Initial Exam 2013-301 Final Simulator Scenarios
ML13248A096
Person / Time
Site: Oconee  Duke Energy icon.png
Issue date: 09/04/2013
From:
NRC/RGN-II
To:
Duke Energy Carolinas
References
50-269/13-301, 50-270/13-301, 50-287/13-301
Download: ML13248A096 (115)


Text

Facility: Oconee Scenario No.: 1 Op-Test No.: 1 Examiners: ________________________ Operators: ________________________SRO

________________________ ________________________OATC

________________________ ________________________BOP Initial Conditions:

  • Reactor power = 100%

Turnover:

  • AMSAC/DSS bypassed for I&E
  • Small LPSW leak in Reactor Building. Pumping RBNS approximately twice per shift.
  • 1MS-82 and 1MS-84 closed in support of maintenance. TDEFWP supply from AS only.
  • Unit 2 has the AS header Event Malfunction Event Event Type* Description No. No.

0a MPI 300 Block all Rx Trips except Manual 0b Override Block Rx Manual Trip Pushbutton 0c Override AMSAC/DSS bypassed 0d Override 1LWD-1 breaker trips when being closed C: BOP, SRO 1 Override Pump the RB Normal Sump (1LWD-1 fails to close).

(TS) 2 MPS061 C, BOP, SRO 1A Letdown Cooler Leak C: BOP, SRO Operating (A) LPSW Pump trips and standby pump 3 Updater (TS) fails to start 4 MCS008 I: OATC, SRO Selected Tcold Fails HIGH MSS190 5 Override C: OATC, SRO Main Turbine trips resulting in an ATWS (Rule 1) 1A Steam Generator Tube Rupture 6 MPS010 M: All

  • (N)ormal, (R)eactivity, (I)nstrument, (C)omponent, (M)ajor

Appendix D Required Operator Actions Form ES-D-2 ILT43 June 10, 2013 Op-Test No.: ILT43 Scenario No.: 1 Event No.: 1 Page 1 of 2 Event

Description:

Pump the RB Normal Sump Time Position Applicant's Actions or Behavior Plant Response:

Statalarm ISA-09/A-6 (Reactor Building Normal Sump Level High/Low) alarms o Alarm Setpoint High Alarm = 8 inches Board indications:

  • Reactor Building Sump Level indications are 8 inches.

Crew Response:

ARG 1SA-09/A-6 3.1 High Level: - Align normal sump pump and lower level in sump per OP/1-2/A/1104/007 (Liquid Waste Disposal System).

SRO/BOP OP/1/A/1104/007 Enclosure 4.1, Pumping RBNS to 1 3.1 Verify MWHUT level adequate to receive waste volume.

3.2 Position the following:

  • Ensure open 1LWD-2 (RB NORMAL SUMP ISOLATION) 3.3 Start one or both of the following:

Changes in LAWT levels may occur during pumping.

RIA Alarms may be indicative of gas leakage.

If RBNS level was above 14" when pumps were started, a level increase following securing the RBNS pumps may occur. {7}

3.4 WHEN RBNS is at desired level OR at 1" (low level alarm), ensure the following:

Examiner Note: 1LWD-1 will not close when attempted to secure from the RBNS pumping.

3.5 IF required to close the valves, position the following:

This event is complete when the SRO has referred to Tech Specs, or as directed by the lead examiner Page 2 of 27

Appendix D Required Operator Actions Form ES-D-2 ILT43 June 10, 2013 Op-Test No.: ILT43 Scenario No.: 1 Event No.: 1 Page 2 of 2 Event

Description:

Pump the RB Normal Sump Time Position Applicant's Actions or Behavior EXAMINER NOTE: The crew should diagnose the failure of 1LWD-1 and the SRO will refer to Tech Specs. Since 1LWD-1 is a Containment SRO Isolation Valve, the applicable Tech spec is 3.6.3. Since this path has 2 Containment Isolation Valves, Condition A applies and the Completion Time is 4 hours4.62963e-5 days <br />0.00111 hours <br />6.613757e-6 weeks <br />1.522e-6 months <br />.

Booth Cue: If directed by the control room, SPOC will investigate the problem with 1LWD-1. Troubleshooting/repair of the valve will be turned over to the WCC and the valve is not expected to be returned to service on this shift.

This event is complete when the SRO has referred to Tech Specs, or as directed by the lead examiner Page 3 of 27

Appendix D Required Operator Actions Form ES-D-2 ILT43 June 10, 2013 Op-Test No.: ILT43 Scenario No.: 1 Event No.: 2 Page 1 of 5 Event

Description:

1A Letdown Cooler Leak Time Position Applicant's Actions or Behavior Plant Response:

Statalarms:

  • 1SA-08/B-9 (PROCESS MONITOR RADIATION HIGH)

1SA-08/B-9 3.1 Determine radiation monitors in alarm.

3.1.1 IF VIEW node OR either SCADA node is NOT in service, refer to OP/1/A/1103/026, (Loss of Sorrento Radiation Monitor).

NOTE TO EXAMINER: Steps 3.2 through 3.10 are IF statements for which RIA is in alarm. In this case, the crew determines the radiation monitor alarming is 1RIA-50, so step 3.9 applies.

3.9 IF any of the following RIAs have valid alarms, GO TO AP/18 (Abnormal Release of Radioactivity).

RIA RIA-31 1RIA-32 1RIA-35 1RIA-39 1RIA-41 1RIA-42 1RIA-45, 46 1RIA-47, 48, 49, 49A 1RIA-50 1RIA-54 AP/18 (Can be performed by Unit 2 if AP/2 has been entered) 4.1 Perform the following:

At the discretion of the CR SRO, make a PA announcement of the event including any necessary precautions to be observed.

Notify OSM to reference the following:

RP /0/B/1000/001 (Eme rge ncy Cla s s ifica tion).

NS D-202 (Reportability)

OMP 1-14 (Notifications)

This event is complete when 1A Letdown cooler has been isolated and the crew is monitoring RCS leakage OR as directed by the lead examiner.

Page 4 of 27

Appendix D Required Operator Actions Form ES-D-2 ILT43 June 10, 2013 Op-Test No.: ILT43 Scenario No.: 1 Event No.: 2 Page 2 of 5 Event

Description:

1A Letdown Cooler Leak Time Position Applicant's Actions or Behavior SRO /BOP AP/18 (cont) 4.2 GO TO appropriate sections for any monitors in High or Alert alarm:

NOTE TO EXAMINER: Crew should go to Section 4I for 1RIA-50.

4I 1RIA-50 Section 4I 1 Verify either of the following:

  • CC SURGE TANK increasing 5 /hour
  • CC SURGE TANK off-scale high
2. Initiate AP/2 (Excessive RCS Leakage).

SRO/OATC/ AP/2 BOP Immediate Actions 3.1 Verify HPI operating.

3.2 IAAT RC makeup flow is > 100 gpm, AND Pzr level is decreasing, THEN close 1HP-5.

3.3 IAAT all the following exist:

  • HPI flow is > NORMAL MAKEUP CAPABILITY (160 gpm) with letdown isolated
  • Pzr level decreasing
  • SG Tube Leakage NOT indicated
  • LPI DHR NOT providing core cooling THEN perform the following:

A. Ensure Rx is tripped.

B. Initiate Unit 1 EOP.

Subsequent Actions 4.1 Initiate Pzr and LDST level makeup using Unit 1 EOP Encl 5.5 (Pzr and LDST Level Control), as necessary.

4.2 Announce AP entry using the PA system.

4.3 IAAT LPI DHR in service, AND RCS leakage > LDST makeup capability ( 50 gpm ),

THEN GO TO AP/26 (Loss of Decay Heat Removal)

This event is complete when 1A Letdown cooler has been isolated and the crew is monitoring RCS leakage OR as directed by the lead examiner.

Page 5 of 27

Appendix D Required Operator Actions Form ES-D-2 ILT43 June 10, 2013 Op-Test No.: ILT43 Scenario No.: 1 Event No.: 2 Page 3 of 5 Event

Description:

1A Letdown Cooler Leak Time Position Applicant's Actions or Behavior Crew Response SRO/OATC/ AP/2 (Cont)

BOP 4.4 Initiate the following notifications:

__ OSM to reference the following:

  • RP/0/B/1000/001 (Emergency Classification)
  • OMP 1-14 (Notifications)
  • Encl 5.9 (Oversight Guidelines)

__ STA

__ RP 4.5 Monitor the following trends to determine leak area (AB or RB) and trend for degradation:

  • "T6 AP02"
  • "T6 WASTE"
  • RIAs 4.6 Verify specific leak location is identified. (If not see RNO below)

RNO: Notify WCC SRO to initiate Encl 5.2 (Primary Leak Check) and of the leak area (AB or RB), if known 4.7 Initiate Encl 5.1 (Leak Rate Determination). (This will calculate RCS leakage based on CC surge tank level increase and is a very gross calculation since there is no OAC point for CC surge tank level and therefore control room gage must be used. Leak rate is 2-3 gpm) 4.8 WHEN leak area/failure is identified, THEN GO TO applicable step that best fits leak area/failure:

CC 1RIA-50 4.16 System CC Surge Tank Level 4.16 Verify all of the following:

  • CC Surge Tank level increasing at 5 gpm) or 0.65 /level houris

(

off-scale high

  • 1RIA-50 in alarm or increasing This event is complete when 1A Letdown cooler has been isolated and the crew is monitoring RCS leakage OR as directed by the lead examiner.

