MONTHYEARCNL-24-017, Tennessee Valley Authority - Central Emergency Control Center Emergency Plan Implementing Procedure and Emergency Preparedness Department Procedure Revisions2024-01-17017 January 2024 Tennessee Valley Authority - Central Emergency Control Center Emergency Plan Implementing Procedure and Emergency Preparedness Department Procedure Revisions CNL-23-068, Request for Exemption from Enhanced Weapons, Firearms Background Checks, and Security Event Notifications Implementation2023-12-21021 December 2023 Request for Exemption from Enhanced Weapons, Firearms Background Checks, and Security Event Notifications Implementation CNL-23-036, Application to Revise Function 5 of Technical Specification Table 3.3.2-1, Engineered Safety Feature Actuation System Instrumentation, for the Sequoyah Nuclear Plant and Watts Bar Nuclear Plant (SQN-TS-23-02 and WBN-TS-23-08)2023-12-18018 December 2023 Application to Revise Function 5 of Technical Specification Table 3.3.2-1, Engineered Safety Feature Actuation System Instrumentation, for the Sequoyah Nuclear Plant and Watts Bar Nuclear Plant (SQN-TS-23-02 and WBN-TS-23-08) CNL-23-067, Central Emergency Control Center Emergency Plan Implementing Procedure Revisions2023-11-27027 November 2023 Central Emergency Control Center Emergency Plan Implementing Procedure Revisions CNL-23-061, Tennessee Valley Authority - Central Emergency Control Center Emergency Plan Implementing Procedure Revision2023-09-20020 September 2023 Tennessee Valley Authority - Central Emergency Control Center Emergency Plan Implementing Procedure Revision CNL-23-059, Supplement to Sequoyah Nuclear Plant, Units 1 and 2, and Watts Bar Nuclear Plant, Units 1 and 2, Application to Revise Technical Specifications to Adopt TSTF-567-A, Revision 1, Add Containment Sump TS to Address GSI-191 Issues (SQN-TS-23-2023-09-20020 September 2023 Supplement to Sequoyah Nuclear Plant, Units 1 and 2, and Watts Bar Nuclear Plant, Units 1 and 2, Application to Revise Technical Specifications to Adopt TSTF-567-A, Revision 1, Add Containment Sump TS to Address GSI-191 Issues (SQN-TS-23-03 CNL-23-057, Central Emergency Control Center Emergency Plan Implementing Procedure Revisions. Includes CECC-EPIP-1, Revision 76 and CECC-EPIP-9, Revision 642023-09-0505 September 2023 Central Emergency Control Center Emergency Plan Implementing Procedure Revisions. Includes CECC-EPIP-1, Revision 76 and CECC-EPIP-9, Revision 64 CNL-23-028, Application to Revise Technical Specifications to Adopt TSTF-567-A, Revision 1, Add Containment Sump TS to Address GSI-191 Issues (SQN-TS-23-03 and WBN-TS-23-06)2023-08-0202 August 2023 Application to Revise Technical Specifications to Adopt TSTF-567-A, Revision 1, Add Containment Sump TS to Address GSI-191 Issues (SQN-TS-23-03 and WBN-TS-23-06) CNL-23-055, Tennessee Valley Authority - Emergency Preparedness Department Procedure Revision. Includes EPDP-3, Revision 3, Emergency Plan Exercises and Preparedness Drills2023-07-25025 July 2023 Tennessee Valley Authority - Emergency Preparedness Department Procedure Revision. Includes EPDP-3, Revision 3, Emergency Plan Exercises and Preparedness Drills CNL-23-053, Tennessee Valley Authority - Radiological Emergency Plan Revisions2023-07-18018 July 2023 Tennessee Valley Authority - Radiological Emergency Plan Revisions CNL-23-049, Tennessee Valley Authority - Radiological Emergency Plan and Central Emergency Control Center Emergency Plan .2023-06-26026 June 2023 Tennessee Valley Authority - Radiological Emergency Plan and Central Emergency Control Center Emergency Plan . CNL-23-042, Radiological Emergency Plan and Central Emergency Control Center Emergency