ML17082A637
ML17082A637 | |
Person / Time | |
---|---|
Site: | LaSalle |
Issue date: | 11/16/2016 |
From: | Chuck Zoia NRC/RGN-III/DRS/OLB |
To: | Exelon Generation Co |
Shared Package | |
ML15274A401 | List: |
References | |
ES-301-5 | |
Download: ML17082A637 (8) | |
Text
ES-301 Transient and Event Checklist Form ES-301-5 CREW 1 Facility: LaSalle Date of Exam: 10/17/16 Operating Test Number: NRC 15-1 A E Scenarios P V 1 2 3 -
P E T M L N CREW CREW CREW CREW O I I T POSITION POSITION POSITION POSITION T N C A I A T S A B S A B S A B S A B L M N Y R T O R T O R T O R T O U T P O C P O C P O C P O C P M(*)
E R I U RX 2 4 - 2 1 1 0 RO NOR 1 - 1 2 1 1 1 SRO-I 4568 4 4 2 (1) I/C 10 79 23 9 SRO-U MAJ 9 11 8 68 5 2 2 1 TS 37 - - 2 0 2 2 RX 2 4 4 3 1 1 0 RO NOR - 1 1 2 1 1 1 SRO-I I/C 48 3679 2357 10 4 4 2 (2)
SRO-U MAJ 9 11 8 68 5 2 2 1 TS - 25 - 2 0 2 2 RX - - 4 1 1 1 0 RO (1) NOR 1 1 - 2 1 1 1 SRO-I I/C 56 36 57 6 4 4 2 SRO-U MAJ 9 11 8 68 5 2 2 1 TS - - - 0 0 2 2 RX 1 1 0 RO NOR 1 1 1 SRO-I I/C 4 4 2 SRO-U MAJ 2 2 1 TS 0 2 2 Instructions:
- 1. Check the applicant level and enter the operating test number and Form ES-D-1 event numbers for each event type; TS are not applicable for RO applicants. ROs must serve in both the at-the-controls (ATC) and balance-of-plant (BOP) positions. Instant SROs must serve in both the SRO and the ATC positions, including at least two instrument or component (I/C) malfunctions and one major transient, in the ATC position. If an Instant SRO additionally serves in the BOP position, one I/C malfunction can be credited toward the two I/C malfunctions required for the ATC position.
- 2. Reactivity manipulations may be conducted under normal or controlled abnormal conditions (refer to Section D.5.d) but must be significant per Section C.2.a of Appendix D. (*) Reactivity and normal evolutions may be replaced with additional instrument or component malfunctions on a 1-for-1 basis.
- 3. Whenever practical, both instrument and component malfunctions should be included; only those that require verifiable actions that provide insight to the applicants competence count toward the minimum requirements specified for the applicants license level in the right-hand columns.
- 4. For licensees that use the ATC operator primarily for monitoring plant parameters, the chief examiner may place SRO-I applicants in either the ATC or BOP position to best evaluate the SRO-I in manipulating plant controls.
ES-301, Page 26 of 27
ES-301 Transient and Event Checklist Form ES-301-5 CREW 2 Facility: LaSalle Date of Exam: 10/17/16 Operating Test Number: NRC 15-1 A E Scenarios P V 1 2 3 -
P E T M L N CREW CREW CREW CREW O I I T POSITION POSITION POSITION POSITION T N C A I A T S A B S A B S A B S A B L M N Y R T O R T O R T O R T O U T P O C P O C P O C P O C P M(*)
E R I U RX 2 4 - 2 1 1 0 RO NOR 1 - 1 2 1 1 1 SRO-I 4568 4 4 2 (5) I/C 10 79 23 9 SRO-U MAJ 9 11 8 68 5 2 2 1 TS 37 - - 2 0 2 2 RX 2 4 4 3 1 1 0 RO NOR - 1 1 2 1 1 1 SRO-I I/C 48 3679 2357 10 4 4 2 (4)
SRO-U MAJ 9 11 8 68 5 2 2 1 TS - 25 - 2 0 2 2 RX - - 4 1 1 1 0 RO (4) NOR 1 1 - 2 1 1 1 SRO-I I/C 56 36 57 6 4 4 2 SRO-U MAJ 9 11 8 68 5 2 2 1 TS - - - 0 0 2 2 RX 1 1 0 RO NOR 1 1 1 SRO-I I/C 4 4 2 SRO-U MAJ 2 2 1 TS 0 2 2 Instructions:
- 1. Check the applicant level and enter the operating test number and Form ES-D-1 event numbers for each event type; TS are not applicable for RO applicants. ROs must serve in both the at-the-controls (ATC) and balance-of-plant (BOP) positions. Instant SROs must serve in both the SRO and the ATC positions, including at least two instrument or component (I/C) malfunctions and one major transient, in the ATC position. If an Instant SRO additionally serves in the BOP position, one I/C malfunction can be credited toward the two I/C malfunctions required for the ATC position.
- 2. Reactivity manipulations may be conducted under normal or controlled abnormal conditions (refer to Section D.5.d) but must be significant per Section C.2.a of Appendix D. (*) Reactivity and normal evolutions may be replaced with additional instrument or component malfunctions on a 1-for-1 basis.
- 3. Whenever practical, both instrument and component malfunctions should be included; only those that require verifiable actions that provide insight to the applicants competence count toward the minimum requirements specified for the applicants license level in the right-hand columns.
- 4. For licensees that use the ATC operator primarily for monitoring plant parameters, the chief examiner may place SRO-I applicants in either the ATC or BOP position to best evaluate the SRO-I in manipulating plant controls.
ES-301, Page 26 of 27
ES-301 Transient and Event Checklist Form ES-301-5 CREW 3 Facility: LaSalle Date of Exam: 10/17/16 Operating Test Number: NRC 15-1 A E Scenarios P V 1 2 3 -
P E T M L N CREW CREW CREW CREW O I I T POSITION POSITION POSITION POSITION T N C A I A T S A B S A B S A B S A B L M N Y R T O R T O R T O R T O U T P O C P O C P O C P O C P M(*)
E R I U RX 2 4 4 3 1 1 0 RO NOR 1 1 - 2 1 1 1 SRO-I 4568 4 4 2 (3) I/C 10 3679 57 11 SRO-U MAJ 9 11 8 68 5 2 2 1 TS 37 25 - 4 0 2 2 RX 2 - 1 1 1 0 RO (3) NOR - 1 1 1 1 1 SRO-I I/C 48 36 4 4 4 2 SRO-U MAJ 9 11 8 3 2 2 1 TS - - 0 0 2 2 RX - 4 - 1 1 1 0 RO (2) NOR 1 - 1 2 1 1 1 SRO-I I/C 56 79 23 6 4 4 2 SRO-U MAJ 9 11 8 68 5 2 2 1 TS - - - 0 0 2 2 RX 1 1 0 RO NOR 1 1 1 SRO-I I/C 4 4 2 SRO-U MAJ 2 2 1 TS 0 2 2 Instructions:
- 1. Check the applicant level and enter the operating test number and Form ES-D-1 event numbers for each event type; TS are not applicable for RO applicants. ROs must serve in both the at-the-controls (ATC) and balance-of-plant (BOP) positions. Instant SROs must serve in both the SRO and the ATC positions, including at least two instrument or component (I/C) malfunctions and one major transient, in the ATC position. If an Instant SRO additionally serves in the BOP position, one I/C malfunction can be credited toward the two I/C malfunctions required for the ATC position.
- 2. Reactivity manipulations may be conducted under normal or controlled abnormal conditions (refer to Section D.5.d) but must be significant per Section C.2.a of Appendix D. (*) Reactivity and normal evolutions may be replaced with additional instrument or component malfunctions on a 1-for-1 basis.
- 3. Whenever practical, both instrument and component malfunctions should be included; only those that require verifiable actions that provide insight to the applicants competence count toward the minimum requirements specified for the applicants license level in the right-hand columns.
- 4. For licensees that use the ATC operator primarily for monitoring plant parameters, the chief examiner may place SRO-I applicants in either the ATC or BOP position to best evaluate the SRO-I in manipulating plant controls.
