MONTHYEARML13266A1832013-08-20020 August 2013 08/20/2013 Public Scoping Meeting for the Byron Nuclear Station License Renewal Application Transcript - Afternoon Session Project stage: Meeting ML13266A1822013-08-20020 August 2013 08/20/2013 Public Scoping Meeting for the Byron Nuclear Station License Renewal Application Transcript - Evening Session Project stage: Meeting ML13275A0402013-08-20020 August 2013 License Renewal Process and Environmental Scoping Meeting Slides Project stage: Meeting ML13263A2212013-09-16016 September 2013 Comment (1) of Kim P. Gouker on Behalf of Ogle County, Illinois Supporting the License Renewal Application of the Byron Power Generating Station Project stage: Other ML13277A3062013-09-27027 September 2013 Comment (2) of David Kraft on Behalf of Neis Re Supplement to Nrc'S Generic Environmental Impact Statement for License Renewal for the Byron Nuclear Power Station Project stage: Supplement ML13240A2342013-10-0404 October 2013 8/10/2013 - Summary of Public Scoping Meetings Conducted Related to the Review of the Byron Nuclear Station, License Renewal Application(Tac Nos. MF1790 and MF1791) Project stage: Meeting ML13312A3172013-12-13013 December 2013 Audit Trip Report SAMA Project stage: Other ML14013A3392014-01-13013 January 2014 Environmental RAIs - 1 Supplemental Request Project stage: RAI RS-14-033, Response to NRC Requests for Additional Information for the Severe Accident Mitigation Alternatives Review, Dated January 6, 2014 License Renewal Application2014-02-0404 February 2014 Response to NRC Requests for Additional Information for the Severe Accident Mitigation Alternatives Review, Dated January 6, 2014 License Renewal Application Project stage: Response to RAI ML14104B1312014-05-0505 May 2014 Schedule Revision for Environmental Review of Byron and Braidwood Nuclear Stations License Renewal Application - Environmental Review Schedule (TAC Nos. MF1790, MF1791, MF1792, and MF1793) Project stage: Approval ML14041A3342014-05-28028 May 2014 Issuance of Environmental Scoping Summary Report Associated with the Staff'S Review of the Byron Nuclear Station, Units 1 and 2, License Renewal Application Project stage: Approval ML14338A1282014-12-23023 December 2014 FRN for Notice of Availability of the Supplement 54 to the GEIS for License Renewal of Nuclear Plant Regarding Byron, Units 1 and 2 (TAC Nos. MF1790 and MF1791) Project stage: Other ML14338A1242014-12-23023 December 2014 Notice of Availability of the Draft Plant Specific Supplement 54 to the Generic Environmental Impact Statement for License Renewal of Nuclear Plants Regarding Byron, Units 1 and 2, (TAC Nos. MF1790 and MF1791) Project stage: Draft Other ML14351A1612014-12-24024 December 2014 Notice of Availability of the Draft Plant-Specific Supplement 54 to the Generic Environmental Impact Statement for License Renewal of Nuclear Plants Regarding Byron, Units 1 and 2, (TAC Nos. MF1790 and MF1791) Project stage: Draft Other ML14357A0422014-12-31031 December 2014 NUREG-1437 - Supp 54, Draft Generic Environmental Impact Statement for License Renewal of Nuclear Plants Regarding Byron Station, Units 1 and 2. Project stage: Draft Other 2014-01-13
[Table View] |
Similar Documents at Byron |
---|
Category:Federal Register Notice
MONTHYEARML24010A2072024-01-25025 January 2024 Federal Register Notice - Issuance of Multiple Exemptions Regarding 10 CFR Part 73 - December 2023 ML21294A3762021-11-16016 November 2021 Federal Register Notice for Order Approving Indirect Transfer of Licenses ML21260A1392021-09-28028 September 2021 ISFSI Withdrawal of Licensing Actions Associated with the Scheduled Permanent Shut Down and Decommissioning of Units (EPIDs L-2020-LLA-0215,L-2020-LLE-0156,L-2020-LLA-0238,L-2020-LLA-0240,L-2021-JLD-0004,L-2021-JLD-0005,L-2021-LRO-0041 ML21260A1372021-09-28028 September 2021 Notice of Withdrawal of November 