ML14316A373

From kanterella
Jump to navigation Jump to search
301 RO Exam as Given
ML14316A373
Person / Time
Site: Farley  Southern Nuclear icon.png
Issue date: 11/12/2014
From:
NRC/RGN-II
To:
Southern Nuclear Operating Co
References
ES-401, ES-401-7 50-348/OL-14, 50-364/OL-14
Download: ML14316A373 (184)


Text

l ES-401 Site-Specific RO Written Examination Form ES-401-7 Cover Sheet U.S. Nuclear Regulatory Commission l Site-Specific RO Written Examination Applicant Information Name:

Date: October 21, 2014 Facility/Unit: FARLEY Unit 1 & 2 l Region: I II X III IV Reactor Type: W X CE BW GE l

Start Time: Finish Time:

Instructions Use the answer sheets provided to document your answers. Staple this cover sheet l on top of the answer sheets. To pass the examination, you must achieve a final grade of at least 80.00 percent. Examination papers will be collected 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br /> after the examination begins.

Applicant Certification All work done on this examination is my own. I have neither given nor received aid.

Applicants Signature Results Examination Value __________ Points Applicants Score __________ Points Applicants Grade __________ Percent ES-401, Page 30 of 33

1. Unit 1 is at 100% power with the following conditions:
  • Rods are in manual.
  • Control Bank D is at 225 steps.
  • Median Tavg is 568.5°F.
  • Tref is 571.0°F.

Subsequently, the operator places the ROD CONTROL BANK SELECTOR SWITCH in AUTO.

Which one of the following completes the statement below?

Rod Speed will indicate (1) and Control Bank D will (2) .

(1) (2)

A. 40 steps per minute remain at 225 steps B. 40 steps per minute begin to move out C. 8 steps per minute remain at 225 steps D. 8 steps per minute begin to move out

2. The following conditions exist on Unit 1:

At 1000:

  • Rod control is in AUTO.
  • TI-408A, Tavg - Tref deviation, indicates 0°F and stable.
  • Pressurizer level is stable.
  • Reactor Power is approximately 75% and stable.
  • Control Bank D step counters are at 144 steps.

At 1002:

  • TI-408A, Tavg - Tref deviation, indicates +2°F and rising.
  • Pressurizer level is slowly rising.
  • Pressurizer spray valves have throttled open.
  • Reactor Power is approximately 76% and slowly rising.
  • Control Bank D step counters are at 150 steps and stepping out.
  • There is no load change in progress.

Which one of the following completes the statement below?

The event in progress is an (1) and the action required is to (2) .

A. 1) uncontrolled continuous Control Rod withdrawal

2) trip the reactor and enter EEP-0.0, Reactor Trip or Safety Injection B. 1) uncontrolled continuous Control Rod withdrawal
2) place the rod control mode selector switch to MANUAL and verify that rod motion stops C. 1) inadvertent RCS boration
2) trip the reactor and enter EEP-0, Reactor Trip or Safety Injection D. 1) inadvertent RCS boration
2) place the rod control mode selector switch to MANUAL and match Tavg with Tref by inserting rods
3. Unit 1 is at 45% power with the following conditions:
  • DC2, RCP #1 SEAL LKOF FLOW HI, is in alarm.
  • 1C RCP #1 seal leakoff flow is 6.5 gpm.
  • TE0126, RCP C SEAL WATER OUTLET TEMP, is 150°F and stable.
  • TE0125, RCP C LOWER SEAL WATER BRG TEMP, is 155°F and stable.

Which one of the following describes actions required in accordance with AOP-4.1, Abnormal Reactor Coolant Pump Seal Leakage?

A. Immediately trip the Reactor, secure 1C RCP and close the seal leakoff valve.

B. Perform a controlled shutdown then secure 1C RCP and close the seal leakoff valve.

C. Indefinite power operation is allowed, maintain 6-13 gpm seal injection flow.

D. Continue power operation for a maximum of 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br />, maintain >9 gpm seal injection flow.

4. Unit 1 is at 100% power with the following conditions:
  • PK-145, LP LTDN PRESS, demand is failing to 0% in automatic.

Which one of the following completes the statements below?

Letdown flow will (1) .

The operator is required to take action to adjust letdown flow, not to exceed a MAXIMUM of (2) .

(1) (2)

A. increase 135 gpm B. increase 125 gpm C. decrease 135 gpm D. decrease 125 gpm

5. Unit 1 is at 100% power with the following conditions:
  • An Auto makeup has just started.
  • MKUP MODE SELECTOR switch is in AUTO.
  • MKUP MODE CONT switch RED light is LIT.

Which one of the following completes the statement below?

FCV114A, MKUP TO VCT, will _____ .

A. open fully B. remain closed C. modulate open based on FK-113 pot setting D. modulate open based on FK-168 pot setting

6. Unit 1 is in Mode 4 preparing for a Refueling Outage with the following conditions:
  • An RCS cooldown is in progress.
  • The 'A' and 'B' RHR Loop suction valves have been opened.
  • RCS temp is 250°F.

Per SOP-7.0, Residual Heat Removal System, which one of the following completes the statements below?

The reason (1) train(s) of RHR is(are) in service cooling down the RCS is to (2) .

A. (1) ONE (2) prevent RHR operability concerns B. (1) ONE (2) prevent excessive RCS cooldown C. (1) TWO (2) prevent excessive heatup of one train of CCW D. (1) TWO (2) ensure low temperature overpressure protection (LTOP) requirements are met

7. Unit 1 is operating at 100% with the following conditions:
  • 1B Charging pump is aligned to 'B' Train.
  • 1B Charging pump is running.

Subsequently, an LOSP with a concurrent Safety Injection occurs and the following conditions exist:

  • 22 seconds after the actuation, EB1, CHG PUMP OVERLOAD TRIP, comes into alarm.
  • The AMBER light on the handswitch for the 1C Charging pump is illuminated.

Which one of the following completes the statement below?

1B Charging pump .

A. must be manually started B. will start from the ESS sequencer C. will remain running throughout the event per design D. will start due to 1C Charging Pump tripping on overload

8. Which one of the following completes the statements below?

The PRT is maintained with a (1) cover gas.

The PRT rupture disc is designed to rupture at (2) psid.

(1) (2)

A. Hydrogen 100 B. Nitrogen 100 C. Hydrogen 150 D. Nitrogen 150

9. Unit 1 is operating at 100% power with the following conditions:
  • The RX TRIP ACTUATION handswitch is placed in TRIP.

Which one of the following completes the statement below?

The Reactor Trip Breaker Shunt Trip devices receive power from (1) and (2) to open the Reactor Trip Breakers.

(1) (2)

A. 120VAC energize B. 125VDC energize C. 120VAC de-energize D. 125VDC de-energize

10. Per SOP-1.2, Reactor Coolant Pressure Relief System, which one of the following completes the statements below?

During normal operation, the PRT temperature should not exceed a maximum of (1) .

The NORMAL method to cooldown the PRT is using (2) .

A. (1) 120°F (2) spray from RMWST and drain to the RCDT B. (1) 170°F (2) spray from RMWST and drain to the RCDT C. (1) 120°F (2) recirculation through the RCDT heat exchanger D. (1) 170°F (2) recirculation through the RCDT heat exchanger

11. Unit 1 is in Mode 3 and the following conditions exist:
  • PI-455, PRZR PRESS, is 1400 psig.
  • PI-472, PRT PRESS, is 30 psig.
  • PCV-444B, PRZR PORV, failed open and cannot be closed.
  • PCV-444B is NOT capable of being manually cycled.

Which one of the following completes the statements below?

The temperature indicated on TI-463, PORV, is approximately (1) .

Per TS 3.4.11, Pressurizer Power Operated Relief Valves (PORVs), within one hour, close and (2) MOV-8000B, PRZR PORV ISO.

Reference Provided (1) (2)

A. 535°F remove power from B. 280°F remove power from C. 535°F maintain power to D. 280°F maintain power to

12. Unit 1 is operating at 100% when the following conditions occur:
  • The "On Service" Train of CCW has been lost.

Which one of the following completes the statement below?

The RCP (1) radial bearing temperatures will rapidly rise and (2) is the MINIMUM bearing temperature, if exceeded, at which the RCPs must be secured.

(1) (2)

A. pump 195°F B. motor 195°F C. pump 260°F D. motor 260°F

13. Unit 1 is operating at 100% power and the following conditions exist:

At 1000:

  • PCV-444B, PRZR PORV, failed open and cannot be closed.
  • The immediate operator actions of AOP-100, Instrumentation Malfunction, are complete.

At 1015:

  • A rupture occurs on the 1A SG and EEP-3.0, Steam Generator Tube Rupture, is in progress with the following conditions:

- The operating crew is at the step to reduce RCS pressure.

- Normal Pressurizer Spray is NOT available.

Per EEP-3.0, which one of the following completes the statements below?

The required method of RCS pressure reduction is using (1) .

PCV-444B (2) be used for the RCS pressure reduction.

(1) (2)

A. Auxiliary Spray CAN B. one Pressurizer PORV CAN C. Auxiliary Spray CANNOT D. one Pressurizer PORV CANNOT

14. Unit 1 is operating at 100% power when the following occurs:
  • PT-445, PRZR PRESS, fails HIGH.

Which one of the following completes the statements below?

PCV-444D, 1B LOOP SPRAY VLV, (1) open due to the failure.

RCS Pressure will (2) .

A. (1) WILL (2) lower causing a Reactor Trip and Safety Injection.

B. (1) will NOT (2) lower causing a Reactor Trip and Safety Injection.

C. (1) WILL (2) cycle at approximately 2000 psig.

D. (1) will NOT (2) cycle at approximately 2000 psig.

15. Unit 1 is at 8% power with the following conditions:
  • NI-42, POWER RANGE, has failed HIGH.
  • AOP-100, Instrumentation Malfunction, is in progress.
  • At the step to remove the control power fuses for NI-42, the UO inadvertently removes the control power fuses for NI-36, INTERMEDIATE RANGE.

Which one of the following completes the statements below?

The operating crew is required to (1) .

The Source Range Nuclear Instruments (2) immediately energize.

Procedure name: EEP-0.0, Reactor Trip or Safety Injection (1) (2)

A. enter EEP-0.0 will NOT B. enter EEP-0.0 WILL C. continue in AOP-100 will NOT D. continue in AOP-100 WILL

16. Unit 1 was at 100% power when the following occurred:
  • The 1A Auxiliary Building DC Bus de-energizes.
  • An dual Unit LOSP occurs.
  • An SI occurs on Unit 1 concurrently with the LOSP.

Which one of the following completes the statements below?

The 1-2A DG (1) start.

The B1F Sequencer (2) automatically sequence loads on.

(1) (2)

A. WILL WILL B. WILL will NOT C. will NOT WILL D. will NOT will NOT

17. Unit 1 was at 100% power when the following occurred:

At 1000:

  • A Loss of all Offsite Power occurs.

At 1020:

  • The following conditions exist:

- RCS pressure is 2235 psig and steady.

- RCS Loop THOT in all 3 loops is 595°F and decreasing slowly.

- RCS Loop TCOLD in all 3 loops is 551°F and steady.

- Core exit TCs indicate approximately 600°F and decreasing slowly.

- Steam Generator pressures are approximately 1038 psig and steady.

Which one of the following completes the statement below?

At 1020, Natural Circulation (1) exist.

Per ESP-0.1, Reactor Trip Response, the (2) would be used to dump steam.

(1) (2)

A. does NOT Steam Dumps B. DOES Steam Dumps C. does NOT SG Atmospheric Relief Valves D. DOES SG Atmospheric Relief Valves

18. Which one of the following completes the statement below?

NI-32, SOURCE RANGE, is powered from (1) 120VAC Vital Panel.

NI-44, POWER RANGE, is powered from (2) 120VAC Vital Panel.

(1) (2)

A. 1A 1D B. 1A 1C C. 1B 1D D. 1B 1C

19. Given the following plant conditions on Unit 2:
  • Natural circulation verification is in progress.
  • The Subcooled Margin Monitor is in CETC mode.

Which one of the following completes the statement below?

The failed Core Exit Thermocouples' output will be failed (1) and the Subcooled Margin Monitor calculation (2) be accurate.

(1) (2)

A. high will NOT B. high WILL C. low WILL D. low will NOT

20. Unit 1 was operating at 100% power with the following conditions:
  • 1A is selected on the CTMT CLR FAN SEL SWITCH.
  • All containment cooler fans are running in FAST speed.

Subsequently, a Large Break LOCA occurred with the following conditions:

  • Containment pressure reached 33 psig.
  • A Dual Unit LOSP occurred.
  • The 1B DG tripped when it auto started.
  • BA1, 1A CTMT CLR FAN FAULT, is in alarm.
  • The AMBER light above 1A CTMT CLR FAN SLOW SPEED handswitch is illuminated.

Which one of the following completes the statements below?

Per EEP-0.0, the operating crew will verify at least one Containment Cooler fan per train is running in (1) speed.

The 1B Containment Cooler SLOW speed fan (2) start when the 1A Containment Cooler SLOW speed fan trips.

(1) (2)

A. SLOW WILL B. SLOW will NOT C. FAST WILL D. FAST will NOT

21. Unit 1 is in Mode 5 with the following conditions:

At 1000:

  • 1A RHR pump is tagged out.
  • All SG Wide Range levels are 84%.
  • Pzr level is being maintained at 21% on LI-462, PRZR LVL.
  • RCS temperature is 195°F.
  • RCS pressure is 325 psig.
  • All RCPs are secured.
  • 1B RHR pump is running in the cooldown lineup.

At 1005:

  • PT-402, 1C LOOP RCS PRESS, fails HIGH.

Which one of the following completes the statements below?

At 1005, RHR cooling (1) been lost.

Per AOP-12.0, RHR Malfunction, a loss of RHR cooling would require (2) to be established for core cooling.

(1) (2)

A. HAS feed and bleed B. HAS secondary heat sink C. has NOT feed and bleed D. has NOT secondary heat sink

22. A LOCA has occurred on Unit 1 and the following conditions exist:

At 1000,

  • 'B' Train Phase B failed to actuate and cannot be manually actuated.
  • Containment Pressure is 32 psig and slowly lowering.

At 1005, The Unit Operator manually starts the 1B Containment Spray pump.

Which one of the following completes the statements below?

At 1000, FRP-Z.1, Response to High Containment Pressure, entry conditions (1) met.

At 1005, MOV-8820B, 1B CS PUMP TO SPRAY HDR ISO, (2) automatically open.

