ML17080A184

From kanterella
Jump to navigation Jump to search
2017-02 Draft Outline Comments
ML17080A184
Person / Time
Site: Arkansas Nuclear  Entergy icon.png
Issue date: 02/22/2017
From: Vincent Gaddy
Operations Branch IV
To:
Entergy Operations
References
Download: ML17080A184 (2)


Text

DRAFT OUTLINE COMMENTS Facility: ANO Unit 2 First Exam Date: Feb 10, 2017 Written Exam Outline (Date)

Comment Resolution 1 None Administrative JPM Outline (Date)

Comment Resolution A1/A5. Ensure that there are no dilution No dilution activities in the scenarios that are 1

activities in the simulator scenarios. similar in nature to the admin JPMs.

Control Room / In-Plant System JPM Outline (Date)

Comment Resolution On the ES-301-2 forms, indicate the Added total number of type code attributes.

1 total number of attributes (type code criteria)

Simulator Scenario Outline Comments (Date)

Comment Resolution Scenario 1. If one MFP trips, how is One Feed pump automatically trips when the 1 there a loss of all feedwater when the reactor / turbine trips.

second EFW pump fails?

All of the scenarios state, All Removed All Engineered Safety Features 2 Engineered Safety Features systems systems are in standby from all D-1 forms.

are in standby except Scenario 1. OBDI 202 - IOLE Process Rev 2

Schedule:

Needs to show a designated lunch period (approximately 45 minutes) each day.

Should show 30 minutes between the end of one scenario and the start of the other.

Instead of Hedger, examiner 5 will be Chris Steely.

On Monday, have E1 and E3 in the simulator.

On Monday, have start time at 9:00 am.

On Tuesday - Friday, have start time at 7:30 am.

Keeping examiner designators and crew assignments the same, make the assignments: R1/E2, R2/E3, R3/E2, R4/E1, R5/E5, R6/E3, R7/E5, R8/E4, R9/E3, R10/E5, U1/E4, U2/E4, U3/E1 Crew Applicant/Examiner Assignments # of scenarios 1 U1/E4 R1/E2 R2/E3 2 2 U2/E4 R3/E2 R4/E1 2 3 Su R5/E5 R6/E3 2 4 Su R7/E5 R8/E4 2 5 U3/E1 R9/E3 R10/E5 2 OBDI 202 - IOLE Process Rev 2