ML15201A563

From kanterella
Jump to navigation Jump to search
301 General Correspondence
ML15201A563
Person / Time
Site: Saint Lucie  NextEra Energy icon.png
Issue date: 07/16/2015
From: Baldwin R, Guthrie G
NRC/RGN-II
To:
Florida Power & Light Co
References
Download: ML15201A563 (6)


Text

December 5, 2014

  • 10 CFR 55.5 10 CFR 55.40 Mr. Gene Guthrie, Chief, 0B2 L-201 4-36 1 Attn. Mr. Richard Baldwin U.S. Nuclear Regulatory Commission, Region II Marquis One Tower 245 Peachtree Center Ave., NE, Suite 1200 Atlanta, GA 30303-1257 RE: St. Lucie Units 1 & 2 Docket Nos. 50-335 and 50-389 Reactor and Senior Reactor Operator Initial Examinations Outline 050000335/2015301 & 05000389/2015301 Facility License Nos. DPR-67 and NFP-16 In accordance with the requirements of NUREG-1 021, Revision 9, Supplement 1, the operating test outline is due 75 days prior to the Nuclear Regulatory Commission (NRC) examination date, St. Lucie Plant Reactor and Senior Reactor Operator (RO/SRO) initial examinations are scheduled March 2, 2015.

Specific items enclosed per these requirements are:

  • ES-201-2, Examination Outline Quality Checklist
  • ES-201-3, Examination Security Agreement
  • ES-301-2, Control Room/In-Plant Systems Outline
  • ES-401 -2, PWR Examination Outline (Tier I & 2)
  • ES-401-3, Generic Knowledge and Abilities Outline (Tier 3)
  • ES-401-4, Record of Rejected K/As Questions or comments should be directed to Mr. John Owens at (772) 468-4158 (office) or (772) 341-9745 (cell); or Mr. Terry Benton at (772) 539-2597 (cell).

In accordance with 10 CFR 2.390 and NUREG-1021 (Revision 9, Supplement 1, ES-201) information must be withheld from public disclosure until affer the examinations are complete.

Very tri4y yours, Jensen Site Vice President St. Lucie Plant JJ/tlt Enclosures Florida Power & Light Company 6501 S. Ocean Drive, Jensen Beach, FL 34957

0PPL.

January 13, 2015 10 CFR 55.5 10 CFR 55.40 Mr. Gene Guthrie, Chief, 0B2 L-201 5-002 Attn. Mr. Richard Baldwin U.S. Nuclear Regulatory Commission, Region Marquis One Tower 245 Peachtree Center Ave., NE, Suite 1200 Atlanta, GA 30303-1257 RE: St. Lucie Units 1 & 2 Docket Nos. 50-335 and 50-389 Reactor and Senior Reactor Operator Initial Examination Materials 050000335/201 5301 & 05000389/2015301 Facility License Nos. DPR-67 and NFP-16 In accordance with the requirements of NUREG-1021, Revision 9, Supplement 1, the proposed operating examination, supporting documents and reference material is due 45 days prior to the Nuclear Regulatory Commission (NRC) examination date. St. Lucie Plant Reactor and Senior Reactor Operator (RO/SRO) initial examinations are scheduled March 2, 2015.

Specific items enclosed per these requirements are:

  • NRC Written Examination and compact discs (CDs)
  • NRC Simulator Scenarios and CDs
  • ES-301-3, Operating Test Quality Checklist
  • ES-301-4, Simulator Scenario Quality Checklist
  • ES-401-6, Written Examination Quality Checklist
  • ES-201-3, Examination Security Agreement
  • 1 CD with reference materials including plant procedures and Technical Specifications Questions or comments should be directed to Mr. John Owens at (772) 468-4158 (office) or (772) 341-9745 (cell); or Mr. Terry Benton at (772) 539-2597 (cell).

In accordance with 10 CFR 2.390 and NUREG-1021 (Revision 9, Supplement 1, ES-201) information must be withheld from public disclosure until after the examinations are complete.

Very tly yours, Jensen St. Lucie Plant JJ/tlt Enclosures Florida Power & Light Company 6501 S. Ocean Drive, Jensen Beach, FL 34957

/.->

,4

) 10 C rn 2. 30&

January 29, 2015 L-201 5-029 10 CFR 55.31 10 CFR 2.390 Regional Administrator, Region II U. S. Nuclear Regulatory Commission Mr. Eugene F. Guthrie, Chief Operations Branch 2 Director of Reactor Safety Attn: Mr. Richard Baldwin Atlanta, GA 30303 Re: St. Lucie Units 1 and 2 Docket Nos. 50-335 and 50-389 Preliminary License Applications Licensed Operator Examination March 2015 Pursuant to 10 CFR 55.31, Florida Power & Light Company (FPL) requests that operator license tests be administered to the applicants listed on page 2 of this letter. Enclosed for your preliminary review is one unsigned copy of the License Application (NRC Form 398) and an unsigned copy of the Medical Certification (NRC Form 396) for each applicant.