(1) (2)

A. ARE will NOT B. are NOT will NOT C. ARE WILL D. are NOT WILL

23. Unit 1 is at 100% power with the following conditions:
  • AOP-9.0, Loss of Component Cooling Water, is in progress due to a CCW malfunction.
  • The standby CCW pump has been started.
  • Seal injection flow to each RCP is:

- A RCP 6.3 gpm

- B RCP 6.5 gpm

- C RCP 7.1 gpm Which one of the following completes the statements below?

HV-3045 will close when downstream flow reaches (1) .

Per AOP-9.0, seal injection flow (2) adequate to allow continued RCP operation.

(1) (2)

A. 160 gpm is NOT B. 75 gpm is NOT C. 160 gpm IS D. 75 gpm IS

24. Which one of the following completes the statements below?

A Train CS Pump, A Train HHSI Pump, and the A Train RHR Pump have (1) suction header(s) penetrating the RWST.

The Containment Spray (CS) Pump Room Coolers are DIRECTLY started (2) .

A. (1) three separate (2) by a CS actuation signal B. (1) one common (2) by a CS actuation signal C. (1) three separate (2) when the CS pump breaker closes D. (1) one common (2) when the CS pump breaker closes

25. Unit 2 is at 100% power, and PT-444, PRZR PRESS, is stuck at 2230 psig.

Which one of the following describes the effects on PK-444A, PRZR PRESS REFERENCE, and the pressurizer liquid density due to this malfunction?

PK-444A controller demand goes (1) ,

and the density of the Pressurizer liquid initially goes (2) .

(1) (2)

A. down up B. down down C. up up D. up down

26. Which one of the following completes the statement below?

To enhance the retention of Iodine in solution, the Containment Spray System sprays water from the (1) at a pH of approximately (2) .

(1) (2)

A. Containment Sump 4.5 B. RWST 4.5 C. Containment Sump 7.5 D. RWST 7.5

27. Unit 1 is in Mode 4 and and the following condition exists:
  • Containment Mini-Purge is in service.
  • R-24A and R-24B, CONTAINMENT PURGE, are rising but NOT at the alarm setpoint.
  • The OATC manually actuates a Phase A Containment Isolation.

Which one of the following completes the statements below?

Radiation levels (1) stop rising in the Main Exhaust Plenum.

The Mini-Purge Supply and Exhaust fans (2) stop automatically.

(1) (2)

A. WILL WILL B. WILL will NOT C. will NOT WILL D. will NOT will NOT

28. Unit 1 was operating at 100% power when the following occurred:
  • The 1B SG becomes faulted inside Containment.

Which one of the following describes the actions required by EEP-2.0, Faulted Steam Generator Isolation, to isolate the 1B SG?

The minimum action for Main Steam line isolation is to (1) .

The actions for isolation of AFW flow to the 1B SG is to (2) .

Valve nomenclature:

MOV-3764B & D, MDAFW TO 1B SG ISO Q1N23V017B, TDAFWP TO 1B SG FCV INLET ISO HV-3227B, MDAFWP TO 1B SG FLOW CONT HV-3228B, TDAFWP TO 1B SG FLOW CONT A. 1) close ONLY the MSIVs for the 1B steam line

2) close MOV-3764B & D on the BOP and locally close Q1N23V017B B. 1) close ONLY the MSIVs for the 1B steam line
2) close HV-3227B and HV-3228B on the MCB and fail air locally C. 1) close all MSIVs
2) close MOV-3764B & D on the BOP and locally close Q1N23V017B D. 1) close all MSIVs
2) close HV-3227B and HV-3228B on the MCB and fail air locally
29. Given the following conditions on Unit 1:

At 1000:

  • Mode 6 with core off-load in progress.
  • Refueling Cavity level is 153 ft 6 in.

At 1015:

  • The Refueling Cavity level is lowering rapidly.

At 1030:

  • The leak has been isolated.
  • Refueling Cavity level is stable at 143 ft.

Which one of the following completes the statements below?

At 1015, AOP-30, Refueling Accident, (1) required to be entered.

At 1030, TS 3.9.6, Refueling Cavity Water Level, (2) required to be entered.

(1) (2)

A. IS IS B. is NOT IS C. IS is NOT D. is NOT is NOT

30. Unit 1 is at 70% power with the following conditions:
  • R-15A, SJAE EXH, is in alarm and the indication is stable.

Which one of the following completes the statement below?

The SJAE Filtration system (1) automatically align for operation.

Once SJAE Filtration is in service, the R-15A reading will (2) .

(1) (2)

A. WILL lower B. WILL remain the same C. will NOT lower D. will NOT remain the same

31. The following conditions exist on Unit 1:
  • All RCPs have been secured.
  • Operators have determined the required CETC temperature and started the RCS cooldown.

Subsequently, the following conditions exist:

  • The required CETC temperature has NOT been reached.
  • An Orange Path is indicated on the INTEGRITY CSF for the ruptured loop.

Per EEP-3.0, which one of the following describes the required actions?

The overall mitigating strategy is to (1) .

A. continue the RCS cooldown at the current rate and remain in EEP-3.0 B. reduce the RCS cooldown rate and remain in EEP-3.0 C. reduce the RCS cooldown rate and apply the INTEGRITY CSF strategy D. stop the RCS cooldown and apply the INTEGRITY CSF strategy

32. Unit 1 was at 26% power and 240 MWe, and the following conditions occurred:
  • The Reactor tripped.

Which one of the following completes the statements below?

The Steam Dumps are armed due to the (1) .

RCS temperature will be controlled at (2) .

(1) (2)

A. P-4 signal 547°F B. P-4 signal 551°F C. C-7 signal 547°F D. C-7 signal 551°F

33. Unit 1 is cooling down with the following conditions:
  • RCS Tcold is 480°F and stable.
  • RCS pressure is 995 psig and stable.

The plan is to stabilize at this point for data collection. Steam dumps are in steam pressure mode and are ready to be placed in automatic to maintain the current RCS temperature.

Which one of the following completes the statement below?

PK-464, STM HEADER PRESS, SETPT will be set at (1) .

Reference Provided A. 4.60 B. 4.75 C. 8.30 D. 8.40

34. Unit 1 was operating at 100% power when the following occurred:

At 1000:

  • A Load Rejection occurs.

At 1005:

  • The following conditions exist:

- Reactor Power is 70%.

- Turbine Power is 550 MWe.

- FE1, CONT ROD BANK POSITION LO, is in alarm.

- Tavg is 564°F and stable.

- Tref is 561°F and stable.

Which one of the following completes the statements below?

Per AOP-17.0, Turbine Load Rejection, the immediate operator actions require the Main Turbine to be (1) .

At 1005, the operating crew is required to (2) .

A. (1) placed in MANUAL (2) raise turbine load to match Reactor power B. (1) left in OPERATOR AUTO (2) raise turbine load to match Reactor power C. (1) placed in MANUAL (2) borate as necessary to withdraw rods D. (1) left in OPERATOR AUTO (2) borate as necessary to withdraw rods

35. Unit 1 is operating at 40% power when the following occurs:
  • Condenser pressure rapidly rises to 12 psia.

Subsequently, Tavg is being maintained at 551°F.

Which one of the following completes the statements below?

The Steam Dump (1) controller is enabled.

The Steam Dumps are (2) .

(1) (2)

A. Plant Trip CLOSED B. Plant Trip OPEN C. Loss of Load CLOSED D. Loss of Load OPEN

36. Unit 2 is operating at 55% power when a transient in the Main Feedwater System results in the following:
  • 2A SGFP high and low pressure stop valves indicate CLOSED.
  • 2B SGFP is running at minimum speed.
  • 2A SG level: 34% and lowering.
  • 2B SG level: 27% and lowering.
  • 2C SG level: 34% and lowering.

Which one of the following completes the statements below?

The MDAFW pumps (1) received an auto start signal.

The TDAFW pump will auto start when (2) .

(1) (2)

A. HAVE 2B SGFP is TRIPPED B. have NOT 2A SG NR level reaches 28%

C. have NOT 2B SGFP is TRIPPED D. HAVE 2A SG NR level reaches 28%

37. A station blackout has occurred on Unit 1 and ECP-0.0, Loss of All AC Power, has been implemented.

Which one of the following completes the statements below?

HV-3611, INST AIR SUPPLY TO CTMT, (1) CLOSE when Instrument Air pressure is lost.

The Pressurizer PORVs (2) have an available backup means to be operated.

(1) (2)

A. WILL DO B. WILL do NOT C. will NOT DO D. will NOT do NOT

38. Unit 1 was operating at 80% power when the following occurred:
  • A malfunction of the SJAE's causes Condenser pressure to rise rapidly.

Which one of the following is the LOWEST pressure that will cause an automatic trip of the Main Turbine?

A. 2.901 psia B. 3.800 psia C. 4.351 psia D. 5.900 psia

39. The following conditions exist on Unit 1:
  • Unit 1 is in Mode 6.
  • 'A' Train is on service.
  • Fuel movement inside Containment is in progress.
  • 1B DG is tagged out.
  • 2C DG is tagged out.

Subsequently, the 1F 4160V bus loses power and remains de-energized.

Which one of the following completes the statements below?

Fuel movement inside Containment (1) allowed to continue per TS 3.8.2 AC Sources - Shutdown.

Per AOP-5.0, Loss of A or B Train Electrical Power, SFP Cooling is required to be restored using the (2) SFP Cooling pump.

(1) (2)

A. IS 1A B. IS 1B C. is NOT 1A D. is NOT 1B

40. Unit 1 is in Mode 3 with the following plant conditions:
  • NI-32, SOURCE RANGE, is tagged out for power supply replacement.

Subsequently, the 1A 120V AC Vital Panel becomes de-energized.

Which one of the following completes the statement below?

Backup Source Range indication (1) available on the MCB from Gamma-Metrics.

The Reactor Make-up system (2) be affected by the malfunction of the 1A 120V Vital Panel.

(1) (2)

A. IS WILL B. is NOT will NOT C. IS will NOT D. is NOT WILL

41. The following conditions exist on Unit 1:
  • 'A' Train Aux Building DC has been lost.
  • AOP-29.1, Plant Stabilization in Hot Standby and Cooldown Without "A" Train AC or DC Power, is in progress.
  • RCS temperature must be lowered.

Which one of the following completes the statements below?

Steam Dumps (1) be used for RCS temperature control.

If required, Atmospheric Relief valves (2) be operated from the Hot Shutdown Panel.

(1) (2)

A. CAN CANNOT B. CAN CAN C. CANNOT CANNOT D. CANNOT CAN

42. Unit 1 is at 45% power with the following conditions:
  • FT-477 is selected on FS/478Y, A SG FW FLOW SEL SW.

Subsequently, FT-477, 1A SG FW FLOW, fails low.

Which one of the following completes the statement below?

Controller demand on FK-478, 1A SG FW FLOW, will initially (1) .

Controller demand on SK-509A, SGFP MASTER CONT, will initially (2) .

(1) (2)

A. rise lower B. rise rise C. lower lower D. lower rise

43. Unit 1 is at 100% power when the following occurs:

1B SGFP trips.

AOP-13.0, Condensate and Feedwater Malfunction, immediate operator actions are complete.

Which one of the following describes the overall Steam Generator pressure response during the transient and the reason for the pressure change?

SG pressures .

A. rise due to the Main Turbine ramp down B. rise due to swell in the Steam Generators C. lower due to the Main Turbine ramp down D. lower due to shrink in the Steam Generators

44. The following conditions exist on Unit 1:
  • EEP-1.0, Loss of Reactor or Secondary Coolant, is in progress.
  • Make up to the CST is not available and the level is lowering.

Which one of the following completes the statements below?

The FIRST level at which AFW pump suctions are required to be aligned to their backup source of water is (1) .

The backup source of water to the AFW pump suctions is (2) .

(1) (2)

A. 5.3 ft Service Water B. 4.5 ft Service Water C. 5.3 ft Fire Protection Water D. 4.5 ft Fire Protection Water

45. Unit 1 was operating at 30% power with only the 1A SGFP running when the following occurred.
  • The 1A SGFP tripped.

Subsequently, BKR DG15, 1B S/U XFMR TO 1G 4160 V BUS, trips followed by a spurious Safety Injection.

  • All SG NR levels are 50% and slowly rising.

Which one of the following completes the statement below, per SOP-22.0, Auxiliary Feedwater?

To stop the 1B MDAFW pump, in addition to placing the MCB switch to STOP, is(are) required.

A. no other actions B. resetting the SI C. placing the 1B MDAFWP AUTO/DEFEAT switch in DEFEAT D. locally cycling the control power breaker for the 1B MDAFW pump breaker

46. Given the following conditions on Unit 1:
  • The 1A inverter is being manually transferred to the alternate source for maintenance in accordance with SOP-36.4, 120V AC Distribution Systems.

Which one of the following completes the statement below?

The MANUAL BYPASS switch (1) placed in the BYPASS SOURCE TO LOAD position and the inverter amperage output indication on the EPB (2) be available .

(1) (2)

A. IS WILL B. is NOT will NOT C. IS will NOT D. is NOT WILL

47. Unit 1 is operating at 100% reactor power when the following occurs:
  • One of the Service Water to Turbine Building isolations has gone closed due to the malfunction of its associated D/P switch.
  • AF5, SW TO TURB BLDG A OR B TRN FLOW HI, is in alarm.

Which one of the following completes the statements below?

(1) , has gone closed.

If the hand switch for the closed MOV is placed in the OPEN position by the operator, the valve will (2) .

(1) (2)

A. MOV-517, SW TO TURB BLDG ISO B TRN remain closed B. MOV-517, SW TO TURB BLDG ISO B TRN open and reclose C. MOV-515, SW TO TURB BLDG ISO A TRN remain closed D. MOV-515, SW TO TURB BLDG ISO A TRN open and reclose

48. The following indications and alarms are received:
  • The UNIT 1 AUX BLDG DC BUS - A TRN GROUND DET white light comes ON momentarily and then goes OFF.
  • WC3, 1A 125V DC BUS BATT BKR 72-LA05 TRIPPED, is in alarm.
  • WC2, 1A 125V DC BUS UV OR GND, alarms and clears.

Which ONE of the following describes the status of the indications on the EPB for the 1A DC BUS and the 1A and 1B Inverters?

1A DC BUS VOLTAGE reads approximately (1) .

1A and 1B INVERTER AMPERES are reading approximately (2) .

A. (1) 0 DC VOLTS (2) 25 amps B. (1) 0 DC VOLTS (2) 0 amps C. (1) 125 DC VOLTS (2) 0 amps D. (1) 125 DC VOLTS (2) 25 amps

49. ECP-0.0, Loss of All AC Power, is in progress and the Shift Supervisor dispatches operators to minimize DC loads per Attachment 4.

