Supplemental Information Regarding Proposed Changes to Technical Specifications Section 6.0 Administrative Controls for Permanently Defueled Condition
ML17060A436
Person / Time
Site: Oyster Creek
Issue date: 03/01/2017
From: Gallagher M
Exelon Generation Co
To:
Document Control Desk, Office of Nuclear Material Safety and Safeguards, Office of Nuclear Reactor Regulation
References
RA-17-018
Download: ML17060A436 (39)


Text

Michael P. Gallagher Exelon Nuclear Vice President Exelon Generation ~ License Renewal and Decomm1ss1onmg 200 Exelon Way Kennett Square. PA 19348 610 765 5958 Office 610 765 5658 Fax www.exeloncorp.com m1chaelp.gallagher@exeloncorp.com 10 CFR 50.90 RA-17-018 March 1, 2017 U.S. Nuclear Regulatory Commission ATTN: Document Control Desk Washington, DC 20555 Oyster Creek Nuclear Generating Station Renewed Facility Operating License No. DPR-16 NRG Docket Nos. 50-219 and 72-15

Subject:

Supplemental Information Regarding Proposed Changes to Technical Specifications Section 6.0 Administrative Controls for Permanently Def ueled Condition

References:

1) Letter from Michael P. Gallagher (Exelon Generation Company, LLC) to U.S. Nuclear Regulatory Commission - "License Amendment Request- Proposed Changes to Technical Specifications Section 6.0 Administrative Controls for Permanently Defueled Condition," dated May 17, 2016 (ML16138A129)
2) Letter from Michael P. Gallagher (Exelon Generation Company, LLC) to U.S. Nuclear Regulatory Commission - "Response to Request for Additional Information and Supplemental Information Regarding Proposed Changes to Technical Specifications Section 6.0 Administrative Controls for Permanently Defueled Condition," dated November 2, 2016 (ML16308A029)

By letter dated May 17, 2016 (Reference 1), Exelon Generation Company, LLC (Exelon) submitted a License Amendment Request (LAA) for Oyster Creek Nuclear Generating Station (OCNGS). The LAA proposed changes to the organization, staffing, and training requirements contained in Section 6.0, Administrative Controls, of the OCNGS Technical Specifications (TS) to support the transition of the OCNGS facility to a permanently defueled condition.

In Reference 2, Exelon responded to a Request for Additional Information (RAI) from the U.S. Nuclear Regulatory Commission's (NRG) and provided a supplement requesting additional proposed administrative changes to the LAA. During a teleconference between Exelon and the NRG on February 21, 2017, two items from the Reference 2 submission

U.S. Nuclear Regulatory Commission Supplemental Information to OCNGS License Amendment Request Docket Nos. 50-219 and 72-15 March 1, 2017 Page2 were discussed. A legacy issue was identified where the title of a specification listed in the TS Table of Contents did not match the title of the specification. Further, the supplement (Reference 2) requested an editorial change to a specification that was not required.

Based on this discussion, Exelon determined to further supplement the LAR.

Accordingly, Attachment 1 of this letter contains the supplemental information in support of this amendment request. Attachment 2 includes the revised Technical Specifications page mark-ups and Attachment 3 contains clean re-typed TS pages. The clean TS pages being submitted in this letter supersede in entirety those submitted in Reference 2.

Exelon has reviewed the information supporting a finding of no significant hazards consideration and the environmental consideration provided to the NRC in Reference 1.

The additional information provided in this response does not affect the bases for concluding that the proposed license amendment does not involve a significant hazards consideration. Furthermore, the additional information provided in this response does not affect the bases for concluding that neither an environmental impact statement nor an environmental assessment needs to be prepared in connection with the proposed amendment.

There are no regulatory commitments contained in this submittal.

If you have any questions concerning this submittal, please contact Paul Bonnett at (610) 765-5264.

I declare under penalty of perjury that the foregoing is true and correct. Executed on the 51 1 day of March 2017.

Respectfully, Michael P. Gallagher Vice President, License Renewal & Decommissioning Exelon Generation Company, LLC Attachments: 1) Supplemental Information Regarding Proposed Changes to Technical Specifications Section 6.0 Administrative Controls for Permanently Defueled Condition

2) Revised Technical Specifications Page Mark-ups
3) Clean Re-typed Technical Specifications Pages cc: w/ Attachments Regional Administrator - NRC Region I NRC Senior Resident Inspector - Oyster Creek Nuclear Generating Station NRC Project Manager - Oyster Creek Nuclear Generating Station Director, Bureau of Nuclear Engineering, New Jersey Department of Environmental Protection Mayor of Lacey Township, Forked River, New Jersey

ATTACHMENT 1 Supplemental Information Regarding Proposed Changes to Technical Specifications Section 6.0 Administrative Controls for Permanently Defueled Condition Oyster Creek Nuclear Generating Station Docket Nos. 50-219 and 72-15 Supplemental Information to OCNGS LAA Docket Nos. 50-219 and 72-15 Page 1 of 2 ATTACHMENT 1 Supplemental Information Regarding Proposed Changes to Technical Specifications Section 6.0 Administrative Controls for Permanently Defueled Condition Oyster Creek Nuclear Generating Station Docket Nos. 50-219 and 72-15 PROPOSED SUPPLEMENTAL CHANGES Table of Contents Current Proposed TS Proposed Supplement TS 6.21 Technical Specification (TS) Bases 6.21 Technical Specifications (TS) Bases Control Program Control Proaram BASIS The proposed change corrects a legacy issue between the title of TS 6.21 listed in the Table of Contents and the title of TS 6.21 "Technical Specifications (TS) Bases Control Program." The corrected title is consistent with NUREG-1433, "Standard Technical Specifications General Electric BWR/4 Plants" Revision 4. This change is considered to be editorial in nature.

TS Section 6.21 - Technical Specifications (TS) Bases Control Program Current Proposed TS Proposed Supplement TS 6.21 Technical Specifications (TS) Bases 6.21 +esl=!Risal S~esifisatieRs {+S) Bases Control Program ~:-~-:* n--:~::=- TECHNICAL SPECIFICATIONS tTS) BASES CONTROL PROGRAM BASIS The proposed change corrects the format of the title from "Technical Specifications (TS) Bases Control Program" to all capitals letters "TECHNICAL SPECIFICATION (TS} BASES CONTROL PROGRAM." Further, this change corrects a legacy issue between this specification and the Table of Contents. This chanae is considered to be editorial in nature.

TS Section 6.22 - Control Room Envelope Habitability Program Current Proposed TS Proposed Supplement TS

o. Req1:1it=EJff1ents fer (i) deterfflining the 6.

1:1n##ered air in!eakage past the CRE bo1:1ndary into the d.

Supplemental Information to OCNGS LAA Docket Nos. 50-219 and 72-15 Page 2 of 2 TS Section 6.22- Control Room Envelope Habitability Program CuFFeRt PFepesed :i:s PFepesed SupplemeRt +s GEJide 1.197, "Q.eFRBRst::a#Rg GeRt.t:e! "QemeAstFatiAJ GeAtFel ReeFA eA1.ielei:ie RBBFR &1YB~B IRtsgfity. at A.4Js.JeaF- PB'llfH 1Ate)Fity at ti.JblsleaF Pe1,yeF ReasteFs,"

ReastBFB, " R-ev.isiBR Q, May ~gg~, aRd fi*9 ~ei.iisieA G, May aGGa, aAEI (ii) assessiAJ assessiRfJ Gfle Ral:J#atJ#ity. at IRe G~e l=laeitaeility at tl=le fFSEfbleAsies ffeEflJBRGiBB spesi#BG iR aBG#BRS G. 1 aREI si:iesifieEI iA SestieAs G.~ aAEI G.a ef G.~ el Reg1JlaW17' G1Jide 1.197, R-ev.isieR Q. Re§bllateiy Gb!iEle ~ .~ 97, ~ei.iisieA Q.

BASIS This proposed change for TS 6.22.c was requested in Reference 2. The change is unnecessary; therefore, Exelon retracts this proposed change. This specification was oreviouslv aooroved as part of TS Amendment 265.

REFERENCES

1. Letter from Michael P. Gallagher (Exelon Generation Company, LLC} to U.S. Nuclear Regulatory Commission - "License Amendment Request- Proposed Changes to Technical Specifications Section 6.0 Administrative Controls for Permanently Defueled Condition," dated May 17, 2016 (ML16138A129)
2. Letter from Michael P. Gallagher (Exelon Generation Company, LLC) to U.S. Nuclear Regulatory Commission - "Response to Request for Additional Information and Supplemental Information Regarding Proposed Changes to Technical Specifications Section 6.0 Administrative Controls for Permanently Defueled Condition," dated November 2, 2016 (ML16308A029)

ATTACHMENT 2 Revised Technical Specifications Page Mark-ups Oyster Creek Nuclear Generating Station Renewed Facility Operating License No. DPR-16 NRC Docket No. 50*219 Proposed supplemental page changes to the administrative requirements for the OCNGS staff contained in Section 6.0, Administrative Controls, of the OCNGS Technical Specifications (TS) are indicated by a box/cloud designation. The marked-up TS pages below supersede the affected marked-up pages previously submitted.