2, 2020, Application Revision to Emergency Plan for Permanently Shut Down and Defueled Condition (FRN) ML21260A1342021-09-28028 September 2021 Notice of Withdrawal of October 29, 2020, Application Proposed Defueled Technical Specifications and Revised License Conditions for Permanently Defueled Condition (FRN) ML21260A1382021-09-28028 September 2021 Notice of Withdrawal of September 24, 2020, Application Administrative Controls for Permanently Defueled Condition (FRN) ML21204A0812021-08-23023 August 2021 FRN Byron - 73.55 - Exemption from the Requirements of 10 CFR 73.55(p)(1)(i) and (p)(1)(ii) Related to the Suspension of Security Measures in an Emergency or During Severe Weather ML21204A0802021-08-23023 August 2021 Exemption - Byron 73.55 Re Approval Authority for Suspension of Security Measures in Emergency or During Severe Weather ML21145A0142021-05-26026 May 2021 Fleet and the Associated Independent Spent Fuel Storage Installations - Extension of Comment Period for Notice of Consideration of Approval of Transfer of Licenses and Conforming Amendments and Opportunity to Request a Hearing EPID L-2021-L ML21145A0152021-05-26026 May 2021 FRN Exelon License Transfer - Extend Comment Period ML21102A0752021-04-28028 April 2021 Fleet - Notice of Consideration of Approval of Transfer of Licenses and Conforming Amendments and Opportunity for a Hearing (FRN) ML20271A0002020-10-13013 October 2020 FRN - Notice of Issuance of Multiple Exemptions Regarding Various Parts of 10 CFR Due to COVID-19 Impacts for September 2020 ML20269A2002020-09-30030 September 2020 Request to Use a Provision of Later Edition of the ASME Boiler and Pressure Vessel Code, Section XI (EPID L2020-LLR-0117 ML20243A0002020-09-23023 September 2020 FRN - Notice of Issuance of Multiple Exemptions Regarding Various Parts of 10 CFR Due to COVID-19 Impacts for August 2020 ML20205L6112020-08-13013 August 2020 FRN, Individual SUNSI Notice, Revision to Technical Specification 5.5.9, Steam Generator (SG) Program, for a One-Time Deferral of Steam Generator Tube Inspections ML20098D3312020-05-0505 May 2020 Applications and Amendments to Facility Operating Licenses and Combined Licenses Involving Proposed No Significant Hazards Considerations and Containing Sensitive Unclassified Non-Safeguards Information and Order Imposing Procedures: May 5, ML19337A0312019-12-11011 December 2019 Biweekly Federal Register Notice - Applications and Amendments to Facility Operating Licenses and Combined Licenses Involving No Significant Hazards Considerations - Publication Date: 12/17/2019 ML19295F0902019-11-0505 November 2019 Biweekly Federal Register Notice - Applications and Amendments to Facility Operating Licenses and Combined Licenses Involving No Significant Hazards Considerations - Publication Date: 11/05/2019 ML19085A2172019-03-29029 March 2019 Biweekly Federal Register Notice - Applications and Amendments to Facility Operating Licenses and Combined Licenses Involving No Significant Hazards Considerations - Publication Date: 04/09/2019 ML19057A1912019-03-11011 March 2019 Withdrawal of Amendment Noticed FRN NRC-2018-0186, Withdrawal of Amendment Noticed FRN2019-03-11011 March 2019 Withdrawal of Amendment Noticed FRN ML19022A0042019-01-29029 January 2019 Individual Notice of Consideration of Issuance of Amendments to Renewed Facility Operating Licenses, Proposed No Significant Hazards Consideration Determination, and Opportunity for a Hearing ML19022A0062019-01-29029 January 2019 FRN - Byron Station, Unit 2- Individual Notice of Consideration of Issuance of Amendments to Renewed Facility Operating Licenses, Proposed No Significant Hazards Consideration Determination, and Opportunity for a Hearing ML18295A7442018-10-25025 October 2018 Biweekly Federal Register Notice - Applications and Amendments to Facility Operating Licenses and Combined Licenses Involving