Category:Letter
MONTHYEARIR 05000335/20250102024-10-21021 October 2024 Notification of St. Lucie Plant Units 1 & 2 Comprehensive Engineering Team Inspection - U.S. Nuclear Regulatory Commission Inspection Report 05000335/2025010 and 05000389/2025010 ML24227A9702024-10-18018 October 2024 Letter to Kenneth Mack Dir, License and Reg Compliance, NextEra Energy, Inc Response to Request Re Engagement Re Sub License Renewal Environmental Review - St Lucie Nuclear Plant 1 and 2 L-2024-085, Refueling Outage SL1-32 Low Pressure Turbine Rotor Inspection Results2024-10-15015 October 2024 Refueling Outage SL1-32 Low Pressure Turbine Rotor Inspection Results L-2024-165, Report of 10 CFR 50.59 Plant Changes, Tests and Experiments Made2024-10-14014 October 2024 Report of 10 CFR 50.59 Plant Changes, Tests and Experiments Made L-2024-118, Fleet License Amendment Request to Relocate Staff Qualifications from Technical Specifications to the Quality Assurance Topical Report (FPL-1)2024-10-0808 October 2024 Fleet License Amendment Request to Relocate Staff Qualifications from Technical Specifications to the Quality Assurance Topical Report (FPL-1) ML24255A3092024-09-30030 September 2024 SLRA - Revised SE Letter L-2024-155, Subsequent License Renewal Application, Third Annual Update2024-09-27027 September 2024 Subsequent License Renewal Application, Third Annual Update L-2024-158, Supplemental Information to License Amendment Request to Adopt Common Emergency Plan with Site-Specific Annexes2024-09-25025 September 2024 Supplemental Information to License Amendment Request to Adopt Common Emergency Plan with Site-Specific Annexes 05000335/LER-2024-001, Unplanned Reactor Scram2024-09-25025 September 2024 Unplanned Reactor Scram IR 05000335/20240112024-09-18018 September 2024 Biennial Problem Identification and Resolution Inspection Report 05000335/2024011 and 05000389/2024011 L-2024-136, Supplement to License Amendment Request to Adopt Common Emergency Plan with Site-Specific Annexes2024-09-16016 September 2024 Supplement to License Amendment Request to Adopt Common Emergency Plan with Site-Specific Annexes L-2024-138, License Amendment Request L-2024-138, Fuel Methodology Changes in Support of St. Lucie, Unit 2 Transition to 24-Month Fuel Cycles2024-09-11011 September 2024 License Amendment Request L-2024-138, Fuel Methodology Changes in Support of St. Lucie, Unit 2 Transition to 24-Month Fuel Cycles L-2024-148, Submittal of Offsite Dose Calculation Manual (Odcm), Revision 552024-09-0909 September 2024 Submittal of Offsite Dose Calculation Manual (Odcm), Revision 55 IR 05000335/20240052024-08-22022 August 2024 Updated Inspection Plan for St. Lucie, Units 1 & 2 - Report 05000335/2024005 and 05000389/2024005 L-2024-140, Cycle 28 Core Operating Limits Report2024-08-14014 August 2024 Cycle 28 Core Operating Limits Report L-2024-133, Snubber Program Plan Submittal2024-08-14014 August 2024 Snubber Program Plan Submittal L-2024-132, 2024 Population Update Analysis2024-08-13013 August 2024 2024 Population Update Analysis IR 05000335/20240022024-08-13013 August 2024 Integrated Inspection Report 05000335-2024002 and 05000389-2024002 L-2024-129, Relief Request (RR) 14. Limited Coverage Exams Due to Impractical Inservice Inspection Requirements - Fourth Ten-Year Inservice Inspection Program Interval2024-08-0707 August 2024 Relief Request (RR) 14. Limited Coverage Exams Due to Impractical Inservice Inspection Requirements - Fourth Ten-Year Inservice Inspection Program Interval 05000389/LER-2024-003, Unplanned Reactor Scram2024-08-0505 August 2024 Unplanned Reactor Scram ML24163A0012024-08-0505 August 2024 LTR-24-0119-1-1 