Which one of the following completes the statement below?

One of the loads that will be de-energized by the operators is the (1) .

Minimizing DC loads per Attachment 4 will extend the availability of the (2) .

(1) (2)

A. Waste Gas Panel MCB Indications B. Waste Gas Panel TDAFWP C. SPDS Computer System MCB Indications D. SPDS Computer System TDAFWP

50. The 1-2A DG was in Mode 1 when a Unit 1 LOSP occurred. The 1-2A DG started and and tied to its respective Emergency Bus.

Subsequently, WA1, 1-2A DG ENGINE S/D, was received on the EPB and the System Operator was dispatched to the local alarm panel.

Which one of the following alarm windows at the LOCAL alarm panel indicates the condition that was the cause of the shutdown?

A. HIGH CRANKCASE PRESSURE B. GENERATOR BEARINGS TEMP HIGH C. LUBE OIL PRESSURE LOW D. JACKET COOLANT TEMP HIGH

51. A complete loss of instrument air has occurred on Unit 1, and the following conditions exist:
  • AOP-6.0, Loss of Instrument Air is in progress.
  • The Reactor was tripped.
  • The TDAFW pump auto started.
  • BOTH MDAFW pumps failed to start and cannot be started.
  • SG NR Levels are:

- 1A SG is 27% and slowly rising.

- 1B SG is 29% and slowly rising.

- 1C SG is 30% and slowly rising.

Which one of the following completes the statements below?

Alignment of the Emergency Air Compressors to the TDAFW components is required within a MAXIMUM of (1) in order to (2) .

(1) (2)

A. 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br /> ensure adequate heat sink B. 2 hours2.314815e-5 days <br />5.555556e-4 hours <br />3.306878e-6 weeks <br />7.61e-7 months <br /> ensure adequate heat sink C. 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br /> prevent excessive cooldown D. 2 hours2.314815e-5 days <br />5.555556e-4 hours <br />3.306878e-6 weeks <br />7.61e-7 months <br /> prevent excessive cooldown

52. Unit 1 is at 100% power with the following conditions:
  • A Control Room evacuation has been initiated per AOP-28.0, Control Room Inaccessibility.

Which one of the following completes the statements below?

In accordance with AOP-28.0, a Reactor trip is initiated (1) .

Expeditiously taking local control of Charging flow at the Hot Shutdown Panels is required because (2) .

A. 1) from the Control Room prior to evacuation

2) letdown will not automatically isolate and Pressurizer pressure control will be degraded due to a loss of Pressurizer level B. 1) from the Control Room prior to evacuation
2) an automatic isolation of Letdown will complicate Pressurizer level control C. 1) locally at the Reactor Trip Switchgear after the Control Room evacuation
2) letdown will not automatically isolate and Pressurizer pressure control will be degraded due to a loss of Pressurizer level D. 1) locally at the Reactor Trip Switchgear after the Control Room evacuation
2) an automatic isolation of Letdown will complicate Pressurizer level control
53. Unit 2 is at 100% power with the following conditions:
  • A #1 Waste Monitor Tank (WMT) release is in progress with the #1 WMT pump running.
  • RCV-18, WMT DISCH TO ENVIRONMENT, is open.

Subsequently R-18, LIQ WASTE DISCH, alarms HIGH.

Which one of the following completes the statements below?

RCV-18 will (1) .

The #1 WMT pump will (2) .

(1) (2)

A. remain open trip B. remain open continue to run C. close trip D. close continue to run

54. R-14, PLANT VENT, is in HIGH alarm on Unit 1.

Which one of the following actions will occur as a result of the high alarm on R-14?

A. If in progress, the Waste Gas release will isolate.

B. RADWASTE Exhaust fans will trip.

C. Auxiliary Building Main Exhaust fans will trip.

D. The Control Room Emergency Filtration/Pressurization system will auto start.

55. Which one of the following completes the statement below?

Q1P16V516, SW TO TURB BLDG ISO A TRN, on Unit 1 is powered from 600V (1) , which is supplied from a(n) (2) Diesel Generator during an LOSP.

(1) (2)

A. MCC 1N A Train B. MCC 1T B Train C. MCC 1N B Train D. MCC 1T A Train

56. Unit 1 is operating at 100% power with the following conditions:
  • WE2, 1F, 4KV BUS OV-OR-UV OR LOSS OF DC, is in alarm.
  • AOP-5.2, Degraded Grid, has just been entered.
  • Voltage on all emergency busses for both units are reading 3825 volts.
  • MVARs are reading (+) 550 on the MCB.
  • The Generator Capability Curve has been exceeded.
  • The Shift Supervisor has directed to maintain (+) 400 MVARs.

Which one of the following completes the statements below?

The operator will (1) Voltage, to reach (+) 400 MVARs.

After adjusting voltage, current to large motors, such as the RCP or CW pump motors, will (2) .

(1) (2)

A. LOWER LOWER B. LOWER RISE C. RAISE LOWER D. RAISE RISE

57. MOV-514, 515, 516 AND 517, SW to TURB BLDG ISOs have inadvertently closed.

Which one of the following completes the statements below?

The Instrument Air Compressors (1) have cooling supplied.

A back up source of cooling to the Condensate pumps (2) be aligned.

(1) (2)

A. DO CAN B. DO CANNOT C. do NOT CAN D. do NOT CANNOT

58. A Large Break LOCA has occurred on Unit 2, and the following conditions exist:
  • Containment pressure has risen to 18 psig and is stable.

Which one of the following completes the statements below?

R-11, CTMT PARTICULATE and R-12, CTMT GAS, (1) isolated.

HV-3184, CCW FROM RCP THRM BARR, (2) closed.

(1) (2)

A. ARE is NOT B. ARE IS C. are NOT is NOT D. are NOT IS

59. The OATC discovers that additional information is required to be inserted into the narrative of an archived log.

Per FNP-0-SOP-0.11, Watch Station Tours and Operator Logs, which one of the following completes the statements below?

The entry (1) required to be designated as a LATE ENTRY.

The entry (2) have to be recorded by the person that was responsible for the original log entry.

(1) (2)

A. IS DOES B. IS does NOT C. is NOT DOES D. is NOT does NOT

60. Both Units are operating at 100% power with the following conditions:
  • A non-licensed Fire Protection Administrator who is qualified as a Shift Communicator is on shift.

Which one of the following completes the statements below?

Per EIP-0.0, Emergency Organization, a minimum of (1) licensed Plant Operators are required to staff the current shift.

The maximum number of hours that a Plant Operator may work in any 24 hour2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> period is (2) per NMP-AD-016-003, Scheduling and Calculating Work Hours.

(1) (2)

A. 3 18 B. 3 16 C. 4 18 D. 4 16

61. Unit 1 is at 100% power with the following conditions:

RCS leakage is:

  • Total Leakage is 7.06 gpm
  • Leakage to the RCDT 4.01 gpm
  • Leakage to PRT 0.00 gpm Primary-to-Secondary leakage is:

The Primary to Secondary Leakage LCO limit (1) been exceeded.

The Unidentified Leakage LCO limit (2) been exceeded.

(1) (2)

A. has NOT has NOT B. HAS HAS C. has NOT HAS D. HAS has NOT

62. Unit 1 is at approximately 30% power with the following conditions:
  • The TSLB3 Bistable status is as follows:

1, PR P8 NC-41N, Bistable light is LIT.

2, PR P8 NC-42N, Bistable light is LIT.

3, PR P8 NC-43N, Bistable light is DARK.

4, PR P8 NC-44N, Bistable light is DARK.

  • The Low Power Low Flow Trip Block P-8 light on the Bypass and Permissive Panel is DARK.

Which one of the following completes the statement below?

If 1A Reactor Coolant Pump trips, EEP-0.0, Reactor Trip or Safety Injection, entry (1) required.

If Reactor power is reduced to 25%, the Low Power Low Flow Trip Block P-8 light on the Bypass and Permissive Panel will be (2) .

(1) (2)

A. is NOT DARK B. IS DARK C. is NOT LIT D. IS LIT

63. The following conditions exist on Unit 2:
  • The plant was operating at 100% power.
  • The crew is performing the actions in EEP-3.0, Steam Generator Tube Rupture, to isolate the 2B SG.

Which one of the following describes the actions required to minimize radiation releases in accordance with EEP-3.0?

A. Place the 2B SG Atmospheric Relief Valve in MANUAL and maintain closed.

B. Verify the 2B SG Atmospheric Relief Valve in AUTO with controller setpoint at 8.25 (1035 psig).

C. Verify the 2B SG Atmospheric Relief Valve in AUTO with controller setpoint at 8.56 (1070 psig).

D. Place the 2B SG Atmospheric Relief Valve in MANUAL and control pressure at 1035 psig.

64. Two Plant Operators are in the RCA.

Subsequently, they are required to enter a High Radiation Area to align filters for a Tagging Order.

Which one of the following completes the statements below?

The MINIMUM radiation level at which this posting is required is (1) .

A briefing by Health Physics (2) required prior to entering the High Radiation Area.

(1) (2)

A. > 100 mrem/hr IS B. > 100 mrem/hr is NOT C. > 1000 mrem/hr IS D. > 1000 mrem/hr is NOT

65. The Unit 1 Plant Operators have just informed the Shift Supervisor that the Victoreen airborne detector R-31, RADWASTE AREA VENTS EL 121', is in HIGH alarm.

The source of their information was from which one of the following?

A. Westinghouse PERMS radiation monitoring system panels on MCB.

B. Gaseous Waste processing panel annunciator reported by the RADSIDE SO.

C. Victoreen process and effluent monitoring system panel on BOP.

D. A report from the systems operator in the area of the rad monitor.

66. An ALERT has been declared on Unit 1.

Per NMP-AD-021, Control Room Access and Decorum, which one of the following personnel can grant permission to enter the AT THE CONTROLS AREA (red carpet area)?

A. Shift Manager ONLY.

B. Shift Supervisor ONLY.

C. Unit Operator or Operator At The Controls ONLY.

D. Shift Supervisor, Unit Operator or Operator at the Controls.

67. A Unit Operator discovers a ruptured pipe in a system that is creating a flooding condition in the 1A MDAFW pump room.

Subsequently, the Unit Operator also discovers a small fire in a trash can.

Per EIP-1.0, Duties of an Individual who Discovers an Emergency Condition, which one of the following completes the statements below?

The Unit Operator (1) required to use the System Operating Procedure to isolate the ruptured pipe using an upstream valve from a safe location.

The Unit Operator (2) allowed to extinguish the small fire using portable fire fighting equipment in the area.

(1) (2)

A. is NOT is NOT B. IS IS C. is NOT IS D. IS Is NOT

68. Unit 1 is in Mode 5, with the following conditions:

At 1000:

  • RCS Tcold is 100°F.
  • Both trains of RHR are in service.
  • RCS level is 129'7".

At 1010: the following events occur:

  • RCS level is 129'2" and slowly lowering.
  • There are no indications of cavitation on either RHR pump.
  • Both RHR pump discharge flowrates are 3000 gpm and stable.

Which one of the following completes the statements below?

Per AOP-12.0, (1) RHR pump(s) is(are) secured and flowpath(s) isolated.

V013A & B are located in (2) .

Nomenclature: Q1E11V013B (1-RHR-V-8720B), 1B RHR Hx to CVCS Letdown Iso Q1E11V013A (1-RHR-V-8720A), 1A RHR Hx to CVCS Letdown Iso (1) (2)

A. ONLY 1B the RHR Heat Exchanger room B. ONLY 1B their respective pump rooms C. BOTH 1A and 1B the RHR Heat Exchanger room D. BOTH 1A and 1B their respective pump rooms

69. Given the following conditions on Unit 1:
  • A LOCA has occurred.
  • RCS pressure is 500 psig and stable.
  • Containment pressure rose to 20 psig and is currently 14.1 psig and stable.
  • The crew is performing actions of ESP-1.2, Post LOCA Cooldown and Depressurization.

Which one of the following describes the method that will be used to perform the cooldown of the RCS?

A. SG atmospherics at less than 100°F in any 60 minute period.

B. SG atmospherics at the maximum attainable rate.

C. Steam dumps at less than 100°F in any 60 minute period.

D. Steam dumps at the maximum attainable rate.

70. The following conditions exist on Unit 1:
  • The Operating crew has just entered ECP-1.2, LOCA Outside Containment, from EEP-0.0, Reactor Trip or Safety Injection.

Which one of the following completes the statements below per ECP-1.2?

Seal Injection (1) one of the flowpaths that will be isolated to check for leakage.

The instrumentation used to determine when the intersystem LOCA has been isolated is (2) .

(1) (2)

A. IS RCS pressure B. is NOT RCS pressure C. IS Pressurizer Level D. is NOT Pressurizer Level

71. A loss of ALL feedwater has occurred on Unit 1. The team is implementing FRP-H.1, Response to Loss of Secondary Heat Sink, and the following conditions exist:
  • SI has not actuated.
  • RCS temp is 547°F.
  • 1A SGFP has just been started and has been aligned to feed all SGs.
  • Attachment 1, MAIN FEEDWATER BYPASS VALVES AUTOMATIC CLOSURE DEFEAT, has been completed.
  • The red light is LIT on the following handswitches:

MOV-3232A, MAIN FW TO 1A SG STOP VLV MOV-3232B, MAIN FW TO 1B SG STOP VLV MOV-3232C, MAIN FW TO 1C SG STOP VLV Immediately upon feeding the SGs, GB5, STM LINE LO PRESS RX TRIP SI, annunciator comes into alarm.

Which one of the following completes the statements below?

The 1A SGFP (1) trip.

MOV-3232A, B, C (2) automatically close.

(1) (2)

A. will NOT will NOT B. will NOT WILL C. WILL will NOT D. WILL WILL

72. FRP-C.2, Response to Degraded Core Cooling, has been entered on Unit 2. The operating crew is at the step to "Check RCP Status" and the following conditions exist:
  • All RCPs are running.
  • 2B RCP seal injection is 4 gpm and cannot be raised any higher.
  • HH1 and HH3, RCP 2A and 2C BRG UPPER/LOWER OIL RES LO LVL, are in alarm.

Which one of the following completes the statement below?

Per FRP-C.2, the operating crew is required to .