Plan Implementing Procedure Revisions2023-05-16016 May 2023 Radiological Emergency Plan and Central Emergency Control Center Emergency Plan Implementing Procedure Revisions CNL-23-032, Clinch River, Sequoyah, Units 1 and 2, Watts Bar, Unit 1 and 2, Nuclear Quality Assurance Plan, TVA-NQA-PLN89-A, Revision 412023-04-27027 April 2023 Clinch River, Sequoyah, Units 1 and 2, Watts Bar, Unit 1 and 2, Nuclear Quality Assurance Plan, TVA-NQA-PLN89-A, Revision 41 CNL-23-030, Tennessee Valley Authority - Hydrologic Engineering Center River Analysis System Project Milestone Status Update2023-04-27027 April 2023 Tennessee Valley Authority - Hydrologic Engineering Center River Analysis System Project Milestone Status Update CNL-23-033, Radiological Emergency Plan and Central Emergency Control Center Emergency Plan Implementing Procedure Revision2023-04-24024 April 2023 Radiological Emergency Plan and Central Emergency Control Center Emergency Plan Implementing Procedure Revision CNL-23-029, Radiological Emergency Plan and Central Emergency Control Center Emergency Plan Implementing Procedure Revisions2023-04-11011 April 2023 Radiological Emergency Plan and Central Emergency Control Center Emergency Plan Implementing Procedure Revisions CNL-23-012, Revision to the Application to Revise Updated Final Safety Analysis Report Regarding Changes to Hydrologic Analysis, (TS-19-02)2023-04-11011 April 2023 Revision to the Application to Revise Updated Final Safety Analysis Report Regarding Changes to Hydrologic Analysis, (TS-19-02) CNL-23-023, Annual Insurance Status Report2023-03-30030 March 2023 Annual Insurance Status Report CNL-23-024, TVA Guarantee of Payment of Deferred Premiums - 2022 Annual Report2023-03-29029 March 2023 TVA Guarantee of Payment of Deferred Premiums - 2022 Annual Report CNL-23-022, Decommissioning Funding Status Report2023-03-29029 March 2023 Decommissioning Funding Status Report CNL-23-021, Radiological Emergency Plan and Central Emergency Control Center Emergency Plan Implementing Procedure Revisions2023-03-0808 March 2023 Radiological Emergency Plan and Central Emergency Control Center Emergency Plan Implementing Procedure Revisions CNL-22-037, Application to Revise Technical Specifications to Adopt TSTF-541-A, Add Exceptions to Surveillance Requirements for Valves and Dampers Locked in the Actuated Position (BFN TS-533)2023-01-31031 January 2023 Application to Revise Technical Specifications to Adopt TSTF-541-A, Add Exceptions to Surveillance Requirements for Valves and Dampers Locked in the Actuated Position (BFN TS-533) CNL-23-003, Browns Nuclear Plant, Units 1, 2 & 3; Sequoyah Nuclear Plant, Units 1 & 2; and Watts Bar Nuclear Plant, Units 1 & 2 - Organizational Topic Report TVA-NPOD89-A2023-01-30030 January 2023 Browns Nuclear Plant, Units 1, 2 & 3; Sequoyah Nuclear Plant, Units 1 & 2; and Watts Bar Nuclear Plant, Units 1 & 2 - Organizational Topic Report TVA-NPOD89-A CNL-23-011, Steam Generator Tube Inspection Report to Reflect TSTF-577 Reporting Requirements2023-01-18018 January 2023 Steam Generator Tube Inspection Report to Reflect TSTF-577 Reporting Requirements CNL-23-009, Response to Request for Additional Information Request to Revise Technical Specification 3.4.122023-01-0404 January 2023 Response to Request for Additional Information Request to Revise Technical Specification 3.4.12 CNL-23-008, Tennessee Valley Authority Radiological Emergency Plan and Central Emergency Control Center Emergency Plan Implementing Procedure Revisions2022-12-22022 December 2022 Tennessee Valley Authority Radiological Emergency Plan and Central Emergency Control Center Emergency Plan Implementing Procedure Revisions