No Significant Hazards Considerations - Publication Date: 11/06/18 ML18228A7102018-08-27027 August 2018 FRN Individual Notice of Proposed Issuance ML18228A7042018-08-27027 August 2018 Individual Notice of Consideration of Issuance of Amendments to Renewed Facility Operating Licenses, Proposed No Significant Hazards Consideration Determination, and Opportunity for a Hearing NRC-2018-0140, Biweekly Federal Register Notice - Applications and Amendments to Facility Operating Licenses and Combined Licenses Involving No Significant Hazards Considerations - Publication Date: 7/17/20182018-07-0505 July 2018 Biweekly Federal Register Notice - Applications and Amendments to Facility Operating Licenses and Combined Licenses Involving No Significant Hazards Considerations - Publication Date: 7/17/2018 ML18180A2182018-07-0505 July 2018 Biweekly Federal Register Notice - Applications and Amendments to Facility Operating Licenses and Combined Licenses Involving No Significant Hazards Considerations - Publication Date: 7/17/2018 NRC-2018-0122, Environmental Assessment: Exelon Generation Company, LLC - Braidwood, Units 1 and 2; Byron, Unit Nos. 1 and 2; Clinton, Unit No. 1; Dresden, Units 1, 2, and 3; LaSalle, Units 1 and 2; Quad Cities, Units 1 and 22018-06-13013 June 2018 Environmental Assessment: Exelon Generation Company, LLC - Braidwood, Units 1 and 2; Byron, Unit Nos. 1 and 2; Clinton, Unit No. 1; Dresden, Units 1, 2, and 3; LaSalle, Units 1 and 2; Quad Cities, Units 1 and 2 ML18135A1882018-06-13013 June 2018 Environmental Assessment: Exelon Generation Company, LLC - Braidwood, Units 1 and 2; Byron, Unit Nos. 1 and 2; Clinton, Unit No. 1; Dresden, Units 1, 2, and 3; LaSalle, Units 1 and 2; Quad Cities, Units 1 and 2 NRC-2018-0096, Biweekly Federal Register Notice - Applications and Amendments to Facility Operating Licenses and Combined Licenses Involving No Significant Hazards Considerations - Publication Date: May 22, 20182018-05-14014 May 2018 Biweekly Federal Register Notice - Applications and Amendments to Facility Operating Licenses and Combined Licenses Involving No Significant Hazards Considerations - Publication Date: May 22, 2018 ML18127B7232018-05-14014 May 2018 Biweekly Federal Register Notice - Applications and Amendments to Facility Operating Licenses and Combined Licenses Involving No Significant Hazards Considerations - Publication Date: May 22, 2018 ML18087A2642018-04-26026 April 2018 OEDO-17-00104 - Byron Station, Unit Nos. 1 and 2, and Braidwood Station, Units 1 and 2 - Final Quigley Directors Decision FRN ML18087A1872018-04-24024 April 2018 OEDO-17-00104 - Byron Station, Unit Nos. 1 and 2, and Braidwood Station, Units 1 and 2 - Directors Decision ML17291A2982018-02-23023 February 2018 Proposed Director'S Decision Under 10 CFR 2.2016 ML17125A2472017-07-20020 July 2017 OEDO-17-00104 - FRN for Barry Quigley, Citizen, E-mail 2.206 Petition for Byron and Braidwood Units 1 & 2 High Energy Line Break NRC-2017-0167, OEDO-17-00104 - FRN for Barry Quigley, Citizen, E-mail 2.206 Petition for Byron and Braidwood Units 1 & 2 High Energy Line Break2017-07-20020 July 2017 OEDO-17-00104 - FRN for Barry Quigley, Citizen, E-mail 2.206 Petition for Byron and Braidwood Units 1 & 2 High Energy Line Break ML16126A0612016-06-20020 June 2016 Exemption from the Requirements of 10 CFR Part 50, Section 50.46 and Appendix K to Allow the Use of Optimized Zirlo Clad Fuel Rods ML15356A5992015-12-29029 December 2015 Biweekly Federal Register Notice - Applications and Amendments to Facility Operating Licenses and Combined Licenses Involving No Significant Hazards Considerations - Publication Date: January 5, 2016 ML15271A1172015-11-19019 November 2015 Renewed Licenses - Federal Register Notice ML15218A6252015-08-14014 August 2015 Biweekly FRN - Applications and Amendments to Facility Operating Licenses and Combined