U Type Safety System / JPM Title Code* Function
- a. 286000 / Starting Service Water Pumps to Maintain Fire Header Pressure D, P, S 8 (S-FP-01)
- b. 201006 / Substitute a Control Rod Position IAW LOP-RM-02 N, S 7
- c. 295036 / Establish One Loop of Suppression Pool Cooling with Discharge A, EN, N, S 5 Piping Rupture (S-RH-28)
- d. 201003 / Respond to an Uncoupled Control Rod (S-NR-12) A, L, N, S 1
- e. N/A N/A N/A
- f. 264000 / 1A DG Fast Start Loading with High Cooling Water A, D, S 6 Temperature (S-DG-12)
- g. 217000 / Startup RCIC for Surveillance Testing with High Turbine A, N, S 4 Exhaust Pressure and Failure to Isolate (S-RI-13)
- h. 209002 / Startup HPCS with an Overcurrent Alarm (S-HP-06) A, D, S 2 In-Plant Systems * (3 for RO); (3 for SRO-I); (3 or 2 for SRO-U)
- i. 295012 / Defeat Isolations per LGA-VP-01 (P-VP-04) D, E, P, R 5
- j. 295031 / Perform In-Plant Actions to Lineup CY to B LPCI (P-CY-02) D, E, R 2
- k. 239002 / Respond to a Stuck OPEN SRV IAW LOA-SRV-101 (P-NB-01) D, E, R 3
- All RO and SRO-I control room (and in-plant) systems must be different and serve different safety functions; all five SRO-U systems must serve different safety functions; in-plant systems and functions may overlap those tested in the control room.
- Type Codes Criteria for RO / SRO-I / SRO-U (A)lternate path 4-6 / 4-6 / 2-3 (C)ontrol room (D)irect from bank <9 / <8 / <4 (E)mergency or abnormal in-plant >1 / >1 / >1 (EN)gineered safety feature > 1 / > 1 / > 1 (control room system)
(L)ow-Power / Shutdown >1 / >1 / >1 (N)ew or (M)odified from bank including 1(A) >2 / >2 / >1 (P)revious 2 exams < 3 / < 3 / < 2 (randomly selected)
(R)CA >1 / >1 / >1 (S)imulator ES-301, Page 23 of 27