CNL-22-106, Tennessee Valley Authority - Radiological Emergency Plan and Central Emergency Control Center Emergency Plan Implementing Procedure Revision. Includes CECC EPIP-14, Revision 38, Nuclear Emergency Public Information Organization and Operat2022-11-28028 November 2022 Tennessee Valley Authority - Radiological Emergency Plan and Central Emergency Control Center Emergency Plan Implementing Procedure Revision. Includes CECC EPIP-14, Revision 38, Nuclear Emergency Public Information Organization and Operatio CNL-22-099, Tennessee Valley Authority - Hydrologic Engineering Center River Analysis System Project Milestone Status Update2022-10-31031 October 2022 Tennessee Valley Authority - Hydrologic Engineering Center River Analysis System Project Milestone Status Update CNL-22-104, Correction to Response to Request for Additional Information Regarding Sequoyah Nuclear Plant, Units 1 and 2, American Society of Mechanical Engineers Operation and Maintenance Code, Request for Alternative RV-022022-10-31031 October 2022 Correction to Response to Request for Additional Information Regarding Sequoyah Nuclear Plant, Units 1 and 2, American Society of Mechanical Engineers Operation and Maintenance Code, Request for Alternative RV-02 CNL-22-098, Tennessee Valley Authority - Radiological Emergency Plan and Central Emergency Control Center Emergency Plan Implementing Procedure Revisions. Includes CECC EPIP-7, Rev. 45 & CECC EPIP-8, Rev. 552022-10-17017 October 2022 Tennessee Valley Authority - Radiological Emergency Plan and Central Emergency Control Center Emergency Plan Implementing Procedure Revisions. Includes CECC EPIP-7, Rev. 45 & CECC EPIP-8, Rev. 55 CNL-22-084, Response to Request for Additional Information Regarding License Amendment Request to License Amendment Request to Modify Approved 10 CFR 50.69 Categorization Process (SQN-TS-21-07)2022-09-16016 September 2022 Response to Request for Additional Information Regarding License Amendment Request to License Amendment Request to Modify Approved 10 CFR 50.69 Categorization Process (SQN-TS-21-07) CNL-22-085, Response to Request for Additional Information Regarding Sequoyah Nuclear Plant (Sqn), Units 1 and 2 and Watts Bar Nuclear Plant (Wbn), Units 1 and 2, American Society of Mechanical Engineers Operation and Maintenance Code, Request for Al2022-09-0202 September 2022 Response to Request for Additional Information Regarding Sequoyah Nuclear Plant (Sqn), Units 1 and 2 and Watts Bar Nuclear Plant (Wbn), Units 1 and 2, American Society of Mechanical Engineers Operation and Maintenance Code, Request for Alte CNL-22-053, Response to Request for Additional Information Regarding Application to Revise Sequoyah Nuclear Plant Units 1 and 2 Updated Final Safety Analysis Report Regarding Changes to Hydrologic Analysis - Second Partial Response to Additional Requ2022-08-22022 August 2022 Response to Request for Additional Information Regarding Application to Revise Sequoyah Nuclear Plant Units 1 and 2 Updated Final Safety Analysis Report Regarding Changes to Hydrologic Analysis - Second Partial Response to Additional Reques CNL-22-077, Radiological Emergency Plan and Central Emergency Control Center Emergency Plan Implementing Procedure Revisions2022-08-11011 August 2022 Radiological Emergency Plan and Central Emergency Control Center Emergency Plan Implementing Procedure Revisions CNL-22-030, Application to Revise Technical Specification 3.4.12, Low Temperature Overpressure Protection System for Sequoyah Nuclear Plant (SQN-TSC-22-01) and TS 3.4.12 Cold Overpressure Mitigation System for Watts Bar Nuclear Plant (WBN-TS-22-03)2022-07-27027 July 2022 Application to Revise