TS Pages ii iii 1.0-9 6-10 6-11 6-12 6-13 6-16 6-17 6-18 6-19 6-20 6-21 6-22 6-23

TABLE OF CONTENTS (Cont'd) 1.52 Certified Fuel Handler Page 1.53 Non-Certified Operator 1.44 Local Linear Heat Generation Rate 1.0-8 1.45 Shutdown Margin (SDM) 1.0-8 1.46 Idle Recirculation Loop 1.0-8 1.47 Isolated Recirculation Loop 1.0-8 1.48 Operational Condition 1.0-8 1.49 Rated Thermal Power 1.0-9 1.50 Thermal Power 1.0-9 1.51 Pressure and Temperature Limits Report (PTLR) 1.0-9 Section 2 Safety Limits and Limiting Safety System Settings 2.1 Safety Limit - Fuel Cladding Integrity 2.1-1 2.2 Safety Limit - Reactor Coolant System Pressure 2.2-1 2.3 Limiting Safety System Settings 2.2-3 Section 3 Limiting Conditions for Operation 3.0 Limiting Conditions for Operation (General) 3.0-1 3.1 Protective Instrumentation 3.1-1 3.2 Reactivity Control 3.2-1 3.3 Reactor Coolant 3.3-1 3.4 Emergency Cooling 3.4-1 3.5 Containment 3.5-1 3.6 Radioactive Effluents 3.6-1 3.7 Auxiliary Electrical Power 3.7-1 3.8 Isolation Condenser 3.8-1 3.9 Refueling 3.9-1 3.10 Core Limits 3.10-1 3.11 (Not Used) 3.11-1 3.12 Alternate Shutdown Monitoring Instrumentation 3.12-1 3.13 Accident Monitoring Instrumentation 3.13-1 3.14 DELETED 3.14-1 3.15 Explosive Gas Monitoring Instrumentation 3.15-1 3.16 (Not Used) 3.16-1 3.17 Control Room Heating, Ventilating and Air Conditioning System 3.17-1 Section 4 Surveillance Requirements 4.0 Surveillance Requirement Applicability 4.0-1 4.1 Protective Instrumentation 4.1-1 4.2 Reactivity Control 4.2-1 4.3 Reactor Coolant 4.3-1 4.4 Emergency Cooling 4.4-1 4.5 Containment 4.5-1 4.6 Radioactive Effluents 4.6-1 4.7 Auxiliary Electrical Power 4.7-1 4.8 Isolation Condenser 4.8-1 4.9 Refueling 4.9-1 OYSTER CREEK ii Amendment No.: 166, 185, 186, 241, 266, 269

TABLE OF CONTENTS (cont'd)

Page 4.10 ECCs Related Core Limits 4.10-1 4.11 Sealed Source Contamination 4.11-1 4.12 Alternate Shutdown Monitoring Instrumentation 4.12-1 4.13 Accident Monitoring Instrumentation 4.13-1 4.14 DELETED 4.14-1 4.15 Explosive Gas Monitoring Instrumentation 4.15-1 4.16 (Deleted) 4.16-1 4.17 Control Room Heating, Ventilating and Air Conditioning System 4.17-1 Section 5 Design Features 5.1 Site 5.1-1 5.2 Containment 5.2-1 5.3 Auxiliary Equipment 5.3-1 Section 6 Administrative Controls 6.1 Responsibility 6-1 6.2 Organization 6-1 6.3 Facility Staff Qualifications 6-2a 6.4 DELETED 6-3 2 6.5 DELETED 6-3 6-6 Reportable Event Action DELETED 6-9 6-7 Safety Limit Violation 6-9 3 6-8 Procedures and Programs 6-10 6-9 Reporting Requirements 6-13 6 6-10 Record Retention 6-17 8 6-11 Radiation Protection Program 6-18 9 6-12 (Deleted) 6-18 6-13 High Radiation Area 6-18 6-14 Environmental Qualification 6-19* 10 6-15 Integrity of Systems Outside Containment 6-19 6-16 Iodine Monitoring 6-19 11 6-17 Post Accident Sampling DELETED 6-20 6-18 Process Control Plan 6-20 6-19 Offsite Dose Calculation Manual Specifications 6-20 12 6-20 DELETED 6-20 6-21 Technical Specification (TS) Bases Control Program 6-21 6-22 Control Room Envelope Habitability Program 6-21 13 6-23 Reactor Coolant System (RCS) PRESSURE AND TEMPERATURE LIMITS REPORT (PTLR) 6-22 14 6.24 Surveillance Frequency Control Program 6-23 6.25 Snubber Inspection Program 6-23

  • Issued by NRC Order dated 10-24-80 OYSTER CREEK iii Amendment No.: 94, 97, 98,108,115, 134,166,186, 232, 240,241,265, 269,273, 276, 286

1.49 RATED THERMAL POWER (RTP)

RTP shall be a total reactor core heat transfer rate to the reactor coolant of 1930 MWt.

1.50 THERMAL POWER THERMAL POWER shall be the total reactor core heat transfer rate to the reactor coolant.

1.51 PRESSURE AND TEMPERATURE LIMITS REPORT (PTLR)

The PTLR is the unit specific document that provides the reactor vessel pressure and temperature limits, including heatup and cooldown rates, for the current reactor vessel fluence period. These pressure and temperature limits shall be determined for each fluence period in accordance with Specification 6.23.

1.52 CERTIFIED FUEL HANDLER A CERTIFIED FUEL HANDLER is an individual who complies with provisions of the CERTIFIED FUEL HANDLER training program required by Specification 6.3.2.

1.53 NON-CERTIFIED OPERATOR A NON-CERTIFIED OPERATOR is a non-licensed operator who complies with the qualification requirements of Specification 6.3.1, but is not a CERTIFIED FUEL HANDLER.

OYSTER CREEK 1.0-9 Amendment No. 266, 269

6.8 PROCEDURES AND PROGRAMS 6.8.1 Written procedures shall be established, implemented, and maintained covering the items referenced below:

applicable to safe storage of nuclear fuel

a. The applicable procedures recommended in Appendix "A" of Regulatory Guide 1.33 as referenced in the QATR.
b. Surveillance and test activities of equipment that affects nuclear safety and radioactive waste management equipment.

Fuel Handling

c. Refueling Operations.
d. Security Plan Implementation.
e. Fire Protection Program Implementation.
f. Emergency Plan Implementation.
g. Process Control Plan Implementation.
h. Offsite Dose Calculation Manual Implementation.
i. Quality Assurance Program for effluent and environmental monitoring using the guidance in Regulatory Guide 4.15, Revision 1.
j. Plant Staff Overtime pursuant to Technical Specification 6.2.2.2(i), above.

6.8.2 Each procedure required by 6.8.1 above, and substantive changes thereto, shall be reviewed and approved prior to implementation and shall be reviewed periodically as set forth in administrative procedures.

6.8.3 Temporary changes to procedures of 6.8.1, above, may be made provided:

a. The intent of the original procedure is not altered; facility
b. The change is approved by two members of the licensee's management staff knowledgeable in the area affected by the procedure. For changes which may affect the operational status of unit systems or equipment, at least one of these individuals shall be a member of unit management or supervision holding a Senior Reactor Operator's License on the unit.

operations

c. The change is documented, reviewed and approved within 14 days of implementation.

who is a CERTIFIED FUEL HANDLER.

69,78,89,108,117,125,134,161, 180,181,194,203,210,213,224,232,251,273, 6-3 OYSTER CREEK 6-10 Amendment No.: 69, 78, 84, 108, 125, 134, 161, 166, 210, 213, 251, 273

6.8.4 The following programs shall be established, implemented and maintained:

a. Radioactive Effluent Controls Program A program shall be provided conforming with 10 CFR 50.36a for the control of radioactive effluent and for maintaining the doses to MEMBERS OF THE PUBLIC from radioactive effluent as low as reasonably achievable. The program (1) shall be contained in the ODCM, (2) shall be implemented by operating procedures, and (3) shall include remedial actions to be taken whenever the program limits are exceeded. The program shall include the following elements:
1. Limitations on the operability of radioactive liquid and gaseous monitoring instrumentation including the surveillance tests and setpoint determination in accordance with the methodology in the ODCM,
2. Limitations on the concentrations of radioactive material released in liquid effluent to the UNRESTRICTED AREA conforming to less than the concentration values in Appendix B, Table 2, Column 2 to 10 CFR 20.1001-20.2402.
3. Monitoring, sampling, and analysis of radioactive liquid and gaseous effluent in accordance with 10 CFR 20.1302 and with the methodology and parameters in the ODCM.
4. Limitations on the annual and quarterly doses and dose commitment to a MEMBER OF THE PUBLIC from radioactive materials in liquid effluent released to the UNRESTRICTED AREA conforming to Appendix I of 10 CFR 50,
5. Determination of cumulative dose contributions from radioactive effluents for the current calendar quarter and current calendar year in accordance with the methodology and parameters in the ODCM at least every 31 days. Determination of projected dose contributions from radioactive effluents in accordance with the methodology in the ODCM at least every 31 days.
6. Limitations on the operability and use of the liquid and gaseous effluent treatment systems to ensure that the appropriate portions of these systems are used to reduce releases of radioactivity when the projected doses in the 31 day period would exceed 2 percent of the guidelines for the annual dose or dose commitment conforming to Appendix I to 10 CFR 50,
7. Limitations on the dose rate resulting from radioactive materials released in gaseous effluents from the site to the UNRESTRICTED AREA shall be limited to the following:
a. For noble gases: Less than or equal to a dose rate of 500 mRems/yr to the total body and less than or equal to a dose rate of 3000 mRems/yr to the skin, and
b. For iodine-131, iodine-133, tritium, and for all radionuclides in particulate form with half-lives greater than 8 days: Less than or equal to a dose rate of 1500 mRems/yr to any organ.
8. Limitations on the annual and quarterly air doses resulting from noble gases released in gaseous effluents to the UNRESTRICTED AREA conforming to Appendix I of 10 CFR 50, 6-4 OYSTER CREEK 6-11 Amendment No.: 272

I-131, I-133

9. Limitations on the annual and quarterly doses to a MEMBER OF THE PUBLIC from 1-131, 1-133, tritium, and all radionuclides in particulate form with half-lives greater than 8 days in gaseous effluent released beyond the SITE BOUNDARY conforming to Appendix I of 10 CFR 50,
10. Limitations on the annual dose or dose commitment to any MEMBER OF THE PUBLIC due to releases of radioactivity and to radiation from Uranium fuel cycle sources conforming to 40 CFR Part 190.
b. Radiological Environmental Monitoring Program A program shall be provided to monitor the radiation and radionuclides in the environs of the plant. The program shall provide (1) representative measurements of radioactivity in the highest potential exposure pathways, and (2) verification of the accuracy of the effluent monitoring program and modeling of environmental exposure pathways. The program shall (1) be contained in the ODCM, (2) conform to the guidance of Appendix I to 10 CFR Part 50, and (3) include the following:
1. Monitoring, sampling, analysis, and reporting of radiation and radionuclides in the environment in accordance with the methodology and parameters in the ODCM,
2. A Land Use Census to ensure that changes in the use of areas at and beyond the SITE BOUNDARY are identified and that modifications to the monitoring program are made if required by the results of this census, and
3. Participation in an Interlaboratory Comparison Program to ensure that independent checks on the precision and accuracy of the measurements of radioactive materials in environmental sample matrices are performed as part of the quality assurance program for environmental monitoring.

6.8.5 Station Battery Monitoring and Maintenance Program This Program provides for restoration and maintenance, based on the recommendations of IEEE Standard 450, IEEE Recommended Practice for Maintenance, Testing, and Replacement of Vented Lead-Acid Batteries For Stationary Applications, of the following:

a. Actions to restore station battery cells with float voltage < 2.13 volts, and
b. Actions to equalize and test station battery cells that have been discovered with electrolyte level below the top of the plates.

6-5 OYSTER CREEK 6-12 Amendment No.: 69,78,84,108,125,134,166,205,245 Corrected by letter of 10/15/2004

6.9 REPORTING REQUIREMENTS In addition to the applicable reporting requirements of 10 CFR, the following identified reports shall be submitted to the Administrator of the NRC Region I office unless otherwise noted.

Routine Reports 6.9.1 ROUTINE REPORTS

a. Startup Report. A summary report of plant startup and power escalation testing shall be submitted following (1) receipt of an operating license, (2) amendment to the license involving a planned increase in power level, (3) installation of fuel that has a different design or has been manufactured by a different fuel supplier, and (4) modifications that may have significantly altered the nuclear, thermal, or hydraulic performance of the DELETED plant. The report shall address each of the tests identified in the FSAR and shall in general include a description of the measured values of the operating conditions or characteristics obtained during the test program and a comparison of these values with design predictions and specifications. Any corrective actions that were required to obtain satisfactory operation shall also be described. Any additional specified details required in license conditions based on other commitments shall be included in this report.

Startup reports shall be submitted within (1) 90 days following completion of the startup test program, (2) 90 days following resumption or commencement of commercial power operation, or (3) 9 months following initial criticality, whichever is earliest. If the Startup Report does not cover all three events (i.e., initial criticality, completion of startup test program, and resumption or commencement of commercial power operation),

supplementary reports shall be submitted at least every three months until all three events have been completed.

b. DELETED
c. DELETED 6-6 OYSTER CREEK 6-13 Amendment No.: 69,78,84,108,125, 134,166,183,191, 254

Unique Reporting 6.9.3 UNIQUE REPORTING REQUIREMENTS Requirements Special reports shall be submitted to the Director of Regulatory Operations Regional Office within the time period specified for each report. These reports shall be submitted covering the activities identified below pursuant to the requirements of the applicable reference specification.

a. Materials Radiation Surveillance Specimen Reports (4.3A)
b. (Deleted)
c. Results of required leak tests performed on sealed sources if the tests reveal the presence of 0.005 microcuries or more of removable contamination.
d. Deleted e-j. Pursuant to the ODCM.
k. Records of results of analyses required by the Radiological Environmental Monitoring Program.
l. Failures and challenges to Relief and Safety Valves which do not constitute an LER will be the subject of a special report submitted to the Commission within 60 days of the occurrence. A challenge is defined as any automatic actuation (other than during surveillance or testing) of Safety or Relief Valves.
m. Plans for compliance with standby liquid control Specifications 3.2.C.3(b) and 3.2.C.3(e)(1) or plans to obtain enrichment test results per Specification 4.2.E.5.
n. Inoperable high range radioactive noble gas effluent monitor (3.13.H) 6-7 OYSTER CREEK 6-16 Amendment No.: 134, 137, 161, 166, 186, 217

6.10 RECORD RETENTION 6.10.1 The following records shall be retained for at least five years:

a. Records and logs of facility operation covering time interval at each power level.
b. Records and logs of principle maintenance activities, inspections, repair and replacement of principal items of equipment related to nuclear safety.
c. All Licensee Event Reports.
d. Records of surveillance activities, inspections and calibrations required by these technical specifications.
e. Records of reactor tests and experiments.
f. Records of changes made to operating procedures.
g. Deleted.
h. Records of sealed source leak tests and results.
i. Records of annual physical inventory of all source material of record.

6.10.2 The following records shall be retained for the duration of the Facility Operating License:

a. Record and drawing changes reflecting facility design modifications made to systems and equipment described in the Final Safety Analysis Report.
b. Records of new and irradiated fuel inventory, fuel transfers and assembly burnup histories.
c. Records of facility radiation and contamination surveys.
d. Records of doses received by all individuals for whom monitoring was required entering radiation control areas.
e. Records of gaseous and liquid radioactive material released to the environs.
f. Records of transient or operational cycles for those facility components designed for a limited number of transients or cycles.
g. Records of training and qualification for current members of the plant staff.
h. Records of inservice inspections performed pursuant to these technical specifications.
i. Records of reviews performed for changes made to procedures or equipment or reviews of tests and experiments pursuant to 10 CFR 50.59.
j. Deleted.

6-8 OYSTER CREEK 6-17 Amendment No.: 69, 108, 177, 134, 166, 191, 251

k. Records of Environmental Qualification which are covered under the provisions for paragraph 6.14.
l. Deleted.
m. Records of results of analyses required by the Radiological Environmental Monitoring Program.
n. Records of reviews performed for changes made to the OFFSITE DOSE CALCULATION MANUAL and the PROCESS CONTROL PLAN.
o. Records of radioactive shipments 6.10.3 Quality Assurance Records shall be retained as specified by the QATR.

6.11 RADIATION PROTECTION PROGRAM Procedures for personnel radiation protection shall be prepared consistent with the requirements of 10 CFR 20 and shall be approved, maintained and adhered to for all operations involving personnel radiation exposure.

6.12 (Deleted) 6.13 HIGH RADIATION AREA 6.13.1 In lieu of the "control device" or "alarm signal" required by Section 20.1601 of 10 CFR 20, each high radiation area in which the intensity of radiation at 30 cm (11.8 in.) is greater than deep dose equivalent of 100 mRem/hr but less than 1,000 mRem/hr shall be barricaded and conspicuously posted as a high radiation area and entrance thereto shall be controlled by requiring issuance of a Radiation Work Permit (RWP).

NOTE: Health Physics personnel shall be exempt from the RWP issuance requirement during the performance of their assigned radiation protection duties, provided they are following plant radiation protection procedures for entry into high radiation areas.