A. stop 2B RCP ONLY B. stop ALL RCPs C. stop 2A and 2C RCPs ONLY D. leave ALL RCPs running

73. An RCS soak is in progress per FRP-P.1, Response to Imminent Pressurized Thermal Shock Condition, with the following conditions:

At 1000:

  • RCS Pressure is 950 psig and stable.
  • RCS Cold Leg Temperature is 450°F and stable.
  • Narrow Range SG water level is 50% and stable on all SGs.

At 1000, Per FRP-P.1, which one of the following completes the statements below?

Isolating Accumulators (1) permitted.

Increasing AFW flow to the SGs (2) permitted.

(1) (2)

A. is NOT IS B. IS IS C. is NOT is NOT D. IS is NOT

74. The following conditions exist on Unit 1:
  • A LOCA has occurred.
  • EEP-1.0, Loss of Reactor or Secondary Coolant, is in progress.
  • The operating crew is at the step to "Verify cold leg recirculation capability -

AVAILABLE".

Which one of the following completes the statements below?

MOV-3185A, CCW TO 1A RHR HX, not capable of being opened (1) result in the loss of 'A' Train Cold Leg recirculation capability.

MOV-8706B, 1B RHR HX TO CHG PUMP SUCT, not capable of being opened (2) result in the loss of 'B' Train Cold Leg recirculation capability.

(1) (2)

A. will NOT will NOT B. WILL will NOT C. will NOT WILL D. WILL WILL

75. The following plant conditions exist on Unit 1 following a Large Break LOCA:
  • ECCS is aligned for Cold Leg Recirculation.
  • Containment pressure is 12 psig and stable.
  • LI-3594A, CTMT SUMP LVL, indicates 8.2 feet and rising.
  • The Motor Driven Fire Pump is running.

Which one of the following completes the statements below?

FRP-Z.2, Containment Flooding, (1) required to be entered.

A potential source of Containment flooding (2) water from the Fire Protection Header.

(1) (2)

A. IS is NOT B. IS IS C. is NOT is NOT D. is NOT IS

ANSWER KEY ES-401 Site-Specific SRO Written Examination Form ES-401-8 Cover Sheet U.S. Nuclear Regulatory Commission Site-Specific SRO Written Examination Applicant Information Name:

Date: October 21, 2014 Facility/Unit: FARLEY Unit 1 & 2 Region: I II X III IV Reactor Type: W X CE BW GE Start Time: Finish Time:

Instructions Use the answer sheets provided to document your answers. Staple this cover sheet on top of the answer sheets. To pass the examination you must achieve a final grade of at least 80.00 percent overall, with 70.00 percent or better on the SRO-only items if given in conjunction with the RO exam; SRO-only exams given alone require a final grade of 80.00 percent to pass. You have 8 hours9.259259e-5 days <br />0.00222 hours <br />1.322751e-5 weeks <br />3.044e-6 months <br /> to complete the combined examination, and 3 hours3.472222e-5 days <br />8.333333e-4 hours <br />4.960317e-6 weeks <br />1.1415e-6 months <br /> if you are only taking the SRO portion.

Applicant Certification All work done on this examination is my own. I have neither given nor received aid.

Applicants Signature Results RO/SRO-Only/Total Examination Values / / Points Applicants Scores / / Points Applicants Grade / / Percent ANSWER KEY ES-401, Page 31 of 33

1. 001A3.06 001 Unit 1 is at 100% power with the following conditions:
  • Rods are in manual.
  • Control Bank D is at 225 steps.
  • Median Tavg is 568.5°F.
  • Tref is 571.0°F.

Subsequently, the operator places the ROD CONTROL BANK SELECTOR SWITCH in AUTO.

Which one of the following completes the statement below?

Rod Speed will indicate (1) and Control Bank D will (2) .

(1) (2)

A. 40 steps per minute remain at 225 steps B. 40 steps per minute begin to move out C. 8 steps per minute remain at 225 steps D. 8 steps per minute begin to move out

2. 001AG2.4.11 002 The following conditions exist on Unit 1:

At 1000:

  • Rod control is in AUTO.
  • TI-408A, Tavg - Tref deviation, indicates 0°F and stable.
  • Pressurizer level is stable.
  • Reactor Power is approximately 75% and stable.
  • Control Bank D step counters are at 144 steps.

At 1002:

  • TI-408A, Tavg - Tref deviation, indicates +2°F and rising.
  • Pressurizer level is slowly rising.
  • Pressurizer spray valves have throttled open.
  • Reactor Power is approximately 76% and slowly rising.
  • Control Bank D step counters are at 150 steps and stepping out.
  • There is no load change in progress.

Which one of the following completes the statement below?

The event in progress is an (1) and the action required is to (2) .

A. 1) uncontrolled continuous Control Rod withdrawal

2) trip the reactor and enter EEP-0.0, Reactor Trip or Safety Injection B. 1) uncontrolled continuous Control Rod withdrawal
2) place the rod control mode selector switch to MANUAL and verify that rod motion stops C. 1) inadvertent RCS boration
2) trip the reactor and enter EEP-0, Reactor Trip or Safety Injection D. 1) inadvertent RCS boration
2) place the rod control mode selector switch to MANUAL and match Tavg with Tref by inserting rods
3. 003K6.02 003 Unit 1 is at 45% power with the following conditions:
  • DC2, RCP #1 SEAL LKOF FLOW HI, is in alarm.
  • 1C RCP #1 seal leakoff flow is 6.5 gpm.
  • TE0126, RCP C SEAL WATER OUTLET TEMP, is 150°F and stable.
  • TE0125, RCP C LOWER SEAL WATER BRG TEMP, is 155°F and stable.

Which one of the following describes actions required in accordance with AOP-4.1, Abnormal Reactor Coolant Pump Seal Leakage?

A. Immediately trip the Reactor, secure 1C RCP and close the seal leakoff valve.

B. Perform a controlled shutdown then secure 1C RCP and close the seal leakoff valve.

C. Indefinite power operation is allowed, maintain 6-13 gpm seal injection flow.

D. Continue power operation for a maximum of 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br />, maintain >9 gpm seal injection flow.

4. 004A1.07 004 Unit 1 is at 100% power with the following conditions:
  • PK-145, LP LTDN PRESS, demand is failing to 0% in automatic.

Which one of the following completes the statements below?

Letdown flow will (1) .

The operator is required to take action to adjust letdown flow, not to exceed a MAXIMUM of (2) .

(1) (2)

A. increase 135 gpm B. increase 125 gpm C. decrease 135 gpm D. decrease 125 gpm

5. 004K1.06 005 Unit 1 is at 100% power with the following conditions:
  • An Auto makeup has just started.
  • MKUP MODE SELECTOR switch is in AUTO.
  • MKUP MODE CONT switch RED light is LIT.

Which one of the following completes the statement below?

FCV114A, MKUP TO VCT, will _____ .

A. open fully B. remain closed C. modulate open based on FK-113 pot setting D. modulate open based on FK-168 pot setting

6. 005K5.02 006 Unit 1 is in Mode 4 preparing for a Refueling Outage with the following conditions:
  • An RCS cooldown is in progress.
  • The 'A' and 'B' RHR Loop suction valves have been opened.
  • RCS temp is 250°F.

Per SOP-7.0, Residual Heat Removal System, which one of the following completes the statements below?

The reason (1) train(s) of RHR is(are) in service cooling down the RCS is to (2) .

A. (1) ONE (2) prevent RHR operability concerns B. (1) ONE (2) prevent excessive RCS cooldown C. (1) TWO (2) prevent excessive heatup of one train of CCW D. (1) TWO (2) ensure low temperature overpressure protection (LTOP) requirements are met

7. 006A4.01 007 Unit 1 is operating at 100% with the following conditions:
  • 1B Charging pump is aligned to 'B' Train.
  • 1B Charging pump is running.

Subsequently, an LOSP with a concurrent Safety Injection occurs and the following conditions exist:

  • 22 seconds after the actuation, EB1, CHG PUMP OVERLOAD TRIP, comes into alarm.
  • The AMBER light on the handswitch for the 1C Charging pump is illuminated.

Which one of the following completes the statement below?

1B Charging pump .

A. must be manually started B. will start from the ESS sequencer C. will remain running throughout the event per design D. will start due to 1C Charging Pump tripping on overload

8. 007A1.02 008 Which one of the following completes the statements below?

The PRT is maintained with a (1) cover gas.

The PRT rupture disc is designed to rupture at (2) psid.

(1) (2)

A. Hydrogen 100 B. Nitrogen 100 C. Hydrogen 150 D. Nitrogen 150

9. 007EK2.02 009 Unit 1 is operating at 100% power with the following conditions:
  • The RX TRIP ACTUATION handswitch is placed in TRIP.

Which one of the following completes the statement below?

The Reactor Trip Breaker Shunt Trip devices receive power from (1) and (2) to open the Reactor Trip Breakers.

(1) (2)

A. 120VAC energize B. 125VDC energize C. 120VAC de-energize D. 125VDC de-energize

10. 007K4.01 010 Per SOP-1.2, Reactor Coolant Pressure Relief System, which one of the following completes the statements below?

During normal operation, the PRT temperature should not exceed a maximum of (1) .

The NORMAL method to cooldown the PRT is using (2) .

A. (1) 120°F (2) spray from RMWST and drain to the RCDT B. (1) 170°F (2) spray from RMWST and drain to the RCDT C. (1) 120°F (2) recirculation through the RCDT heat exchanger D. (1) 170°F (2) recirculation through the RCDT heat exchanger

11. 008AK2.01 011 Unit 1 is in Mode 3 and the following conditions exist:
  • PI-455, PRZR PRESS, is 1400 psig.
  • PI-472, PRT PRESS, is 30 psig.
  • PCV-444B, PRZR PORV, failed open and cannot be closed.
  • PCV-444B is NOT capable of being manually cycled.

Which one of the following completes the statements below?

The temperature indicated on TI-463, PORV, is approximately (1) .

Per TS 3.4.11, Pressurizer Power Operated Relief Valves (PORVs), within one hour, close and (2) MOV-8000B, PRZR PORV ISO.

Reference Provided (1) (2)

A. 535°F remove power from B. 280°F remove power from C. 535°F maintain power to D. 280°F maintain power to

12. 008K3.03 012 Unit 1 is operating at 100% when the following conditions occur:
  • The "On Service" Train of CCW has been lost.

Which one of the following completes the statement below?

The RCP (1) radial bearing temperatures will rapidly rise and (2) is the MINIMUM bearing temperature, if exceeded, at which the RCPs must be secured.

(1) (2)

A. pump 195°F B. motor 195°F C. pump 260°F D. motor 260°F

13. 010A4.03 013 Unit 1 is operating at 100% power and the following conditions exist:

At 1000:

  • PCV-444B, PRZR PORV, failed open and cannot be closed.
  • The immediate operator actions of AOP-100, Instrumentation Malfunction, are complete.

At 1015:

  • A rupture occurs on the 1A SG and EEP-3.0, Steam Generator Tube Rupture, is in progress with the following conditions:

- The operating crew is at the step to reduce RCS pressure.

- Normal Pressurizer Spray is NOT available.

Per EEP-3.0, which one of the following completes the statements below?

The required method of RCS pressure reduction is using (1) .

PCV-444B (2) be used for the RCS pressure reduction.

(1) (2)

A. Auxiliary Spray CAN B. one Pressurizer PORV CAN C. Auxiliary Spray CANNOT D. one Pressurizer PORV CANNOT

14. 010K6.01 014 Unit 1 is operating at 100% power when the following occurs:
  • PT-445, PRZR PRESS, fails HIGH.

Which one of the following completes the statements below?

PCV-444D, 1B LOOP SPRAY VLV, (1) open due to the failure.

RCS Pressure will (2) .

A. (1) WILL (2) lower causing a Reactor Trip and Safety Injection.

B. (1) will NOT (2) lower causing a Reactor Trip and Safety Injection.

C. (1) WILL (2) cycle at approximately 2000 psig.

D. (1) will NOT (2) cycle at approximately 2000 psig.

15. 012A2.03 015 Unit 1 is at 8% power with the following conditions:
  • NI-42, POWER RANGE, has failed HIGH.
  • AOP-100, Instrumentation Malfunction, is in progress.
  • At the step to remove the control power fuses for NI-42, the UO inadvertently removes the control power fuses for NI-36, INTERMEDIATE RANGE.

Which one of the following completes the statements below?

The operating crew is required to (1) .

The Source Range Nuclear Instruments (2) immediately energize.

Procedure name: EEP-0.0, Reactor Trip or Safety Injection (1) (2)

A. enter EEP-0.0 will NOT B. enter EEP-0.0 WILL C. continue in AOP-100 will NOT D. continue in AOP-100 WILL

16. 013K2.01 016 Unit 1 was at 100% power when the following occurred:
  • The 1A Auxiliary Building DC Bus de-energizes.
  • An dual Unit LOSP occurs.
  • An SI occurs on Unit 1 concurrently with the LOSP.

Which one of the following completes the statements below?

The 1-2A DG (1) start.

The B1F Sequencer (2) automatically sequence loads on.

(1) (2)

A. WILL WILL B. WILL will NOT C. will NOT WILL D. will NOT will NOT

17. 015AK1.01 017 Unit 1 was at 100% power when the following occurred:

At 1000:

  • A Loss of all Offsite Power occurs.

At 1020:

  • The following conditions exist:

- RCS pressure is 2235 psig and steady.

- RCS Loop THOT in all 3 loops is 595°F and decreasing slowly.

- RCS Loop TCOLD in all 3 loops is 551°F and steady.

- Core exit TCs indicate approximately 600°F and decreasing slowly.

- Steam Generator pressures are approximately 1038 psig and steady.

Which one of the following completes the statement below?

At 1020, Natural Circulation (1) exist.

Per ESP-0.1, Reactor Trip Response, the (2) would be used to dump steam.

(1) (2)

A. does NOT Steam Dumps B. DOES Steam Dumps C. does NOT SG Atmospheric Relief Valves D. DOES SG Atmospheric Relief Valves

18. 015K2.01 018 Which one of the following completes the statement below?

NI-32, SOURCE RANGE, is powered from (1) 120VAC Vital Panel.

NI-44, POWER RANGE, is powered from (2) 120VAC Vital Panel.

(1) (2)

A. 1A 1D B. 1A 1C C. 1B 1D D. 1B 1C

19. 017K6.01 019 Given the following plant conditions on Unit 2:
  • Natural circulation verification is in progress.
  • The Subcooled Margin Monitor is in CETC mode.

Which one of the following completes the statement below?

The failed Core Exit Thermocouples' output will be failed (1) and the Subcooled Margin Monitor calculation (2) be accurate.