Response to Nh Letter Regarding Review of NextEras Emergency Preparedness Amendment Review L-2024-121, Subsequent License Renewal Commitment 30 Revision2024-07-30030 July 2024 Subsequent License Renewal Commitment 30 Revision L-2024-123, Submittal of In-Service Inspection Program Owners Activity Report (OAR-1)2024-07-29029 July 2024 Submittal of In-Service Inspection Program Owners Activity Report (OAR-1) L-2024-125, Notice of Intent to Provide Supplemental Information to License Amendment Request to Adopt Common Emergency Plan with Site-Specific Annexes2024-07-24024 July 2024 Notice of Intent to Provide Supplemental Information to License Amendment Request to Adopt Common Emergency Plan with Site-Specific Annexes ML24184B2822024-07-16016 July 2024 – Request to Use a Later Code Edition and Addenda of the American Society of Mechanical Engineers Boiler and Pressure Vessel Code, Section XI ML24193A2432024-07-12012 July 2024 – Interim Audit Summary Report in Support of Review of License Amendment Requests Regarding Fleet Emergency Plan 05000389/LER-2024-002-01, Safety Injection Tank Vent Through Wall Leakage2024-07-11011 July 2024 Safety Injection Tank Vent Through Wall Leakage L-2024-110, Environmental Protection Plan Report, Unusual or Important Environmental Event - Manatee in Intake2024-07-10010 July 2024 Environmental Protection Plan Report, Unusual or Important Environmental Event - Manatee in Intake L-2024-114, Quality Assurance Topical Report (FPL-1 Revision 31 Annual Submittal2024-07-10010 July 2024 Quality Assurance Topical Report (FPL-1 Revision 31 Annual Submittal L-2024-109, Schedule for Subsequent License Renewal Environmental Review2024-07-0303 July 2024 Schedule for Subsequent License Renewal Environmental Review ML24172A1562024-06-27027 June 2024 Relief Request - PSL2-I5-RR-01 Proposed Alternative to Amse Code XI Code Examination Requirements - System Leakage Test of Reactor Pressure Vessel Bottom Head and Class 1 and 2 Piping in Covered Trenches L-2024-104, Response to Request for Additional Information, St. Luce Relief Request (RR) 7, Proposed Alternative in Accordance with 10 CFR 50.55a(z)(1 Extension of Inspection Interval for Reactor Pressure Vessel Welds from 102024-06-26026 June 2024 Response to Request for Additional Information, St. Luce Relief Request (RR) 7, Proposed Alternative in Accordance with 10 CFR 50.55a(z)(1 Extension of Inspection Interval for Reactor Pressure Vessel Welds from 10 L-2024-097, Technical Specification Special Report2024-06-20020 June 2024 Technical Specification Special Report L-2024-102, Official Service List Update2024-06-19019 June 2024 Official Service List Update ML24149A2862024-06-12012 June 2024 NextEra Fleet - Proposed Alternative Frr 23-01 to Use ASME Code Case N-752-1, Risk-Informed Categorization and Treatment for Repair/Replacement Activities in Class 2 and 3 Systems Section X1, Division 1 (EPID L-2023-LLR-0009) - Letter L-2024-090, Revised Steam Generator Tube Inspection Reports2024-06-0404 June 2024 Revised Steam Generator Tube Inspection Reports IR 05000335/20244012024-06-0303 June 2024 Security Baseline Inspection Report 05000335/2024401 and 05000389/2024401 ML24135A0642024-05-17017 May 2024 Correction Letter - Amendment Nos. 253 and 208 Regarding Conversion to Improved Standard Technical Specifications L-2024-075, Notification of Improved Standard Technical Specifications (ITS) Implementation2024-05-13013 May 2024 Notification of Improved Standard Technical Specifications (ITS) Implementation IR 05000335/20240012024-05-10010 May 2024 Integrated Inspection Report 05000335/2024001 and 05000389/2024001 ML24127A0632024-05-0606 