An individual or group of individuals permitted to enter such areas shall be provided with one or more of the following:

a. A radiation monitoring device which continuously indicates the radiation dose rate in the area.
b. A radiation monitoring device which continuously integrates the radiation dose rate in the area and alarms when a pre-set integrated dose is received. Entry into such areas with this monitoring device may be made after the dose rate levels in the area have been established and personnel have been made knowledgeable of them.
c. A health physics qualified individual (i.e., qualified in radiation protection procedures) with a radiation dose rate monitoring device who is responsible for providing positive exposure control over the activities within the area and who will perform periodic radiation surveillance at the frequency in the RWP. The surveillance frequency will be established by the management position responsible for radiological controls.

69,78,84,117,134,203, 210,213,251, 6-9 OYSTER CREEK 6-18 Amendment No.: 69,100,108,134,166, 191,210,213,251, 286

6.13.2 Specification 6.13.1 shall also apply to each high radiation area in which the intensity of radiation is greater than deep dose equivalent of 1,000 mRem/hr at 30 cm (11.8 in.) but less than 500 rads in 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br /> at 1 meter (3.28 ft.) from sources of radioactivity. In addition, locked doors shall be provided to prevent unauthorized entry into such areas and the keys shall be maintained under the administrative control of operations and/or radiation protection supervision on duty.

6.14 ENVIRONMENTAL QUALIFICATION A. By no later than June 30, 1982 all safety-related electrical equipment in the facility shall be qualified in accordance with the provisions of: Division of Operating Reactors "Guidelines for Evaluating Environmental Qualification of Class IE Electrical Equipment in Operating Reactors" (DOR Guidelines); or, NUREG-0588 "Interim Staff Position of Environmental Qualification of Safety-Related Electrical Equipment," December 1979. Copies of these documents are attached to Order for Modification of License DPR-16 dated October 24, 1980.

B. By no later than December 1, 1980, complete and auditible records must be available and maintained at a central location which describe the environmental qualification method used for all safety-related electrical equipment in sufficient detail to document the degree of compliance with the DOR Guidelines or NUREG-0588. Thereafter, such records should be updated and maintained current as equipment is replaced, further tested, or otherwise further qualified.

6.15 INTEGRITY OF SYSTEMS OUTSIDE CONTAINMENT The licensee shall implement a program to reduce leakage from systems outside containment that would or could contain highly radioactive fluids during a serious transient or accident to as low as practical levels. This program shall include the following:

1. Provisions establishing preventative maintenance and periodic visual inspection requirements, and
2. System leak test requirements, to the extent permitted by system design and radiological conditions, for each system at a frequency of once every 24 months. The systems subject to this testing are (1) Core Spray, (2) Containment Spray, (3) Reactor Water Cleanup, (4) Isolation Condenser, and (5) Shutdown Cooling.

6.16 IODINE MONITORING The licensee shall implement a program which will ensure the capability to accurately determine the airborne iodine concentration in vital areas* under accident conditions. This program shall include the following:

a. Training of personnel,
b. Procedures for monitoring, and
c. Provisions for maintenance of sampling and analysis equipment.
  • Areas requiring personnel access for establishing hot shutdown condition.

OYSTER CREEK 6-19 Amendment No.: 69,108,134,141,166,191 6-10 69,78,84,108,125,134,161, 166,210,213,251,273,

6.17 Deleted 6.18 PROCESS CONTROL PLAN

a. Licensee initiated changes to the PCP:
1. Shall be submitted to the NRC in the Annual Radioactive Effluent Release Report for the period in which the changes were made. This submittal shall contain:
a. sufficiently detailed information to justify the changes without benefit of additional or supplemental information;
b. a determination that the changes did not reduce the overall conformance of the solidified waste product to existing criteria for solid wastes; and
c. documentation that the changes have been reviewed and approved pursuant to Section 6.8.2.
2. Shall become effective upon review and approval by licensee management.

6.19 OFFSITE DOSE CALCULATION MANUAL

a. The ODCM shall be approved by the Commission prior to implementation.
b. Licensee initiated changes to the ODCM shall be submitted to the NRC in the Annual Radioactive Effluent Release Report for the period in which the changes were made. This submittal shall contain:
1. sufficiently detailed information to justify the changes without benefit of additional or supplemental information;
2. a determination that the changes did not reduce the accuracy or reliability of dose calculations or setpoint determination; and,
3. documentation that the changes have been reviewed and approved pursuant to Section 6.8.2.
c. Change(s) shall become effective upon review and approval by licensee management.

272, 6-11 OYSTER CREEK 6-20 Amendment No. 69,98,108,134,166,194,210,213,237

6.20 MAJOR CHANGES TO RADIOACTIVE WASTE TREATMENT SYSTEMS DELETED. TECHNICAL SPECIFICATIONS (TS) BASES CONTROL PROGRAM 6.21 Technical Specifications (TS) Bases Control Program This program provides a means for processing changes to the Bases of these Technical Specifications.

a. Changes to the Bases of the TS shall be made under appropriate administrative controls and reviews.
b. Licensees may make changes to Bases without prior NRC approval provided the changes do not require either of the following:
1. A change in the TS incorporated in the license or
2. A change to the updated FSAR (UFSAR) or Bases that requires NRC approval pursuant to 10 CFR 50.59.
c. The Bases Control Program shall contain provisions to ensure that the Bases are maintained consistent with the UFSAR.
d. Proposed changes that meet the criteria of Specification 6.21.b.1 or 6.21.b.2 above shall be reviewed and approved by the NRC prior to implementation. Changes to the bases implemented without prior NRC approval shall be provided to the NRC on a frequency consistent with 10 CFR 50.71(e). CONTROL ROOM ENVELOPE HABITABILITY PROGRAM 6.22 Control Room Envelope Habitability Program A Control Room Envelope (CRE) Habitability Program shall be established and implemented to ensure that CRE habitability is maintained such that, with an OPERABLE Control Room HVAC System, CRE occupants can control the reactor safely under normal conditions and maintain it in a safe condition following a radiological event, hazardous chemical release, or a smoke challenge.

The program shall ensure that adequate radiation protection is provided to permit access and occupancy of the CRE under design basis accident (DBA) conditions without personnel receiving radiation exposures in excess of a 30-day integrated dose of 5 rem TEDE. The program shall include the following elements:

a. The definition of the CRE and the CRE boundary.
b. Requirements for maintaining the CRE boundary in its design condition including configuration control and preventive maintenance.
c. Requirements for (i) determining the unfiltered air inleakage past the CRE boundary into the CRE in accordance with the testing methods and at the Frequencies specified in Sections C.1 and C.2 of Regulatory Guide 1.197, "Demonstrating Control Room Envelope Integrity at Nuclear Power Reactors," Revision 0, May 2003, and (ii) assessing CRE habitability at the frequencies specified in Sections C.1 and C.2 of Regulatory Guide 1.197, Revision 0.

69,78,84,108,125,134,166,205,245 Corrected by letter of 10/15/2004 6-12 OYSTER CREEK 6-21 Amendment No. 108, 166, 194, 240, 265

The following are exceptions to Sections C.1 and C.2 of Regulatory Guide 1.197, Revision 0:

1. The Oyster Creek CRE boundary operability is not dependent on a measured unfiltered air inleakage value (Reference Oyster Creek letter to NRC dated November 17, 2005, Letter No. 2130-05-20218). No inleakage testing for determining the unfiltered air inleakage past the CRE boundary into the CRE is required at the Oyster Creek site.
d. Measurement, at designated locations, of the CRE pressure relative to areas adjacent to the CRE boundary during the pressurization mode of operation by one subsystem (train) of the Control Room Ventilation System operating at the design flow rate, at a Frequency of 24 months. The results shall be trended and used as part of the 24 month assessment of the CRE boundary.
e. The unfiltered air inleakage limit for radiological challenges is the inleakage flow rate assumed in the licensing basis analyses of DBA consequences. Unfiltered air inleakage limits for hazardous chemicals must ensure that exposure of CRE occupants to these hazards will be within the assumptions in the licensing basis.
f. The provisions of Section 1.24 are applicable to the frequencies for assessing CRE habitability measuring CRE pressure and assessing the CRE boundary as required by paragraphs d and c, respectively.

REACTOR COOLANT SYSTEM 6.23 Reactor Coolant System (RCS) PRESSURE AND TEMPERATURE LIMITS REPORT (PTLR)

a. RCS pressure and temperature limits for heat up, cooldown, low temperature operation, criticality, and hydrostatic testing as well as heatup and cooldown rates shall be established and documented in the PTLR for the following:

i) Limiting Conditions for Operation Section 3.3, "Reactor Coolant" ii) Surveillance Requirements Section 4.3, "Reactor Coolant"

b. The analytical methods used to determine the RCS pressure and temperature limits shall be those previously reviewed and approved by the NRC, specifically those described in the following document:

i) SIR-05-044-A, "Pressure-Temperature Limits Report Methodology for Boiling Water Reactors"

c. The PTLR shall be provided to the NRC upon issuance for each reactor vessel fluence period and for any revision or supplement thereto.