Technical Specification 3.4.12, Low Temperature Overpressure Protection System for Sequoyah Nuclear Plant (SQN-TSC-22-01) and TS 3.4.12 Cold Overpressure Mitigation System for Watts Bar Nuclear Plant (WBN-TS-22-03) CNL-22-080, Request for Enforcement Discretion from the Requirements of Technical Specification 3.5.2, ECCS - Operating2022-07-22022 July 2022 Request for Enforcement Discretion from the Requirements of Technical Specification 3.5.2, ECCS - Operating CNL-22-081, Supplement to Sequoyah Nuclear Plant, Unit 1, American Society of Mechanical Engineers Operation and Maintenance Code, Request for Alternative RP-122022-07-21021 July 2022 Supplement to Sequoyah Nuclear Plant, Unit 1, American Society of Mechanical Engineers Operation and Maintenance Code, Request for Alternative RP-12 CNL-22-079, American Society of Mechanical Engineers Operation and Maintenance Code, Request for Alternative RP-122022-07-20020 July 2022 American Society of Mechanical Engineers Operation and Maintenance Code, Request for Alternative RP-12 CNL-22-071, Supplement to Application to Revise Technical Specifications to Adopt TSTF-577, Revised Frequencies for Steam Generator Tube Inspections (SQN-TS-21-03 and WBN-TS-21-08)2022-07-13013 July 2022 Supplement to Application to Revise Technical Specifications to Adopt TSTF-577, Revised Frequencies for Steam Generator Tube Inspections (SQN-TS-21-03 and WBN-TS-21-08) CNL-22-039, Application to Revise Technical Specifications to Adopt TSTF-554-A, Revision 1, Revise Reactor Coolant Leakage Requirements (BFN TS-537) (SQN-21-05) (WBN-TS-21-04)2022-07-13013 July 2022 Application to Revise Technical Specifications to Adopt TSTF-554-A, Revision 1, Revise Reactor Coolant Leakage Requirements (BFN TS-537) (SQN-21-05) (WBN-TS-21-04) CNL-22-069, Response to Request for Additional Information Regarding License Amendment Request to Revise Technical Specifications to Adopt Risk-Informed Completion Times TSTF-505, Revision 2, Provide Risk-Informed Extended Completion Times - Ritstf.2022-07-0101 July 2022 Response to Request for Additional Information Regarding License Amendment Request to Revise Technical Specifications to Adopt Risk-Informed Completion Times TSTF-505, Revision 2, Provide Risk-Informed Extended Completion Times - Ritstf. CNL-22-070, Status Regarding the Improved Flood Mitigation System Project2022-06-30030 June 2022 Status Regarding the Improved Flood Mitigation System Project CNL-22-062, Response to Request for Additional Information Regarding American Society of Mechanical Engineers Operation and Maintenance Code, Request for Alternative RV-022022-06-28028 June 2022 Response to Request for Additional Information Regarding American Society of Mechanical Engineers Operation and Maintenance Code, Request for Alternative RV-02 CNL-22-008, and Watts Bar Nuclear Plant - Application to Revise Technical Specifications to Adopt TSTF-529, Clarify Use and Application Rules (BFN-TS-541, SQN-TS-21-09, and WBN-TS-22-002)2022-06-13013 June 2022 and Watts Bar Nuclear Plant - Application to Revise Technical Specifications to Adopt TSTF-529, Clarify Use and Application Rules (BFN-TS-541, SQN-TS-21-09, and WBN-TS-22-002) CNL-22-064, Response to Request for Additional Information Regarding Tennessee Valley Authority License Amendment Request to Revise Emergency Plan Implementing Procedure Regarding Seismic Event Emergency Action Level Change2022-06-0909 June 2022 Response to Request for Additional Information Regarding Tennessee Valley Authority License Amendment Request to Revise Emergency Plan Implementing Procedure Regarding Seismic Event Emergency Action Level Change CNL-22-068, Tennessee Valley