Page 6 of 27

Appendix D Required Operator Actions Form ES-D-2 ILT43 June 10, 2013 Op-Test No.: ILT43 Scenario No.: 1 Event No.: 2 Page 4 of 5 Event

Description:

1A Letdown Cooler Leak Time Position Applicant's Actions or Behavior Crew Response AP/2 (cont)

NOTE:

  • CC Surge Tank is hard piped to overflow to LAWT.
  • Chemicals from the CC system will rapidly exhaust demineralizers used to process LAWT water. Radwaste has limited storage capability and a Rx shutdown may be required if the leak CANNOT be isolated.

SRO /BOP 4.17 IAAT CC Surge Tank level is off-scale high, THEN notify Radwaste that the CC Surge Tank has overflowed to the LAWT.

4.18 IAAT RCS leakage is flashing the CC system, OR threatens to overflow the LAWT, THEN perform the following: N/A at this time NOTE RCS to CC leakage may be indicated by one RCP cooler outlet temperature increasing more than the others (use historical temperature trend) near the time of increase on 1RIA-50.

4.19 Verify leakage indicated by change in RCP cooler outlet temperatures (Turn-on code "GD AP02"): (No leakage indicated)

RNO GO TO Step 4.24 NOTE RCS leakage to CC in the letdown coolers may be indicated by a cooler outlet temperature increasing more than the other cooler. Due to CC system setup, letdown cooler CC outlet temperatures may be different. A historical OAC temperature trend may be required to determine if leakage exists and if actions taken are successful in leak isolation. If leaking cooler CANNOT be identified, the coolers will be isolated one at a time starting with the 1A Letdown Cooler.

4.24 Monitor letdown cooler outlet temperatures to determine which cooler is leaking (Turn-on code "GD AP02"):

  • O1A0065 (LETDOWN COOLER 1A CC OUTLET TEMP)
  • O1A0066 (LETDOWN COOLER 1B CC OUTLET TEMP) 4.25 GO TO the appropriate step to isolate affected cooler:

This event is complete when 1A Letdown cooler has been isolated and the crew is monitoring RCS leakage OR as directed by the lead examiner.

Page 7 of 27

Appendix D Required Operator Actions Form ES-D-2 ILT43 June 10, 2013 Op-Test No.: ILT43 Scenario No.: 1 Event No.: 2 Page 5 of 5 Event

Description:

1A Letdown Cooler Leak Time Position Applicant's Actions or Behavior AP/2 (cont)

EXAMINER NOTE: According to the Note above and the table below, the crew ends up in the same place whether they have diagnosed which cooler is leaking or not.

Letdown Cooler GO TO to be isolated STEP 1A 4.26 1B 4.33 Unknown 4.26 4.26 Verify 1B Letdown Cooler is isolated.

SRO /BOP RNO: 1 Isolate the 1A Letdown Cooler by performing the following:

A. Close 1CC-1/1HP-1.

B. Close 1HP-3.

2. GO TO Step 4.31.

4.31 Verify the leak isolation was successful:

  • Decrease in RCS leakage This event is complete when 1A Letdown cooler has been isolated and the crew is monitoring RCS leakage OR as directed by the lead examiner.

Page 8 of 27

Appendix D Required Operator Actions Form ES-D-2 ILT43 June 10, 2013 Op-Test No.: ILT43 Scenario No.: 1 Event No.: 3 Page 1 of 2 Event

Description:

Operating (A) LPSW Pump trips and standby pump fails to start Time Position Applicant's Actions or Behavior Plant response:

Statalarms:

OAC Alarm:

  • LPSW Header A/B Pressure Low SRO/BOP Crew response:
  • Refer to OAC alarm response
1. Refer to AP/24 (Loss of LPSW)
2. Notify engineering
3. Refer to TS 3.7.7
  • Refer to ARG for 1SA-9/A-9 (LPSW Header A/B Press Low) 3.1 Refer to AP/1/A/1700/024 (Loss of LPSW) 3.2 Have Unit 2 refer to AP/2/A/1700/024 (Loss of LPSW).

Booth Cue: If notified to refer to AP/2/A/1700/024, inform operator that AP/2/A/1700/24 will be referenced.

AP/1/A/1700/024 (Loss of LPSW) steps begin on next page.

This event is complete when the SRO has referred to TS, or as directed by the Lead Examiner.

Page 9 of 27

Appendix D Required Operator Actions Form ES-D-2 ILT43 June 10, 2013 Op-Test No.: ILT43 Scenario No.: 1 Event No.: 3 Page 2 of 2 Event

Description:

Operating (A) LPSW Pump trips and standby pump fails to start Time Position Applicant's Actions or Behavior SRO/BOP AP/1/A/1700/024 (Loss of LPSW)

NOTE Unit 1 normally handles LPSW System operation unless otherwise directed by the CR SRO 4.1 Verify Unit 1 is going to handle LPSW system operations.

4.2 IAAT any LPSW pump is cavitating, THEN perform Steps 4.3 - 4.4 RNO: GO TO Step 4.5 4.5 Start available (NOT previously cavitating) LPSW pumps, as necessary, to raise LPSW header pressure.

4.6 IAAT LPSW to all RBCUs has been isolated, AND LPSW header pressure is > 25 psig, THEN perform Step 4.7 RNO: GO TO Step 4.8 4.8 Verify normal LPSW System operation is restored.

4.9 Verify that RB Auxiliary Coolers have isolated:

  • 1LPSW-1062 closed RNO: GO TO Step 4.11 4.11 EXIT this procedure SRO The SRO should refer to TS:
  • TS 3.7.7 (Low Pressure Service Water System) o Condition A applies. Restore required LPSW pump to operable status. 72 hours8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br /> completion time.

o Condition B applies due to LPSW Leakage Accumulator Level Alarm (exit this TS Condition when alarm clears).

  • TS 3.3.28 (LPSW pump Auto-Start Circuitry) Condition A. Restore Auto-Start Circuitry to operable. 7 day completion time.

This event is complete when the SRO has referred to TS, or as directed by the Lead Examiner.

Page 10 of 27

Appendix D Required Operator Actions Form ES-D-2 ILT43 June 10, 2013 Op-Test No.: 1 Scenario No.: 1 Event No.: 4 Page 1 of 2 Event

Description:

Selected Tcold Fails HIGH Time Time Time Plant Response:

  • Loop "B" Tc Dixson meter high (620°F)
  • Loop "B" T Dixson meter reads 0°F
  • Tc meter reads low (-10°F; B loop Hot)
  • Controlling NR Tave digital display reads 595.5°F
  • Controlling Tave Chessell dislplay reads 595°F
  • 1SA-2/B4 (RC Average Temperature High/Low)
  • 1SA-2/B-5, RC COLD LEG DIFF TEMP HIGH
  • When the Statalarms are received, the candidates should utilize the Plant OATC Transient Response process to stabilize the plant, which should include ICS to HAND, inserting control rods, and re-ratioing feedwater.
  • Verbalize to the SRO reactor power level and direction of movement.
  • Place the Diamond and both FDW Masters in manual and position as necessary to stabilize the plant.
  • The SRO should:

Refer to AP/28, ICS Instrument Failures Contact SPOC to repair the failed instrument.

AP/28, ICS Instrument Failures 4.1 Provide control bands as required.

SRO 4.2 Initiate notification of the following:

__ OSM to reference the following:

  • OMP 1-14 (Notifications)

__ STA 4.3 Verify a power transient 5% has occurred.

RNO: GO TO Step 4.5.

4.4 Notify Rx Engineering and discuss the need for a maneuvering plan This event is complete when Section 4A Step 6 is reached, or as directed by the Lead Examiner.

