ML13317A634

From kanterella
Jump to navigation Jump to search

Notice of Issuance & Negative Declaration of Amend 55 to License DPR-13
ML13317A634
Person / Time
Site: San Onofre Southern California Edison icon.png
Issue date: 06/08/1981
From: Crutchfield D
Office of Nuclear Reactor Regulation
To:
Shared Package
ML13317A631 List:
References
TAC-42090, NUDOCS 8106170325
Download: ML13317A634 (2)


Text

7590-01 UNITED STATES NUCLEAR REGULATORY. COMMISSION DOCKET NO. 50-206 SOUTHERN CALIFORNIA EDISON COMPANY AND SAN DIEGO GAS AND ELECTRIC COMPANY NOTICE OF ISSUANCE OF AMENDMENT TO PROVISIONAL OPERATING LICENSE AND NEGATIVE DECLARATION The U. S. Nuclear Regulatory Commission (the Commission) has issued Amendment No.5: to Provisional Operating License No. DPR-13, issued to Southern California Edison Company and San Diego Gas and Electric Company (the licensees), which revised the license and its related Appendix A Technical Specifications and Bases for operation of the San Onofre Nuclear Generating Station Unit No. 1 (the facility) located in San Diego County, California. The amendment is effective as of its date of issuance.

The amendment authorizes changes to the Appendix A Technical Specifications and Bases which are required to allow San Onofre Nuclear Generating Station (SONGS) Unit No. 1 to resume power operation for Cycle 8 following extensive repair to the steam generator tubes, and changes to allow modifications of the primary to secondary leakage limits, action statements in the event of leakage, and clarification of the preventative plugging limits. The amendment also reinstates, a License ConditiQn 3.E (Steam Generator Inspections) which requires.shutdown for a steam generator inspection within six effective full-power months following restart from the current outage.

The applications for the amendment,comply with the standards and requirements of.the Atomic Energy Act of 1954, as amended (the Act), and the Commission's rules and regulations. The Commission has made appropriate findings as required by the Act and the Commission's rules and regulations in 10 CFR Chapter I, which are set forth in the license amendment. Prior public notice of this amendment was not required since the amendment does not involve a significant hazards consideration.

N

-2 The Commission has prepared an environmental impact apprasial for this action and has concluded that the action will not significantly affect the quality of the human environment. Therefore, the Commission has determined that an Environmental Impact Statement need not be prepared, and that, pursuant to 10 CFR 51.5(c)(1), the issuance of a negative declaration to this effect is appropriate.

For further details'with respect to this action, see (1) the application for amendment dated December 10, 1980, including its supplements April 10, And 15, 1981 and application dated May 5, 1981, in addition to the supporting submittals identified in the transmittal letter for the amendment, (2)

Amendment No. 55 to License No. DPR-13, (3) the Commission's related Safety Evaluation and (4) the Commission's Environmental Impact Appraisal.

All of these items are available for public inspection at the Commission's Public Document Room, 1717 H Street, N. W., Washington, D. C. 20555 and at the Mission Viejo Branch Library, 24851 Chrisanta Drive, Mission Viejo, California.

A copy of items (2), (3) and (4) may be obtained upon request addressed to the U. S. Nuclear Regulatory Commission, Washington, D. C. 20555, Attention:

Director, Division of Licensing.

Dated at Bethesda, Maryland, this 8th day of June, 1981.

FOR THE NUCLEAR REGULATORY COMMISSION Dennis M. Crutchf d

Chi Operating Reactors Branch #5 Division of Licensing