(1) (2)

A. high will NOT B. high WILL C. low WILL D. low will NOT

20. 022A2.01 020 Unit 1 was operating at 100% power with the following conditions:
  • 1A is selected on the CTMT CLR FAN SEL SWITCH.
  • All containment cooler fans are running in FAST speed.

Subsequently, a Large Break LOCA occurred with the following conditions:

  • Containment pressure reached 33 psig.
  • A Dual Unit LOSP occurred.
  • The 1B DG tripped when it auto started.
  • BA1, 1A CTMT CLR FAN FAULT, is in alarm.
  • The AMBER light above 1A CTMT CLR FAN SLOW SPEED handswitch is illuminated.

Which one of the following completes the statements below?

Per EEP-0.0, the operating crew will verify at least one Containment Cooler fan per train is running in (1) speed.

The 1B Containment Cooler SLOW speed fan (2) start when the 1A Containment Cooler SLOW speed fan trips.

(1) (2)

A. SLOW WILL B. SLOW will NOT C. FAST WILL D. FAST will NOT

21. 025AK3.01 021 Unit 1 is in Mode 5 with the following conditions:

At 1000:

  • 1A RHR pump is tagged out.
  • All SG Wide Range levels are 84%.
  • Pzr level is being maintained at 21% on LI-462, PRZR LVL.
  • RCS temperature is 195°F.
  • RCS pressure is 325 psig.
  • All RCPs are secured.
  • 1B RHR pump is running in the cooldown lineup.

At 1005:

  • PT-402, 1C LOOP RCS PRESS, fails HIGH.

Which one of the following completes the statements below?

At 1005, RHR cooling (1) been lost.

Per AOP-12.0, RHR Malfunction, a loss of RHR cooling would require (2) to be established for core cooling.

(1) (2)

A. HAS feed and bleed B. HAS secondary heat sink C. has NOT feed and bleed D. has NOT secondary heat sink

22. 026A2.03 024 A LOCA has occurred on Unit 1 and the following conditions exist:

At 1000,

  • 'B' Train Phase B failed to actuate and cannot be manually actuated.
  • Containment Pressure is 32 psig and slowly lowering.

At 1005, The Unit Operator manually starts the 1B Containment Spray pump.

Which one of the following completes the statements below?

At 1000, FRP-Z.1, Response to High Containment Pressure, entry conditions (1) met.

At 1005, MOV-8820B, 1B CS PUMP TO SPRAY HDR ISO, (2) automatically open.

(1) (2)

A. ARE will NOT B. are NOT will NOT C. ARE WILL D. are NOT WILL

23. 026AA1.07 022 Unit 1 is at 100% power with the following conditions:
  • AOP-9.0, Loss of Component Cooling Water, is in progress due to a CCW malfunction.
  • The standby CCW pump has been started.
  • Seal injection flow to each RCP is:

- A RCP 6.3 gpm

- B RCP 6.5 gpm

- C RCP 7.1 gpm Which one of the following completes the statements below?

HV-3045 will close when downstream flow reaches (1) .

Per AOP-9.0, seal injection flow (2) adequate to allow continued RCP operation.

(1) (2)

A. 160 gpm is NOT B. 75 gpm is NOT C. 160 gpm IS D. 75 gpm IS

24. 026K1.01 023 Which one of the following completes the statements below?

A Train CS Pump, A Train HHSI Pump, and the A Train RHR Pump have (1) suction header(s) penetrating the RWST.

The Containment Spray (CS) Pump Room Coolers are DIRECTLY started (2) .

A. (1) three separate (2) by a CS actuation signal B. (1) one common (2) by a CS actuation signal C. (1) three separate (2) when the CS pump breaker closes D. (1) one common (2) when the CS pump breaker closes

25. 027AK1.02 025 Unit 2 is at 100% power, and PT-444, PRZR PRESS, is stuck at 2230 psig.

Which one of the following describes the effects on PK-444A, PRZR PRESS REFERENCE, and the pressurizer liquid density due to this malfunction?

PK-444A controller demand goes (1) ,

and the density of the Pressurizer liquid initially goes (2) .

(1) (2)

A. down up B. down down C. up up D. up down

26. 027K1.01 026 Which one of the following completes the statement below?

To enhance the retention of Iodine in solution, the Containment Spray System sprays water from the (1) at a pH of approximately (2) .

(1) (2)

A. Containment Sump 4.5 B. RWST 4.5 C. Containment Sump 7.5 D. RWST 7.5

27. 029A1.02 027 Unit 1 is in Mode 4 and and the following condition exists:
  • Containment Mini-Purge is in service.
  • R-24A and R-24B, CONTAINMENT PURGE, are rising but NOT at the alarm setpoint.
  • The OATC manually actuates a Phase A Containment Isolation.

Which one of the following completes the statements below?

Radiation levels (1) stop rising in the Main Exhaust Plenum.

The Mini-Purge Supply and Exhaust fans (2) stop automatically.

(1) (2)

A. WILL WILL B. WILL will NOT C. will NOT WILL D. will NOT will NOT

28. 035A4.06 028 Unit 1 was operating at 100% power when the following occurred:
  • The 1B SG becomes faulted inside Containment.

Which one of the following describes the actions required by EEP-2.0, Faulted Steam Generator Isolation, to isolate the 1B SG?

The minimum action for Main Steam line isolation is to (1) .

The actions for isolation of AFW flow to the 1B SG is to (2) .

Valve nomenclature:

MOV-3764B & D, MDAFW TO 1B SG ISO Q1N23V017B, TDAFWP TO 1B SG FCV INLET ISO HV-3227B, MDAFWP TO 1B SG FLOW CONT HV-3228B, TDAFWP TO 1B SG FLOW CONT A. 1) close ONLY the MSIVs for the 1B steam line

2) close MOV-3764B & D on the BOP and locally close Q1N23V017B B. 1) close ONLY the MSIVs for the 1B steam line
2) close HV-3227B and HV-3228B on the MCB and fail air locally C. 1) close all MSIVs
2) close MOV-3764B & D on the BOP and locally close Q1N23V017B D. 1) close all MSIVs
2) close HV-3227B and HV-3228B on the MCB and fail air locally
29. 036AA2.02 029 Given the following conditions on Unit 1:

At 1000:

  • Mode 6 with core off-load in progress.
  • Refueling Cavity level is 153 ft 6 in.

At 1015:

  • The Refueling Cavity level is lowering rapidly.

At 1030:

  • The leak has been isolated.
  • Refueling Cavity level is stable at 143 ft.

Which one of the following completes the statements below?

At 1015, AOP-30, Refueling Accident, (1) required to be entered.

At 1030, TS 3.9.6, Refueling Cavity Water Level, (2) required to be entered.

(1) (2)

A. IS IS B. is NOT IS C. IS is NOT D. is NOT is NOT

30. 037AA2.07 030 Unit 1 is at 70% power with the following conditions:
  • R-15A, SJAE EXH, is in alarm and the indication is stable.

Which one of the following completes the statement below?

The SJAE Filtration system (1) automatically align for operation.

Once SJAE Filtration is in service, the R-15A reading will (2) .

(1) (2)

A. WILL lower B. WILL remain the same C. will NOT lower D. will NOT remain the same

31. 038EG2.4.6 031 The following conditions exist on Unit 1:
  • All RCPs have been secured.
  • Operators have determined the required CETC temperature and started the RCS cooldown.

Subsequently, the following conditions exist:

  • The required CETC temperature has NOT been reached.
  • An Orange Path is indicated on the INTEGRITY CSF for the ruptured loop.

Per EEP-3.0, which one of the following describes the required actions?

The overall mitigating strategy is to (1) .

A. continue the RCS cooldown at the current rate and remain in EEP-3.0 B. reduce the RCS cooldown rate and remain in EEP-3.0 C. reduce the RCS cooldown rate and apply the INTEGRITY CSF strategy D. stop the RCS cooldown and apply the INTEGRITY CSF strategy

32. 039K4.02 032 Unit 1 was at 26% power and 240 MWe, and the following conditions occurred:
  • The Reactor tripped.

Which one of the following completes the statements below?

The Steam Dumps are armed due to the (1) .

RCS temperature will be controlled at (2) .

(1) (2)

A. P-4 signal 547°F B. P-4 signal 551°F C. C-7 signal 547°F D. C-7 signal 551°F

33. 041K5.02 033 Unit 1 is cooling down with the following conditions:
  • RCS Tcold is 480°F and stable.
  • RCS pressure is 995 psig and stable.

The plan is to stabilize at this point for data collection. Steam dumps are in steam pressure mode and are ready to be placed in automatic to maintain the current RCS temperature.

Which one of the following completes the statement below?

PK-464, STM HEADER PRESS, SETPT will be set at (1) .

Reference Provided A. 4.60 B. 4.75 C. 8.30 D. 8.40

34. 045A2.12 034 Unit 1 was operating at 100% power when the following occurred:

At 1000:

  • A Load Rejection occurs.

At 1005:

  • The following conditions exist:

- Reactor Power is 70%.

- Turbine Power is 550 MWe.

- FE1, CONT ROD BANK POSITION LO, is in alarm.

- Tavg is 564°F and stable.

- Tref is 561°F and stable.

Which one of the following completes the statements below?

Per AOP-17.0, Turbine Load Rejection, the immediate operator actions require the Main Turbine to be (1) .

At 1005, the operating crew is required to (2) .

A. (1) placed in MANUAL (2) raise turbine load to match Reactor power B. (1) left in OPERATOR AUTO (2) raise turbine load to match Reactor power C. (1) placed in MANUAL (2) borate as necessary to withdraw rods D. (1) left in OPERATOR AUTO (2) borate as necessary to withdraw rods

35. 051AK3.01 035 Unit 1 is operating at 40% power when the following occurs:
  • Condenser pressure rapidly rises to 12 psia.

Subsequently, Tavg is being maintained at 551°F.

Which one of the following completes the statements below?

The Steam Dump (1) controller is enabled.

The Steam Dumps are (2) .

(1) (2)

A. Plant Trip CLOSED B. Plant Trip OPEN C. Loss of Load CLOSED D. Loss of Load OPEN

36. 054AA2.03 036 Unit 2 is operating at 55% power when a transient in the Main Feedwater System results in the following:
  • 2A SGFP high and low pressure stop valves indicate CLOSED.
  • 2B SGFP is running at minimum speed.
  • 2A SG level: 34% and lowering.
  • 2B SG level: 27% and lowering.
  • 2C SG level: 34% and lowering.

Which one of the following completes the statements below?

The MDAFW pumps (1) received an auto start signal.

The TDAFW pump will auto start when (2) .

(1) (2)

A. HAVE 2B SGFP is TRIPPED B. have NOT 2A SG NR level reaches 28%

C. have NOT 2B SGFP is TRIPPED D. HAVE 2A SG NR level reaches 28%

37. 055EA2.01 037 A station blackout has occurred on Unit 1 and ECP-0.0, Loss of All AC Power, has been implemented.

Which one of the following completes the statements below?

HV-3611, INST AIR SUPPLY TO CTMT, (1) CLOSE when Instrument Air pressure is lost.

The Pressurizer PORVs (2) have an available backup means to be operated.

(1) (2)

A. WILL DO B. WILL do NOT C. will NOT DO D. will NOT do NOT

38. 055K3.01 038 Unit 1 was operating at 80% power when the following occurred:
  • A malfunction of the SJAE's causes Condenser pressure to rise rapidly.

Which one of the following is the LOWEST pressure that will cause an automatic trip of the Main Turbine?

A. 2.901 psia B. 3.800 psia C. 4.351 psia D. 5.900 psia

39. 056AG2.2.39 039 The following conditions exist on Unit 1:
  • Unit 1 is in Mode 6.
  • 'A' Train is on service.
  • Fuel movement inside Containment is in progress.
  • 1B DG is tagged out.
  • 2C DG is tagged out.

Subsequently, the 1F 4160V bus loses power and remains de-energized.

Which one of the following completes the statements below?

Fuel movement inside Containment (1) allowed to continue per TS 3.8.2 AC Sources - Shutdown.

Per AOP-5.0, Loss of A or B Train Electrical Power, SFP Cooling is required to be restored using the (2) SFP Cooling pump.

(1) (2)

A. IS 1A B. IS 1B C. is NOT 1A D. is NOT 1B

40. 057AA1.05 040 Unit 1 is in Mode 3 with the following plant conditions:
  • NI-32, SOURCE RANGE, is tagged out for power supply replacement.

Subsequently, the 1A 120V AC Vital Panel becomes de-energized.

Which one of the following completes the statement below?

Backup Source Range indication (1) available on the MCB from Gamma-Metrics.

The Reactor Make-up system (2) be affected by the malfunction of the 1A 120V Vital Panel.

(1) (2)

A. IS WILL B. is NOT will NOT C. IS will NOT D. is NOT WILL

41. 058AK3.02 041 The following conditions exist on Unit 1:
  • 'A' Train Aux Building DC has been lost.
  • AOP-29.1, Plant Stabilization in Hot Standby and Cooldown Without "A" Train AC or DC Power, is in progress.
  • RCS temperature must be lowered.

Which one of the following completes the statements below?

Steam Dumps (1) be used for RCS temperature control.

If required, Atmospheric Relief valves (2) be operated from the Hot Shutdown Panel.

(1) (2)

A. CAN CANNOT B. CAN CAN C. CANNOT CANNOT D. CANNOT CAN

42. 059A4.08 042 Unit 1 is at 45% power with the following conditions:
  • FT-477 is selected on FS/478Y, A SG FW FLOW SEL SW.

Subsequently, FT-477, 1A SG FW FLOW, fails low.

Which one of the following completes the statement below?

Controller demand on FK-478, 1A SG FW FLOW, will initially (1) .

Controller demand on SK-509A, SGFP MASTER CONT, will initially (2) .

(1) (2)

A. rise lower B. rise rise C. lower lower D. lower rise

43. 059K3.03 043 Unit 1 is at 100% power when the following occurs:

1B SGFP trips.

AOP-13.0, Condensate and Feedwater Malfunction, immediate operator actions are complete.

Which one of the following describes the overall Steam Generator pressure response during the transient and the reason for the pressure change?

SG pressures .

A. rise due to the Main Turbine ramp down B. rise due to swell in the Steam Generators C. lower due to the Main Turbine ramp down D. lower due to shrink in the Steam Generators

44. 061A1.04 044 The following conditions exist on Unit 1:
  • EEP-1.0, Loss of Reactor or Secondary Coolant, is in progress.
  • Make up to the CST is not available and the level is lowering.

Which one of the following completes the statements below?

The FIRST level at which AFW pump suctions are required to be aligned to their backup source of water is (1) .