Page 11 of 27

Appendix D Required Operator Actions Form ES-D-2 ILT43 June 10, 2013 Op-Test No.: _1_ Scenario No.: 1 Event No.: 4 Page 2 of 2 Event

Description:

Selected Tcold Fails HIGH Time Position Applicant's Actions or Behavior AP/28 (continued)

SRO/OATC 4.5 Use the following, as necessary, to determine the applicable section from table in Step 4.6:

  • OAC alarm video
  • OAC display points
  • Control Board indications
  • SPOC assistance, as needed 4.6 GO TO Section 4A, RCS Temperature AP/1/A/1700/028 Section 4A RCS Temperature Failure
1. Ensure the following in HAND:

__ 1A FDW MASTER

__ 1B FDW MASTER

2. Ensure DIAMOND in MANUAL.
3. Notify SPOC to perform the following:
  • Select a valid RCS Tave and Delta Tc input to ICS per AM/1/A/0326/020 (Control of Unit 1 Star Module Signal Selection Function).
  • Investigate and repair the failed RCS temperature instrumention.
4. PERFORM an instrumentation surveillance using applicable table in Encl 5.2 (ICS Instrument Surveillances) for the failed instrument.
5. Verify instrumentation surveillance in Encl 5.2 (ICS Instrument Surveillances) was performed satisfactorily as written.
6. WHEN notified by SPOC that a valid RCS Tave and Delta Tc input have been restored to ICS, THEN GO TO OP/1/A/1102/004 A Encl (Placing ICS Stations To Auto).

Examiner Note: The ICS will remain in manual for the remainder of the scenario.

Examiner Note: The crew may initiate EOP Encl 5.5 for inventory control.

These steps are included beginning on page 18 if necessary.

This event is complete when Section 4A Step 6 is reached, or as directed by the Lead Examiner.

Page 12 of 27

Appendix D Required Operator Actions Form ES-D-2 ILT43 June 10, 2013 Op-Test No.: 1 Scenario No.: 1 Event No.: 5 Page 1 of 3 Event

Description:

Main Turbine trips resulting in an ATWS (Rule 1)

Time Position Applicant's Actions or Behavior Plant Response:

An automatic RX trip should have occurred due to a Main Turbine Trip Crew Response:

The SRO will direct the OATC to perform EOP Immediate Manual Actions The SRO will direct the BOP to perform a Symptoms Check OATC EOP Immediate Manual Actions:

3.1 Depress REACTOR TRIP pushbutton.

3.2 Verify reactor power < 5% FP and decreasing.

RNO: GO TO Rule 1 (ATWS/Unanticipated Nuclear Power Production)

EOP Rule 1 (CT-24)

OATC 1. Verify any Power Range NI 5% FP

2. Initiate manual control rod insertion to the IN LIMIT
3. Notify CR SRO to GO TO UNPP tab (see next page)
4. Open 1HP-24 and 1HP-25
5. Ensure only one of the following operating:
6. Start 1C HPI PUMP
7. Open 1HP-26 and 1HP-27
8. Dispatch one operator without wearing Arc Flash PPE to open 600V CRD breakers on the following:

BOOTH CUE: Fire Timer 10 which will trip the CRD Breakers after a 3 minute time delay.

EXAMINER NOTE: Tripping the CRD breakers inserts control rods and initiates the SGTR on the 1A SG (Event #6)

9. Verify only two HPI pumps operating RNO: IF all HPI pumps operating, THEN perform the following:

(does not apply)

10. EXIT this rule This event is complete when the SRO transfers to the Subsequent Actions tab, or as directed by the Lead Examiner.

Page 13 of 27

Appendix D Required Operator Actions Form ES-D-2 ILT43 June 10, 2013 Op-Test No.: 1 Scenario No.: 1 Event No.: 5 Page 2 of 3 Event

Description:

Main Turbine trips resulting in an ATWS (Rule 1)

Time Position Applicant's Actions or Behavior EOP UNPP tab:

SRO/OATC/ 1. Ensure Rule 1 is in progress or complete BOP

2. Verify Main FDW is operating and in AUTO
3. IAAT Main FDW is NOT operating, THEN perform the following:

A. Trip the turbine-generator B. Start all available EFDW pumps

4. IAAT all power range NIs are < 5% FP, THEN perform Steps 5-6 EXAMINER NOTE: Depending on timing, operator could go to step 5 or step 7 form here (may have to come back to step 5 when < 5% FP).

The turbine should not be manually tripped if power is not < 5%.

There is also a power/timing dependent decision below at step 7.

RNO: GO TO Step 7

5. Depress turbine TRIP pushbutton
6. Verify all turbine stop valves closed
7. Verify any wide range NI > 1% FP RNO: GO TO Step 16
8. Open 1RC-4
9. Verify 1HP-5 open
10. Maximize letdown
11. Verify Main FDW available
12. Adjust Main FDW flow as necessary to control RCS temperature
13. Verify overcooling in progress RNO: GO TO Step 16
16. Secure makeup to LDST
17. WHEN all Wide Range NIs are 1% FP, AND decreasing, THEN continue
18. Control RCS temperature using the following methods:

__ Tave 555°F - Adjust SG pressure as necessary to stabilize RCS temperature using either of the following:

  • Dispatch two operators to perform Encl 5.24 (Operation of the ADVs)

__ Tave > 555°F - Utilize Rule 7 (SG Feed Control) to control SG feed rate as necessary to maintain cooldown rate within Tech Spec limits during the approach to the SG Level Control Point.

This event is complete when the SRO transfers to the Subsequent Actions tab, or as directed by the Lead Examiner.

Page 14 of 27

Appendix D Required Operator Actions Form ES-D-2 ILT43 June 10, 2013 Op-Test No.: 1 Scenario No.: 1 Event No.: 5 Page 3 of 3 Event

Description:

Main Turbine trips resulting in an ATWS (Rule 1)

Time Position Applicant's Actions or Behavior EOP UNPP Tab (continued)

SRO/OATC/

19. Throttle HPI per Rule 6 (HPI)

BOP

20. WHEN RCS pressure < 2300 psig, THEN continue
21. Verify PORV closed
22. Adjust letdown flow as desired
23. Verify RCP seal injection available
24. GO TO Subsequent Actions tab EOP Subsequent Actions tab:

4.1 Verify all control rods in Groups 1-7 fully inserted 4.2 Verify Main FDW in operation 4.3 Verify either of the following:

__ Main FDW overfeeding causing excessive temperature decrease

__ Main FDW underfeeding causing SG level decrease below setpoint RNO: GO TO Step 4.5 4.5 IAAT Main FDW is operating, AND level in any SG is > 96% on the Operating Range, THEN perform Steps 4.6 - 4.8 RNO: GO TO Step 4.9 4.9 IAAT TBVs CANNOT control SG pressure at desired setpoint, THEN manually control pressure in affected SG using either of the following:

__ TBVs

__ Dispatch two operators to perform Encl 5.24 (Operation of the ADVs) (PS) 4.10 Verify 1RIA-40 operable with CSAE OFF-GAS BLOWER operating 4.11 GO TO Step 4.14 4.14 Dispatch operator with Encl 5.29 (MSRV Locations) to verify all MSRVs have reseated 4.15 Verify ES is required RNO: 1. Initiate Encl 5.5 (Pzr and LDST Level Control) (page 18)

2. GO TO Step 4.17 This event is complete when the SRO transfers to the Subsequent Actions tab, or as directed by the Lead Examiner.

Page 15 of 27

Appendix D Required Operator Actions Form ES-D-2 ILT43 June 10, 2013 Op-Test No.: 1 Scenario No.: 1 Event No.: 6 Page 1 of 2 Event

Description:

1A Steam Generator Tube Rupture Time Position Applicant's Actions or Behavior Plant Response:

1SA-08/E-10 (N-16 RM PRIMARY TO SECONDARY TUBE LEAK) 1SA-08/D-10 (RM CSAE EXHAUST RADIATION HIGH)

Crew Response:

The SRO will transfer to the SGTR tab from SA Parallel Actions Page The SRO will declare Emergency Dose Limits in effect.

EOP SGTR tab SRO/OATC/ 1. Verify Rx tripped BOP 2. Maintain Pzr level 140 - 180 [175 - 215 acc] by initiating Encl 5.5 NOTE The remainder of this page may be given to an RO. The Procedure Director may continue.

3. Start A and B OUTSIDE AIR BOOSTER FANS (CT-27 within 30 minutes to maintain Control Room habitability)
4. Notify Unit 3 to start 3A and 3B OUTSIDE AIR BOOSTER FANS
5. Perform the following:

__ Monitor RIAs 16 and 17 to identify all SGs with a tube rupture

__ Inform SRO of results

6. Dispatch an operator to open:
7. Notify RP to survey both MS lines for radiation
8. GO TO Step 27
27. Secure any unnecessary offsite release paths (Main Vacuum Pumps, TDEFDW, Emergency Steam Air Ejector, etc.)
28. Verify Main FDW or EFDW controlling properly
29. Open 1HP-24 and 1HP-25
30. Secure makeup to LDST
31. Maintain both SG pressures < 950 psig using TBVs
32. IAAT all the following exists:

__ All SCMs > 0°F

__ ES Bypass Permit satisfied

__ RCS pressure controllable THEN perform Step 33 RNO: GO TO Step 34 This event is complete when crew reduces SCM to between 0-30 degrees with the PORV, and ES HPI has been bypassed, or as directed by the Lead Examiner.

