9 Southern California Edison Company P. 0. BOX 800 2244 WALNUT GROVE AVENUE ROSEMEAD, CALIFORNIA 91770 M.O.MEDFORD TELEPHONE MANAGER OF NUCLEAR ENGINEERING O
o 27, 1986 (9181 302-1749 AND LICENSING OctoberU~
27, 1986U Director, Office of Nuclear Reactor Regulation Attention:
Mr. G. E. Lear, Director PWR Project Directorate No. 1 Division of PWR Licensing-A U. S. Nuclear Regulatory Commission Washington, D.C. 20555 Gentlemen:
Subject:
Docket No. 50-206 Anticipated Transients Without Scram San Onofre Nuclear Generating Station Unit 1 By letter dated September 22, 1986 the NRC provided SCE with a copy of the safety evaluation for the AMSAC Generic Design Package, WCAP-10858.
The letter requested that SCE provide a schedule for submitting plant specific design features as discussed in the safety evaluation and the schedule for implementation of an ATWS mitigation system following NRC approval.
As indicated in SCE's October 15, 1985 letter to the NRC, an independent and diverse system for automatic initiation of auxiliary feedwater exists at San Onofre Unit 1. A method for initiating turbine trip is required to complete the ATWS mitigation system requirements. SCE currently plans to transmit by March 16, 1987, a description of the plant specific design features of the ATWS mitigation system at San Onofre Unit 1. The schedule for implementation of the turbine trip portion of the ATWS mitigation system is currently the Cycle X refueling outage. This schedule was determined by the Integrated Living.Schedule process as indicated in SCE's October 15, 1985 letter. This implementation schedule is dependent on NRC review and approval prior to the Cycle X refueling outage.
If you have any questions regarding this matter, please let me know.
Very truly yours, cc: R. F. Dudley, NRC San Onofre Unit 1 Project Manager F. R. Huey, NRC Senior Resident Inspector J. B. Martin, NRC Region V Regional Administrator 8611070101 861027 PDR ADOC 05000206 PDR