Licenses Involving No Significant Hazards Considerations - Publication Date: August 14, 2015 ML13018A2392015-04-0808 April 2015 G20110171 - Letter to Petitioner Saporito on Proposed Director'S Decision Regarding 2.206 Petition Dated: March 12, 2011 ML14338A1282014-12-23023 December 2014 FRN for Notice of Availability of the Supplement 54 to the GEIS for License Renewal of Nuclear Plant Regarding Byron, Units 1 and 2 (TAC Nos. MF1790 and MF1791) ML14003A2752014-12-22022 December 2014 MF3203 MF3204 Emergency Drill Exemption Evaluation NRC-2015-0002, MF3203 MF3204 Emergency Drill Exemption Evaluation2014-12-22022 December 2014 MF3203 MF3204 Emergency Drill Exemption Evaluation ML14239A3702014-12-22022 December 2014 G20120269 - Quigley Ltr - Final Directors Decision ML14003A2742014-12-22022 December 2014 Expemption from the Requirements of 10 CFR Part 50, Appendix E, Section IV.F.2.C ML14317A5432014-11-17017 November 2014 Federal Register Notice Regarding the ACRS Plant License Renewal Subcommittee Meeting (Braidwood/Byron), December 3, 2014 ML14303A3812014-10-31031 October 2014 Biweekly Sholly FRN - Application and Amendments to Facility Operating Licenses and Combined Licenses Involving No Significant Hazards Considerations - Publication Date: November 12, 2014 NRC-2014-0917, Biweekly Sholly FRN - Applications and Amendments to Facility Operating Licenses and Combined Licenses Involving No Significant Hazards Considerations - Publication Date: September 16, 20142014-09-0505 September 2014 Biweekly Sholly FRN - Applications and Amendments to Facility Operating Licenses and Combined Licenses Involving No Significant Hazards Considerations - Publication Date: September 16, 2014 2024-01-25
[Table view] |
Text
[7590-01-P]
NUCLEAR REGULATORY COMMISSION
[Docket Nos. 50-454 and 50-455; NRC-2013-0178]
License Renewal Application for Byron Station Units 1 and 2 AGENCY: Nuclear Regulatory Commission.
ACTION: Draft supplemental generic environmental impact statement, issuance, public meetings, request for comment.
SUMMARY
- The U.S. Nuclear Regulatory Commission (NRC) is issuing for public comment a draft plant-specific Supplement 54 to the Generic Environmental Impact Statement (GEIS) for License Renewal of Nuclear Plants, NUREG-1437, regarding the renewal of operating license NPF-37 and NPF-66 for an additional 20 years of operation for Byron Station, Units 1 and 2 (Byron). Byron is located in Byron, Illinois. Possible alternatives to the proposed action (license renewal) include no action and reasonable alternative energy sources. The NRC staff plans to hold two public meetings during the public comment period to present an overview of the draft plant-specific supplement to the GEIS and to accept public comments on the document.
DATES: Submit comments by February 20, 2015. Comments received after this date will be considered, if it is practical to do so, but the NRC staff is able to ensure consideration only for comments received on or before this date.
ADDRESSES: You may submit comments by any of the following methods (unless this document describes a different method for submitting comments on a specific subject):
telephone: 301-287-3422; e-mail: Carol.Gallagher@nrc.gov. For technical questions, contact the individual listed in the FOR FURTHER INFORMATION CONTACT section of this document.
- Mail comments to: Cindy Bladey, Office of Administration, Mail Stop: 3WFN A44M, U.S. Nuclear Regulatory Commission, Washington, DC 20555-0001.
For additional direction on obtaining information and submitting comments, see Obtaining Information and Submitting Comments in the SUPPLEMENTARY INFORMATION section of this document.
FOR FURTHER INFORMATION CONTACT: Lois James, Office of Nuclear Reactor Regulation, telephone: 301-415-3306, e-mail to Lois.James@nrc.gov; U.S. Nuclear Regulatory Commission, Washington, DC 20555-0001.