Page 16 of 27

Appendix D Required Operator Actions Form ES-D-2 ILT43 June 10, 2013 Op-Test No.: 1 Scenario No.: 1 Event No.: 6 Page 2 of 2 Event

Description:

1A Steam Generator Tube Rupture Time Position Applicant's Actions or Behavior EOP SGTR Tab (cont):

33. Bypass HPI and LPI as applicable SRO/OATC/

BOP 34. Verify any RCP operating

35. Maintain RCP NPSH during the reduction of SCM (using the OAC and/or Enclosure 5.18)
36. Reduce and maintain core SCM at minimum using any/all of the following methods: (CT-7)

Note: To satisfy this CT, SCM will be reduced to between >0 and <30 degrees. Demonstrating control of SCM during the reduction is required to satisfy the CT.

__ De-energize all Pzr heaters

__ Use Pzr spray

__ Maintain Pzr level 140 - 180 [175 - 215 acc]

EXAMINER NOTE: The Pzr Sray valve is failed closed therefore depressurization methods should be deemed inadequate and steps to use the PORV should be utilized.

37. IAAT RCS de-pressurization methods are inadequate in minimizing core SCM, THEN perform Steps 38-40
38. Verify Pzr spray nozzle T 410°F
39. Close 1LWD-1 and 1LWD-2
40. Cycle PORV as necessary EXAMINER NOTE: The crew may stop the depressurization when ES Bypass Permit is satisfied in order to bypass ES and then continue.
41. Verify 1SA-2/C-8 (AFIS HEADER A INITIATED) lit RNO: Select OFF for both digital channels on AFIS HEADER A
42. Verify 1SA-2/D-8 (AFIS HEADER B INITIATED) lit RNO: Select OFF for both digital channels on AFIS HEADER B
43. Verify RCS temperature > 532°F
44. Initiate a cooldown as follows:

__ Decrease SG pressure to 835 - 845 psig using any of the following:

  • TBV setpoint adjusted to 710 - 720 psig
  • ADVs

__ Maximize cooldown rate limited only by the ability to maintain Pzr level > 100 [180 acc]

This event is complete when crew reduces SCM to between 0-30 degrees with the PORV, and ES HPI has been bypassed, or as directed by the Lead Examiner.

Page 17 of 27

Appendix D Required Operator Actions Form ES-D-2 ILT43 June 10, 2013 Page 1 of 8 NOTE At any time during this scenario the operator may choose to use Enclosure 5.5 to maintain RCS inventory control. See below.

ENCLOSURE 5.5 ACTION/EXPECTED RESPONSE RESPONSE NOT OBTAINED NOTE Maintaining Pzr level >100 [180 acc] will ensure Pzr heater bundles remain covered.

1. __ Utilize the following as necessary to __ IF 1HP-26 will NOT open, maintain desired Pzr level: THEN throttle 1HP-410 to maintain
  • 1A HPI Pump desired Pzr level.
2. __ IAAT makeup to the LDST is desired, THEN makeup from 1A BHUT.
3. __ IAAT it is desired to secure makeup to LDST, THEN secure makeup from 1A BHUT.
4. __ IAAT it is desired to bleed letdown flow to 1A BHUT, THEN perform the following:

A. Open:

__ 1CS-26

__ 1CS-41 B. __ Position 1HP-14 to BLEED.

C. __ Notify SRO.

5. __ IAAT letdown bleed is NO longer desired, THEN position 1HP-14 to NORMAL.

Page 18 of 27

Appendix D Required Operator Actions Form ES-D-2 ILT43 June 10, 2013 Page 2 of 8 ENCLOSURE 5.5 (cont.)

ACTION/EXPECTED RESPONSE RESPONSE NOT OBTAINED

6. __ IAAT 1C HPI PUMP is required, __ GO TO Step 10.

THEN perform Steps 7 - 9.

7. __ Open: 1. __ IF both BWST suction valves

B. __ Start 1B LPI PUMP.

C. Open:

__ 1LP-15

__ 1LP-16

__ 1LP-9

__ 1LP-10

__ 1LP-6

__ 1LP-7 D. __ IF two LPI Pumps are running only to provide HPI pump suction, THEN secure one LPI pump.

E. __ Dispatch an operator to open 1HP-363 (Letdown Line To LPI Pump Suction Block) (A-1-119, U1 LPI Hatch Rm, N end).

F. __ GO TO Step 8.

2. __ IF only one BWST suction valve (1HP-24 or 1HP-25) is open, THEN perform the following:

A. __ IF three HPI pumps are operating, THEN secure 1B HPI PUMP.

B. __ IF < 2 HPI pumps are operating, THEN start HPI pumps to obtain two HPI pump operation, preferably in opposite headers.

C. __ GO TO Step 9.

Page 19 of 27

Appendix D Required Operator Actions Form ES-D-2 ILT43 June 10, 2013 Page 3 of 8 ENCLOSURE 5.5 (cont.)

ACTION/EXPECTED RESPONSE RESPONSE NOT OBTAINED

8. __ Start 1C HPI PUMP. __ IF at least two HPI pumps are operating, THEN throttle 1HP-409 to maintain desired Pzr level.
9. Throttle the following as required to maintain 1. __ IF at least two HPI pumps are operating, desired Pzr level: AND 1HP-26 will NOT open, THEN throttle 1HP-410 to maintain

__ 1HP-26 desired Pzr level.

__ 1HP-27

2. __ IF 1A HPI PUMP and 1B HPI PUMP are operating, AND 1HP-27 will NOT open, THEN throttle 1HP-409 to maintain desired Pzr level.

Page 20 of 27

Appendix D Required Operator Actions Form ES-D-2 ILT43 June 10, 2013 Page 4 of 8 ENCLOSURE 5.5 (cont.)

ACTION/EXPECTED RESPONSE RESPONSE NOT OBTAINED

10. __ IAAT LDST level CANNOT be __ GO TO Step 12.

maintained, THEN perform Step 11.

11. __ Perform the following: 1. __ IF both BWST suction valves

A. __ Start 1A LPI PUMP.

B. __ Start 1B LPI PUMP.

C. Open:

__ 1LP-15

__ 1LP-16

__ 1LP-9

__ 1LP-10

__ 1LP-6

__ 1LP-7 D. __ IF two LPI Pumps are running only to provide HPI pump suction, THEN secure one LPI pump.

E. __ Dispatch an operator to open 1HP-363 (Letdown Line To LPI Pump Suction Block) (A-1-119, U1 LPI Hatch Rm, N end).

F. __ GO TO Step 12.

2. __ IF only one BWST suction valve (1HP-24 or 1HP-25) is open, AND three HPI pumps are operating, THEN secure 1B HPI PUMP.

Page 21 of 27

Appendix D Required Operator Actions Form ES-D-2 ILT43 June 10, 2013 Page 5 of 8 ENCLOSURE 5.5 (cont.)

ACTION/EXPECTED RESPONSE RESPONSE NOT OBTAINED

12. __ IAAT additional makeup flow to LDST is desired, AND 1A BLEED TRANSFER PUMP is operating, THEN dispatch an operator to close 1CS-48 (1A BHUT Recirc) (A-1-107, Unit 1 RC Bleed Transfer Pump Rm.).
13. __ IAAT two Letdown Filters are desired, THEN perform the following:

__ Open 1HP-17.

__ Open 1HP-18

14. __ IAAT all of the following exist: __ GO TO Step 34.

__ Letdown isolated

__ LPSW available

__ Letdown restoration desired THEN perform Steps 15 - 33. {41}

15. Open: 1. __ Notify CR SRO that letdown CANNOT be

__ 1CC-7 restored due to inability to restart the CC

__ 1CC-8 system.

2. __ GO TO Step 34.
16. __ Ensure only one CC pump running.
17. __ Place the non-running CC pump in AUTO.
18. Verify both are open: 1. __ IF 1HP-1 is closed due to 1HP-3 failing to

__ 1HP-1 close,

__ 1HP-2 THEN GO TO Step 20.

2. __ IF 1HP-2 is closed due to 1HP-4 failing to close, THEN GO TO Step 20.
19. __ GO TO Step 22.

NOTE Verification of leakage requires visual observation of East Penetration Room.

20. __ Verify letdown line leak in East __ GO TO Step 22.

Penetration Room has occurred.

21. __ GO TO Step 34.

Page 22 of 27

Appendix D Required Operator Actions Form ES-D-2 ILT43 June 10, 2013 Page 6 of 8 ENCLOSURE 5.5 (cont.)

