Februar4, 1990 Docket No. 50-206 DISTRIBUTION Docket File LTran NRC & LPDRs CLiang CTrammell JTatum (2)
Mr. Harold B. Ray JZwolinski Vice President PShea Southern California Edison Company OGC-White Flint Irvine Operations Center PD5 Plant File 23 Parker EJordan Irvine, California 92718 BGrimes ACRS (10)
Dear Mr. Ray:
SUBJECT:
ATWS RULE (10 CFR 50.62) SAN ONOFRE NUCLEAR GENERATING STATION, UNIT NO. 1 (TAC NO. 59138)
In your submittal dated January 29, 1988, relating to ATWS rule requirements, you indicated that only one train of AFW would be initiated to satisfy AFW flow requirements. Your design does not satisfy the intent of the rule and does not satisfy the Westinghouse generic design assumptions discussed in WCAP-8330 and Westinghouse to NRC letter dated December 30, 1979. In discussing this matter with Mr. Ornelas of your staff, I understand that Westinghouse is performing a site-specific analysis to establish AFW flow requirements for San Onofre Unit 1 relative to the ATWS rule.
Please provide the results of the Westinghouse analysis so that we may complete our review regarding this matter. Also, please identify for our review any other generic design assumptions relative to the ATWS rule that are not applicable to San Onofre Unit 1 and your resolution of any such discre pancies. Inasmuch as NRC review of this subject was identified as a critical NRC review item in your October 2, 1989 letter regarding FTOL open items, your response is requested within 30 days of your receipt of this letter or as soon thereafter as possible.
The reporting and/or recordkeeping requirements contained in this letter affect fewer than ten respondents; therefore, OMB clearance is not required under Pub. L.96-511.
Please contact us if you should have any questions regarding this request.
Sincerely, d b J~a~s Tturn Ya snal
. YNge, roemc Manauer Project Directorate V Division of Reactor Projects -
- III, IV, V and Special Projects Office of Nuclear Reactor Regulation cc:
See next page 6RSP/PD5 R
AD:PD5
- atum:dr rammell 2//23/90 2/
/90
[SO1 RAI 59138]
V 9002230079 900213 fiN PDR ADOCK 05000206 P
PNU
t VtREG UNITED STATES NUCLEAR REGULATORY COMMISSION WASHINGTON, D. C. 20555 February 13, 1990 Docket No. 50-206 Mr. Harold B. Ray Vice President Southern California Edison Company Irvine Operations Center 23 Parker Irvine, California 92718
Dear Mr. Ray:
SUBJECT:
ATWS RULE (10 CFR 50.62) SAN ONOFRE NUCLEAR GENERATING STATION, UNIT NO. 1 (TAC NO. 59138)
In your submittal dated January 29, 1988, relating to ATWS rule requirements, you indicated that only one train of AFW would be initiated to satisfy AFW flow requirements. Your design does not satisfy the intent of the rule and does not satisfy the Westinghouse generic design assumptions discussed in WCAP-8330 and Westinghouse to NRC letter dated December 30, 1979. In discussing this matter with Mr. Ornelas of your staff, I understand that Westinghouse is performing a site-specific analysis to establish AFW flow requirements for San Onofre Unit 1 relative to the ATWS rule.
Please provide the results of the Westinghouse analysis so that we may complete our review regarding this matter. Also, please identify for our review any other generic design assumptions relative to the ATWS rule that are not applicable to San Onofre Unit 1 and your resolution of any such discre pancies. Inasmuch as NRC review of this subject was identified as a critical NRC review item in your October 2, 1989 letter regarding FTOL open items, your response is requested within 30 days of your receipt of this letter or as soon thereafter as possible.
The reporting and/or recordkeeping requirements contained in this letter affect fewer than ten respondents; therefore, OMB clearance is not required under Pub. L.96-511.
Please contact us if you should have any questions regarding this request.
Sincerely, James E. Tatum, Project Manager Project Directorate V Division of Reactor Projects - III, IV, V and Special Projects Office of Nuclear Reactor Regulation cc:
See next page
Mr. Harold B. Ray San Onofre Nuclear Generating Southern California Edison Company Station, Unit No. 1 cc David R. Pigott Mr. F. B. Marsh, Project Manager Orrick, Herrington & Sutcliffe Bechtel Power Corporation 600 Montgomery Street P. 0. Box 60860 San Francisco, California 94111 Terminal Annex Los Angeles, California 90060 Mr. Robert G. Lacy Manager, Nuclear Mr. Phil Johnson San Diego Gas & Electric Company U.S. Nuclear Regulatory Commission P. 0. Box 1831 Region V San Diego, California 92112 1450 Maria Lane, Suite 210 Walnut Creek, California 94596 Resident Inspector/San Onofre NPS U.S. NRC P. 0. Box 4329 San Clemente, California 92672 Mayor City of San Clemente San Clemente, California 92672 Chairman Board of Supervisors County of San Diego 1600 Pacific Highway Room 335 San Diego, California 92101 Regional Administrator, Region V U.S. Nuclear Regulatory Commission 1450 Maria Lane, Suite 210 Walnut Creek, California 94596 Mr. John Hickman Senior Health Physicist Environmental Radioactive Management Unit Environmental Management Branch State Department of Health Services 714 P Street, Room 616 Sacramento, California 95814 Mr. Don Womeldorf Chief Environmental Management California Department of Health 714 P Street, Room 616 Sacramento, California 95814