69,78,84,108,125,134,166,183,191,254 6-13 OYSTER CREEK 6-22 Amendment No. 265, 269

6.24 SURVEILLANCE FREQUENCY CONTROL PROGRAM This program provides controls for Surveillance Frequencies. The program shall ensure that Surveillance Requirements specified in the Technical Specifications are performed at intervals sufficient to assure the associated Limiting Conditions for Operation are met.

a. The Surveillance Frequency Control Program shall contain a list of Frequencies of those Surveillance Requirements for which the Frequency is controlled by the program.
b. Changes to the Frequencies listed in the Surveillance Frequency Control Program shall be made in accordance with NEI 04-10, Risk-Informed Method for Control of Surveillance Frequencies, Revision 1.
c. The provisions of Definition 1.24 and Surveillance Requirement 4.0.2 are applicable to the Frequencies established in the Surveillance Frequency Control Program.

6.25 SNUBBER INSPECTION PROGRAM This program conforms to the examination, testing, and service life monitoring for dynamic restraints (snubbers) in accordance with 10 CFR 50.55a inservice inspection (ISI) requirements for supports. The program shall be in accordance with the following:

a. This program shall meet 10 CFR 50.55a(g) ISI requirements for supports.
b. The program shall meet the requirements for ISI of supports set forth in subsequent editions of the Code of Record and addenda of the American Society of Mechanical Engineers (ASME) Boiler and Pressure Vessel (B&PV) Code and the ASME Code for Operation and Maintenance of Nuclear Power Plants (OM Code) that are incorporated by reference in 10 CFR 50.55a(a), 50.55a(a)(1),

50.55a(a)(1)(i), and 50.55a(a)(1)(iv), subject to its limitations and modifications, and subject to Commission approval.

c. The program shall, as allowed by 10 CFR 50.55a(b)(3)(v)(B), meet Subsection ISTA, "General Requirements," and Subsection ISTD, "Preservice and Inservice Examination and Testing of Dynamic Restraints (Snubbers) in Light-Water Reactor Nuclear Power Plants," in lieu of Section XI of the ASME B&PV Code ISI requirements for snubbers, or meet authorized alternatives pursuant to 10 CFR 50.55a(z).
d. The 120-month program updates shall be made in accordance with 10 CFR 50.55a (including 10 CFR 50.55a(g)(4)(ii)) subject to the conditions listed therein.
e. Records of the service life of all snubbers, including the date which the service life commences, and associated installation and maintenance records shall be maintained for the duration of the Facility Operating License.

69,108,134,147,166, 6-14 248,264, OYSTER CREEK 6-23 Amendment No. 276, 286

ATTACHMENT 3 Clean Re-typed Technical Specifications Pages Oyster Creek Nuclear Generating Station Renewed Facility Operating License No. DPR-16 NRC Docket No. 50-219 The clean re-typed TS pages being submitted below supersede in entirety the clean re-typed pages previously submitted.

TS Pages ii iii 1.0-9 6-1 6-2 6-3 6-4 6-5 6-6 6-7 6-8 6-9 6-10 6-11 6-12 6-13 6-14

TABLE OF CONTENTS (Cont'd)

Page 1.44 Local Linear Heat Generation Rate 1.0-8 1.45 Shutdown Margin (SDM) 1.0-8 1.46 Idle Recirculation Loop 1.0-8 1.47 Isolated Recirculation Loop 1.0-8 1.48 Operational Condition 1.0-8 1.49 Rated Thermal Power 1.0-9 1.50 Thermal Power 1.0-9 1.51 Pressure and Temperature Limits Report (PTLR) 1.0-9 1.52 Certified Fuel Handler 1.0-9 1.53 Non-Certified Operator 1.0-9 Section 2 Safety Limits and Limiting Safety System Settings 2.1 Safety Limit - Fuel Cladding Integrity 2.1-1 2.2 Safety Limit - Reactor Coolant System Pressure 2.2-1 2.3 Limiting Safety System Settings 2.2-3 Section 3 Limiting Conditions for Operation 3.0 Limiting Conditions for Operation (General) 3.0-1 3.1 Protective Instrumentation 3.1-1 3.2 Reactivity Control 3.2-1 3.3 Reactor Coolant 3.3-1 3.4 Emergency Cooling 3.4-1 3.5 Containment 3.5-1 3.6 Radioactive Effluents 3.6-1 3.7 Auxiliary Electrical Power 3.7-1 3.8 Isolation Condenser 3.8-1 3.9 Refueling 3.9-1 3.10 Core Limits 3.10-1 3.11 (Not Used) 3.11-1 3.12 Alternate Shutdown Monitoring Instrumentation 3.12-1 3.13 Accident Monitoring Instrumentation 3.13-1 3.14 DELETED 3.14-1 3.15 Explosive Gas Monitoring Instrumentation 3.15-1 3.16 (Not Used) 3.16-1 3.17 Control Room Heating, Ventilating and Air Conditioning System 3.17-1 Section 4 Surveillance Requirements 4.0 Surveillance Requirement Applicability 4.0-1 4.1 Protective Instrumentation 4.1-1 4.2 Reactivity Control 4.2-1 4.3 Reactor Coolant 4.3-1 4.4 Emergency Cooling 4.4-1 4.5 Containment 4.5-1 4.6 Radioactive Effluents 4.6-1 4.7 Auxiliary Electrical Power 4.7-1 4.8 Isolation Condenser 4.8-1 4.9 Refueling 4.9-1 OYSTER CREEK ii Amendment No.: 166, 185, 186, 241, 266, 269, 290

TABLE OF CONTENTS (cont'd)

Page 4.10 ECCs Related Core Limits 4.10-1 4.11 Sealed Source Contamination 4.11-1 4.12 Alternate Shutdown Monitoring Instrumentation 4.12-1 4.13 Accident Monitoring Instrumentation 4.13-1 4.14 DELETED 4.14-1 4.15 Explosive Gas Monitoring Instrumentation 4.15-1 4.16 (Deleted) 4.16-1 4.17 Control Room Heating, Ventilating and Air Conditioning System 4.17-1 Section 5 Design Features 5.1 Site 5.1-1 5.2 Containment 5.2-1 5.3 Auxiliary Equipment 5.3-1 Section 6 Administrative Controls 6.1 Responsibility 6-1 6.2 Organization 6-1 6.3 Facility Staff Qualifications 6-2 6.4 DELETED 6-2 6.5 DELETED 6-2 6-6 DELETED 6-2 6-7 DELETED 6-2 6-8 Procedures and Programs 6-3 6-9 Reporting Requirements 6-6 6-10 Record Retention 6-8 6-11 Radiation Protection Program 6-9 6-12 (Deleted) 6-9 6-13 High Radiation Area 6-9 6-14 Environmental Qualification 6-10*

6-15 Integrity of Systems Outside Containment 6-10 6-16 Iodine Monitoring 6-10 6-17 DELETED 6-11 6-18 Process Control Plan 6-11 6-19 Offsite Dose Calculation Manual 6-11 6-20 DELETED 6-12 6-21 Technical Specifications (TS) Bases Control Program 6-12 6-22 Control Room Envelope Habitability Program 6-12 6-23 Reactor Coolant System (RCS) PRESSURE AND TEMPERATURE LIMITS REPORT (PTLR) 6-13 6.24 Surveillance Frequency Control Program 6-14 6.25 Snubber Inspection Program 6-14

  • Issued by NRC Order dated 10-24-80 OYSTER CREEK iii Amendment No.: 94, 97, 98,108,115, 134,166,186,232,240,241,265,269, 273, 276, 286, 290

1.49 RATED THERMAL POWER (RTP)

RTP shall be a total reactor core heat transfer rate to the reactor coolant of 1930 MWt.

1.50 THERMAL POWER THERMAL POWER shall be the total reactor core heat transfer rate to the reactor coolant.

1.51 PRESSURE AND TEMPERATURE LIMITS REPORT (PTLR)

The PTLR is the unit specific document that provides the reactor vessel pressure and temperature limits, including heatup and cooldown rates, for the current reactor vessel fluence period. These pressure and temperature limits shall be determined for each fluence period in accordance with Specification 6.23.

1.52 CERTIFIED FUEL HANDLER A CERTIFIED FUEL HANDLER is an individual who complies with provisions of the CERTIFIED FUEL HANDLER training program required by Specification 6.3.2.

1.53 NON-CERTIFIED OPERATOR A NON-CERTIFIED OPERATOR is a non-licensed operator who complies with the qualification requirements of Specification 6.3.1, but is not a CERTIFIED FUEL HANDLER.

OYSTER CREEK 1.0-9 Amendment No. 266, 269, 290

ADMINISTRATIVE CONTROLS 6.1 RESPONSIBILITY 6.1.1 The Plant Manager shall be responsible for overall facility operation and shall delegate in writing the succession to this responsibility during the Plant Managers absence.

The Plant Manager or the designee shall approve, prior to implementation, each proposed test, experiment, or modification to systems or equipment that affect safe storage and maintenance of spent nuclear fuel.

6.1.2 The Shift Manager shall be responsible for the shift command function.

6.2 ORGANIZATION 6.2.1 Onsite and Offsite Organizations Onsite and offsite organizations shall be established for facility staff and corporate management.

The onsite and offsite organization shall include the positions for activities affecting the safe storage and handling of spent nuclear fuel.

a. Lines of authority, responsibility and communication shall be established and defined from the highest management levels through intermediate levels to and including facility organization positions. These relationships shall be documented and updated as appropriate, in the form of organizational descriptions. These organizational descriptions will be documented in the Updated FSAR and updated in accordance with 10 CFR 50.71e.
b. The Plant Manager shall be responsible for overall facility safe operation and shall have control over those onsite activities necessary for safe storage and maintenance of spent nuclear fuel.
c. A responsible officer shall have corporate responsibility for the safe storage and handling of spent nuclear fuel and shall take measures needed to ensure acceptable performance of the staff in operating, maintaining, and providing technical support to the facility to ensure safe management of spent nuclear fuel.
d. Individuals who train the CERTIFIED FUEL HANDLERs and those who carry out the health physics and quality assurance functions may report to the appropriate manager on site; however, these individuals shall have sufficient organizational freedom to ensure their ability to perform their assigned functions.

6.2.2 Facility Staff The facility organization shall meet the following:

a. Each on duty shift shall include at least the following shift staffing:
  • One (1) Shift Manager (see f. below)
  • One (1) NON-CERTIFIED OPERATOR (see g. below)
b. Shift crew composition may be one less than the minimum requirements of 6.2.2.a for a period of time not to exceed two hours, in order to accommodate unexpected absence of on-duty shift crew members. Immediate action must be OYSTER CREEK 6-1 Amendment No. 54,59,65,69,102,134,194,195, 203,210,213,220, 290

taken to restore the shift crew composition to within the requirements given above.

During such absences, no fuel movement or movement of loads over the spent fuel shall be permitted. This provision does not permit any shift crew position to be unmanned upon shift change due to an incoming shift crew member being late or absent.

c. At all times when nuclear fuel is stored in the spent fuel pool, at least one person qualified to stand watch in the control room (NON-CERTIFIED OPERATOR or CERTIFIED FUEL HANDLER) shall be present in the control room.
d. Oversight of fuel handling operations shall be provided by a CERTIFIED FUEL HANDLER.
e. An individual qualified in radiation protection measures shall be on site during movement of fuel and during the movement of loads over the fuel.
f. The Shift Manager shall be a CERTIFIED FUEL HANDLER.
g. The position of NON-CERTIFIED OPERATOR may be filled by a CERTIFIED FUEL HANDLER.

6.3 FACILITY STAFF QUALIFICATIONS 6.3.1 Each member of the facility staff shall meet or exceed the minimum qualifications of ANSI/ANS 3.1 of 1978 for comparable positions unless otherwise noted in the Technical Specifications. Technicians and maintenance personnel who do not meet ANSI/ANS 3.1 of 1978, Section 4.5, are permitted to perform work for which qualification has been demonstrated.

6.3.2 The management position responsible for radiological controls shall meet or exceed the qualifications of Regulatory Guide 1.8 (Rev. 1-R, 9/75). Each other member of the radiation protection organization for which there is a comparable position described in ANSI N18.1-1971 shall meet or exceed the minimum qualifications specified therein, or in the case of radiation protection technicians, they shall have at least one year's continuous experience in applied radiation protection work in a nuclear facility dealing with radiological problems similar to those encountered in nuclear power stations and shall have been certified by the management position responsible for radiological controls as qualified to perform assigned functions. This certification must be based on an NRC approved, documented program consisting of classroom training with appropriate examinations and documented positive findings by responsible supervision that the individual has demonstrated his ability to perform each specified procedure and assigned function with an understanding of its basis and purpose.

6.3.3 The NRC approved training and retraining program for CERTIFIED FUEL HANDLERs shall be maintained.

6.4 DELETED 6.5 DELETED 6.6 DELETED 6.7 DELETED OYSTER CREEK 6-2 Amendment No.: 92,102,134,161,203,220,274,290

6.8 PROCEDURES AND PROGRAMS 6.8.1 Written procedures shall be established, implemented, and maintained covering the items referenced below:

a. The procedures applicable to safe storage of nuclear fuel recommended in Appendix "A" of Regulatory Guide 1.33 as referenced in the QATR.
b. Surveillance and test activities of equipment that affects nuclear safety and radioactive waste management equipment.
c. Fuel Handling Operations.
d. Security Plan Implementation.
e. Fire Protection Program Implementation.
f. Emergency Plan Implementation.
g. Process Control Plan Implementation.
h. Offsite Dose Calculation Manual Implementation.
i. Quality Assurance Program for effluent and environmental monitoring using the guidance in Regulatory Guide 4.15, Revision 1.

6.8.2 Each procedure required by 6.8.1 above, and substantive changes thereto, shall be reviewed and approved prior to implementation and shall be reviewed periodically as set forth in administrative procedures.

6.8.3 Temporary changes to procedures of 6.8.1, above, may be made provided:

a. The intent of the original procedure is not altered;
b. The change is approved by two members of the licensee's management staff knowledgeable in the area affected by the procedure. For changes which may affect the operational status of facility systems or equipment, at least one of these individuals shall be a member of operations management or supervision who is a CERTIFIED FUEL HANDLER.
c. The change is documented, reviewed and approved within 14 days of implementation.

OYSTER CREEK 6-3 Amendment No.: 69,78,89,108,117,125,134,161, 180,181,194,203,210,213,224,232,251,273, 290

6.8.4 The following programs shall be established, implemented and maintained:

a. Radioactive Effluent Controls Program A program shall be provided conforming with 10 CFR 50.36a for the control of radioactive effluent and for maintaining the doses to MEMBERS OF THE PUBLIC from radioactive effluent as low as reasonably achievable. The program (1) shall be contained in the ODCM, (2) shall be implemented by operating procedures, and (3) shall include remedial actions to be taken whenever the program limits are exceeded. The program shall include the following elements:
1. Limitations on the operability of radioactive liquid and gaseous monitoring instrumentation including the surveillance tests and setpoint determination in accordance with the methodology in the ODCM,
2. Limitations on the concentrations of radioactive material released in liquid effluent to the UNRESTRICTED AREA conforming to less than the concentration values in Appendix B, Table 2, Column 2 to 10 CFR 20.1001-20.2402.
3. Monitoring, sampling, and analysis of radioactive liquid and gaseous effluent in accordance with 10 CFR 20.1302 and with the methodology and parameters in the ODCM.
4. Limitations on the annual and quarterly doses and dose commitment to a MEMBER OF THE PUBLIC from radioactive materials in liquid effluent released to the UNRESTRICTED AREA conforming to Appendix I of 10 CFR 50,
5. Determination of cumulative dose contributions from radioactive effluents for the current calendar quarter and current calendar year in accordance with the methodology and parameters in the ODCM at least every 31 days. Determination of projected dose contributions from radioactive effluents in accordance with the methodology in the ODCM at least every 31 days.
6. Limitations on the operability and use of the liquid and gaseous effluent treatment systems to ensure that the appropriate portions of these systems are used to reduce releases of radioactivity when the projected doses in the 31 day period would exceed 2 percent of the guidelines for the annual dose or dose commitment conforming to Appendix I to 10 CFR 50,
7. Limitations on the dose rate resulting from radioactive materials released in gaseous effluents from the site to the UNRESTRICTED AREA shall be limited to the following:
a. For noble gases: Less than or equal to a dose rate of 500 mRems/yr to the total body and less than or equal to a dose rate of 3000 mRems/yr to the skin, and
b. For iodine-131, iodine-133, tritium, and for all radionuclides in particulate form with half-lives greater than 8 days: Less than or equal to a dose rate of 1500 mRems/yr to any organ.
8. Limitations on the annual and quarterly air doses resulting from noble gases released in gaseous effluents to the UNRESTRICTED AREA conforming to Appendix I of 10 CFR 50, OYSTER CREEK 6-4 Amendment No.: 290
9. Limitations on the annual and quarterly doses to a MEMBER OF THE PUBLIC from I-131, I-133, tritium, and all radionuclides in particulate form with half-lives greater than 8 days in gaseous effluent released beyond the SITE BOUNDARY conforming to Appendix I of 10 CFR 50,
10. Limitations on the annual dose or dose commitment to any MEMBER OF THE PUBLIC due to releases of radioactivity and to radiation from Uranium fuel cycle sources conforming to 40 CFR Part 190.
b. Radiological Environmental Monitoring Program A program shall be provided to monitor the radiation and radionuclides in the environs of the plant. The program shall provide (1) representative measurements of radioactivity in the highest potential exposure pathways, and (2) verification of the accuracy of the effluent monitoring program and modeling of environmental exposure pathways. The program shall (1) be contained in the ODCM, (2) conform to the guidance of Appendix I to 10 CFR Part 50, and (3) include the following:
1. Monitoring, sampling, analysis, and reporting of radiation and radionuclides in the environment in accordance with the methodology and parameters in the ODCM,
2. A Land Use Census to ensure that changes in the use of areas at and beyond the SITE BOUNDARY are identified and that modifications to the monitoring program are made if required by the results of this census, and
3. Participation in an Interlaboratory Comparison Program to ensure that independent checks on the precision and accuracy of the measurements of radioactive materials in environmental sample matrices are performed as part of the quality assurance program for environmental monitoring.