ACTION/EXPECTED RESPONSE RESPONSE NOT OBTAINED

22. __ Monitor for unexpected conditions while restoring letdown.
23. __ Verify both letdown coolers to be placed 1. __ IF 1A letdown cooler is to be placed in in service. service, THEN open:

__1HP-1

__1HP-3

2. __ IF 1B letdown cooler is to be placed in service, THEN open:

__1HP-2

__1HP-4

3. __ GO TO Step 25.
24. Open:

__ 1HP-1

__ 1HP-2

__ 1HP-3

__ 1HP-4

25. __ Verify at least one letdown cooler is Perform the following:

aligned. A. __ Notify CR SRO of problem.

B. __ GO TO Step 34.

26. __ Close 1HP-6.
27. __ Close 1HP-7.
28. __ Verify letdown temperature < 125°F. 1. __ Open 1HP-13.
2. Close:

__1HP-8

__1HP-9&11

3. __ IF any deborating IX is in service, THEN perform the following:

A. __Select 1HP-14 to NORMAL.

B. __Close 1HP-16.

4. __ Select LETDOWN HI TEMP INTLK BYP switch to BYPASS.

Page 23 of 27

Appendix D Required Operator Actions Form ES-D-2 ILT43 June 10, 2013 Page 7 of 8 ENCLOSURE 5.5 (cont.)

ACTION/EXPECTED RESPONSE RESPONSE NOT OBTAINED

29. __ Open 1HP-5.
30. __ Adjust 1HP-7 for 20 gpm letdown.
31. __ WHEN letdown temperature is

< 125°F, THEN place LETDOWN HI TEMP INTLK BYP switch to NORMAL.

32. __ Open 1HP-6.
33. __ Adjust 1HP-7 to control desired letdown flow.

NOTE AP/32 (Loss of Letdown) provides direction to cool down the RCS to offset increasing pressurizer level.

34. __ IAAT it is determined that letdown is unavailable due to equipment failures or letdown system leakage, THEN notify CR SRO to initiate AP/32 (Loss of Letdown).
35. __ IAAT > 1 HPI pump is operating, AND additional HPI pumps are NO longer needed, THEN perform the following:

A. __ Obtain SRO concurrence to reduce running HPI pumps.

B. __ Secure the desired HPI pumps.

C. __ Place secured HPI pump switch in AUTO, if desired.

36. __ IAAT all the following conditions exist:

__ Makeup from BWST NOT required

__ LDST level > 55

__ All control rods inserted

__ Cooldown Plateau NOT being used THEN close:

__ 1HP-24

__ 1HP-25 Page 24 of 27

Appendix D Required Operator Actions Form ES-D-2 ILT43 June 10, 2013 Page 8 of 8 ENCLOSURE 5.5 (cont.)

ACTION/EXPECTED RESPONSE RESPONSE NOT OBTAINED

37. __ Verify 1CS-48 (1A BHUT Recirc) has __ GO TO Step 39.

been closed to provide additional makeup flow to LDST.

38. __ WHEN 1CS-48 (1A BHUT Recirc) is NO longer needed to provide additional makeup flow to LDST, THEN perform the following:

A. __ Stop 1A BLEED TRANSFER PUMP.

B. __ Locally position 1CS-48 (1A BHUT Recirc) one turn open (A-1-107, Unit 1 RC Bleed Transfer Pump Rm.).

C. __ Close 1CS-46.

D. __ Start 1A BLEED TRANSFER PUMP.

E. __ Locally throttle 1CS-48 (1A BHUT Recirc) to obtain 90 - 110 psig discharge pressure.

F. __ Stop 1A BLEED TRANSFER PUMP.

39. __ Verify two Letdown Filters in service, __ GO TO Step 41.

AND only one Letdown filter is desired.

40. Perform one of the following:

__ Place 1HP-17 switch to CLOSE.

__ Place 1HP-18 switch to CLOSE.

41. __ WHEN directed by CR SRO, THEN EXIT this enclosure.
  • *
  • END
  • Page 25 of 27

Appendix D Required Operator Actions Form ES-D-2 ILT43 June 10, 2013 CRITICAL TASKS

1. Shutdown the Reactor in accordance with EOP Rule 1 (CT-24) (page 13)

Ensure Reactor is shutdown by aligning Emergency Boration and tripping the CRD breakers.

2. Start A and B OUTSIDE AIR BOOSTER FANs (CT-27) (page 16). Must be started within 30 minutes of LOCA to maintain Control Room habitability.
3. Minimize SCM (CT-7) (page 17)

SCM must be being reduced to >0 to <30 degrees in a controlled evolution during SGTR mitigation to minimize primary to secondary leakage, but still above the RCP NPSH (if applicable).

Page 26 of 27

SAFETY: Take a Minute UNIT 0 (OSM)

SSF Operable: Yes KHU's Operable: U1 - OH, U2 - UG LCTs Operable: 2 Fuel Handling: No UNIT STATUS (CR SRO)

Unit 1 Simulator Other Units Mode: 1 Unit 2 Unit 3 Reactor Power: 100% Mode: 1 Mode: 1 Gross MWE: 896 100% Power 100% Power RCS Leakage: 0.137 gpm EFDW Backup: Yes EFDW Backup: Yes RBNS Rate: 0.01 gpm Technical Specifications/SLC Items (CR SRO)

Component/Train OOS Restoration Required TS/SLC #

Date/Time Date/Time AMSAC/DSS 48 hours5.555556e-4 days <br />0.0133 hours <br />7.936508e-5 weeks <br />1.8264e-5 months <br /> ago 5 days from now SLC 16.7.2 Shift Turnover Items (CR SRO)

Primary

  • AMSAC/DSS bypassed
  • Reactor Building Normal Sump Level is slowly increasing due to a small LPSW system leak.

The crew has been pumping the sump approximately twice per shift.

Secondary

  • 1MS-82 and 1MS-84 closed in support of maintenance. TDEFWP supply from AS only.

Reactivity Management (CR SRO)

RCS Boron: 6 ppmB Gp 7 Rod Position: 92%

Human Performance Emphasis (OSM)

Procedure Use and Adherence

Appendix D Scenario Outline Form ES-D-1 ILT43 June 10, 2013 Facility: Oconee Scenario No.: 2 Op-Test No.: 1 Examiners: ________________________ Operators: ________________________SRO

________________________ ________________________OATC

________________________ ________________________BOP Initial Conditions:

  • Reactor Power = 70% Stable Turnover:
  • Holding power at 70% following FDW heater repairs. Rx Engineering evaluating return to power maneuvering plan. Anticipate power increase next shift.
  • No water additions for reactivity control required this shift.
  • 1MS-82 and 1MS-84 closed in support of maintenance. TDEFWP supply from AS only.
  • 1B CFT Pressure high. In-leakage has been identified and repaired. Reduce 1B CFT pressure to below the High Pressure alarm setpoint Event Malfunction Event Event Type* Description No. No.

0a Override AFIS disabled MPI290 0b Main Turbine fails to trip Override 0c Updater Standby LPSW Pump Auto Start disabled 0d Override Manual Override of ES-1 blocked 1 Override N: BOP, SRO Vent 1B CFT to QT C, BOP, SRO 2 Override Failure of AS Controller (TS)

MPI281 3 Override C: OATC, SRO 1A2 RCP trips with failure of Tc C: BOP, SRO 4 MPS 290 1HP-5 fails closed (TS) 5 R: OATC, SRO Rapid Manual Plant Shutdown 1B2 RCP trips causing Rx trip but Main Turbine fails to 6 Override C: OATC, SRO trip requiring EHC pump lockout 1A MSLB inside RB & AFIS fails to actuate 7 MSS360 M: All

  • ES Channel 1 fails to go to Manual
  • (N)ormal, (R)eactivity, (I)nstrument, (C)omponent, (M)ajor

Appendix D Required Operator Actions Form ES-D-2 ILT43 June 10, 2013 Op-Test No.: ILT43 Scenario No.: 2 Event No.: 1 Page 1 of 2 Event

Description:

Vent 1B CFT to QT Time Position Applicant's Actions or Behavior Plant Response:

Statalarm in alarm at turnover:

  • ISA-08/A-12 (CORE FLOOD TANK "B" PRESSURE HIGH/LOW) in alarm o Alarm Setpoint High Alarm ~ 615 psig Board indications:
  • All CFT B pressure indications are ~ 617 psig Crew Response:

Refer to OP/1/A/1104/001 (Core Flooding System) to adjust pressure as necessary.

OP/1/A/1104/001 Enclosure 4.13 (Lowering 1B CFT Pressure)

Booth Cue: If asked, the High Pressure N2 Header is in service.

3.1 Verify high pressure nitrogen header in service.

SRO/BOP 3.2 RCS > 800 psig.

3.3 Verify 1B CFT 610 psig:

3.4 Review TS 3.5.1 (CFTs).

3.5 IF RB is open for entry, perform the following: N/A 3.6 Station an Operator at 1XP-R2B (1CF-6 Bkr).

Booth Cue: If asked, there is already an R&R in support of operating 1XP-R2B (1CF-6 Bkr) 3.7 Remove White Tag and close 1XP-R2B (1CF-6 Bkr).

NOTE: 1CF-6 must be throttled with a series of small bumps to switch. 1CF-6 may NOT indicate throttled as CFT pressure begins to decrease.

3.8 Throttle 1CF-6 (1B CFT VENT).

3.9 IF AT ANY TIME QT approaches 5 psig, perform the following:

3.9.1 Close 1CF-6 (1B CFT VENT).

3.9.2 Depressurize QT per OP/1/A/1104/017 (Enclosure 4.4) (see next page) 3.9.3 IF 1B CFT depressurization needs to continue, throttle 1CF-6 3.10 WHEN CFT pressure is acceptable, close 1CF-6 (1B CFT VENT) switch.

EXAMINER NOTE: After the crew discusses the need to vent the QT, they may also discuss the need to lock open 1CF-6 Bkr and re-hang white tag.

This event is complete when the initial 1B CFT venting to the Quench Tank is completed, or as directed by the Lead Examiner.

Page 2 of 38

Appendix D Required Operator Actions Form ES-D-2 ILT43 June 10, 2013 Op-Test No.: ILT43 Scenario No.: 2 Event No.: 1 Page 2 of 2 Event

Description:

Vent 1B CFT to QT Time Position Applicant's Actions or Behavior OP/1/A/1104/017 (Enclosure 4.4) Lower QT Pressure SRO/BOP 2.1 Open 1GWD-12 (QUENCH TANK VENT INSIDE RB).

NOTE:

Cycling 1GWD-13 will prevent exceeding Vent Header Pressure limit.

Do NOT exceed +2 inches Vent Header Pressure.

2.2 Cycle 1GWD-13 (QUENCH TANK VENT OUTSIDE RB) as required to lower QT pressure.

2.3 WHEN Quench Tank at desired pressure, perform the following:

  • Ensure closed 1GWD-12 (QUENCH TANK VENT INSIDE RB).
  • Ensure closed 1GWD-13 (QUENCH TANK VENT OUTSIDE RB).

This event is complete when the initial 1B CFT venting to the Quench Tank is completed, or as directed by the Lead Examiner.

Page 3 of 38

Appendix D Required Operator Actions Form ES-D-2 ILT43 June 10, 2013 Op-Test No.: 1 Scenario No.: 2 Event No.: 2 Page 1 of 2 Event

Description:

Failure of AS Controller Time Position Applicant's Actions or Behavior Plant response:

Crew response:

1SA06/C-10 ARG Booth Cue: While the crew is referring to the ARG, call Unit 1 control room to notify them (using time compression) that Unit 2 AS Controller has failed and Unit 3 cannot take control. The OSM is directing you as Unit 1 to take control of AS system pressure.

SRO/BOP 3.1 IF excessive steam flow exists, reduce AS load or locate and isolate leak.

3.2 Verify proper operation of MS/AS controller on Unit supplying Auxiliary Steam Header (U2).

3.3 IF necessary, transfer AS Header to another Unit per OP/1/A/1106/22 (Auxiliary Steam System).

OP/1/A/1106/22 (Auxiliary Steam System) Encl 4.2 (Transfer Aux Steam From Another Unit to Unit One)

Initial Conditions 1.1 Verify Unit 1 in Mode 1 or 2.

1.2 Verify all conditions of SLC 16.10.9 will be met with Unit 1 supplying the Aux Steam Header. {15}

NOTE: If ICS is in Manual, supplying Aux Steam Header from MS has the potential to affect core reactivity by changing RCS temperature.

1.3 Verify Unit 1 ICS in "AUTO". (R.M.)

1.4 Verify Unit 1 has 100 EFPD Core burnup. {12}

1.5 Notify Secondary chemist that the AS header will be transferred Person Notified Date 1.6 Review Limits and Precautions.

This event is complete when the Unit 1 AS controller is in AUTO and Tech Spec determination has been made or when directed by the lead examiner.

Page 4 of 38

Appendix D Required Operator Actions Form ES-D-2 ILT43 June 10, 2013 Op-Test No.: 1 Scenario No.: 2 Event No.: 2 Page 2 of 2 Event

Description:

Failure of AS Controller Time Position Applicant's Actions or Behavior OP/1/A/1106/22 (Auxiliary Steam System) Encl 4.2 (Transfer Aux Steam From Another Unit to Unit One) (continued)

Procedure SRO/BOP 2.1 Notify Unit 2 to reduce setpoint on AS controller. (no actions required since pressure is below setpoint due to the failure).

2.2 Ensure 1MS-126 & 1MS-129 (MAIN STM TO SU STM PRESS) controller in MANUAL.

2.3 Ensure closed 1MS-126 & 1MS-129 (MAIN STM TO SU STM PRESS).

2.4 Verify Unit 2 has reduced setpoint on AS controller. (no actions required since pressure is below setpoint due to the failure) 2.5 Perform one of the following: Open 1MS-24 (or Open 1MS-33 )

2.6 Manually throttle open 1MS-126 & 1MS-129 (MAIN STM TO SU STM PRESS) to increase Aux Steam Header pressure.

2.7 Continue to throttle 1MS-126 & 1MS-129 (MAIN STM TO SU STM PRESS) to increase Aux Steam Header pressure to 300 psig.

2.8 WHEN Aux Steam Header is 300 psig:

2.8.2 Adjust 1MS-126 & 1MS-129 (MAIN STM TO SU STM PRESS) controller setpoint to match Aux Steam Header pressure.

Place 1MS-126 & 1MS-129 (MAIN STM TO SU STM PRESS) controller to AUTO.

2.9 Notify Unit 2 to secure AS supply.

2.10 IF Aux Steam will remain being supplied from Unit 1, align Condensate Returns to Unit 1 per OP/0/A/1104/37 (Plant Heating).

NOTE to Examiner: Since AS pressure is set to go to < 250 psig, the below TS applies.

SRO The SRO should refer to TS:

72 hours8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br /> AND 10 days from discovery of failure to meet LCO.

This event is complete when the Unit 1 AS controller is in AUTO and Tech Spec determination has been made or when directed by the lead examiner.

Page 5 of 38

Appendix D Required Operator Actions Form ES-D-2 ILT43 June 10, 2013 Op-Test No.: ILT43 Scenario No.: 2 Event No.: 3 Page 1 of 2 Event

Description:

1A2 RCP trips with failure of Tc Time Position Applicant's Actions or Behavior Plant Response:

  • The following alarms actuate due to the RCP trip:
  • FDW flow will begin to re-ratio but the delta Tc failure will not allow correct re-ratio
  • Actual TC to increase (become more negative).
  • NIs will begin to slowly diverge until Tcs are restored to normal.
  • Tech Specs: Failure to adjust FDW flow will result in QPT alarm (1SA-4/C1) approximately 4 minutes following the failure. This will eventually result in entry into TS 3.2.3 if incore tilt exceeds allowable value. It may also result in PZR level > 260 which is entry into TS 3.4.9.

Crew Response:

OATC/BOP

  • Crew should perform Plant Transient Response (PTR)
  • Diagnose the TC failure by observing the TC meter on 1UB1. It should return to zero but is staying at + 3.5 degrees.
  • Take the Diamond and Feedwater Masters to MANUAL and re-ratio feedwater using the Loop TC meters and/or OAC to return actual TC to near zero.

SRO will refer to AP/28 (ICS Instrument Failures)

SRO/OATC/

4.1 Provide control bands as required (per OMP 1-18 Attach I)

BOP 4.2 Initiate notification of the following:

__ OSM to reference OMP 1-14 and Emergency Plan

__ STA 4.3 Verify a power transient 5% has occurred 4.4 Notify Rx Engineering and discuss the need for a maneuvering plan 4.5 Determine the applicable section from table in Step 4.6 4.6 GO TO the applicable section per the following table:

Section Failure 4F Delta TC This event is complete when the SRO reaches the WHEN step (4) in Section 4F, or as directed by the Lead Evaluator.

Page 6 of 38

Appendix D Required Operator Actions Form ES-D-2 ILT43 June 10, 2013 Op-Test No.: ILT43 Scenario No.: 2 Event No.: 3 Page 2 of 2 Event

Description:

1A2 RCP trips with failure of Tc Time Position Applicant's Actions or Behavior AP/28 Section 4F NOTE

  • This section applies to Delta TC controller failures. TC input signal failures are addressed in Section 4A The following may occur when an ICS Delta TC controller fails:
  • Delta TC controller may re-ratio loop FDW flows
  • Possible ICS RUNBACK
1. Ensure the following in HAND:

SRO/OATC

__ 1A and 1B FDW MASTERS

__ DELTA TC CAUTION:

Total feedwater flow should be maintained constant while individual loop flows are adjusted to establish the desired Tc. Maintaining total FDW flow constant will prevent unwanted changes in reactor power.