May 2024 Supplemental Information to License Amendment Request to Adopt Common Emergency Plan with Site-Specific Annexes L-2024-053, License Amendment Request L-2024-053, Updated Spent Fuel Pool Criticality Analysis2024-04-30030 April 2024 License Amendment Request L-2024-053, Updated Spent Fuel Pool Criticality Analysis L-2024-070, Cycle 32 Core Operating Limits Report2024-04-29029 April 2024 Cycle 32 Core Operating Limits Report L-2024-071, Cycle 27 Core Operating Limits Report2024-04-29029 April 2024 Cycle 27 Core Operating Limits Report ML24108A0632024-04-18018 April 2024 – Notification of Inspection and Request for Information for NRC Problem Identification and Resolution Inspection L-2024-056, Annual Radiological Environmental Operating Report for Calendar Year 20232024-04-17017 April 2024 Annual Radiological Environmental Operating Report for Calendar Year 2023 L-2024-064, Florida Power & Light Company - 10 CFR 50.46 - Emergency Core Cooling System SBLOCA 30-Day Report2024-04-17017 April 2024 Florida Power & Light Company - 10 CFR 50.46 - Emergency Core Cooling System SBLOCA 30-Day Report L-2024-054, 2023 Annual Environmental Operating Report2024-04-0909 April 2024 2023 Annual Environmental Operating Report ML24093A2612024-04-0202 April 2024 – Investigation Summary, Office of Investigations Case Number 2-2023-005 L-2024-047, Proposed Use of a Subsequent ASME Code Edition and Addenda2024-03-28028 March 2024 Proposed Use of a Subsequent ASME Code Edition and Addenda 2024-09-09
[Table view] |
Text
February 28, 2024
SUBJECT:
ANNUAL ASSESSMENT LETTER FOR ST LUCIE UNITS 1 & 2 - REPORT 05000335/2023006 AND 05000389/2023006
Dear Bob Coffey:
The NRC has completed its end-of-cycle performance assessment of St. Lucie Units 1 & 2, reviewing performance indicators (PIs), inspection results, and enforcement actions from January 1, 2023, through December 31, 2023. This letter informs you of the NRCs assessment of your facility during this period and its plans for future inspections at your facility. The NRC concluded that overall performance at your facility preserved public health and safety. The baseline inspection program was completed at your facility as defined in Inspection Manual Chapter 2515, Light-Water Reactor Inspection Program - Operations Phase.
The NRC determined the performance at St. Lucie Units 1 & 2 during the most recent quarter was within the Licensee Response Column, the highest performance category of the NRCs Reactor Oversight Process (ROP) Action Matrix, because all inspection findings had very low safety significance (i.e., Green), and all PIs were within the expected range (i.e., Green).
Therefore, the NRC plans to conduct ROP baseline inspections at your facility
The enclosed inspection plan lists the inspections scheduled through December 31, 2025.
The NRC provides the inspection plan to allow for the resolution of any scheduling conflicts and personnel availability issues. Routine inspections performed by resident inspectors are not included in the inspection plan. The inspections listed during the last twelve months of the inspection plan are tentative and may be revised. The NRC will contact you as soon as possible to discuss changes to the inspection plan should circumstances warrant any changes.
In accordance with Title 10 of the Code of Federal Regulations (10 CFR) 2.390 of the NRCs Rules of Practice, a copy of this letter will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of NRC's document system (ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room). Please contact me at 404-997-4628 with any questions you have regarding this letter.