The backup source of water to the AFW pump suctions is (2) .

(1) (2)

A. 5.3 ft Service Water B. 4.5 ft Service Water C. 5.3 ft Fire Protection Water D. 4.5 ft Fire Protection Water

45. 061G2.1.23 045 Unit 1 was operating at 30% power with only the 1A SGFP running when the following occurred.
  • The 1A SGFP tripped.

Subsequently, BKR DG15, 1B S/U XFMR TO 1G 4160 V BUS, trips followed by a spurious Safety Injection.

  • All SG NR levels are 50% and slowly rising.

Which one of the following completes the statement below, per SOP-22.0, Auxiliary Feedwater?

To stop the 1B MDAFW pump, in addition to placing the MCB switch to STOP, is(are) required.

A. no other actions B. resetting the SI C. placing the 1B MDAFWP AUTO/DEFEAT switch in DEFEAT D. locally cycling the control power breaker for the 1B MDAFW pump breaker

46. 062A1.03 046 Given the following conditions on Unit 1:
  • The 1A inverter is being manually transferred to the alternate source for maintenance in accordance with SOP-36.4, 120V AC Distribution Systems.

Which one of the following completes the statement below?

The MANUAL BYPASS switch (1) placed in the BYPASS SOURCE TO LOAD position and the inverter amperage output indication on the EPB (2) be available .

(1) (2)

A. IS WILL B. is NOT will NOT C. IS will NOT D. is NOT WILL

47. 062AA2.03 047 Unit 1 is operating at 100% reactor power when the following occurs:
  • One of the Service Water to Turbine Building isolations has gone closed due to the malfunction of its associated D/P switch.
  • AF5, SW TO TURB BLDG A OR B TRN FLOW HI, is in alarm.

Which one of the following completes the statements below?

(1) , has gone closed.

If the hand switch for the closed MOV is placed in the OPEN position by the operator, the valve will (2) .

(1) (2)

A. MOV-517, SW TO TURB BLDG ISO B TRN remain closed B. MOV-517, SW TO TURB BLDG ISO B TRN open and reclose C. MOV-515, SW TO TURB BLDG ISO A TRN remain closed D. MOV-515, SW TO TURB BLDG ISO A TRN open and reclose

48. 063A3.01 048 The following indications and alarms are received:
  • The UNIT 1 AUX BLDG DC BUS - A TRN GROUND DET white light comes ON momentarily and then goes OFF.
  • WC3, 1A 125V DC BUS BATT BKR 72-LA05 TRIPPED, is in alarm.
  • WC2, 1A 125V DC BUS UV OR GND, alarms and clears.

Which ONE of the following describes the status of the indications on the EPB for the 1A DC BUS and the 1A and 1B Inverters?

1A DC BUS VOLTAGE reads approximately (1) .

1A and 1B INVERTER AMPERES are reading approximately (2) .

A. (1) 0 DC VOLTS (2) 25 amps B. (1) 0 DC VOLTS (2) 0 amps C. (1) 125 DC VOLTS (2) 0 amps D. (1) 125 DC VOLTS (2) 25 amps

49. 063G2.4.35 049 ECP-0.0, Loss of All AC Power, is in progress and the Shift Supervisor dispatches operators to minimize DC loads per Attachment 4.

Which one of the following completes the statement below?

One of the loads that will be de-energized by the operators is the (1) .

Minimizing DC loads per Attachment 4 will extend the availability of the (2) .

(1) (2)

A. Waste Gas Panel MCB Indications B. Waste Gas Panel TDAFWP C. SPDS Computer System MCB Indications D. SPDS Computer System TDAFWP

50. 064G2.4.45 050 The 1-2A DG was in Mode 1 when a Unit 1 LOSP occurred. The 1-2A DG started and and tied to its respective Emergency Bus.

Subsequently, WA1, 1-2A DG ENGINE S/D, was received on the EPB and the System Operator was dispatched to the local alarm panel.

Which one of the following alarm windows at the LOCAL alarm panel indicates the condition that was the cause of the shutdown?

A. HIGH CRANKCASE PRESSURE B. GENERATOR BEARINGS TEMP HIGH C. LUBE OIL PRESSURE LOW D. JACKET COOLANT TEMP HIGH

51. 065AK3.04 051 A complete loss of instrument air has occurred on Unit 1, and the following conditions exist:
  • AOP-6.0, Loss of Instrument Air is in progress.
  • The Reactor was tripped.
  • The TDAFW pump auto started.
  • BOTH MDAFW pumps failed to start and cannot be started.
  • SG NR Levels are:

- 1A SG is 27% and slowly rising.

- 1B SG is 29% and slowly rising.

- 1C SG is 30% and slowly rising.

Which one of the following completes the statements below?

Alignment of the Emergency Air Compressors to the TDAFW components is required within a MAXIMUM of (1) in order to (2) .

(1) (2)

A. 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br /> ensure adequate heat sink B. 2 hours2.314815e-5 days <br />5.555556e-4 hours <br />3.306878e-6 weeks <br />7.61e-7 months <br /> ensure adequate heat sink C. 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br /> prevent excessive cooldown D. 2 hours2.314815e-5 days <br />5.555556e-4 hours <br />3.306878e-6 weeks <br />7.61e-7 months <br /> prevent excessive cooldown

52. 068AK3.18 052 Unit 1 is at 100% power with the following conditions:
  • A Control Room evacuation has been initiated per AOP-28.0, Control Room Inaccessibility.

Which one of the following completes the statements below?

In accordance with AOP-28.0, a Reactor trip is initiated (1) .

Expeditiously taking local control of Charging flow at the Hot Shutdown Panels is required because (2) .

A. 1) from the Control Room prior to evacuation

2) letdown will not automatically isolate and Pressurizer pressure control will be degraded due to a loss of Pressurizer level B. 1) from the Control Room prior to evacuation
2) an automatic isolation of Letdown will complicate Pressurizer level control C. 1) locally at the Reactor Trip Switchgear after the Control Room evacuation
2) letdown will not automatically isolate and Pressurizer pressure control will be degraded due to a loss of Pressurizer level D. 1) locally at the Reactor Trip Switchgear after the Control Room evacuation
2) an automatic isolation of Letdown will complicate Pressurizer level control
53. 068K4.01 053 Unit 2 is at 100% power with the following conditions:
  • A #1 Waste Monitor Tank (WMT) release is in progress with the #1 WMT pump running.
  • RCV-18, WMT DISCH TO ENVIRONMENT, is open.

Subsequently R-18, LIQ WASTE DISCH, alarms HIGH.

Which one of the following completes the statements below?

RCV-18 will (1) .

The #1 WMT pump will (2) .

(1) (2)

A. remain open trip B. remain open continue to run C. close trip D. close continue to run

54. 073K4.01 054 R-14, PLANT VENT, is in HIGH alarm on Unit 1.

Which one of the following actions will occur as a result of the high alarm on R-14?

A. If in progress, the Waste Gas release will isolate.

B. RADWASTE Exhaust fans will trip.

C. Auxiliary Building Main Exhaust fans will trip.

D. The Control Room Emergency Filtration/Pressurization system will auto start.

55. 076K2.08 055 Which one of the following completes the statement below?

Q1P16V516, SW TO TURB BLDG ISO A TRN, on Unit 1 is powered from 600V (1) , which is supplied from a(n) (2) Diesel Generator during an LOSP.

(1) (2)

A. MCC 1N A Train B. MCC 1T B Train C. MCC 1N B Train D. MCC 1T A Train

56. 077AG2.4.31 056 Unit 1 is operating at 100% power with the following conditions:
  • WE2, 1F, 4KV BUS OV-OR-UV OR LOSS OF DC, is in alarm.
  • AOP-5.2, Degraded Grid, has just been entered.
  • Voltage on all emergency busses for both units are reading 3825 volts.
  • MVARs are reading (+) 550 on the MCB.
  • The Generator Capability Curve has been exceeded.
  • The Shift Supervisor has directed to maintain (+) 400 MVARs.

Which one of the following completes the statements below?

The operator will (1) Voltage, to reach (+) 400 MVARs.

After adjusting voltage, current to large motors, such as the RCP or CW pump motors, will (2) .

(1) (2)

A. LOWER LOWER B. LOWER RISE C. RAISE LOWER D. RAISE RISE

57. 078K1.04 057 MOV-514, 515, 516 AND 517, SW to TURB BLDG ISOs have inadvertently closed.

Which one of the following completes the statements below?

The Instrument Air Compressors (1) have cooling supplied.

A back up source of cooling to the Condensate pumps (2) be aligned.

(1) (2)

A. DO CAN B. DO CANNOT C. do NOT CAN D. do NOT CANNOT

58. 103A3.01 058 A Large Break LOCA has occurred on Unit 2, and the following conditions exist:
  • Containment pressure has risen to 18 psig and is stable.

Which one of the following completes the statements below?

R-11, CTMT PARTICULATE and R-12, CTMT GAS, (1) isolated.

HV-3184, CCW FROM RCP THRM BARR, (2) closed.

(1) (2)

A. ARE is NOT B. ARE IS C. are NOT is NOT D. are NOT IS

59. G2.1.18 059 The OATC discovers that additional information is required to be inserted into the narrative of an archived log.

Per FNP-0-SOP-0.11, Watch Station Tours and Operator Logs, which one of the following completes the statements below?

The entry (1) required to be designated as a LATE ENTRY.

The entry (2) have to be recorded by the person that was responsible for the original log entry.

(1) (2)

A. IS DOES B. IS does NOT C. is NOT DOES D. is NOT does NOT

60. G2.1.5 060 Both Units are operating at 100% power with the following conditions:
  • A non-licensed Fire Protection Administrator who is qualified as a Shift Communicator is on shift.

Which one of the following completes the statements below?

Per EIP-0.0, Emergency Organization, a minimum of (1) licensed Plant Operators are required to staff the current shift.

The maximum number of hours that a Plant Operator may work in any 24 hour2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> period is (2) per NMP-AD-016-003, Scheduling and Calculating Work Hours.

(1) (2)

A. 3 18 B. 3 16 C. 4 18 D. 4 16

61. G2.2.42 061 Unit 1 is at 100% power with the following conditions:

RCS leakage is:

  • Total Leakage is 7.06 gpm
  • Leakage to the RCDT 4.01 gpm
  • Leakage to PRT 0.00 gpm Primary-to-Secondary leakage is:

The Primary to Secondary Leakage LCO limit (1) been exceeded.

The Unidentified Leakage LCO limit (2) been exceeded.

(1) (2)

A. has NOT has NOT B. HAS HAS C. has NOT HAS D. HAS has NOT

62. G2.2.44 062 Unit 1 is at approximately 30% power with the following conditions:
  • The TSLB3 Bistable status is as follows:

1, PR P8 NC-41N, Bistable light is LIT.

2, PR P8 NC-42N, Bistable light is LIT.

3, PR P8 NC-43N, Bistable light is DARK.

4, PR P8 NC-44N, Bistable light is DARK.

  • The Low Power Low Flow Trip Block P-8 light on the Bypass and Permissive Panel is DARK.

Which one of the following completes the statement below?

If 1A Reactor Coolant Pump trips, EEP-0.0, Reactor Trip or Safety Injection, entry (1) required.

If Reactor power is reduced to 25%, the Low Power Low Flow Trip Block P-8 light on the Bypass and Permissive Panel will be (2) .

(1) (2)

A. is NOT DARK B. IS DARK C. is NOT LIT D. IS LIT

63. G2.3.11 063 The following conditions exist on Unit 2:
  • The plant was operating at 100% power.
  • The crew is performing the actions in EEP-3.0, Steam Generator Tube Rupture, to isolate the 2B SG.

Which one of the following describes the actions required to minimize radiation releases in accordance with EEP-3.0?

A. Place the 2B SG Atmospheric Relief Valve in MANUAL and maintain closed.

B. Verify the 2B SG Atmospheric Relief Valve in AUTO with controller setpoint at 8.25 (1035 psig).

C. Verify the 2B SG Atmospheric Relief Valve in AUTO with controller setpoint at 8.56 (1070 psig).

D. Place the 2B SG Atmospheric Relief Valve in MANUAL and control pressure at 1035 psig.

64. G2.3.12 064 Two Plant Operators are in the RCA.

Subsequently, they are required to enter a High Radiation Area to align filters for a Tagging Order.

Which one of the following completes the statements below?

The MINIMUM radiation level at which this posting is required is (1) .

A briefing by Health Physics (2) required prior to entering the High Radiation Area.

(1) (2)

A. > 100 mrem/hr IS B. > 100 mrem/hr is NOT C. > 1000 mrem/hr IS D. > 1000 mrem/hr is NOT

65. G2.3.5 065 The Unit 1 Plant Operators have just informed the Shift Supervisor that the Victoreen airborne detector R-31, RADWASTE AREA VENTS EL 121', is in HIGH alarm.

The source of their information was from which one of the following?

A. Westinghouse PERMS radiation monitoring system panels on MCB.

B. Gaseous Waste processing panel annunciator reported by the RADSIDE SO.

C. Victoreen process and effluent monitoring system panel on BOP.

D. A report from the systems operator in the area of the rad monitor.

66. G2.4.37 066 An ALERT has been declared on Unit 1.

Per NMP-AD-021, Control Room Access and Decorum, which one of the following personnel can grant permission to enter the AT THE CONTROLS AREA (red carpet area)?

A. Shift Manager ONLY.

B. Shift Supervisor ONLY.

C. Unit Operator or Operator At The Controls ONLY.

D. Shift Supervisor, Unit Operator or Operator at the Controls.

67. G2.4.49 067 A Unit Operator discovers a ruptured pipe in a system that is creating a flooding condition in the 1A MDAFW pump room.

Subsequently, the Unit Operator also discovers a small fire in a trash can.

Per EIP-1.0, Duties of an Individual who Discovers an Emergency Condition, which one of the following completes the statements below?

The Unit Operator (1) required to use the System Operating Procedure to isolate the ruptured pipe using an upstream valve from a safe location.

The Unit Operator (2) allowed to extinguish the small fire using portable fire fighting equipment in the area.

(1) (2)

A. is NOT is NOT B. IS IS C. is NOT IS D. IS Is NOT

68. G2.4.9 068 Unit 1 is in Mode 5, with the following conditions:

At 1000:

  • RCS Tcold is 100°F.
  • Both trains of RHR are in service.
  • RCS level is 129'7".

At 1010: the following events occur:

  • RCS level is 129'2" and slowly lowering.
  • There are no indications of cavitation on either RHR pump.
  • Both RHR pump discharge flowrates are 3000 gpm and stable.

