IR 05000333/2015008

From kanterella
(Redirected from ML15314A159)
Jump to navigation Jump to search
Assessment Follow-Up Letter for James A. Fitzpatrick Nuclear Power Plant (Report 05000333/2015008)
ML15314A159
Person / Time
Site: FitzPatrick Constellation icon.png
Issue date: 11/06/2015
From: Glenn Dentel
Reactor Projects Branch 2
To: Brian Sullivan
Entergy Nuclear Northeast
Dentel G
References
IR 2015008
Download: ML15314A159 (3)


Text

UNITED STATES ovember 6, 2015

SUBJECT:

ASSESSMENT FOLLOW-UP LETTER FOR JAMES A. FITZPATRICK NUCLEAR POWER PLANT (REPORT 05000333/2015008)

Dear Mr. Sullivan:

On November 6, 2015, the U.S. Nuclear Regulatory Commission (NRC) completed its quarterly review of performance at the James A. FitzPatrick Nuclear Power Plant (FitzPatrick). The review included performance indicators (PI) and inspection results. This letter informs you of the NRCs assessment of your facility and supplements, but does not supersede, the mid-cycle letter issued on September 1, 2015.

The Unplanned Power Changes per 7,000 Critical Hours PI exceeded the Green-to-White threshold value in the fourth quarter of 2012. In the fourth quarter of 2014, the NRC completed a review of the White PI using Inspection Procedure 95001, Supplemental Inspection for One or Two White Inputs in a Strategic Performance Area." The results of this inspection were documented in the fourth quarter integrated inspection report 05000333/2014005, dated February 6, 2015 (ADAMS Accession No. ML15037A280). The NRC concluded that the corrective actions taken were adequate to preclude repetition of the unplanned power changes and were sufficient to meet the inspection objectives.

The NRCs review of FitzPatricks performance identified that the Unplanned Power Changes per 7,000 Critical Hours PI returned to the nominal, expected range (i.e., Green) in the third quarter of 2015. Therefore, all inspection findings had very low (i.e., Green) safety significance, and all PIs indicated that your performance was within the nominal, expected range (i.e.,

Green). Accordingly, per the guidance in Inspection Manual Chapter 0305, Operating Reactor Assessment Program, FitzPatrick transitioned to the Licensee Response Column (Column 1) of the NRC Reactor Oversight Process Action Matrix, effective October 1, 2015.

In accordance with Title 10 of the Code of Federal Regulations, Part 2.390 of the NRCs Rules of Practice, a copy of this letter will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records component of NRC's Agencywide Documents Access and Management System (ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).

Please contact me at (610) 337-5233 with any questions you have regarding this letter.

Sincerely,

/RA/

Glenn T. Dentel, Chief Reactor Projects Branch 2 Division of Reactor Projects Docket No. 50-333 License No. DPR-59 cc: Distribution via ListServ

ML15314A159 SUNSI Review Non-Sensitive Publicly Available Sensitive Non-Publicly Available OFFICE RI/DRP RI/DRP NAME MDraxton/MSD GDentel/GTD DATE 10/29/15 11/6/15