NL-16-1782, Edwin I Hatch Nuclear Plant Units 1 & 2 - Notification of Completion of Corrective Actions - Findings Associated with Inspection of Implementation of Interim Cyber Security Milestones 1-7

From kanterella
(Redirected from ML17003A012)
Jump to navigation Jump to search
Edwin I Hatch Nuclear Plant Units 1 & 2 - Notification of Completion of Corrective Actions - Findings Associated with Inspection of Implementation of Interim Cyber Security Milestones 1-7
ML17003A012
Person / Time
Site: Hatch  Southern Nuclear icon.png
Issue date: 12/29/2016
From: Pierce C
Southern Nuclear Operating Co
To:
Document Control Desk, Office of Nuclear Reactor Regulation
Shared Package
ML17003A017 List:
References
NL-16-1782 IR 2013404
Download: ML17003A012 (2)


Text

Enclosure contains security-related information - withhold under 10 CFR 2.390 When separated from Enclosure, the remainder of this document is decontrolled.

.& Southern Nuclear Charles R. Pierce Regulatory Affairs Director 40 Inverness Center Parkway Post Office Box 1295 Birmingham, AL 35242 205 992 7872 tel 205 992 7601 fax DEC 2 9 2016 crpierce@southernco.com Docket Nos.: 50-321 NL-16-1782 50-366 U.S. Nuclear Regulatory Commission ATTN: Document Control Desk Washington, D.C. 20555-0001 Edwin I. Hatch Nuclear Plant Units 1&2 Notification of Completion of Corrective Actions - Findings Associated with Inspection of Implementation of Interim Cyber Security Milestones 1-7 Ladies and Gentlemen:

Southern Nuclear Operating Company (SNC) received Nuclear Regulatory Commission (NRC) Inspection Report 2013404, dated October 23, 2013, which documented the results of NRC Temporary Instruction 2201/004, "Inspection of Implementation of Interim Cyber Security Milestones 1-7" performed for Hatch Nuclear Plant (HNP), Units 1&2.

As documented in the report, two of the findings identified in this inspection were determined to involve violations, with two additional licensee-identified violations (LIVs) also listed. These were all treated as non-cited violations (NCVs) and a determination was made by the NRC Security Issues Forum (SIF) panel to exercise enforcement discretion due to the "good-faith" attempt of SNC to interpret and implement the Interim Cyber Security Milestones 1 - 7 commitments.

The report requested SNC to provide, upon completion of all corrective actions, written notification to the NRC's regional office as to the method and date of closure for the identified issues. The Enclosure to this letter constitutes the requested written notification.

This letter contains no NRC commitments. If you have any questions, please contact Joshua West at 912.366.2000 ext. 2350 C.R. Pierce Regulatory Affairs Director Sool ft CRP/ndj/lac

Enclosure:

Response to Cyber Security Inspection Report 2013404

U. S. Nuclear Regulatory Commission NL-16-1782 Page 2 cc: Southern Nuclear Operating Company Mr. S. E. Kuczynski, Chairman, President & CEO Mr. D. G. Bost, Executive Vice President & Chief Nuclear Officer Mr. D. R. Vineyard Vice President - Hatch Mr. M. D. Meier, Vice President - Regulatory Affairs Mr. D. R. Madison, Vice President - Fleet Operations Mr. B. J. Adams, Vice President - Engineering Mr. G. L. Johnson, Regulatory Affairs Manager - Hatch RTYPE: CHA02.004 U. S. Nuclear Regulatory Commission Ms. C. Haney, Regional Administrator Mr. M. D. Orenak, NRR Project Manager - Hatch Mr. D. H. Hardage, Senior Resident Inspector - Hatch Enclosure contains security-related information - withhold Under 10 CFR 2.390 When separated from Enclosure. the remainder of this document is decontrolled.