Authority - Radiological Emergency Plan and Central Emergency Control Center Emergency Plan Implementing Procedure Revisions2022-06-0808 June 2022 Tennessee Valley Authority - Radiological Emergency Plan and Central Emergency Control Center Emergency Plan Implementing Procedure Revisions CNL-22-047, Central Emergency Control Center Emergency Plan Implementing Procedure and Emergency Preparedness Department Procedure Revisions2022-05-23023 May 2022 Central Emergency Control Center Emergency Plan Implementing Procedure and Emergency Preparedness Department Procedure Revisions CNL-22-034, Second Supplement to License Amendment Request to Revise Technical Specifications to Adopt Risk-Informed Completion Times TSTF-505, Revision 2, Provide Risk-Informed Extended Completion Times - RITSTF Initiative 4b (SQN-TS-20-03)2022-05-13013 May 2022 Second Supplement to License Amendment Request to Revise Technical Specifications to Adopt Risk-Informed Completion Times TSTF-505, Revision 2, Provide Risk-Informed Extended Completion Times - RITSTF Initiative 4b (SQN-TS-20-03) CNL-22-027, Clinch River, Sequoyah, Units 1 and 2, Watts Bar, Unit 1 and 2, Nuclear Quality Assurance Plan, TVA-NQA-PLN89-A, Revision 40 - Annual Update and Proposed Changes to Revision 402022-04-28028 April 2022 Clinch River, Sequoyah, Units 1 and 2, Watts Bar, Unit 1 and 2, Nuclear Quality Assurance Plan, TVA-NQA-PLN89-A, Revision 40 - Annual Update and Proposed Changes to Revision 40 CNL-22-023, Supplement to License Amendment Request to Revise Technical Specifications to Adopt Risk-Informed Completion Times TSTF-505, Revision 2, Provide Risk-Informed Extended Completion Times - Ritstf2022-04-28028 April 2022 Supplement to License Amendment Request to Revise Technical Specifications to Adopt Risk-Informed Completion Times TSTF-505, Revision 2, Provide Risk-Informed Extended Completion Times - Ritstf 2024-01-17
[Table view] |
Text
Tennessee Valley Authority, 1101 Market Street, Chattanooga, Tennessee 37402 CNL-15-210 October 22, 2015 10 CFR 50.4 ATTN: Document Control Desk U.S. Nuclear Regulatory Commission Washington, D.C. 20555-0001 Sequoyah Nuclear Plant, Units 1 and 2 Renewed Facility Operating License Nos. DPR-77 and DPR-79 NRC Docket Nos. 50-327 and 50-328
Subject:
Sequoyah Nuclear Plant, Units 1 and 2 - Withdrawal of Proposed Technical Specification Change, Ultimate Heat Sink (UHS) Temperature Limitations Supporting Alternate Essential Raw Cooling Water (ERCW)
Loop Alignments (SQN-TS-13-01 and 13-02)
References:
- 1. Letter from TVA to NRC, Sequoyah Nuclear Plant, Units 1 And 2 -
Proposed Technical Specification Change, Ultimate Heat Sink (UHS)
Temperature Limitations Supporting Alternate Essential Raw Cooling Water (ERCW) Loop Alignments (SQN-TS-13-01 and 13-02), dated October 2, 2013 [ML13280A267]
- 2. Electronic Mail from NRC to TVA, Sequoyah 1 and 2 UHS LAR (SQN-TS-13-01 and SQN-TS-13-02) Post Acceptance Review RAIs (TAC Nos. MF2852 and MF2853), dated November 11, 2013
[ML13316B206]
- 3. Letter from TVA to NRC, CNL-13-139 Response to Request for Additional Information Regarding Sequoyah Nuclear Plant, Units 1 and 2, Ultimate Heat Sink License Amendment Request (TAC Nos. MF2852 and MF2853), dated December 11, 2013 [ML13354A715]
- 4. Electronic Mail from NRC to TVA, Request For Additional Information Related To License Amendment Request To Revise Technical Specification On Ultimate Heat Sink, dated May 13, 2014 [ML14133A653]
- 5. Letter from TVA to NRC, CNL-14-103 Response to Request for Additional Information #2 Regarding Sequoyah Nuclear Plant, Units 1 and 2, Ultimate Heat Sink License Amendment Request (TAC Nos. MF2852 and MF2853), dated August 14, 2014 [ML14231B294]