Sincerely, David E. Dumbacher, Chief Reactor Projects Branch 3 Division of Reactor Projects Docket Nos. 05000335 and 05000389 License Nos. DPR-67 and NPF-16 Enclosure:
St Lucie Inspection/Activity Plan (3/1/24 - 12/31/25)
cc: w/ encl: Distribution via LISTSERV Signed by Dumbacher, David on 02/28/24
ML24053A069 SUNSI Review Non-Sensitive Publicly Available Sensitive Non-Publicly Available OFFICE RII:DRP RII:DRP
NAME J. Hamman D. Dumbacher DATE 2/23/2024 2/28/2024
Saint Lucie
03/01/2024 - 12/31/2025 Unit Start End Activity CAC Title Staff Count
UNIT 1 IN-SERVICE INSPECTION +SG 2 1 3/18/2024 3/22/2024 IP 71111.08P 000702 Inservice Inspection Activities (PWR)
FPL CORPORATE SECURITY INSPECTION AA/FFD 2
1,2 4/15/2024 4/18/2024 IP 71130.01 000733 Access Authorization
1,2 4/15/2024 4/18/2024 IP 71130.08 000740 Fitness-For-Duty Program
SECURITY BASELINE INSPECTION 2
1,2 5/20/2024 5/23/2024 IP 71130.01 000733 Access Authorization
1,2 5/20/2024 5/23/2024 IP 71130.02 000734 Access Control
1,2 5/20/2024 5/23/2024 IP 71130.08 000740 Fitness-For-Duty Program
1,2 5/20/2024 5/23/2024 IP 71130.09 001656 Security Plan Changes
1,2 5/20/2024 5/23/2024 IP 71151 001338 Performance Indicator Verification
PROBLEM IDENTIFICATION & RESOLUTION 4
1,2 6/10/2024 6/14/2024 IP 71152B 000747 Problem Identification and Resolution
1,2 6/24/2024 6/28/2024 IP 71152B 000747 Problem Identification and Resolution
UNIT 2 IN-SERVICE INSPECTION +SG 2
2 9/9/2024 9/13/2024 IP 71111.08P 000702 Inservice Inspection Activities (PWR)
RP OCCUPATIONAL RAD SAFETY AND TRANSPORTATION BASELINE INSPECTION 2
1,2 8/26/2024 8/30/2024 IP 71124.08 000732 Radioactive Solid Waste Processing & Radioactive Material Handling, Storage, & Transportation 1,2 8/26/2024 8/30/2024 IP 71151 000746 Performance Indicator Verification
1,2 9/9/2024 9/13/2024 IP 71124.01 000725 Radiological Hazard Assessment and Exposure Controls
1,2 9/9/2024 9/13/2024 IP 71151 000746 Performance Indicator Verification
FOCUSED ENGINEERING INSPECTION (AGE-RELATED) 3
1,2 11/18/2024 11/22/2024 IP 71111.21N.04 001832 Age-Related Degradation
1,2 12/2/2024 12/6/2024 IP 71111.21N.04 001832 Age-Related Degradation
ST LUCIE INITIAL LICENSE EXAM 5
1,2 10/13/2024 10/18/2024 OV 000956 FB-OR-ONSITE VALIDATION OF INITIAL LICENSE EXAMINATION (OV)
1,2 12/2/2024 12/13/2024 EXAD 000500 FB-OR-INITIAL LICENSE EXAM ADMINISTRATION (EXAD)
MATERIAL CONTROL AND ACCOUNTING 1 1,2 12/9/2024 12/11/2024 IP 71130.11 000742 Material Control and Accounting (MC&A)
EMERGENCY PREPAREDNESS PROGRAM INSPECTION 2
1,2 1/13/2025 1/17/2025 IP 71114.02 000717 Alert and Notification System Testing
1,2 1/13/2025 1/17/2025 IP 71114.03 000718 Emergency Response Organization Staffing and Augmentation System
1,2 1/13/2025 1/17/2025 IP 71114.04 000719 Emergency Action Level and Emergency Plan Changes