Which one of the following completes the statements below?

Per AOP-12.0, (1) RHR pump(s) is(are) secured and flowpath(s) isolated.

V013A & B are located in (2) .

Nomenclature: Q1E11V013B (1-RHR-V-8720B), 1B RHR Hx to CVCS Letdown Iso Q1E11V013A (1-RHR-V-8720A), 1A RHR Hx to CVCS Letdown Iso (1) (2)

A. ONLY 1B the RHR Heat Exchanger room B. ONLY 1B their respective pump rooms C. BOTH 1A and 1B the RHR Heat Exchanger room D. BOTH 1A and 1B their respective pump rooms

69. W/E03EK2.2 069 Given the following conditions on Unit 1:
  • A LOCA has occurred.
  • RCS pressure is 500 psig and stable.
  • Containment pressure rose to 20 psig and is currently 14.1 psig and stable.
  • The crew is performing actions of ESP-1.2, Post LOCA Cooldown and Depressurization.

Which one of the following describes the method that will be used to perform the cooldown of the RCS?

A. SG atmospherics at less than 100°F in any 60 minute period.

B. SG atmospherics at the maximum attainable rate.

C. Steam dumps at less than 100°F in any 60 minute period.

D. Steam dumps at the maximum attainable rate.

70. W/E04EK2.1 070 The following conditions exist on Unit 1:
  • The Operating crew has just entered ECP-1.2, LOCA Outside Containment, from EEP-0.0, Reactor Trip or Safety Injection.

Which one of the following completes the statements below per ECP-1.2?

Seal Injection (1) one of the flowpaths that will be isolated to check for leakage.

The instrumentation used to determine when the intersystem LOCA has been isolated is (2) .

(1) (2)

A. IS RCS pressure B. is NOT RCS pressure C. IS Pressurizer Level D. is NOT Pressurizer Level

71. W/E05EK1.1 071 A loss of ALL feedwater has occurred on Unit 1. The team is implementing FRP-H.1, Response to Loss of Secondary Heat Sink, and the following conditions exist:
  • SI has not actuated.
  • RCS temp is 547°F.
  • 1A SGFP has just been started and has been aligned to feed all SGs.
  • Attachment 1, MAIN FEEDWATER BYPASS VALVES AUTOMATIC CLOSURE DEFEAT, has been completed.
  • The red light is LIT on the following handswitches:

MOV-3232A, MAIN FW TO 1A SG STOP VLV MOV-3232B, MAIN FW TO 1B SG STOP VLV MOV-3232C, MAIN FW TO 1C SG STOP VLV Immediately upon feeding the SGs, GB5, STM LINE LO PRESS RX TRIP SI, annunciator comes into alarm.

Which one of the following completes the statements below?

The 1A SGFP (1) trip.

MOV-3232A, B, C (2) automatically close.

(1) (2)

A. will NOT will NOT B. will NOT WILL C. WILL will NOT D. WILL WILL

72. W/E06EG2.1.20 072 FRP-C.2, Response to Degraded Core Cooling, has been entered on Unit 2. The operating crew is at the step to "Check RCP Status" and the following conditions exist:
  • All RCPs are running.
  • 2B RCP seal injection is 4 gpm and cannot be raised any higher.
  • HH1 and HH3, RCP 2A and 2C BRG UPPER/LOWER OIL RES LO LVL, are in alarm.

Which one of the following completes the statement below?

Per FRP-C.2, the operating crew is required to .

A. stop 2B RCP ONLY B. stop ALL RCPs C. stop 2A and 2C RCPs ONLY D. leave ALL RCPs running

73. W/E08EA1.1 073 An RCS soak is in progress per FRP-P.1, Response to Imminent Pressurized Thermal Shock Condition, with the following conditions:

At 1000:

  • RCS Pressure is 950 psig and stable.
  • RCS Cold Leg Temperature is 450°F and stable.
  • Narrow Range SG water level is 50% and stable on all SGs.

At 1000, Per FRP-P.1, which one of the following completes the statements below?

Isolating Accumulators (1) permitted.

Increasing AFW flow to the SGs (2) permitted.

(1) (2)

A. is NOT IS B. IS IS C. is NOT is NOT D. IS is NOT

74. W/E11EA1.1 074 The following conditions exist on Unit 1:
  • A LOCA has occurred.
  • EEP-1.0, Loss of Reactor or Secondary Coolant, is in progress.
  • The operating crew is at the step to "Verify cold leg recirculation capability -

AVAILABLE".

Which one of the following completes the statements below?

MOV-3185A, CCW TO 1A RHR HX, not capable of being opened (1) result in the loss of 'A' Train Cold Leg recirculation capability.

MOV-8706B, 1B RHR HX TO CHG PUMP SUCT, not capable of being opened (2) result in the loss of 'B' Train Cold Leg recirculation capability.

(1) (2)

A. will NOT will NOT B. WILL will NOT C. will NOT WILL D. WILL WILL

75. W/E15EK1.2 075 The following plant conditions exist on Unit 1 following a Large Break LOCA:
  • ECCS is aligned for Cold Leg Recirculation.
  • Containment pressure is 12 psig and stable.
  • LI-3594A, CTMT SUMP LVL, indicates 8.2 feet and rising.
  • The Motor Driven Fire Pump is running.

Which one of the following completes the statements below?

FRP-Z.2, Containment Flooding, (1) required to be entered.

A potential source of Containment flooding (2) water from the Fire Protection Header.

(1) (2)

A. IS is NOT B. IS IS C. is NOT is NOT D. is NOT IS

76. 003AG2.2.22 076 Unit 1 is at 98% power with the following conditions:
  • Control Bank D is at 227 steps.
  • Control Rod D12, located near N-42, has dropped to the bottom of the core.

Which one of the following completes the statements below?

Per the BASES of Tech Spec 3.1.4, Rod Group Alignment Limits, a power reduction to < 75% power is required to ensure (1) .

Quadrant Power Tilt Ratio (QPTR) will (2) due to the dropped rod.

A. (1) the amount of stored energy in the fuel will not cause core design criteria to be exceeded (2) increase B. (1) the amount of stored energy in the fuel will not cause core design criteria to be exceeded (2) decrease C. (1) the local Linear Heat Rate increases will not exceed core design criteria (2) increase D. (1) the local Linear Heat Rate increases will not exceed core design criteria (2) decrease

77. 003G2.4.2 077 Unit 1 is operating at 12% power when the following occurs:
  • Two Underfrequency Relays on the 1A 4160V bus have actuated.
  • Two Underfrequency Relays on the 1C 4160V bus have actuated.

Which one of the following completes the statements below?

An automatic Reactor trip (1) occur.

Per the BASES of Tech Spec 3.3.1, RTS Instrumentation, the RCP Underfrequency Reactor Trip (2) .

A. (1) WILL (2) provides a backup to the RCP Under Voltage (UV) Reactor Trip B. (1) WILL (2) ensures that protection is provided against violating the DNBR limit C. (1) will NOT (2) provides a backup to the RCP Under Voltage (UV) Reactor Trip D. (1) will NOT (2) ensures that protection is provided against violating the DNBR limit

78. 006A2.13 078 Unit 1 was operating at 100% power and experienced a spurious Safety Injection (SI).

The following conditions exist:

  • SI termination criteria has been met.

Which one of the following completes the statements below?

Per the bases of EEP-0.0, the impact of NOT terminating the SI in a timely manner is (1) .

The required procedure path to address the current plant conditions is to (2) .

Procedure name: ESP-1.1, SI Termination A. (1) overfilling the Pressurizer (2) immediately go to ESP-1.1 B. (1) overfilling the Pressurizer (2) terminate SI flow in EEP-0.0 then go to ESP-1.1 C. (1) challenging the INTEGRITY Critical Safety Function (2) immediately go to ESP-1.1 D. (1) challenging the INTEGRITY Critical Safety Function (2) terminate SI flow in EEP-0.0 then go to ESP-1.1

79. 007EG2.4.41 079 Unit 1 was operating at 100% power when the following occurred:
  • AOP-19, Malfunction of Rod Control System, was in progress.
  • The CRDM supply breakers were opened from the MCB and all rod bottom lights illuminated.
  • A Safety Injection did not occur.

Which one of the following completes the statements below?

The Main Turbine (1) have automatically tripped when the CRDM supply breakers were opened.

An emergency classification threshold value (2) been exceeded per NMP-EP-110-GL01, FNP EALS - ICs, Threshold Values And Basis.

(1) (2)

A. SHOULD HAS B. SHOULD has NOT C. should NOT HAS D. should NOT has NOT

80. 008G2.4.8 080 Unit 1 is at 100% power with the following conditions:
  • A Train is the On Service Train of CCW with 1C CCW pump running.
  • A leak has been identified on the CCW miscellaneous header.
  • AA5, CCW SRG TK LVL A TRN LO-LO, is in alarm.
  • Makeup to the CCW surge tank is in progress.
  • CCW surge tank level is 10" and lowering.

Subsequently, AOP-9.0, Loss of Component Cooling Water, is entered and a Reactor Trip is initiated.

Which one of the following completes the statements below?

1C CCW pump (1) automatically trip when the CCW Surge Tank reaches its LO-LO level.

The procedural actions required are to continue performance of AOP-9.0 (2) .

(1) (2)

A. will NOT in parallel with the Emergency Response procedures B. WILL in parallel with the Emergency Response procedures C. will NOT after the Emergency Response procedures are completed D. WILL after the Emergency Response procedures are completed

81. 009EG2.1.7 081 A LOCA has occurred on UNIT 1 with the following conditions:
  • EEP-1.0 is in progress.
  • Containment pressure has risen to 3 psig and is stable.
  • Containment Hydrogen concentration is 3%.
  • RCS pressure is 400 psig and stable.
  • The crew is evaluating the step - Check LHSI flow in progress.

Which one of the following completes the statements below?

The Post LOCA Containment Hydrogen Recombiners (1) required to be placed in service.

The operating crew is required to (2) .

Procedure name: EEP-1.0, Loss of Reactor or Secondary Coolant ESP-1.2, Post LOCA Cooldown and Depressurization (1) (2)

A. ARE remain in EEP-1.0 B. ARE go to ESP-1.2 C. are NOT remain in EEP-1.0 D. are NOT go to ESP-1.2

82. 012A2.05 082 Unit 1 was operating at 100% power when the following occurred:
  • NI-43, POWER RANGE, Lower Detector failed and is reading 0 microamps.
  • NI-43 is reading 48.4%.
  • NI-43C, PR3 PERCENT FLUX DIFF, is reading +30% FLUX.

Which one of the following completes the statements below?

The Overtemperature Delta T (OTT) reactor trip setpoint (1) affected by this failure.

The OTT reactor trip function is (2) per TS 3.3.1, Reactor Trip System (RTS)

Instrumentation.

(1) (2)

A. IS OPERABLE B. IS NOT OPERABLE C. is NOT OPERABLE D. is NOT NOT OPERABLE

83. 027AG2.2.25 083 A Pressurizer pressure control system malfunction has occurred and the RCS has exceeded Safety Limit 2.1.2, RCS Pressure SL.

Per Safety Limit 2.1.2, RCS Pressure SL, which one of the following completes the statements below?

Exceeding the Safety Limit is MORE severe in (1) .

The Safety Limit is based on (2) of design pressure of the RCS.

(1) (2)

A. MODE 1 110%

B. MODE 1 125%

C. MODE 4 110%

D. MODE 4 125%

84. 028AG2.1.32 084 Unit 1 is stable at 100% power with the following conditions:
  • AOP-16.0, CVCS Malfunction, is in progress due to a loss of Pressurizer level control.
  • At the step to "Check Pressurizer level", Pressurizer level is 68%.

Which one of the following completes the statements below?

The Pressurizer is (1) per Tech Spec 3.4.9, Pressurizer.

Per AOP-16.0, the operating crew is required to (2) .

(1) (2)

A. OPERABLE trip the Reactor and go to EEP-0.0, Reactor Trip or Safety Injection B. OPERABLE reduce Reactor power/TAVG as necessary using UOP-3.1, Power Operation C. NOT OPERABLE trip the Reactor and go to EEP-0.0, Reactor Trip or Safety Injection D. NOT OPERABLE reduce Reactor power/TAVG as necessary using UOP-3.1, Power Operation

85. 029EA2.05 085 FRP-S.1, Response to Nuclear Power Generation/ATWT, is in progress on Unit 1 with the following conditions:
  • Immediate operator actions are in progress.
  • RCS pressure is 2350 psig and rising.

Subsequently, both PORV's have been MANUALLY opened and RCS pressure is lowering.

Which one of the following completes the statements below?

Per FRP-S.1, the PORV's are required to be MANUALLY closed when RCS pressure is below the MAXIMUM pressure of (1) .

The reduction in pressure is required to (2) .

(1) (2)

A. 2240 raise boron injection flowrate B. 2135 raise boron injection flowrate C. 2240 prevent excessive PORV cycling D. 2135 prevent excessive PORV cycling

86. 034G2.4.30 086 Unit 1 is performing dry cask storage operations in the Spent Fuel Pool (SFP) with the following conditions:

At 1000:

  • The SFP Bridge Crane Operator is in the process of removing the SFP weir gate which weighs approximately 3600 lbs.

At 1015:

  • EH2, SFP LVL HI-LO, alarms.
  • HP reports rising radiation levels in the SFP area.

Which one of the following completes the statements below?

At 1000, per TR 13.9.4, Crane Travel - Spent Fuel Storage Building, the SFP weir gate (1) allowed to be moved over irradiated fuel assemblies in the SFP.

At 1030, the Shift Manager is required to declare a(n) (1) .

Reference Provided (1) (2)

A. IS NOUE (RU2)

B. is NOT NOUE (RU2)

C. IS ALERT (RA2)

D. is NOT ALERT (RA2)

87. 057AA2.16 087 Unit 1 is at 100% power with the following conditions:
  • HUQR5, 1C 120V Regulated AC Panel Channel 1, is tagged OPEN to repair the 1C Solatron Regulator.
  • LS/459Z, PRZR LVL CONT CH, is in the LT459/60 (CH I/II) position.

Subsequently, power is lost to the 1A 120V AC Vital Instrumentation Panel.

Which one of the following completes the statements below?

Actual Pressurizer level (1) be affected.

The Required Action Statement(s) of LCO (2) is(are) required to be performed.