ES-301, Page 26 of 27
ES-301 Transient and Event Checklist Form ES-301-5 CREW 4 Facility: LaSalle Date of Exam: 10/17/16 Operating Test Number: NRC 15-1 A E Scenarios P V 1 2 4 -
P E T M L N CREW CREW CREW CREW O I I T POSITION POSITION POSITION POSITION T N C A I A T S A B S A B S A B S A B L M N Y R T O R T O R T O R T O U T P O C P O C P O C P O C P M(*)
E R I U RX 2 4 - 2 1 1 0 RO NOR 1 - 1 2 1 1 1 SRO-I 4568 4 4 2 (6) I/C 10 79 39 9 SRO-U MAJ 9 11 8 78 5 2 2 1 TS 37 - - 2 0 2 2 RX 2 4 2 3 1 1 0 RO NOR - 1 1 2 1 1 1 SRO-I I/C 48 3679 3459 10 4 4 2 (7)
SRO-U MAJ 9 11 8 78 5 2 2 1 TS - 25 6 3 0 2 2 RX - - 2 1 1 1 0 RO (5) NOR 1 1 - 2 1 1 1 SRO-I I/C 56 36 45 6 4 4 2 SRO-U MAJ 9 11 8 78 5 2 2 1 TS - - - 0 0 2 2 RX 1 1 0 RO NOR 1 1 1 SRO-I I/C 4 4 2 SRO-U MAJ 2 2 1 TS 0 2 2 Instructions:
- 1. Check the applicant level and enter the operating test number and Form ES-D-1 event numbers for each event type; TS are not applicable for RO applicants. ROs must serve in both the at-the-controls (ATC) and balance-of-plant (BOP) positions. Instant SROs must serve in both the SRO and the ATC positions, including at least two instrument or component (I/C) malfunctions and one major transient, in the ATC position. If an Instant SRO additionally serves in the BOP position, one I/C malfunction can be credited toward the two I/C malfunctions required for the ATC position.
- 2. Reactivity manipulations may be conducted under normal or controlled abnormal conditions (refer to Section D.5.d) but must be significant per Section C.2.a of Appendix D. (*) Reactivity and normal evolutions may be replaced with additional instrument or component malfunctions on a 1-for-1 basis.
- 3. Whenever practical, both instrument and component malfunctions should be included; only those that require verifiable actions that provide insight to the applicants competence count toward the minimum requirements specified for the applicants license level in the right-hand columns.
- 4. For licensees that use the ATC operator primarily for monitoring plant parameters, the chief examiner may place SRO-I applicants in either the ATC or BOP position to best evaluate the SRO-I in manipulating plant controls.
ES-301, Page 26 of 27
ES-301 Transient and Event Checklist Form ES-301-5 CREW 5 Facility: LaSalle Date of Exam: 10/17/16 Operating Test Number: NRC 15-1 A E Scenarios P V 4 5 6 -
P E T M L N CREW CREW CREW CREW O I I T POSITION POSITION POSITION POSITION T N C A I A T S A B S A B S A B S A B L M N Y R T O R T O R T O R T O U T P O C P O C P O C P O C P M(*)
E R I U RX 2 2 - 2 1 1 0 RO NOR - 1 1 2 1 1 1 SRO-I 3578 4 4 2 (8) I/C 45 10 23 9 SRO-U MAJ 78 9 8 10 5 2 2 1 TS - 46 - 2 0 2 2 RX 2 2 6 3 1 1 0 RO NOR 1 - 1 2 1 1 1 SRO-I I/C 3459 3 8 10 23479 12 4 4 2 (9)
SRO-U MAJ 78 9 8 10 5 2 2 1 TS 6 - 5 2 0 2 2 RX - - 6 1 1 1 0 RO (6) NOR 1 1 - 2 1 1 1 SRO-I I/C 39 57 47 6 4 4 2 SRO-U MAJ 78 9 8 10 5 2 2 1 TS - - - 0 0 2 2 RX 1 1 0 RO NOR 1 1 1 SRO-I I/C 4 4 2 SRO-U MAJ 2 2 1 TS 0 2 2 Instructions:
- 1. Check the applicant level and enter the operating test number and Form ES-D-1 event numbers for each event type; TS are not applicable for RO applicants. ROs must serve in both the at-the-controls (ATC) and balance-of-plant (BOP) positions. Instant SROs must serve in both the SRO and the ATC positions, including at least two instrument or component (I/C) malfunctions and one major transient, in the ATC position. If an Instant SRO additionally serves in the BOP position, one I/C malfunction can be credited toward the two I/C malfunctions required for the ATC position.