U.S. Nuclear Regulatory Commission CNL-15-210 Page2 October 22, 2015
- 6. Electronic Mail from NRC to TVA, "Sequoyah Nuclear Plant, Units 1 and 2, Related to License Amendment Request to Revise Technical Specification on Ultimate Heat Sink (TAC Nos. MF2852 and MF2853)," dated February 11, 2015 [ML15042A470]
- 7. Letter from TVA to NRC, CNL-15-059 "Response to NRC Request for Additional Information Regarding the Review of the Sequoyah Nuclear Plant, Units 1 and 2, Related to License Amendment Request to Revise Technical Specification on Ultimate Heat Sink (TAC Nos. MF2852 and MF2853)," dated June 19, 2015[ML15173A466]
By letter dated October 2, 2013 (Reference 1), Tennessee Valley Authority (TVA) submitted license amendment requests (LARs) SQN-TS-13-01 and SQN-TS-13-02 for Sequoyah Nuclear Plant (SQN), Units 1 and 2. The amendment proposed changes to Technical Specification (TS) 3.7.5, "Ultimate Heat Sink (UHS)," to place additional limitations on the maximum average Essential Raw Cooling Water (ERCW) system supply header water temperature during operation with one ERCW pump per loop and during operation with one ERCW supply strainer per loop. In addition, the one-time limitations on Unit 1 Ultimate Heat Sink (UHS) temperature and the associated License Condition requirements for the Unit 2 steam generator replacement project were proposed to be deleted.
The October 2, 2013 LAR (Reference 1) was submitted to NRC to address the current TS Limits for having an ERCW train out-of-service, in order to facilitate cleaning and inspection of the 6.9 kV shutdown board and associated 480v shutdown boards without requiring a dual unit shutdown. As a result of TVA's responses to NRC requests for additional information (RAls) related to the LAR (References 2 through 7), the TS 3.7.5 LAR scope changed to include additional ERCW pump operability criteria. Including these criteria in TS 3.7.5 could potentially create confusion for the SQN Operations Staff, because the ERCW Limiting Condition for Operation (LCO) is in TS 3.7.4.
Based on discussions with the NRC staff, TVA is re-evaluating the current plan to address TS Limits for having an ERCW train out of service and therefore, TVA has elected to withdraw LAR SQN-TS-13-01 and SQN-TS-13-02.
There are no new regulatory commitments contained in this submittal. Please address any questions regarding this submittal to Mr. Edward Schrull at (423) 751-2687.
Respectfully, J W. Shea President, Nuclear Licensing cc: See Page 3
U.S. Nuclear Regulatory Commission CNL-15-210 Page 3 October 22, 2015 cc :
NRC Regional Administrator - Region II NRC Senior Resident Inspector - Sequoyah Nuclear Plant Director, Division of Radiological Health - Tennessee State Department of Environment and Conservation
Tennessee Valley Authority, 1101 Market Street, Chattanooga, Tennessee 37402 CNL-15-210 October 22, 2015 10 CFR 50.4 ATTN: Document Control Desk U.S. Nuclear Regulatory Commission Washington, D.C. 20555-0001 Sequoyah Nuclear Plant, Units 1 and 2 Renewed Facility Operating License Nos. DPR-77 and DPR-79 NRC Docket Nos. 50-327 and 50-328
Subject:
Sequoyah Nuclear Plant, Units 1 and 2 - Withdrawal of Proposed Technical Specification Change, Ultimate Heat Sink (UHS) Temperature Limitations Supporting Alternate Essential Raw Cooling Water (ERCW)
Loop Alignments (SQN-TS-13-01 and 13-02)
References:
- 1. Letter from TVA to NRC, Sequoyah Nuclear Plant, Units 1 And 2 -
Proposed Technical Specification Change, Ultimate Heat Sink (UHS)
Temperature Limitations Supporting Alternate Essential Raw Cooling Water (ERCW) Loop Alignments (SQN-TS-13-01 and 13-02), dated October 2, 2013 [ML13280A267]
