Letter Sequence Withholding Request Acceptance |
---|
|
|
|
|
---|
Category:Letter
MONTHYEARIR 05000259/20240112024-12-26026 December 2024 Biennial Problem Identification and Resolution Inspection Report 05000259/2024011, 05000260/2024011, and 05000296/2024011 ML24354A2092024-12-19019 December 2024 American Society of Mechanical Engineers, Section XI, Third 10 Year Inspection Interval, Inspection Service, System Procedure Test, Containment Inspection, and Repair and Replacement Programs, Owners Activity Report for Browns Ferry Nuclear CNL-24-082, Central Emergency Control Center Emergency Plan Implementing Procedure Revision2024-12-17017 December 2024 Central Emergency Control Center Emergency Plan Implementing Procedure Revision CNL-24-009, Brown Ferry Nuclear Plant, Units 1, 2 & 3; Sequoyah Nuclear Plant, Units 1 & 2 and Watts Bar Plant, Units 1 & 2 - Triennial Decommission Funding Plans for Independent Spent Fuel Storage Installations2024-12-17017 December 2024 Brown Ferry Nuclear Plant, Units 1, 2 & 3; Sequoyah Nuclear Plant, Units 1 & 2 and Watts Bar Plant, Units 1 & 2 - Triennial Decommission Funding Plans for Independent Spent Fuel Storage Installations CNL-24-081, Application for Subsequent Renewed Operating Licenses, Third Safety Supplement2024-12-17017 December 2024 Application for Subsequent Renewed Operating Licenses, Third Safety Supplement CNL-24-083, Alabama Department of Environmental Management Letter2024-12-10010 December 2024 Alabama Department of Environmental Management Letter CNL-24-049, Brows Ferry Nuclear Plant, Units 1, 2 and 3 - License Amendment Request for Adoption of TSTF-576 to Revise Safety/Relief Valve Requirements2024-12-0909 December 2024 Brows Ferry Nuclear Plant, Units 1, 2 and 3 - License Amendment Request for Adoption of TSTF-576 to Revise Safety/Relief Valve Requirements 05000296/LER-2024-004, Reactor Coolant System Pressure Boundary Leakage Identified from Recirculation System Small Bore Piping2024-12-0404 December 2024 Reactor Coolant System Pressure Boundary Leakage Identified from Recirculation System Small Bore Piping 05000260/LER-2024-002-01, High Pressure Coolant Injection Inoperable Due to Rupture Disc Failure and Resulting System Isolation2024-11-25025 November 2024 High Pressure Coolant Injection Inoperable Due to Rupture Disc Failure and Resulting System Isolation IR 05000260/20240912024-11-21021 November 2024 Final Significance Determination of a White Finding and Notice of Violation and Assessment Followup Letter NRC Inspection Report 05000260/2024091 ML24324A3332024-11-20020 November 2024 Notification of Licensed Operator Initial Examination 05000259/2025301, 05000260/2025301, 05000296/2025301 IR 05000259/20240102024-11-12012 November 2024 Design Basis Assurance Inspection Program Inspection Report 05000259/2024010 and 05000260/2024010 and 05000296/2024010 IR 05000259/20240032024-11-0404 November 2024 Integrated Inspection Report 05000259/2024003 and 05000260/2024003 and 05000296/2024003 CNL-24-043, Application for Subsequent Renewed Operating Licenses, Second Safety Supplement2024-11-0101 November 2024 Application for Subsequent Renewed Operating Licenses, Second Safety Supplement ML24305A1692024-10-31031 October 2024 Site Emergency Plan Implementing Procedure Revision 05000259/LER-2024-003, Valid Specified System Actuation Caused the Automatic Start of Emergency Diesel Generators2024-10-29029 October 2024 Valid Specified System Actuation Caused the Automatic Start of Emergency Diesel Generators 05000259/LER-2024-001-02, Secondary Containment Isolation Valve Inoperable Due to Mechanical Failure2024-10-28028 October 2024 Secondary Containment Isolation Valve Inoperable Due to Mechanical Failure ML24299A2632024-10-25025 October 2024 Response to Apparent Violation in NRC Inspection Report 05000260/2024090, EA-24-075 ML24289A1232024-10-24024 October 2024 Letter to James Barstow Re Environmental Scoping Summary Report for Browns Ferry CNL-24-074, Tennessee Valley Authority - Central Emergency Control Center Emergency Plan Implementing Procedure Revisions2024-10-23023 October 2024 Tennessee Valley Authority - Central Emergency Control Center Emergency Plan Implementing Procedure Revisions ML24308A0042024-10-16016 October 2024 Ahc 24-1578 Environmental Review of the Browns Ferry Nuclear Plant, Units 1, 2 and 3 Subsequent License Renewal Application Limestone County CNL-24-077, Application for Subsequent Renewed Operating Licenses, Response to Request for Additional Information, Set 12024-10-0909 October 2024 Application for Subsequent Renewed Operating Licenses, Response to Request for Additional Information, Set 1 ML24270A2162024-09-27027 September 2024 Notice of Intentions Regarding Preliminary Finding from NRC Inspection Report 05000260/2024090, EA-24-075 CNL-24-060, Supplement to Request for Approval of the Tennessee Valley Authority Nuclear Quality Assurance Program Description2024-09-24024 September 2024 Supplement to Request for Approval of the Tennessee Valley Authority Nuclear Quality Assurance Program Description ML24262A1502024-09-24024 September 2024 Requalification Program Inspection - Browns Ferry Nuclear Plant ML24262A0602024-09-23023 September 2024 Summary of August 19, 2024, Meeting with Tennessee Valley Authority Regarding a Proposed Supplement to the Tennessee Valley Authority Nuclear Quality Assurance Plan ML24263A2952024-09-19019 September 2024 Site Emergency Plan Implementing Procedure Revision CNL-24-065, Tennessee Valley Authority – Central Emergency Control Center Emergency Plan Implementing Procedure Revisions2024-09-18018 September 2024 Tennessee Valley Authority – Central Emergency Control Center Emergency Plan Implementing Procedure Revisions IR 05000260/20240902024-09-17017 September 2024 NRC Inspection Report 05000260/2024090 and Preliminary White Finding and Apparent Violation - 1 CNL-24-062, Cycle 16 Reload Analysis Report2024-09-16016 September 2024 Cycle 16 Reload Analysis Report ML24255A8862024-09-10010 September 2024 Core Operating Limits Report for Cycle 16 Operation, Revision 0 IR 05000259/20244042024-09-0303 September 2024 Cyber Security Inspection Report 05000259/2024404 and 05000260-2024404 and 05000296/2024404-Cover Letter ML24239A3332024-09-0303 September 2024 Full Audit Plan IR 05000259/20240052024-08-26026 August 2024 Updated Inspection Plan for Browns Ferry Nuclear Plant, Units 1, 2 and 3 - Report 05000259/2024005, 05000260/2024005 and 05000296/2024005 ML24225A1682024-08-16016 August 2024 – Notification of Inspection and Request ML24219A0272024-08-0606 August 2024 Response to NRC Regulatory Issue Summary 2024-01, Preparation and Scheduling of Operator Licensing Examinations IR 05000259/20244022024-08-0606 August 2024 Security Baseline Inspection Report 05000259/2024402 and 05000260/2024402 and 05000296/2024402 IR 05000259/20240022024-08-0202 August 2024 Brown Ferry Nuclear Plant – Integrated Inspection Report05000259/2024002 and 05000260/2024002 and 05000296/2024002 ML24199A0012024-07-22022 July 2024 Clarification and Correction to Exemption from Requirement of 10 CFR 37.11(c)(2) ML24172A1342024-07-15015 July 2024 Exemptions from 10 CFR 37.11(C)(2) (EPID L-2023-LLE-0024) - Letter ML24183A4142024-07-10010 July 2024 – License Renewal Regulatory Limited Scope Audit Regarding the Environmental Review of the License Renewal Application (EPID Number: L-2024-SLE-0000) (Docket Numbers: 50-259, 50-260, and 50-296) 05000296/LER-2024-003, Main Steam Relief Valves Lift Settings Outside of Technical Specifications Required Setpoints2024-07-0808 July 2024 Main Steam Relief Valves Lift Settings Outside of Technical Specifications Required Setpoints 05000259/LER-2024-001-01, Inoperability of Unit 3 Diesel Generator Due to Relay Failure2024-07-0303 July 2024 Inoperability of Unit 3 Diesel Generator Due to Relay Failure ML24184A1142024-07-0202 July 2024 Site Emergency Plan Implementing Procedure Revision ML24183A3842024-07-0101 July 2024 Registration of Use of Cask to Store Spent Fuel (MPC-364, -365) ML24179A0282024-06-26026 June 2024 Evaluation of Effects of Out-of-Limits Condition as Described in IWB-3720(a) 05000259/LER-2024-002, Reactor Scram Due to Generator Step-Up Transformer Failure2024-06-24024 June 2024 Reactor Scram Due to Generator Step-Up Transformer Failure ML24175A0042024-06-23023 June 2024 Interim Report of a Deviation or Failure to Comply Associated with a Valve in the Unit 3 High Pressure Coolant Injection System ML24176A1132024-06-23023 June 2024 American Society of Mechanical Engineers, Section XI, Fourth 10 Year Inspection Interval, Inservice Inspection, System Pressure Test, Containment Inspection, and Repair and Replacement Programs, Owner’S Activity Report Cycle 21 Oper ML24089A1152024-06-21021 June 2024 Transmittal Letter, Environmental Assessments and Findings of No Significant Impact Related to Exemption Requests from 10 CFR 37.11(c)(2) 2024-09-03
[Table view] Category:Proprietary Information Review
MONTHYEARML24071A0292024-06-0505 June 2024 Subsequent License Renewal Application Enclosure 3 - Proprietary Determination Letter ML24068A2612024-06-0505 June 2024 SLRA Fluence Methodology Report - Proprietary Determination Letter ML23045A1192023-02-15015 February 2023 Proprietary Determination Letter Enclosure - Browns Ferry Atrium 11 LAR Supp. 6 ML23009B7502023-02-15015 February 2023 Request for Withholding Information from Public Disclosure for Supplement 6 to Browns Ferry License Amendment Request to Transition to Atrium 11 Fuel ML23010A0932023-02-13013 February 2023 Request for Withholding Information from Public Disclosure for Supplement 7 to Browns Ferry License Amendment Request Transition to Atrium 11 Fuel ML22297A2352023-01-10010 January 2023 Request for Withholding Information from Public Disclosure Regarding Use of Atrium 11 Fuel ML22276A1012022-10-25025 October 2022 Request for Withholding Information from Public Disclosure for Supplement 4 to Browns Ferry License Amendment Request to Transition to Atrium 11 Fuel ML22276A1002022-10-0404 October 2022 Request for Withholding Information from Public Disclosure for Supplement 3 to Browns Ferry License Amendment Request to Transition to Atrium 11 Fuel ML22157A3272022-06-13013 June 2022 Request for Withholding Information from Public Disclosure ML22154A1292022-06-13013 June 2022 Request for Withholding Information from Public Disclosure ML22125A2632022-06-0101 June 2022 Request for Withholding Information from Public Disclosure for Criticality Safety Analysis of Spent Fuel Pool Storage of Atrium 11 Fuel ML19360A0442019-12-30030 December 2019 Request for Withholding Information from Public Disclosure ML19346E6112019-12-26026 December 2019 Request for Withholding Information from Public Disclosure ML19136A2782019-08-26026 August 2019 Request for Withholding Information from Public Disclosure ML19136A2542019-08-26026 August 2019 Request for Withholding Information from Public Disclosure ML19133A1192019-08-26026 August 2019 Request for Withholding Information from Public Disclosure ML19136A0582019-08-26026 August 2019 Request for Withholding Information from Public Disclosure ML19163A1652019-08-0505 August 2019 Request for Withholding Information from Public Disclosure ML19163A0802019-07-22022 July 2019 Request for Withholding Information from Public Disclosure ML19136A3282019-07-22022 July 2019 Request for Withholding Information from Public Disclosure ML19136A1342019-07-22022 July 2019 Request for Additional Information from Public Disclosure ML19008A1752019-01-15015 January 2019 Request for Withholding Information from Public Disclosure ML16305A2142016-10-31031 October 2016 Browns Ferry Nuclear Plant, Units 1, 2, and 3 - Request For Withholding Information From Public Disclosure (CAC Nos. MF6741, MF6742, MF6743) ML16292A7222016-10-26026 October 2016 Browns Ferry Nuclear Plant, Units 1, 2, and 3 - Request for Withholding Information from Public Disclosure (CAC Nos. MF6741, MF6742, and MF6743) ML16270A3662016-10-26026 October 2016 Browns Ferry Nuclear Plant, Units 1, 2, and 3 - EPU LAR GE-Hitachi Proprietary Approval Letter (CAC Nos. MF6741, MF6742, and MF6743) ML16224A1202016-09-26026 September 2016 Request for Withholding Information from Public Disclosure (Cac. Nos. MF6741, MF6742, and MF6743) ML16209A3992016-08-16016 August 2016 Request for Withholding Information from Public Disclosure ML16211A4352016-08-16016 August 2016 Request for Withholding Information from Public Disclosure ML16217A4432016-08-16016 August 2016 Request for Withholding Information from Public Disclosure ML16125A0842016-07-0707 July 2016 Approval for Request for Withholding Information from Public Disclosure ML16144A2982016-07-0707 July 2016 Browns Ferry Nuclear Plant, Units 1, 2, and 3 - Request for Withholding Information from Public Disclosure (CAC Nos. MF6741 and MF6742, and MF6743) ML16173A0262016-07-0707 July 2016 Approval for Request for Withholding Information from Public Disclosure ML16130A6002016-07-0707 July 2016 Request for Withholding Information from Public Disclosure ML16127A6092016-07-0606 July 2016 NRC Letter Request for Withholding Information from Public Disclosure ML16125A4062016-07-0606 July 2016 Request for Withholding Information from Public Disclosure ML16124B0062016-05-19019 May 2016 Request for Withholding Information from Public Disclosure ML16123A3352016-05-16016 May 2016 Request for Withholding Information from Public Disclosure ML16124B1062016-05-12012 May 2016 Request for Withholding Information from Public Disclosure ML16120A0722016-05-12012 May 2016 Request for Withholding Information from Public Disclosure ML16124A9322016-05-12012 May 2016 Request for Withholding Information from Public Disclosure ML16027A1612016-02-0202 February 2016 Request for Withholding of Proprietary Information from Public Disclosure for Browns Ferry Nuclear Plant, Unit 1 ML16027A2312016-02-0202 February 2016 Request for Withholding of Proprietary Information from Public Disclosure for Browns Ferry Nuclear Plant, Unit 1 ML15345A0102015-12-22022 December 2015 Request for Withholding of Proprietary Information from Public Disclosure ML15289A5392015-11-0909 November 2015 Request for Withholding of Proprietary Information from Public Disclosure for Browns Ferry Nuclear Plant, Unit 3 ML15289A5822015-11-0909 November 2015 Request for Withholding of Proprietary Information from Public Disclosure for Browns Ferry Plant, Unit 3 ML15281A1682015-11-0505 November 2015 Request for Withholding of Proprietary Information from Public Disclosure for Browns Ferry Nuclear Plant, Unit 3 ML15252A0462015-10-0505 October 2015 Request for Withholding of Proprietary Information from Public Disclosure ML15170A3162015-09-0404 September 2015 Request for Withholding of Proprietary Information from Public Disclosure ML15044A4802015-03-16016 March 2015 Request for Withholding of Proprietary Information from Public Disclosure ML15006A3602015-01-26026 January 2015 Request for Withholding of Proprietary Information from Public Disclosure 2024-06-05
[Table view] |
Text
UNITED STATES NUCLEAR REGULATORY COMMISSION WASHINGTON, D.C. 20555-0001 Mr. Joseph W. Shea Vice President, Nuclear Licensing Tennessee Valley Authority 1101 Market Street, LP 3R-C Chattanooga, TN 37402-2801 October 5, 2015
SUBJECT:
REQUEST FOR WITHHOLDING OF PROPRIETARY INFORMATION FROM PUBLIC DISCLOSURE FOR BROWNS FERRY NUCLEAR PLANT, UNITS 1, 2, AND 3 (TAC NOS. MF5412, MF5413, AND MF5414)
Dear Mr. Shea:
By letter dated June 3, 2015 (Agencywide Documents Access and Management System Accession No. ML15156A563), Tennessee Valley Authority (TVA) submitted an affidavit dated May 21, 2015, executed by Mr. Alan B. Meginnis of AREVA Inc., requesting that the information contained in the following document be withheld from public disclosure pursuant to Title 1 O of the Code of Federal Regulations (10 CFR), Section 2.390:
ANP-3408P, Revision 0, "AREVA RAI [Request for Additional Information]
Responses for Browns Ferry Steam Dome Pressure for Reactor Core Safety Limits," dated May 2015 The affidavit stated that the submitted information should be considered exempt from mandatory public disclosure for the following reasons:
6.(b)
Use of the information by a competitor would permit the competitor to significantly reduce its expenditures, in time or resources, to design, produce, or market a similar product or service.
6.(d)
The information reveals certain distinguishing aspects of a process, methodology, or component, the exclusive use of which provides a competitive advantage for AREVA in product optimization or marketability.
6.(e)
The information is vital to a competitive advantage held by AREVA, would be helpful to competitors to AREVA, and would likely cause substantial harm to the competitive position of AREVA.
We have reviewed TVA's request and the material in accordance with the requirements of 1 O CFR 2.390 and, on the basis of the statements in the affidavit, have determined that the submitted information sought to be withheld contains propriety commercial information and should be withheld from public disclosure.
Therefore, applicable portions of document ANP-3408P, Revision 0 marked as proprietary, will be withheld from public disclosure pursuant to 10 CFR 2.390(b)(5) and Section 103(b) of the Atomic Energy Act of 1954, as amended.
Withholding from public inspection shall not affect the right, if any, of persons properly and directly concerned to inspect the documents. If the need arises, we may send copies of this information to our consultants working in this area. We will, of course, ensure that the consultants have signed the appropriate agreements for handling proprietary information.
If the basis for withholding this information from public inspection should change in the future such that the information could then be made available for public inspection, TVA should promptly notify the U.S. Nuclear Regulatory Commission (NRC). TVA also should understand that the NRC may have cause to review this determination in the future, for example, if the scope of a Freedom of Information Act request includes your information. In all review situations, if the NRC makes a determination adverse to the above, TVA will be notified in advance of any public disclosure.
If you have any questions regarding this matter, I may be reached at 301-415-1447 or F arideh.Saba@nrc.gov.
Docket Nos. 50-259, 50-260, and 50-296 cc: Mr. Alan B. Meginnis AREVA Inc.
2101 Horn Rapids Road Richland, WA 99354 Additional Distribution via Listserv Sincerely,
~
W#/,f._--- (tvJ Farideh E. Saba, Senior Project Manager Plant Licensing Branch 11-2 Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation
Therefore, applicable portions of document ANP-3408P, Revision 0 marked as proprietary, will be withheld from public disclosure pursuant to 10 CFR 2.390(b)(5) and Section 103(b) of the Atomic Energy Act of 1954, as amended.
Withholding from public inspection shall not affect the right, if any, of persons properly and directly concerned to inspect the documents. If the need arises, we may send copies of this information to our consultants working in this area. We will, of course, ensure that the consultants have signed the appropriate agreements for handling proprietary information.
If the basis for withholding this information from public inspection should change in the future such that the information could then be made available for public inspection, TVA should promptly notify the U.S. Nuclear Regulatory Commission (NRC). TVA also should understand that the NRC may have cause to review this determination in the future, for example, if the scope of a Freedom of Information Act request includes your information. In all review situations, if the NRC makes a determination adverse to the above, TVA will be notified in advance of any public disclosure.
If you have any questions regarding this matter, I may be reached at 301-415-1447 or F arideh.Saba@nrc.gov.
Sincerely,
/RA by CPfefferkorn for/
Farideh E. Saba, Senior Project Manager Plant Licensing Branch 11-2 Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation Docket Nos. 50-259, 50-260, and 50-296 cc: Mr. Alan B. Meginnis AREVA Inc.
2101 Horn Rapids Road Richland, WA 99354 Additional Distribution via Listserv DISTRIBUTION:
PUBLIC RidsNrrLABClayton RidsNrrDssSrxb MPanicker, NRR LPL2-2 R/F RidsNrrPMBrownsFerry RidsNrrDssSnpb MRazzaque, NRR ADAMS A ccess1on N ML15252A046 o.:
OFFICE LPL2-2/PM LPL2-2/LA DSS/SRXB/BC NAME FSaba (AHon for)
BClayton CJackson (LRonewicz for)
DATE 9/14/15 9/10/15 9/28/15 RidsNrrDorllpl2-2 RidsACRS _MailCenter RidsRgn2MailCenter
>Y e-ma1 DSS/SNPB/BC LPL2-2/BC JDean SHelton 9/29/15 10/05/15 OFFICIAL RECORD COPY LPL2-2/PM FSaba (CPfefferkorn for) 10/05/15