The enclosures to this letter contain medical and personal information, the disclosure of which would clearly constitute an unwarranted invasion of personal privacy. Pursuant to 10 CFR 2.390(a)(6), we request that the enclosures be withheld from public disclosure. Should you require additional information, please contact Mr. Erik Feightner at (772) 467-7350.

Very twy yours, seph Jensen Site Vice President St. Lucie Plant JJ/tlt Enclosures d(e3 (ciS J;\l 3 0 2.L01S Florida Power & Light Company 6501 S. Ocean Drive, Jensen Beach, FL 34957

/4,

-J r-fnformattofl--wtthhold Under-1-e-eFR2-390-February 13, 2015 L-201 5-037 10 CFR 55.31 10 CFR 2.390 Regional Administrator, Region II U. S. Nuclear Regulatory Commission Mr. Eugene F. Guthrie, Chief Operations Branch 2 Director of Reactor Safety Attn: Mr. Richard Baldwin Atlanta, GA 30303 Re: St. Lucie Units 1 and 2 Docket Nos. 50-335 and 50-389 Final License Applications Licensed Operator Examination March 2015 Pursuant to 10 CFR 55.31, Florida Power & Light Company (FPL) requests that operator license tests be administered to the applicants listed on page 2 of this letter. Enclosed for your final review are one signed copy of the License Application (NRC Form 398) and a signed copy of the Medical Certification (NRC Form 396) for each applicant.

The enclosures to this letter contain medical and personal information, the disclosure of which would clearly constitute an unwarranted invasion of personal privacy. Pursuant to 10 CFR 2.390(a)(6), we request that the enclosures be withheld from public disclosure. Should you require additional information, please contact Mr. Erik Feightner at (772) 467-7350.

Very truly yours, Christopher R. Costanzo Site Vice President St. Lucie Plant CRC/fit Enclosures (c° FEB 132015 Florida Power & Light Company 6501 S. Ocean Drive, Jensen Beach, FL 34957

0PPL March 23, 2015 10 CFR 55.5 10 CFR 55.40 Mr. Eugene F. Guthrie L-2015-081 Attn. Mr. Daniel Bacon U.S. Nuclear Regulatory Commission, Region II Marquis One Tower 245 Peachtree Center Ave., NE, Suite 1200 Atlanta, GA 30303-1 257 RE: St. Lucie Units I & 2 Docket Nos. 50-335 and 50-389 Post NRC Written Examination Facility Activities 050000335/2015301 & 05000389/2015301 Facility License Nos. DPR-67 and NFP-16 In accordance with Operator Licensing Examination Standards for Power Reactors, NUREG-1 021 Revision 9, Supplement 1, ES-403 and ES-501, Florida Power & Light Company St. Lucie Nuclear Plant is submitting the HLC-22 NRC post examination facility activities.

Specific items provided per those requirements are:

  • Signed ES-403-1, Written Examination Grading Quality Checklist
  • 15 Original applicant written examination answer sheets
  • 15 Photo copied applicant written examination answer sheets
  • 15 Graded, photo copied applicant written examination answer sheets
  • 15 Applicant written examination signed cover sheets
  • 1 Master SRO written examination
  • 1 Master RO written examination
  • 1 Master answer key
  • 1 CD (compact disc), electronic version of written examination (SRO/RO)
  • 21 Pages of student questions with proctor responses
  • 1 Applicant seating chart
  • Written examination performance analysis
  • Attachment 1 St. Lucie NRC Examination Facility Comments ES-201-3, Examination Security Agreement, is currently being completed. It will be sent under separate correspondence.

Questions or comments should be directed to Mr. John Owens at (772) 468-4158 (office) or (772) 341-9745 (cell); or Mr. Terry Benton at (772) 539-2597 (cell).

Very truly yours, ristopher R. Costanzo Site Vice President St. Lucie Plant CRC/tlt Enclosures Florida Power & Light Company 6501 S. Ocean Drive, Jensen Beach, FL 34957

W March 27, 2015 PPL.

10 CFR 55.5 10 CFR 55.40 L-201 5-097 Mr. Eugene F. Guthrie Attn. Mr. Daniel Bacon U.S. Nuclear Regulatory Commission, Region II Marquis One Tower 245 Peachtree Center Ave., NE, Suite 1200 Atlanta, GA 30303-1 257 RE: St. Lucie Units 1 & 2 Docket Nos. 50-335 and 50-389 Post NRC Examination Facility Activities Examination Security Agreement 050000335/201 5301 & 05000389/201 5301 Facility License Nos. DPR-67 and NFP-16 In accordance with Operator Licensing Examination Standards for Power Reactors, NUREG-1 021 Revision 9, Supplement 1, ES-501, Florida Power & Light Company (FPL) forwards NRC post examination facility activities ES-201-3, Examination Security Agreement for HLC-22.

Enclosed for review is ES-201-3, Examination Security Agreement forms.

Questions or comments should be directed to Mr. John Owens at (772) 468-4158 (office) or (772) 341-9745 (cell); or Mr. Terry Benton at (772) 539-2597 (cell).

Verytrulyyours, Christopher R. Costanzo Site Vice President St. Lucie Plant CRC/tlt Enclosure Florida Power & Light Company 6501 S. Ocean Drive, Jensen Beach, FL 34957