SUPPLEMENTARY INFORMATION:
I. Obtaining Information and Submitting Comments.
A. Obtaining Information Please refer to Docket ID NRC-2013-0178 when contacting the NRC about the availability of information regarding this document. You may obtain publicly-available information related to this document by any of the following methods:
- NRCs Agencywide Documents Access and Management System (ADAMS):
You may access publicly available documents online in the ADAMS Public Documents collection at http://www.nrc.gov/reading-rm/adams.html. To begin the search, select ADAMS Public Documents and then select Begin Web-based ADAMS Search. For problems with ADAMS, please contact the NRCs Public Document Room (PDR) reference staff at 1-800-397-
4209, 301-415-4737, or by e-mail to pdr.resource@nrc.gov. The ADAMS accession number for each document referenced in this document (if that document is available in ADAMS) is provided the first time that a document is referenced. The draft plant-specific Supplement 54 to the GEIS for License Renewal of Nuclear Plants, NUREG-1437, is available in ADAMS under Accession No. ML14357A042.
- NRCs PDR: You may examine and purchase copies of public documents at the NRCs PDR, Room O1-F21, One White Flint North, 11555 Rockville Pike, Rockville, Maryland 20852.
B. Submitting Comments Please include Docket ID NRC-2013-0178 in the subject line of your comment submission, in order to ensure that the NRC is able to make your comment submission available to the public in this docket.
The NRC cautions you not to include identifying or contact information in comment submissions that you do not want to be publicly disclosed in your comment submission. The NRC will post all comment submissions at http://www.regulations.gov as well as enter the comment submissions into ADAMS, and the NRC does not routinely edit comment submissions to remove identifying or contact information.
If you are requesting or aggregating comments from other persons for submission to the NRC, you should inform those persons not to include identifying or contact information that they do not want to be publicly disclosed in their comment submission. Your request should state that the NRC does not routinely edit comment submissions to remove such information before making the comment submissions available to the public or entering the comment into ADAMS.
II. Discussion.
The NRC is issuing for public comment a draft plant-specific Supplement 54 to the GEIS
for License Renewal of Nuclear Plants, NUREG-1437, regarding the renewal of operating license NPF-37 AND NPF-66 for an additional 20 years of operation for Byron. Supplement 54 to the GEIS includes the preliminary analysis that evaluates the environmental impacts of the proposed action and alternatives to the proposed action. The NRCs preliminary recommendation is that the adverse environmental impacts of license renewal for Byron are not great enough to deny the option of license renewal for energy-planning decisionmakers.
III. Public Meetings.
The NRC staff will hold public meetings prior to the close of the public comment period to present an overview of the draft plant-specific supplement to the GEIS and to accept public comment on the document. Two meetings will be held at the Byron Forrest Preserve, 7993 North River Road, Byron, Illinois 61010, on Tuesday, February 3, 2015. The first session will convene at 2:00 p.m. and will continue until 4:00 p.m., as necessary. The second session will convene at 7:00 p.m. and will continue until 9:00 p.m., as necessary. The meetings will be transcribed and will include: (1) a presentation of the contents of the draft plant-specific supplement to the GEIS; and (2) the opportunity for interested government agencies, organizations, and individuals to provide comments on the draft report. Additionally, the NRC staff will host informal discussions one hour prior to the start of each session at the same location. No comments on the draft supplement to the GEIS will be accepted during the informal discussions. To be considered in the final supplement to the GEIS, comments must be provided either at the transcribed public meeting or submitted in writing by the comment deadline identified above. Persons may pre-register to attend or present oral comments at the meeting by contacting Mr. Lois James, the NRC project manager, at 1-800-368-5642,
extension 3306, or by e-mail at Lois.James@nrc.gov no later than Tuesday, January 20, 2015.
Members of the public may also register to provide oral comments within 15 minutes of the start of each session. Individual oral comments may be limited by the time available, depending on the number of persons who register. If special equipment or accommodations are needed to attend or present information at the public meeting, the need should be brought to Ms. James attention no later than Tuesday, January 20, 2015, to provide the NRC staff adequate notice to determine whether the request can be accommodated.
Dated at Rockville, Maryland, this 23 day of December, 2014 For The Nuclear Regulatory Commission
/RA/
Elaine Keegan, Acting Chief Projects Branch 2 Division of License Renewal Office of Nuclear Reactor Regulation