ML15341A002
| ML15341A002 | |
| Person / Time | |
|---|---|
| Site: | Calvert Cliffs |
| Issue date: | 12/04/2015 |
| From: | Alexander Chereskin Plant Licensing Branch 1 |
| To: | Enrique Villar Exelon Corp |
| References | |
| MF7056, MF7057 | |
| Download: ML15341A002 (2) | |
Text
1 NRR-PMDAPEm Resource From:
Chereskin, Alexander Sent:
Friday, December 04, 2015 2:57 PM To:
'Enrique.Villar@exeloncorp.com'
Subject:
Acceptance Review Results: License Amendment Request to Relocate Surveillance Frequency Requirements (CAC Nos. MF7056_57)
- Enrique, By letter dated November 5, 2015 (Agencywide Documents Access and Management System Accession No. ML15310A064), Exelon Generation Company, LLC submitted a license amendment request to relocate Surveillance Requirement Frequencies to the previous approved Surveillance Frequency Control Program for the Calvert Cliffs Nuclear Power Plant, Unit Nos. 1 and 2. The purpose of this e-mail is to provide the results of the U.S. Nuclear Regulatory Commission (NRC) staffs acceptance review of this relief request. The acceptance review was performed to determine if there is sufficient technical information in scope and depth to allow the NRC staff to complete its detailed technical review. The acceptance review is also intended to identify whether the application has any readily apparent information insufficiencies in its characterization of the regulatory requirements or the licensing basis of the plant.
The NRC staff has reviewed your application and concluded that it does provide technical information in sufficient detail to enable the NRC staff to complete its detailed technical review and make an independent assessment regarding the acceptability of the proposed change in terms of regulatory requirements and the protection of public health and safety and the environment. Given the lesser scope and depth of the acceptance review, as compared to the detailed technical review, there may be instances in which issues that impact the NRC staffs ability to complete the detailed technical review are identified, despite completion of an adequate acceptance review. If additional information is needed, you will be advised by separate correspondence.
If you have any questions, please contact me.
Alex Chereskin Project Manager NRR/DORL/LPL1-1 O-08 H18 Alexander.Chereskin@nrc.gov Office: (301) 415-2549 Cell: (631) 748-1726
Hearing Identifier:
NRR_PMDA Email Number:
2528 Mail Envelope Properties (Alexander.Chereskin@nrc.gov20151204145600)
Subject:
Acceptance Review Results: License Amendment Request to Relocate Surveillance Frequency Requirements (CAC Nos. MF7056_57)
Sent Date:
12/4/2015 2:56:34 PM Received Date:
12/4/2015 2:56:00 PM From:
Chereskin, Alexander Created By:
Alexander.Chereskin@nrc.gov Recipients:
"'Enrique.Villar@exeloncorp.com'" <Enrique.Villar@exeloncorp.com>
Tracking Status: None Post Office:
Files Size Date & Time MESSAGE 1943 12/4/2015 2:56:00 PM Options Priority:
Standard Return Notification:
No Reply Requested:
No Sensitivity:
Normal Expiration Date:
Recipients Received:
1 NRR-PMDAPEm Resource From:
Chereskin, Alexander Sent:
Friday, December 04, 2015 2:57 PM To:
'Enrique.Villar@exeloncorp.com'
Subject:
Acceptance Review Results: License Amendment Request to Relocate Surveillance Frequency Requirements (CAC Nos. MF7056_57)
- Enrique, By letter dated November 5, 2015 (Agencywide Documents Access and Management System Accession No. ML15310A064), Exelon Generation Company, LLC submitted a license amendment request to relocate Surveillance Requirement Frequencies to the previous approved Surveillance Frequency Control Program for the Calvert Cliffs Nuclear Power Plant, Unit Nos. 1 and 2. The purpose of this e-mail is to provide the results of the U.S. Nuclear Regulatory Commission (NRC) staffs acceptance review of this relief request. The acceptance review was performed to determine if there is sufficient technical information in scope and depth to allow the NRC staff to complete its detailed technical review. The acceptance review is also intended to identify whether the application has any readily apparent information insufficiencies in its characterization of the regulatory requirements or the licensing basis of the plant.
The NRC staff has reviewed your application and concluded that it does provide technical information in sufficient detail to enable the NRC staff to complete its detailed technical review and make an independent assessment regarding the acceptability of the proposed change in terms of regulatory requirements and the protection of public health and safety and the environment. Given the lesser scope and depth of the acceptance review, as compared to the detailed technical review, there may be instances in which issues that impact the NRC staffs ability to complete the detailed technical review are identified, despite completion of an adequate acceptance review. If additional information is needed, you will be advised by separate correspondence.
If you have any questions, please contact me.
Alex Chereskin Project Manager NRR/DORL/LPL1-1 O-08 H18 Alexander.Chereskin@nrc.gov Office: (301) 415-2549 Cell: (631) 748-1726
Hearing Identifier:
NRR_PMDA Email Number:
2528 Mail Envelope Properties (Alexander.Chereskin@nrc.gov20151204145600)
Subject:
Acceptance Review Results: License Amendment Request to Relocate Surveillance Frequency Requirements (CAC Nos. MF7056_57)
Sent Date:
12/4/2015 2:56:34 PM Received Date:
12/4/2015 2:56:00 PM From:
Chereskin, Alexander Created By:
Alexander.Chereskin@nrc.gov Recipients:
"'Enrique.Villar@exeloncorp.com'" <Enrique.Villar@exeloncorp.com>
Tracking Status: None Post Office:
Files Size Date & Time MESSAGE 1943 12/4/2015 2:56:00 PM Options Priority:
Standard Return Notification:
No Reply Requested:
No Sensitivity:
Normal Expiration Date:
Recipients Received: