MONTHYEARML13309B6272013-07-15015 July 2013 Shine Medical Technologies, Inc., Application for Construction Permit Response to Environmental Requests for Additional Information, Enclosure 2, Attachment 25 - 1-HR-SK-001 Rev a, Shine Water Balance Diagram ML13309B0342012-09-26026 September 2012 Shine Medical Technologies, Inc., Application for Construction Permit Response to Environmental Requests for Additional Information, Enclosure 2, Attachment 20 - Data Report of Well Installation (Stevens Point, Wi) Rev 2 ML13309B6232012-08-0303 August 2012 Shine Medical Technologies, Inc., Application for Construction Permit Response to Environmental Requests for Additional Information, Enclosure 2, Attachment 23 - Preliminary Hydrological Analyses (Janesville) Rev 3, Part 1 of 2 ML13309B6242012-08-0303 August 2012 Shine Medical Technologies, Inc., Application for Construction Permit Response to Environmental Requests for Additional Information, Enclosure 2, Attachment 23 - Preliminary Hydrological Analyses (Janesville) Rev 3, Part 2 of 2 ML13309B6252012-08-0303 August 2012 Shine Medical Technologies, Inc., Application for Construction Permit Response to Environmental Requests for Additional Information, Enclosure 2 Attachment 24 - Seismic Hazard Assesment Report (Janesville) Rev 4, Part 1 of 2 ML13309B6262012-08-0303 August 2012 Shine Medical Technologies, Inc., Application for Construction Permit Response to Environmental Requests for Additional Information, Enclosure 2 Attachment 24 - Seismic Hazard Assesment Report (Janesville) Rev 4, Part 2 of 2 ML13309B6182012-08-0303 August 2012 Shine Medical Technologies, Inc., Application for Construction Permit Response to Environmental Requests for Additional Information, Enclosure 2 Attachment 26 - Preliminary Geotechnical Engineering Report (Janesville), Rev 3 ML15027A0432012-05-11011 May 2012 Phase I Environmental Site Assessment Stevens Point, Wi, Rev. 1, Appendix C ML15027A0422012-05-11011 May 2012 Phase I Environmental Site Assessment Stevens Point, Wi, Rev. 1, Appendix B ML15027A0442012-05-11011 May 2012 Phase I Environmental Site Assessment Stevens Point, Wi, Rev. 1 ML15027A0452012-05-11011 May 2012 Phase I Environmental Site Assessment Stevens Point, Wi, Rev. 1, Appendix a ML15027A0462012-05-11011 May 2012 Phase I Environmental Site Assessment Stevens Point, Wi, Rev. 1, Appendix D ML13309B0352012-02-28028 February 2012 Shine Medical Technologies, Inc., Application for Construction Permit Response to Environmental Requests for Additional Information, Enclosure 3, Attachemnt 21 - Groundwater Level Measurements (Stevens Point, Wi) ML13309B0142012-02-10010 February 2012 Shine Medical Technologies, Inc., Application for Construction Permit Response to Environmental Requests for Additional Information, Enclosure 2 Attachment 19 - Draft Phase I Environmental Site Assessment (Stevens Point, Wi) (Part 2 of 9) ML13309B0132012-02-10010 February 2012 Shine Medical Technologies, Inc., Application for Construction Permit Response to Environmental Requests for Additional Information, Enclosure 2 Attachment 19 - Draft Phase I Environmental Site Assessment (Stevens Point, Wi) (Part 1 of 9) ML13309B0362011-10-13013 October 2011 Shine Medical Technologies, Inc., Application for Construction Permit Response to Environmental Requests for Additional Information, Enclosure 2, Attachement 22 - Draft Amec Er Work Plan Rev a ML13309B6192011-01-21021 January 2011 Shine Medical Technologies, Inc., Application for Construction Permit Response to Environmental Requests for Additional Information, Enclosure 2, Attachment 27 - Report of Subsurface Exploration (Chippewa Falls) 2013-07-15
[Table view] |
Text
ENCLOSURE 2 ATTACHMENT 21 SHINE MEDICAL TECHNOLOGIES, INC.
SHINE MEDICAL TECHNOLOGIES, INC. APPLICATION FOR CONSTRUCTION PERMIT RESPONSE TO ENVIRONMENTAL REQUESTS FOR ADDITIONAL INFORMATION GROUNDWATER LEVEL MEASUREMENTS, STEVENS POINT, WISCONSIN DECEMBER 2011, JANUARY 2012, AND FEBRUARY 2012 3 pages follow
GROUNDWATER lEVEL MEASUREMENTS SHINE Medical NRC licensing Project- AMEC Project No. 6225-11-5555 RECORDED- DECEMBER 19, 2011 Total Well Depth Calculation (A*B=C)
Depth to A.
Well Water C. Total Checked By Recording Date Water B.
Time (Feet- Level Tape Correction Well Depth Technician Recorded ID Reading BTOC) Factor* (feetBTOC)
(feet BTOC) 12-19-11 lA 15:48 12.57 20.09 0.29' 19.80 12-19-11 2A 15:57 12.72 20.15 0.29' ' 19.86 12-19-11 3A 16:08 13.00 20.11 0.29' 19.82 12-19-11 4A 16:19 12.12 20.17 0.29' 19.88 BTOC =Below Top of Casrng ID - Identification
- Correction Factor for Waier Level Tape M200-61 (protective case around probe)
Approved By:
Project Manager
GROUNDWATER LEVEL MEASUREMENTS SHINE Medical NRC Licensing Project- AMEC Project No. 6225-11-5555 RECORDED- JANUARY 10, 2012 Total Well Depth Calculation (A*B=C)
A.
Depth to Water Rocording Date Well Time Water Level Tape B. C. Total Checked By Technician Recorded 10 (Feet- Correction Well Depth Reading BTOC) Factor* (feet BTOC)
(feet BTOC) 1-10-12 1A ! 15:30 12.75 20.09 0.29' 19.80 1-10-12 2A I 15:41 12.92 20.15 0.29' 19.86 1-10-12 3A 15:48 13.18 20.11 0.29' 19.82 1-10-12 4A 15:56 12.26 20.17 0.29' 19.88 BTOC= Below Top of Casing 10 =Identification
- Correction Factor for Water level Tape M200-61 (protective case around probe)
Approved By:
Project Manager
GROUNDWATER LEVEL MEASUREMENTS SHINE Medical NRC Licensing Project- AMEC Project No. 6225-11-5555 RECORDED- FEBRUARY 14, 2012 I Recording Date Weli iD Time Depth to Water Total Well De_pth Calculationl A-B::_Cl _
A.
Water Level Tape B. C. Total Checked By Technician Recorded (Feet- Correction Well Depth Reading BTOC) Factor* (feet BTOC)
(feet BTOC) 2-14-12 1A 16:15 13.26 20.09 0.29' 19.80 2-14-12 2A 16:23 13.45 20.15 0.29' 19.86 2-14-12 3A 16:29 1.3.68 20.11 0.29' 19.82
-- 20.17 0.29' 2-14-12 4A 16:36 12.75 19.88 BlOC= Below Top of Casong ID = ld~ntifica tlon
- Correction F~ctOt for W"tcr Level Tape M200-61 (protective case around probe]
Approved By:
Project Manager