2. Re-ratio feedwater flow, as required, to establish desired DELTA TC while maintaining total feedwater flow constant
3. Notify SPOC to perform the following:

__ Investigate and repair the failed Delta TC controller BOOTH CUE: When notified to investigate and repair the failed TC controller, respond as SPOC and state that the TC controller will be repaired as soon as possible.

4. WHEN notified by SPOC that DELTA TC controller has been repaired, THEN GO TO OP/1/A/1102/004 A Encl (Placing ICS Stations To Auto)

EXAMINER NOTE: ICS will remain in manual for the remainder of the scenario.

This event is complete when the SRO reaches the WHEN step (4) in Section 4F, or as directed by the Lead Evaluator.

Page 7 of 38

Appendix D Required Operator Actions Form ES-D-2 ILT43 June 10, 2013 Op-Test No.: ILT43 Scenario No.: 2 Event No.: 4 Page 1 of 3 Event

Description:

1HP-5 fails closed Time Position Applicant's Actions or Behavior Plant Response:

  • 1HP-5 green closed light is lit
  • Pzr Level slowly increases
  • LDST Level slowly decreases Crew Response:

SRO should enter AP/1/A/1700/032 (Loss of Letdown)

NOTE This AP may be performed by an RO if the EOP is also in progress. The Procedure Director should resume directing the actions of this AP as soon as EOP actions allow.

SRO/BOP 4.1 Place 1HP-120 in HAND and reduce demand to zero.

4.2 Position the standby HPI pump switch to OFF.

CAUTION RCP individual seal return valves will close if seal injection is < 22 gpm with CC flow < 575 gpm.

Note: Statalarm 1SA-2/B-2 (RCP SEAL INLET HEADER FLOW HIGH/LOW) will actuate once seal inlet header flow is decreased to < 22 gpm) 4.3 Throttle 1HP-31, preferably in AUTO, to establish 12 - 15 gpm SEAL INLET HDR FLOW.

NOTE The running HPI pump may operate below 65 gpm for up to 4 hours4.62963e-5 days <br />0.00111 hours <br />6.613757e-6 weeks <br />1.522e-6 months <br />. HPI pump time of operation below minimum flow is cumulative.

4.4 Verify HPI pump flow 65 gpm. (30 gpm Recirc + ___ SI +___ MU)

RNO: Log beginning time for HPI pump flow below minimum 4.5 Initiate makeup to LDST as required (Encl.5.5 or OP/1/A/1103/004).

4.6 Initiate notification of the following:

__ OSM to reference the following:

  • OMP 1-14 (Notifications)

__ STA 4.7 Verify 1HP-5 closed 4.8 Dispatch an operator to 1HP-5 (LETDOWN ISOLATION)(East Pen Rm) to establish communication with Control Room.

This event is complete when the Standby HPI pump is placed in AUTO, or as directed by the Lead Examiner.

Page 8 of 38

Appendix D Required Operator Actions Form ES-D-2 ILT43 June 10, 2013 Op-Test No.: ILT43 Scenario No.: 2 Event No.: 4 Page 2 of 3 Event

Description:

1HP-5 fails closed Time Position Applicant's Actions or Behavior AP/1/A/1700/032 (continued)

SRO/ BOP NOTE:

Tech Spec 3.4.9 applies when indicated Pzr level > 260 (

285).

Conditions where it is known that letdown CANNOT be restored do not require waiting until 260 to be gin a Ra pid S hutdown.

4.9 IAAT either of the following exists:

__ Pzr level 260, AND letdown CANNOT be established

__ Plant conditions exist such that letdown will NOT be restored THEN initiate unit shutdown per AP/29 (Rapid Unit Shutdown).

4.10 IAAT Pzr level 375, THEN trip Rx.

4.11 Determine the cause of loss of letdown AND GO TO Step 4.12 for 1HP-5 failed closed.

4.12 Close 1HP-6.

4.13 Close 1HP-7.

4.14 Open 1HP-5 (will NOT open)

RNO: 1. Notify operator dispatched to 1HP-5 to:

A. Manually open 1HP-5 (LETDOWN ISOLATION) (East Pen Rm).

B. Maintain continuous communication with Control Room.

Booth cue: When called, use TIME COMPRESSION and manually open 1HP-5.

2. IF 1HP-5 is manually open, THEN enter TS 3.6.3.
3. IF 1HP-5 CANNOT be manually opened, THEN GO TO Step 4.28.

4.15 Place CC system in operation EXAMINER NOTE: If letdown temp is still <135°F, skip RNO and go directly to step 4.17 4.16 Verify letdown temperature < 135°F.

RNO: 1. Open 1HP-13.

2. Close the following:
  • 1HP-9&11 This event is complete when the Standby HPI pump is placed in AUTO, or as directed by the Lead Examiner.

Page 9 of 38

Appendix D Required Operator Actions Form ES-D-2 ILT43 June 10, 2013 Op-Test No.: ILT43 Scenario No.: 2 Event No.: 4 Page 3 of 3 Event

Description:

1HP-5 fails closed Time Position Applicant's Actions or Behavior AP/1/A/1700/032 step 4.16 RNO (continued)

SRO/ BOP 3. IF any deborating IX in service(no deborating IX is in service)

Note: Statalarm 1SA-2/E-4 (HP LETDOWN FLOW INTERLOCK BYPASSED) will actuate once the LETDOWN HI TEMP INTLK BYP switch is placed in BYPASS.

4. Select LETDOWN HI TEMP INTLK BYP switch to BYPASS 4.17 Throttle open 1HP-7 to establish 20 gpm.

4.18 WHEN letdown temperature < 130°F, THEN place LETDOWN HI TEMP INTLK BYP switch in NORMAL 4.19 Open 1HP-6 4.20 Adjust 1HP-7 to control desired letdown flow ( 78 gpm) 4.21 Re-establish normal makeup through 1HP-120.

4.22 Verify any purification IX in service (should be in service, if not = RNO)

RNO: IF purification IX operation is desired, THEN initiate OP/1/A/1103/004 B (Purification IXs) to establish desired IX operation 4.23 Notify SPOC to initiate repairs on 1HP-5 4.24 Re-establish normal RCP seal injection flow ( 32 gpm) 4.25 Position the standby HPI pump switch to AUTO 4.26 WHEN repairs complete on 1HP-5, THEN perform the following:

A. Locally turn 1HP-5 handwheel fully clockwise B. EXIT TS 3.6.3 4.27 EXIT Note: 1HP-5 will not be repaired for this scenario.

Note: If pressurizer level exceeds 260 inches, TS 3.4.9 Condition A should be entered requiring level be restored within 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br /> The SRO enters TS 3.6.3 Condition A due to one or more penetration flow paths with one containment isolation valve inoperable

  • Required Action is to isolate the affected penetration flow path by use of at least one closed and de-activated automatic valve, one closed and de-activated non-automatic power operated valve, closed manual valve, blind flange, or check valve with flow through the valve secured within 4 hours4.62963e-5 days <br />0.00111 hours <br />6.613757e-6 weeks <br />1.522e-6 months <br /> AND verify the affected penetration flow path is isolated once per 31 days for isolation devices outside containment.

This event is complete when the Standby HPI pump is placed in AUTO, or as directed by the Lead Examiner.

Page 10 of 38

Appendix D Required Operator Actions Form ES-D-2 ILT43 June 10, 2013 Op-Test No.: ILT43 Scenario No.: 2 Event No.: 5 Page 1 of 4 Event

Description:

Rapid Manual Plant Shutdown Time Position Applicant's Actions or Behavior EXAMINER/BOOTH CUE: The booth will call the Control Room as the OSM and inform them that a vehicle has impacted the 1A Main Steam Line concrete supports. There are visible signs of damage to the concrete. The OSM will instruct the crew to perfrom a Rapid Unit Shutdown.

The SRO will initiate AP/29 (Rapid Unit Shutdown) to direct power reduction SRO/BOP AP/29 4.1 Initiate Encl 5.1 (Support Actions During Rapid Unit Shutdown) (Details on page 13) 4.2 Announce AP entry using the PA system.

4.3 IAAT both of the following apply:

__ It is desired to stop power decrease.

__ CTP > 18%

THEN perform Steps 4.4 - 4.7 (Does NOT apply now)

RNO: GO TO Step 4.8 SRO/OATC 4.8 Verify ICS in AUTO (It is NOT in Auto)

RNO: 1. Initiate manual power reduction to desired power level.

Examiner Note: OATC reduces power by first reducing feedwater and then inserting control rods as necessary.

2. GO TO Step 4.10 4.10 Verify both Main FDW pumps running.

NOTE

  • 1B Main FDW Pump is the preferred pump to be shutdown first.
  • To lower 1B Main FDW Pump suction flow, bias is adjusted counter-clockwise.
  • To lower 1A Main FDW Pump suction flow, bias is adjusted clockwise.