6.8.5 Station Battery Monitoring and Maintenance Program This Program provides for restoration and maintenance, based on the recommendations of IEEE Standard 450, IEEE Recommended Practice for Maintenance, Testing, and Replacement of Vented Lead-Acid Batteries For Stationary Applications, of the following:

a. Actions to restore station battery cells with float voltage < 2.13 volts, and
b. Actions to equalize and test station battery cells that have been discovered with electrolyte level below the top of the plates.

OYSTER CREEK 6-5 Amendment No.: 290

6.9 REPORTING REQUIREMENTS In addition to the applicable reporting requirements of 10 CFR, the following identified reports shall be submitted to the Administrator of the NRC Region I office unless otherwise noted.

6.9.1 Routine Reports

a. DELETED
b. DELETED
c. DELETED
d. Radioactive Effluent Release Report The Radioactive Effluent Release Report covering the operation of the facility during the previous year shall be submitted prior to May 1 of each year in accordance with 10 CFR 50.36a. The report shall include a summary of the quantities of radioactive liquid and gaseous effluent and solid waste released from the facility. The material provided shall be consistent with the objectives outlined in the ODCM and Process Control Program and in conformance with 10 CFR 50.36a and 10 CFR Part 50, Appendix I, Section IV.B.1.
e. Annual Radiological Environmental Operating Report The Annual Radiological Environmental Operating Report covering the operation of the facility during the previous calendar year shall be submitted prior to May 1 of each year.

The Report shall include summaries, interpretations, and an analysis of trends of the results of the Radiological Environmental Monitoring Program for the reporting period. The material provided shall be consistent with the objectives outlined in:

(1) the ODCM; and, (2) Sections IV.B.2, IV.B.3, and IV.C of Appendix I to 10 CFR Part 50.

Basis: 6.9.1.e - RELOCATED TO THE ODCM.

f. DELETED 6.9.2 DELETED OYSTER CREEK 6-6 Amendment No.: 290

6.9.3 Unique Reporting Requirements Special reports shall be submitted to the Director of Regulatory Operations Regional Office within the time period specified for each report. These reports shall be submitted covering the activities identified below pursuant to the requirements of the applicable reference specification.

a. Materials Radiation Surveillance Specimen Reports (4.3A)
b. (Deleted)
c. Results of required leak tests performed on sealed sources if the tests reveal the presence of 0.005 microcuries or more of removable contamination.
d. Deleted e-j. Pursuant to the ODCM.
k. Records of results of analyses required by the Radiological Environmental Monitoring Program.
l. Failures and challenges to Relief and Safety Valves which do not constitute an LER will be the subject of a special report submitted to the Commission within 60 days of the occurrence. A challenge is defined as any automatic actuation (other than during surveillance or testing) of Safety or Relief Valves.
m. Plans for compliance with standby liquid control Specifications 3.2.C.3(b) and 3.2.C.3(e)(1) or plans to obtain enrichment test results per Specification 4.2.E.5.
n. Inoperable high range radioactive noble gas effluent monitor (3.13.H)

OYSTER CREEK 6-7 Amendment No.: 290

6.10 RECORD RETENTION 6.10.1 The following records shall be retained for at least five years:

a. Records and logs of facility operation covering time interval at each power level.
b. Records and logs of principle maintenance activities, inspections, repair and replacement of principal items of equipment related to nuclear safety.
c. All Licensee Event Reports.
d. Records of surveillance activities, inspections and calibrations required by these technical specifications.
e. Records of reactor tests and experiments.
f. Records of changes made to operating procedures.
g. Deleted.
h. Records of sealed source leak tests and results.
i. Records of annual physical inventory of all source material of record.

6.10.2 The following records shall be retained for the duration of the Facility Operating License:

a. Record and drawing changes reflecting facility design modifications made to systems and equipment described in the Final Safety Analysis Report.
b. Records of new and irradiated fuel inventory, fuel transfers and assembly burnup histories.
c. Records of facility radiation and contamination surveys.
d. Records of doses received by all individuals for whom monitoring was required
e. Records of gaseous and liquid radioactive material released to the environs.
f. Records of transient or operational cycles for those facility components designed for a limited number of transients or cycles.
g. Records of training and qualification for current members of the plant staff.
h. Records of inservice inspections performed pursuant to these technical specifications.
i. Records of reviews performed for changes made to procedures or equipment or reviews of tests and experiments pursuant to 10 CFR 50.59.
j. Deleted.

OYSTER CREEK 6-8 Amendment No.: 290

k. Records of Environmental Qualification which are covered under the provisions for paragraph 6.14.
l. Deleted.
m. Records of results of analyses required by the Radiological Environmental Monitoring Program.
n. Records of reviews performed for changes made to the OFFSITE DOSE CALCULATION MANUAL and the PROCESS CONTROL PLAN.
o. Records of radioactive shipments 6.10.3 Quality Assurance Records shall be retained as specified by the QATR.

6.11 RADIATION PROTECTION PROGRAM Procedures for personnel radiation protection shall be prepared consistent with the requirements of 10 CFR 20 and shall be approved, maintained and adhered to for all operations involving personnel radiation exposure.

6.12 (Deleted) 6.13 HIGH RADIATION AREA 6.13.1 In lieu of the "control device" or "alarm signal" required by Section 20.1601 of 10 CFR 20, each high radiation area in which the intensity of radiation at 30 cm (11.8 in.) is greater than deep dose equivalent of 100 mRem/hr but less than 1,000 mRem/hr shall be barricaded and conspicuously posted as a high radiation area and entrance thereto shall be controlled by requiring issuance of a Radiation Work Permit (RWP).

NOTE: Health Physics personnel shall be exempt from the RWP issuance requirement during the performance of their assigned radiation protection duties, provided they are following plant radiation protection procedures for entry into high radiation areas.

An individual or group of individuals permitted to enter such areas shall be provided with one or more of the following:

a. A radiation monitoring device which continuously indicates the radiation dose rate in the area.
b. A radiation monitoring device which continuously integrates the radiation dose rate in the area and alarms when a pre-set integrated dose is received. Entry into such areas with this monitoring device may be made after the dose rate levels in the area have been established and personnel have been made knowledgeable of them.
c. A health physics qualified individual (i.e., qualified in radiation protection procedures) with a radiation dose rate monitoring device who is responsible for providing positive exposure control over the activities within the area and who will perform periodic radiation surveillance at the frequency in the RWP. The surveillance frequency will be established by the management position responsible for radiological controls.

OYSTER CREEK 6-9 Amendment No.: 69,78,84,117,134,203,210,213,251, 290

6.13.2 Specification 6.13.1 shall also apply to each high radiation area in which the intensity of radiation is greater than deep dose equivalent of 1,000 mRem/hr at 30 cm (11.8 in.) but less than 500 rads in 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br /> at 1 meter (3.28 ft.) from sources of radioactivity. In addition, locked doors shall be provided to prevent unauthorized entry into such areas and the keys shall be maintained under the administrative control of operations and/or radiation protection supervision on duty.

6.14 ENVIRONMENTAL QUALIFICATION A. By no later than June 30, 1982 all safety-related electrical equipment in the facility shall be qualified in accordance with the provisions of: Division of Operating Reactors "Guidelines for Evaluating Environmental Qualification of Class IE Electrical Equipment in Operating Reactors" (DOR Guidelines); or, NUREG-0588 "Interim Staff Position of Environmental Qualification of Safety-Related Electrical Equipment," December 1979. Copies of these documents are attached to Order for Modification of License DPR-16 dated October 24, 1980.

B. By no later than December 1, 1980, complete and auditible records must be available and maintained at a central location which describe the environmental qualification method used for all safety-related electrical equipment in sufficient detail to document the degree of compliance with the DOR Guidelines or NUREG-0588. Thereafter, such records should be updated and maintained current as equipment is replaced, further tested, or otherwise further qualified.

6.15 INTEGRITY OF SYSTEMS OUTSIDE CONTAINMENT The licensee shall implement a program to reduce leakage from systems outside containment that would or could contain highly radioactive fluids during a serious transient or accident to as low as practical levels. This program shall include the following:

1. Provisions establishing preventative maintenance and periodic visual inspection requirements, and
2. System leak test requirements, to the extent permitted by system design and radiological conditions, for each system at a frequency of once every 24 months. The systems subject to this testing are (1) Core Spray, (2) Containment Spray, (3) Reactor Water Cleanup, (4) Isolation Condenser, and (5) Shutdown Cooling.