Tech Specs: 3.3.1, Reactor Trip System (RTS) Instrumentation 3.8.9, Distribution Systems - Operating (1) (2)

A. WILL 3.3.1 AND 3.8.9 B. WILL 3.8.9 ONLY C. will NOT 3.3.1 AND 3.8.9 D. will NOT 3.8.9 ONLY

88. 062AA2.01 088 Unit 1 is in Mode 3 when the following occurs:
  • MOV-3131 and MOV-3134, SW FROM RCP MTR AIR CLRS, were closed.
  • MOV-3135, SW TO RCP MTR AIR CLRS, was closed.
  • The leak is now isolated.

Which one of the following completes the statements below?

A Service water leak was occurring on the (1) Train.

After the leak is isolated, per Tech Spec 3.7.8, Service Water System, the affected Train of SW is (2) .

(1) (2)

A. A OPERABLE B. B OPERABLE C. A NOT OPERABLE D. B NOT OPERABLE

89. 068AA2.08 089 Unit 1 is operating at 100% power when the following occurred:
  • PT3371B, 1B SG PRESS, failed low.

Subsequently, a fire has required the Control Room to be evacuated.

  • AOP-28.2, Fire in the Control Room, is in progress.
  • Unit 1 control room has shifted control to the Hot Shutdown Panels (HSDP).
  • The crew is performing the step to maintain SG pressures at approximately 1005 psig.

Which one of the following completes the statements below?

Indication for 1B SG pressure on the HSDP (1) affected by the PT3371B failure.

Per Tech Spec 3.7.4, Atmospheric Relief Valves (ARVs), PCV-3371B, 1B SG ATMOS REL VLV, is (2) .

(1) (2)

A. is NOT OPERABLE B. is NOT NOT OPERABLE C. IS OPERABLE D. IS NOT OPERABLE

90. 072A2.03 090 A blown control power fuse on Unit 1 R-5, SFP RM, renders it NON FUNCTIONAL.

Which one of the following completes the statements below?

The loss of R-5 (1) automatically trip the Fuel Handling Area Supply and Exhaust Fan.

The compensatory actions required by TRM 13.3.4, Radiation Monitoring Instrumentation for R-5 being NON FUNCTIONAL is to (2) .

(1) (2)

A. WILL perform area surveys of the SFP every 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> B. WILL install a DAD in the vicinity of R-5 with a setpoint of 15mRem/hr C. will NOT perform area surveys of the SFP every 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> D. will NOT install a DAD in the vicinity of R-5 with a setpoint of 15mRem/hr

91. 073A2.02 091 Unit 1 is at 100% power with the following conditions:
  • R-23B, SGBD TO DILUTION is reading 100 cpm.

Subsequently, the following conditions exist:

  • The R-23B Instrument Power fuse is blown.
  • R-23B is reading MINIMUM scale.

Which one of the following completes the statements below?

The SGBD release (1) AUTOMATICALLY terminate.

Per the ODCM, SGBD releases to the environment can continue if (2) .

(1) (2)

A. WILL grab samples are obtained and analyzed B. WILL samples are continuously collected with auxiliary sampling equipment C. will NOT grab samples are obtained and analyzed D. will NOT samples are continuously collected with auxiliary sampling equipment

92. 079A2.01 092 Unit 1 is operating at 100% power with the following conditions:
  • A rupture has occurred on the Instrument Air header piping in the MSVR.
  • AOP-6.0, Loss of Instrument Air, is in progress.
  • Instrument Air is 75 psig and lowering.

Which one of the following completes the statements below?

Service Air (1) been automatically isolated from Instrument Air.

Per AOP-6.0, to maintain Pressurizer level, the operating crew is required to perform actions of (2) in conjunction with AOP-6.0.

Procedure names: AOP-16.0, CVCS Malfunction SOP-2.1, CVCS Plant Startup and Operation (1) (2)

A. HAS AOP-16.0 B. has NOT AOP-16.0 C. HAS SOP-2.1 D. has NOT SOP-2.1

93. G2.1.41 093 Unit 1 is in Mode 6 with core offload stopped due to a problem with the gripper tube top limit switch on the Manipulator crane and the following conditions exist:
  • No fuel is currently in the manipulator crane.
  • The decision has been made to operate TS-3, Bridge Left Interlock Bypass switch, in order to move the bridge while the gripper tube is not at the top limit.

Which one of the following describes the approval authority for operating TS-3 per FHP-7.0, Limitations and Precautions for Handling Fuel Assemblies?

A. Shift Manager B. Shift Supervisor C. Fuel Handling Supervisor D. Reactor Engineering Supervisor

94. G2.2.37 094 Unit 1 is at 100% power, and the following conditions exist:

At 1000:

  • A risk evaluation has been performed.

Which one of the following completes the statements below?

At 1000, the 1C Accumulator is (1) because (2) .

A. (1) OPERABLE (2) the delay period of SR 3.0.3 may be applied for up to 31 days B. (1) OPERABLE (2) the delay period of SR 3.0.3 may be applied for ONLY the next 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> C. (1) NOT OPERABLE (2) the surveillance frequency has been missed D. (1) NOT OPERABLE (2) the boron concentration is unknown

95. G2.2.38 095 Which one of the following completes the statements below?

The MINIMUM steady state power level at which core power is in an unanalyzed condition is (1) .

This condition is reportable under (2) .

Procedures: NMP-AD-031, SNC Reportability Roles, Responsibilities, and Fleet Requirements NMP-EP-110, Emergency Classification Determination and Initial Action (1) (2)

A. 103% NMP-AD-031 B. 103% NMP-EP-110 C. 107% NMP-AD-031 D. 107% NMP-EP-110

96. G2.3.14 096 Which one of the following completes the statement below?

Compliance with Technical Specification 3.4.16, RCS Specific Activity, ensures that the resulting doses at the site boundary will not exceed an appropriate fraction of (1) limits following a (2) or a Main Steam Line Break.

(1) (2)

A. 10 CFR 100 Steam Generator Tube Rupture B. 10 CFR 100 Loss of Coolant Accident C. 10 CFR 20 Steam Generator Tube Rupture D. 10 CFR 20 Loss of Coolant Accident

97. G2.3.6 097 Both Units are operating at 100% power and the following conditions exist:
  • Unit 1 dilution flow is 23,000 gpm.
  • Unit 2 dilution flow is 23,500 gpm.
  • A Unit 2 Waste Monitor Tank (WMT) release is in progress.

Subsequently, N1P16FR4107, SW DILUTION FLOW RECORDER, is declared INOPERABLE.

Which one of the following completes the statement below?

Per the Offsite Dose Calculation Manual (ODCM),

Unit 1 WMT #1 .

A. CAN be released if WMT #1 activity is verified < 0.01 µCi/gm B. CANNOT be released because a Unit 2 WMT release is in progress C. CANNOT be released because N1P16FR4107 must be OPERABLE D. CAN be released if the Unit 1 dilution flowrate is estimated at least once per 4 hours4.62963e-5 days <br />0.00111 hours <br />6.613757e-6 weeks <br />1.522e-6 months <br /> during the release

98. G2.4.26 098 Per NMP-ES-035-010, Fire Brigade, which one of the following completes the statements below?

Personnel assigned as Technical Specification required minimum staffing (1) be assigned to the Fire Brigade.

A MINIMUM of (2) qualified personnel shall be assigned to the Fire Brigade per shift.

(1) (2) 1 A. CAN 3 B. CAN 5 C. CANNOT 3 D. CANNOT 5

99. G2.4.32 099 Unit 1 is at 100% power with the following conditions:

At 1000:

  • An unplanned loss of ALL Main Control Board Annunciators occurs.

At 1015:

  • The crew takes actions to stabilize the plant and a Reactor Trip does NOT occur.

Which one of the following completes the statements below?

At 1035, the emergency classification in effect is a(n) (1) per NMP-EP-110-GL01, FNP EALs - ICs, Threshold Values and Basis.

Per AOP-35.0, (2) is(are) required within one hour due to the loss of annunciator MH1, Fire.

Reference Provided A. (1) NOUE (SU3)

(2) a Pyrotronics panel firewatch B. (1) ALERT (SA4)

(2) a Pyrotronics panel firewatch C. (1) NOUE (SU3)

(2) hourly fire watches in all affected zones D. (1) ALERT (SA4)

(2) hourly fire watches in all affected zones

100. W/E10EA2.2 100 Unit 1 is conducting a natural circulation cooldown per ESP-0.3, Natural Circulation Cooldown with Allowance for Reactor Vessel Head Steam Voiding (with RVLIS).

  • The following conditions exist:

- Pressurizer level has risen to 93%

- BOTH Trains of RVLIS indicates RED for the following:

  • Upper Head - 100% and 0%
  • Upper Support Plate - 100% and 72%
  • Upper Plenum 44%

- All other RVLIS lights indicate GREEN Which one of the following completes the statements below?

The MAXIMUM allowed cooldown rate for the current conditions is (1) .

FRP-I.3, Response to Voids in Reactor Vessel, (2) be performed in conjunction with ESP-0.3.

(1) (2)

A. < 50°F/hr SHOULD B. < 50°F/hr should NOT C. < 100°F in any 60 minute period SHOULD D. < 100°F in any 60 minute period should NOT

ANSWER KEY REPORT for ILT 37 SRO exam Final Test Form: 0 Answers

  1. ID Points Type 0 1 001A3.06 1 1.00 MCS C 2 001AG2.4.11 2 1.00 MCS B 3 003K6.02 3 1.00 MCS B 4 004A1.07 4 1.00 MCS A 5 004K1.06 5 1.00 MCS B 6 005K5.02 6 1.00 MCS A 7 006A4.01 7 1.00 MCS D 8 007A1.02 8 1.00 MCS B 9 007EK2.02 9 1.00 MCS B 10 007K4.01 10 1.00 MCS C 11 008AK2.01 11 1.00 MCS B 12 008K3.03 12 1.00 MCS B 13 010A4.03 13 1.00 MCS D 14 010K6.01 14 1.00 MCS D 15 012A2.03 15 1.00 MCS A 16 013K2.01 16 1.00 MCS B 17 015AK1.01 17 1.00 MCS D 18 015K2.01 18 1.00 MCS C 19 017K6.01 19 1.00 MCS C 20 022A2.01 20 1.00 MCS B 21 025AK3.01 21 1.00 MCS D 22 026A2.03 24 1.00 MCS A 23 026AA1.07 22 1.00 MCS C 24 026K1.01 23 1.00 MCS D 25 027AK1.02 25 1.00 MCS D 26 027K1.01 26 1.00 MCS C 27 029A1.02 27 1.00 MCS B 28 035A4.06 28 1.00 MCS C 29 036AA2.02 29 1.00 MCS A 30 037AA2.07 30 1.00 MCS D 31 038EG2.4.6 31 1.00 MCS A 32 039K4.02 32 1.00 MCS C 33 041K5.02 33 1.00 MCS A 34 045A2.12 34 1.00 MCS C 35 051AK3.01 35 1.00 MCS A 36 054AA2.03 36 1.00 MCS D 37 055EA2.01 37 1.00 MCS A 38 055K3.01 38 1.00 MCS C 39 056AG2.2.39 39 1.00 MCS C 40 057AA1.05 40 1.00 MCS A 41 058AK3.02 41 1.00 MCS C 42 059A4.08 42 1.00 MCS B 43 059K3.03 43 1.00 MCS A 44 061A1.04 44 1.00 MCS A 45 061G2.1.23 45 1.00 MCS A 46 062A1.03 46 1.00 MCS C 47 062AA2.03 47 1.00 MCS B Monday, September 22, 2014 2:45:48 PM 1

ANSWER KEY REPORT for ILT 37 SRO exam Final Test Form: 0 Answers

  1. ID Points Type 0 48 063A3.01 48 1.00 MCS D 49 063G2.4.35 49 1.00 MCS A 50 064G2.4.45 50 1.00 MCS C 51 065AK3.04 51 1.00 MCS B 52 068AK3.18 52 1.00 MCS B 53 068K4.01 53 1.00 MCS D 54 073K4.01 54 1.00 MCS A 55 076K2.08 55 1.00 MCS B 56 077AG2.4.31 56 1.00 MCS B 57 078K1.04 57 1.00 MCS A 58 103A3.01 58 1.00 MCS A 59 G2.1.18 59 1.00 MCS B 60 G2.1.5 60 1.00 MCS B 61 G2.2.42 61 1.00 MCS C 62 G2.2.44 62 1.00 MCS D 63 G2.3.11 63 1.00 MCS B 64 G2.3.12 64 1.00 MCS A 65 G2.3.5 65 1.00 MCS D 66 G2.4.37 66 1.00 MCS C 67 G2.4.49 67 1.00 MCS C 68 G2.4.9 68 1.00 MCS A 69 W/E03EK2.2 69 1.00 MCS A 70 W/E04EK2.1 70 1.00 MCS A 71 W/E05EK1.1 71 1.00 MCS D 72 W/E06EG2.1.20 72 1.00 MCS A 73 W/E08EA1.1 73 1.00 MCS D 74 W/E11EA1.1 74 1.00 MCS D 75 W/E15EK1.2 75 1.00 MCS A SECTION 1 ( 75 items) 75.00 76 003AG2.2.22 76 1.00 MCS C 77 003G2.4.2 77 1.00 MCS B 78 006A2.13 78 1.00 MCS B 79 007EG2.4.41 79 1.00 MCS C 80 008G2.4.8 80 1.00 MCS A 81 009EG2.1.7 81 1.00 MCS B 82 012A2.05 82 1.00 MCS B 83 027AG2.2.25 83 1.00 MCS C 84 028AG2.1.32 84 1.00 MCS D 85 029EA2.05 85 1.00 MCS B 86 034G2.4.30 86 1.00 MCS D 87 057AA2.16 87 1.00 MCS B 88 062AA2.01 88 1.00 MCS B 89 068AA2.08 89 1.00 MCS C 90 072A2.03 90 1.00 MCS C 91 073A2.02 91 1.00 MCS A Monday, September 22, 2014 2:45:48 PM 2

ANSWER KEY REPORT for ILT 37 SRO exam Final Test Form: 0 Answers

  1. ID Points Type 0 92 079A2.01 92 1.00 MCS A 93 G2.1.41 93 1.00 MCS C 94 G2.2.37 94 1.00 MCS A 95 G2.2.38 95 1.00 MCS A 96 G2.3.14 96 1.00 MCS A 97 G2.3.6 97 1.00 MCS D 98 G2.4.26 98 1.00 MCS D 99 G2.4.32 99 1.00 MCS B 100 W/E10EA2.2 100 1.00 MCS D SECTION BREAK ( 25 items) 25.00 Monday, September 22, 2014 2:45:48 PM 3