- 2. Electronic Mail from NRC to TVA, Sequoyah 1 and 2 UHS LAR (SQN-TS-13-01 and SQN-TS-13-02) Post Acceptance Review RAIs (TAC Nos. MF2852 and MF2853), dated November 11, 2013
[ML13316B206]
- 3. Letter from TVA to NRC, CNL-13-139 Response to Request for Additional Information Regarding Sequoyah Nuclear Plant, Units 1 and 2, Ultimate Heat Sink License Amendment Request (TAC Nos. MF2852 and MF2853), dated December 11, 2013 [ML13354A715]
- 4. Electronic Mail from NRC to TVA, Request For Additional Information Related To License Amendment Request To Revise Technical Specification On Ultimate Heat Sink, dated May 13, 2014 [ML14133A653]
- 5. Letter from TVA to NRC, CNL-14-103 Response to Request for Additional Information #2 Regarding Sequoyah Nuclear Plant, Units 1 and 2, Ultimate Heat Sink License Amendment Request (TAC Nos. MF2852 and MF2853), dated August 14, 2014 [ML14231B294]
U.S. Nuclear Regulatory Commission CNL-15-210 Page2 October 22, 2015
- 6. Electronic Mail from NRC to TVA, "Sequoyah Nuclear Plant, Units 1 and 2, Related to License Amendment Request to Revise Technical Specification on Ultimate Heat Sink (TAC Nos. MF2852 and MF2853)," dated February 11, 2015 [ML15042A470]
- 7. Letter from TVA to NRC, CNL-15-059 "Response to NRC Request for Additional Information Regarding the Review of the Sequoyah Nuclear Plant, Units 1 and 2, Related to License Amendment Request to Revise Technical Specification on Ultimate Heat Sink (TAC Nos. MF2852 and MF2853)," dated June 19, 2015[ML15173A466]
By letter dated October 2, 2013 (Reference 1), Tennessee Valley Authority (TVA) submitted license amendment requests (LARs) SQN-TS-13-01 and SQN-TS-13-02 for Sequoyah Nuclear Plant (SQN), Units 1 and 2. The amendment proposed changes to Technical Specification (TS) 3.7.5, "Ultimate Heat Sink (UHS)," to place additional limitations on the maximum average Essential Raw Cooling Water (ERCW) system supply header water temperature during operation with one ERCW pump per loop and during operation with one ERCW supply strainer per loop. In addition, the one-time limitations on Unit 1 Ultimate Heat Sink (UHS) temperature and the associated License Condition requirements for the Unit 2 steam generator replacement project were proposed to be deleted.
The October 2, 2013 LAR (Reference 1) was submitted to NRC to address the current TS Limits for having an ERCW train out-of-service, in order to facilitate cleaning and inspection of the 6.9 kV shutdown board and associated 480v shutdown boards without requiring a dual unit shutdown. As a result of TVA's responses to NRC requests for additional information (RAls) related to the LAR (References 2 through 7), the TS 3.7.5 LAR scope changed to include additional ERCW pump operability criteria. Including these criteria in TS 3.7.5 could potentially create confusion for the SQN Operations Staff, because the ERCW Limiting Condition for Operation (LCO) is in TS 3.7.4.
Based on discussions with the NRC staff, TVA is re-evaluating the current plan to address TS Limits for having an ERCW train out of service and therefore, TVA has elected to withdraw LAR SQN-TS-13-01 and SQN-TS-13-02.
There are no new regulatory commitments contained in this submittal. Please address any questions regarding this submittal to Mr. Edward Schrull at (423) 751-2687.
Respectfully, J W. Shea President, Nuclear Licensing cc: See Page 3
U.S. Nuclear Regulatory Commission CNL-15-210 Page 3 October 22, 2015 cc :
NRC Regional Administrator - Region II NRC Senior Resident Inspector - Sequoyah Nuclear Plant Director, Division of Radiological Health - Tennessee State Department of Environment and Conservation