- 2. Reactivity manipulations may be conducted under normal or controlled abnormal conditions (refer to Section D.5.d) but must be significant per Section C.2.a of Appendix D. (*) Reactivity and normal evolutions may be replaced with additional instrument or component malfunctions on a 1-for-1 basis.
- 3. Whenever practical, both instrument and component malfunctions should be included; only those that require verifiable actions that provide insight to the applicants competence count toward the minimum requirements specified for the applicants license level in the right-hand columns.
- 4. For licensees that use the ATC operator primarily for monitoring plant parameters, the chief examiner may place SRO-I applicants in either the ATC or BOP position to best evaluate the SRO-I in manipulating plant controls.
ES-301, Page 26 of 27
ES-301 Transient and Event Checklist Form ES-301-5 CREW 6 Facility: LaSalle Date of Exam: 10/17/16 Operating Test Number: NRC 15-1 A E Scenarios P V 4 5 7 -
P E T M L N CREW CREW CREW CREW O I I T POSITION POSITION POSITION POSITION T N C A I A T S A B S A B S A B S A B L M N Y R T O R T O R T O R T O U T P O C P O C P O C P O C P M(*)
E R I U RX 2 2 - 2 1 1 0 RO NOR - 1 2 2 1 1 1 SRO-I 3578 4 4 2 (11) I/C 45 10 47 9 SRO-U MAJ 78 9 9 11 5 2 2 1 TS - 46 - 2 0 2 2 RX 2 2 1 3 1 1 0 RO NOR 1 - 2 2 1 1 1 SRO-I 3457 4 4 2 (12) I/C 3459 3 8 10 10 12 SRO-U MAJ 78 9 9 11 5 2 2 1 TS 6 - 68 3 0 2 2 RX - - 1 1 1 1 0 RO (9) NOR 1 1 - 2 1 1 1 SRO-I I/C 39 57 35 5 4 4 2 SRO-U MAJ 78 9 9 11 5 2 2 1 TS - - - 0 0 2 2 RX 1 1 0 RO NOR 1 1 1 SRO-I I/C 4 4 2 SRO-U MAJ 2 2 1 TS 0 2 2 Instructions:
- 1. Check the applicant level and enter the operating test number and Form ES-D-1 event numbers for each event type; TS are not applicable for RO applicants. ROs must serve in both the at-the-controls (ATC) and balance-of-plant (BOP) positions. Instant SROs must serve in both the SRO and the ATC positions, including at least two instrument or component (I/C) malfunctions and one major transient, in the ATC position. If an Instant SRO additionally serves in the BOP position, one I/C malfunction can be credited toward the two I/C malfunctions required for the ATC position.
- 2. Reactivity manipulations may be conducted under normal or controlled abnormal conditions (refer to Section D.5.d) but must be significant per Section C.2.a of Appendix D. (*) Reactivity and normal evolutions may be replaced with additional instrument or component malfunctions on a 1-for-1 basis.
- 3. Whenever practical, both instrument and component malfunctions should be included; only those that require verifiable actions that provide insight to the applicants competence count toward the minimum requirements specified for the applicants license level in the right-hand columns.
- 4. For licensees that use the ATC operator primarily for monitoring plant parameters, the chief examiner may place SRO-I applicants in either the ATC or BOP position to best evaluate the SRO-I in manipulating plant controls.
ES-301, Page 26 of 27
ES-301 Transient and Event Checklist Form ES-301-5 CREW 7 Facility: LaSalle Date of Exam: 10/17/16 Operating Test Number: NRC 15-1 A E Scenarios P V 4 6 7 -
P E T M L N CREW CREW CREW CREW O I I T POSITION POSITION POSITION POSITION T N C A I A T S A B S A B S A B S A B L M N Y R T O R T O R T O R T O U T P O C P O C P O C P O C P M(*)
E R I U RX 2 6 1 3 1 1 0 RO NOR 1 1 - 2 1 1 1 SRO-I 4 4 2 (10) I/C 3459 23479 35 11 SRO-U MAJ 78 8 10 9 11 6 2 2 1 TS 6 5 - 2 0 2 2 RX 2 - 1 1 1 0 RO (7) NOR - 1 1 1 1 1 SRO-I I/C 45 23 4 4 4 2 SRO-U MAJ 78 8 10 4 2 2 1 TS - - 0 0 2 2 RX - 6 - 1 1 1 0 RO (8) NOR 1 - 2 2 1 1 1 SRO-I I/C 39 47 47 6 4 4 2 SRO-U MAJ 78 8 10 9 11 6 2 2 1 TS - - - 0 0 2 2 RX 1 1 0 RO NOR 1 1 1 SRO-I I/C 4 4 2 SRO-U MAJ 2 2 1 TS 0 2 2 Instructions:
- 1. Check the applicant level and enter the operating test number and Form ES-D-1 event numbers for each event type; TS are not applicable for RO applicants. ROs must serve in both the at-the-controls (ATC) and balance-of-plant (BOP) positions. Instant SROs must serve in both the SRO and the ATC positions, including at least two instrument or component (I/C) malfunctions and one major transient, in the ATC position. If an Instant SRO additionally serves in the BOP position, one I/C malfunction can be credited toward the two I/C malfunctions required for the ATC position.
- 2. Reactivity manipulations may be conducted under normal or controlled abnormal conditions (refer to Section D.5.d) but must be significant per Section C.2.a of Appendix D. (*) Reactivity and normal evolutions may be replaced with additional instrument or component malfunctions on a 1-for-1 basis.
- 3. Whenever practical, both instrument and component malfunctions should be included; only those that require verifiable actions that provide insight to the applicants competence count toward the minimum requirements specified for the applicants license level in the right-hand columns.
- 4. For licensees that use the ATC operator primarily for monitoring plant parameters, the chief examiner may place SRO-I applicants in either the ATC or BOP position to best evaluate the SRO-I in manipulating plant controls.
ES-301, Page 26 of 27
ES-301 Transient and Event Checklist Form ES-301-5 CREW 8 Facility: LaSalle Date of Exam: 10/17/16 Operating Test Number: NRC 15-1 A E Scenarios P V 5 6 7 -
P E T M L N CREW CREW CREW CREW O I I T POSITION POSITION POSITION POSITION T N C A I A T S A B S A B S A B S A B L M N Y R T O R T O R T O R T O U T P O C P O C P O C P O C P M(*)
E R I U RX 2 6 1 3 1 1 0 RO NOR 1 1 - 2 1 1 1 SRO-I 3578 4 4 2 (13) I/C 10 23479 35 12 SRO-U MAJ 9 8 10 9 11 5 2 2 1 TS 46 5 - 3 0 2 2 RX 2 - 1 1 1 0 RO (11) NOR - 1 1 1 1 1 SRO-I I/C 3 8 10 23 5 4 4 2 SRO-U MAJ 9 8 10 3 2 2 1 TS - - 0 0 2 2 RX - 6 - 1 1 1 0 RO (10) NOR 1 - 2 2 1 1 1 SRO-I I/C 57 47 47 6 4 4 2 SRO-U MAJ 9 8 10 9 11 5 2 2 1 TS - - - 0 0 2 2 RX 1 1 0 RO NOR 1 1 1 SRO-I I/C 4 4 2 SRO-U MAJ 2 2 1 TS 0 2 2 Instructions:
- 1. Check the applicant level and enter the operating test number and Form ES-D-1 event numbers for each event type; TS are not applicable for RO applicants. ROs must serve in both the at-the-controls (ATC) and balance-of-plant (BOP) positions. Instant SROs must serve in both the SRO and the ATC positions, including at least two instrument or component (I/C) malfunctions and one major transient, in the ATC position. If an Instant SRO additionally serves in the BOP position, one I/C malfunction can be credited toward the two I/C malfunctions required for the ATC position.
- 2. Reactivity manipulations may be conducted under normal or controlled abnormal conditions (refer to Section D.5.d) but must be significant per Section C.2.a of Appendix D. (*) Reactivity and normal evolutions may be replaced with additional instrument or component malfunctions on a 1-for-1 basis.
- 3. Whenever practical, both instrument and component malfunctions should be included; only those that require verifiable actions that provide insight to the applicants competence count toward the minimum requirements specified for the applicants license level in the right-hand columns.
- 4. For licensees that use the ATC operator primarily for monitoring plant parameters, the chief examiner may place SRO-I applicants in either the ATC or BOP position to best evaluate the SRO-I in manipulating plant controls.
ES-301, Page 26 of 27