1 of 3 1,2 1/13/2025 1/17/2025 IP 71114.05 000720 Maintenance of Emergency Preparedness
1,2 1/13/2025 1/17/2025 IP 71151 001397 Performance Indicator Verification
PREOPERATIONAL TESTING OF AN ISFSI 2
1,2 1/27/2025 1/31/2025 IP 60856 001003 Review of 10 CFR 72.212(b) Evaluations
1,2 2/10/2025 2/14/2025 IP 60856 001003 Review of 10 CFR 72.212(b) Evaluations
1,2 3/10/2025 3/14/2025 IP 60854 001000 Preoperational Testing Of An ISFSI
1,2 3/31/2025 4/4/2025 IP 60854 001000 Preoperational Testing Of An ISFSI
1,2 4/28/2025 5/2/2025 IP 60854 001000 Preoperational Testing Of An ISFSI
CYBER SECURITY INSPECTION 4 1,2 3/17/2025 3/21/2025 IP 71130.10 000741 Cybersecurity
COMPREHENSIVE ENGINEERING TEAM INSPECTION (CETI) 7
1,2 3/24/2025 3/28/2025 IP 71111.21M 000713 Comprehensive Engineering Team Inspection
1,2 4/7/2025 4/11/2025 IP 71111.21M 000713 Comprehensive Engineering Team Inspection
SECURITY BASELINE INSPECTION 3
1,2 4/21/2025 4/24/2025 IP 71130.02 000734 Access Control
1,2 4/21/2025 4/24/2025 IP 71130.05 000737 Protective Strategy Evaluation
1,2 4/21/2025 4/24/2025 IP 71130.09 001656 Security Plan Changes
1,2 4/21/2025 4/24/2025 IP 71151 001338 Performance Indicator Verification
OPERATION OF AN ISFSI 2
1,2 5/5/2025 5/9/2025 IP 60855 001001 Operation Of An ISFSI
SECURITY BASELINE INSPECTION 2 1,2 5/19/2025 5/22/2025 IP 71130.04 000736 Equipment Performance, Testing, and Maintenance
1,2 5/19/2025 5/22/2025 IP 71130.07 000739 Security Training
UNIT 1 IN-SERVICE INSPECTION +SG 2 1 9/29/2025 10/10/2025 IP 71111.08P 000702 Inservice Inspection Activities (PWR)
RP OCCUPATIONAL RAD SAFETY BASELINE INSPECTION 3
1,2 9/29/2025 10/3/2025 IP 71124.01 000725 Radiological Hazard Assessment and Exposure Controls
1,2 9/29/2025 10/3/2025 IP 71124.03 000727 In-Plant Airborne Radioactivity Control and Mitigation
1,2 9/29/2025 10/3/2025 IP 71124.04 000728 Occupational Dose Assessment
1,2 9/29/2025 10/3/2025 IP 71124.05 000729 Radiation Monitoring Instrumentation
1,2 9/29/2025 10/3/2025 IP 71151 000746 Performance Indicator Verification
1,2 10/20/2025 10/24/2025 IP 71124.01 000725 Radiological Hazard Assessment and Exposure Controls
1,2 10/20/2025 10/24/2025 IP 71124.03 000727 In-Plant Airborne Radioactivity Control and Mitigation
1,2 10/20/2025 10/24/2025 IP 71124.04 000728 Occupational Dose Assessment
1,2 10/20/2025 10/24/2025 IP 71124.05 000729 Radiation Monitoring Instrumentation
1,2 10/20/2025 10/24/2025 IP 71151 000746 Performance Indicator Verification
ST LUCIE INITIAL EXAM 5
2 of 3 1,2 10/26/2025 11/1/2025 OV 000956 FB-OR-ONSITE VALIDATION OF INITIAL LICENSE EXAMINATION (OV)
1,2 11/30/2025 12/13/2025 EXAD 000500 FB-OR-INITIAL LICENSE EXAM ADMINISTRATION (EXAD)
SAINT LUCIE REQUAL 2
1,2 11/16/2025 11/22/2025 IP 71111.11B 000704 Licensed Operator Requalification Program and Licensed Operator Performance
3 of 3