6.16 IODINE MONITORING The licensee shall implement a program which will ensure the capability to accurately determine the airborne iodine concentration in vital areas* under accident conditions. This program shall include the following:

a. Training of personnel,
b. Procedures for monitoring, and
c. Provisions for maintenance of sampling and analysis equipment.
  • Areas requiring personnel access for establishing hot shutdown condition.

OYSTER CREEK 6-10 Amendment No.: 69,78,84,108,125,134,161, 166,210,213,251,273, 290

6.17 Deleted 6.18 PROCESS CONTROL PLAN

a. Licensee initiated changes to the PCP:
1. Shall be submitted to the NRC in the Annual Radioactive Effluent Release Report for the period in which the changes were made. This submittal shall contain:
a. sufficiently detailed information to justify the changes without benefit of additional or supplemental information;
b. a determination that the changes did not reduce the overall conformance of the solidified waste product to existing criteria for solid wastes; and
c. documentation that the changes have been reviewed and approved pursuant to Section 6.8.2.
2. Shall become effective upon review and approval by licensee management.

6.19 OFFSITE DOSE CALCULATION MANUAL

a. The ODCM shall be approved by the Commission prior to implementation.
b. Licensee initiated changes to the ODCM shall be submitted to the NRC in the Annual Radioactive Effluent Release Report for the period in which the changes were made. This submittal shall contain:
1. sufficiently detailed information to justify the changes without benefit of additional or supplemental information;
2. a determination that the changes did not reduce the accuracy or reliability of dose calculations or setpoint determination; and,
3. documentation that the changes have been reviewed and approved pursuant to Section 6.8.2.
c. Change(s) shall become effective upon review and approval by licensee management.

OYSTER CREEK 6-11 Amendment No. 272, 290

6.20 MAJOR CHANGES TO RADIOACTIVE WASTE TREATMENT SYSTEMS DELETED.

6.21 TECHNICAL SPECIFICATIONS (TS) BASES CONTROL PROGRAM This program provides a means for processing changes to the Bases of these Technical Specifications.

a. Changes to the Bases of the TS shall be made under appropriate administrative controls and reviews.
b. Licensees may make changes to Bases without prior NRC approval provided the changes do not require either of the following:
1. A change in the TS incorporated in the license or
2. A change to the updated FSAR (UFSAR) or Bases that requires NRC approval pursuant to 10 CFR 50.59.
c. The Bases Control Program shall contain provisions to ensure that the Bases are maintained consistent with the UFSAR.
d. Proposed changes that meet the criteria of Specification 6.21.b.1 or 6.21.b.2 above shall be reviewed and approved by the NRC prior to implementation. Changes to the bases implemented without prior NRC approval shall be provided to the NRC on a frequency consistent with 10 CFR 50.71(e).

6.22 CONTROL ROOM ENVELOPE HABITABILITY PROGRAM A Control Room Envelope (CRE) Habitability Program shall be established and implemented to ensure that CRE habitability is maintained such that, with an OPERABLE Control Room HVAC System, CRE occupants can control the reactor safely under normal conditions and maintain it in a safe condition following a radiological event, hazardous chemical release, or a smoke challenge.

The program shall ensure that adequate radiation protection is provided to permit access and occupancy of the CRE under design basis accident (DBA) conditions without personnel receiving radiation exposures in excess of a 30-day integrated dose of 5 rem TEDE. The program shall include the following elements:

a. The definition of the CRE and the CRE boundary.
b. Requirements for maintaining the CRE boundary in its design condition including configuration control and preventive maintenance.
c. Requirements for (i) determining the unfiltered air inleakage past the CRE boundary into the CRE in accordance with the testing methods and at the Frequencies specified in Sections C.1 and C.2 of Regulatory Guide 1.197, "Demonstrating Control Room Envelope Integrity at Nuclear Power Reactors," Revision 0, May 2003, and (ii) assessing CRE habitability at the frequencies specified in Sections C.1 and C.2 of Regulatory Guide 1.197, Revision 0.

OYSTER CREEK 6-12 Amendment No. 69,78,84,108,125,134,166,205,245, 290 Corrected by letter of 10/15/2004

The following are exceptions to Sections C.1 and C.2 of Regulatory Guide 1.197, Revision 0:

1. The Oyster Creek CRE boundary operability is not dependent on a measured unfiltered air inleakage value (Reference Oyster Creek letter to NRC dated November 17, 2005, Letter No. 2130-05-20218). No inleakage testing for determining the unfiltered air inleakage past the CRE boundary into the CRE is required at the Oyster Creek site.
d. Measurement, at designated locations, of the CRE pressure relative to areas adjacent to the CRE boundary during the pressurization mode of operation by one subsystem (train) of the Control Room Ventilation System operating at the design flow rate, at a Frequency of 24 months. The results shall be trended and used as part of the 24 month assessment of the CRE boundary.
e. The unfiltered air inleakage limit for radiological challenges is the inleakage flow rate assumed in the licensing basis analyses of DBA consequences. Unfiltered air inleakage limits for hazardous chemicals must ensure that exposure of CRE occupants to these hazards will be within the assumptions in the licensing basis.
f. The provisions of Section 1.24 are applicable to the frequencies for assessing CRE habitability measuring CRE pressure and assessing the CRE boundary as required by paragraphs d and c, respectively.

6.23 REACTOR COOLANT SYSTEM (RCS) PRESSURE AND TEMPERATURE LIMITS REPORT (PTLR)

a. RCS pressure and temperature limits for heat up, cooldown, low temperature operation, criticality, and hydrostatic testing as well as heatup and cooldown rates shall be established and documented in the PTLR for the following:

i) Limiting Conditions for Operation Section 3.3, "Reactor Coolant" ii) Surveillance Requirements Section 4.3, "Reactor Coolant"

b. The analytical methods used to determine the RCS pressure and temperature limits shall be those previously reviewed and approved by the NRC, specifically those described in the following document:

i) SIR-05-044-A, "Pressure-Temperature Limits Report Methodology for Boiling Water Reactors"

c. The PTLR shall be provided to the NRC upon issuance for each reactor vessel fluence period and for any revision or supplement thereto.

OYSTER CREEK 6-13 Amendment No. 69,78,84,108,125,134,166,183, 191,254, 290

6.24 SURVEILLANCE FREQUENCY CONTROL PROGRAM This program provides controls for Surveillance Frequencies. The program shall ensure that Surveillance Requirements specified in the Technical Specifications are performed at intervals sufficient to assure the associated Limiting Conditions for Operation are met.

a. The Surveillance Frequency Control Program shall contain a list of Frequencies of those Surveillance Requirements for which the Frequency is controlled by the program.
b. Changes to the Frequencies listed in the Surveillance Frequency Control Program shall be made in accordance with NEI 04-10, Risk-Informed Method for Control of Surveillance Frequencies, Revision 1.
c. The provisions of Definition 1.24 and Surveillance Requirement 4.0.2 are applicable to the Frequencies established in the Surveillance Frequency Control Program.

6.25 SNUBBER INSPECTION PROGRAM This program conforms to the examination, testing, and service life monitoring for dynamic restraints (snubbers) in accordance with 10 CFR 50.55a inservice inspection (ISI) requirements for supports. The program shall be in accordance with the following:

a. This program shall meet 10 CFR 50.55a(g) ISI requirements for supports.
b. The program shall meet the requirements for ISI of supports set forth in subsequent editions of the Code of Record and addenda of the American Society of Mechanical Engineers (ASME) Boiler and Pressure Vessel (B&PV) Code and the ASME Code for Operation and Maintenance of Nuclear Power Plants (OM Code) that are incorporated by reference in 10 CFR 50.55a(a), 50.55a(a)(1),

50.55a(a)(1)(i), and 50.55a(a)(1)(iv), subject to its limitations and modifications, and subject to Commission approval.

c. The program shall, as allowed by 10 CFR 50.55a(b)(3)(v)(B), meet Subsection ISTA, "General Requirements," and Subsection ISTD, "Preservice and Inservice Examination and Testing of Dynamic Restraints (Snubbers) in Light-Water Reactor Nuclear Power Plants," in lieu of Section XI of the ASME B&PV Code ISI requirements for snubbers, or meet authorized alternatives pursuant to 10 CFR 50.55a(z).
d. The 120-month program updates shall be made in accordance with 10 CFR 50.55a (including 10 CFR 50.55a(g)(4)(ii)) subject to the conditions listed therein.
e. Records of the service life of all snubbers, including the date which the service life commences, and associated installation and maintenance records shall be maintained for the duration of the Facility Operating License.

OYSTER CREEK 6-14 Amendment No. 69,108,134,147,166,248,264, 290