SRO/BOP 4.11 Adjust bias for first Main FDW pump desired to be shutdown (1B) until its suction flow is 1 X 106 lbm/hr less than remaining Main FDW pump suction flow.

This event is complete once a 10% power decrease has occured and Unit Auxiliaries have been transferred IAW Encl. 5.1 of AP/29 or as directed by the lead examiner.

Page 11 of 38

Appendix D Required Operator Actions Form ES-D-2 ILT43 June 10, 2013 Op-Test No.: ILT43 Scenario No.: 2 Event No.: 5 Page 2 of 4 Event

Description:

Rapid Manual Plant Shutdown Time Position Applicant's Actions or Behavior AP/29 (continued)

SRO/OATC 4.12 WHEN core thermal power is < 65% FP, THEN continue.

4.13 IAAT both Main FDW pumps running, AND both of the following exist:

__ 1B Main FDW Pump is first pump to be shut down.

__ Any of the following alarms occur:

  • FWP B FLOW MINIMUM (1SA-16/A-3)
  • FWP B FLOW BELOW MIN (1SA-16/A-4)

THEN trip 1B Main FDW Pump.

4.14 IAAT both Main FDW pumps running, AND both of the following exists:

BOP

__ 1A Main FDW pump is the first pump to be shut down

__ Any of the following alarms occur:

  • FWP A FLOW MINIMUM (1SA-16/A-1)
  • FWP A FLOW BELOW MIN (1SA-16/A-2)

THEN trip 1A Main FDW Pump (Does not Apply) 4.15 Verify Turbine-Generator shutdown is required.

4.16 Start the TURBINE TURNING GEAR OIL PUMP.

4.17 Start 1A through 1E TURBINE BRNG OIL LIFT PUMPS.

4.18 Start the TURBINE MOTOR SUCTION PUMP.

4.19 IAAT both of the following apply:

ICS in automatic NI power is 18%

THEN deselect MAXIMUM RUNBACK.

This event is complete once a 10% power decrease has occured and Unit Auxiliaries have been transferred IAW Encl. 5.1 of AP/29 or as directed by the lead examiner.

Page 12 of 38

Appendix D Required Operator Actions Form ES-D-2 ILT43 June 10, 2013 Op-Test No.: ILT43 Scenario No.: 2 Event No.: 5 Page 3 of 4 Event

Description:

Rapid Manual Plant Shutdown Time Position Applicant's Actions or Behavior AP/29 Encl. 5.1 BOP 1. Notify WCC SRO to initiate Encl 5.2 (WCC SRO Support During Rapid Unit Shutdown).

2. Start the following pumps:
  • 1A FDWP SEAL INJECTION PUMP
  • 1A FDWP AUXILIARY OIL PUMP
  • 1B FDWP AUXILIARY OIL PUMP
  • 1B FDWP SEAL INJECTION PUMP
3. WHEN CTP is 80%, THEN continue.
4. Stop 1E1 HTR DRN PUMP.
5. Place 1HD-254 switch to OPEN.
6. Stop 1E2 HTR DRN PUMP.
7. Place 1HD-276 switch to OPEN.
8. Verify Turbine-Generator shutdown is required. (It is)
9. Place the following transfer switches to MAN:
  • 1TA AUTO/MAN
  • 1TB AUTO/MAN
10. Close 1TA SU 6.9 KV FDR.
11. Verify 1TA NORMAL 6.9 KV FDR opens.
12. Close 1TB SU 6.9 KV FDR.
13. Verify 1TB NORMAL 6.9 KV FDR opens.
14. Place the following transfer switches to MAN:
  • MFB1 AUTO/MAN
  • MFB2 AUTO/MAN
15. __ Close E11 MFB1 STARTUP FDR.
16. __ Verify N11 MFB1 NORMAL FDR opens.
17. __ Close E21 MFB2 STARTUP FDR.
18. __ Verify N21 MFB2 NORMAL FDR opens.
19. __ Notify CR SRO that Unit auxiliaries have been transferred.

This event is complete once a 10% power decrease has occured and Unit Auxiliaries have been transferred IAW Encl. 5.1 of AP/29 or as directed by the lead examiner.

Page 13 of 38

Appendix D Required Operator Actions Form ES-D-2 ILT43 June 10, 2013 Op-Test No.: ILT43 Scenario No.: 2 Event No.: 5 Page 4 of 4 Event

Description:

Rapid Manual Plant Shutdown Time Position Applicant's Actions or Behavior AP/29 Encl. 5.1 (cont.)

BOP 20. IAAT 1SSH-9 is NOT closed, AND CTP is 75%,

THEN throttle 1SSH-9 to maintain Steam Seal Header pressure 2.5 -

4.5 psig.

21. WHEN CTP 65%,

THEN place the following in MANUAL and close:

__ 1FDW-53

__ 1FDW-65 Examiner Note: If possible, proceeding to next event prior to going below 45% power should ensure ES 1-6 actuation following the MSLB.

This event is complete once a 10% power decrease has occured and Unit Auxiliaries have been transferred IAW Encl. 5.1 of AP/29 or as directed by the lead examiner.

Page 14 of 38

Appendix D Required Operator Actions Form ES-D-2 ILT43 June 10, 2013 Op-Test No.: ILT43 Scenario No.: 2 Event No.: 6 Page 1 of 1 Event

Description:

1B2 RCP trips causing Rx trip but Main Turbine fails to trip requiring EHC pump lockout.

Time Position Applicant's Actions or Behavior Plant response:

  • The Reactor will trip due to 1A2 & 1B2 RCPs tripped.
  • The Main Turbine should trip but does not. This will result in a reduction of steam pressure in both SGs until actions are taken to trip the turbine.

Crew response:

SRO

OATC

  • OATC will perform Immediate Manual Actions

3.2 Verify reactor power < 5% FP and decreasing.

3.3 Depress turbine TRIP pushbutton.

  • Note: The OATC should diagnose that the turbine did not trip and then perform the RNO step which will stop and lock out both EHC pumps. This will cause the turbine to trip 3.4 Verify all turbine stop valves closed.*

RNO: Place both EHC pumps in PULL TO LOCK.

3.5 Verify RCP seal injection available.

Examiner Note: The MSLB that follows will automatically activate as the MSSVs close.

Examiner/Booth Cue: IF OATC completes IMAs without successfully tripping the Main Turbine, wait approximately 30 seconds and initiate the MSLB.

Event is complete when EHC pumps have been placed in Pull to Lock or when directed by the Lead Examiner.

Page 15 of 38

Appendix D Required Operator Actions Form ES-D-2 ILT43 June 10, 2013 Op-Test No.: ILT43 Scenario No.: 2 Event No.: 7 Page 1 of 12 Event

Description:

1A MSLB inside RB & AFIS fails to actuate Time Position Applicant's Actions or Behavior Plant response:

  • 1SA-1/A-1, B-1, C-1, D-1, RP Channel Trip
  • 1SA-2/D-3, RC Press High/Low
  • Statalarm 1SA-02/A-9 (MS PRESS HIGH/LOW)
  • AFIS will fail to actuate Crew response:

SRO will enter the EOP by directing the OATC to perform Immediate Manual Actions (or IMAs).

SRO OATC will perform Immediate Manual Actions OATC Depress REACTOR TRIP pushbutton Verify reactor power < 5% FP and decreasing Depress turbine TRIP pushbutton.

Verify all turbine stop valves closed Verify RCP seal injection available BOP will perform a Symptoms Check (per OMP 1-18 Attachment C) and determine that a MSLB has occured in the 1A Steam Generator BOP BOP performs Rule #5 (Main Steam Line Break) after receiving concurrence from the SRO (detail begin on next page)

BOP will perform Rule 3 (page 19) as directed by Rule 5 and Enclosure 5.9 (page 20) as directed by Rule 3.

SRO refers to Parallel Actions page of the Subsequent Actions Tab and transfers to the Excessive Heat Transfer Tab SRO will initiate EOP Enclosure 5.1 (ES Actuation) (details begin on page 21)

The SRO will direct Excessive Heat Transfer Tab actions (see page 24)

The SRO will direct an RO to make a PA announcement and notify the OSM to reference the Emergency Plan and NSD-202 This event is complete when the SRO reaches step 42 of the EHT Tab, or as directed by the Lead Examiner.

Page 16 of 38

Appendix D Required Operator Actions Form ES-D-2 ILT43 June 10, 2013 Op-Test No.: ILT43 Scenario No.: 2 Event No.: 7 Page 2 of 12 Event

Description:

1A MSLB inside RB & AFIS fails to actuate Time Position Applicant's Actions or Behavior EOP Rule 5 OATC/BOP 1. Perform the following on affected headers:

  • Initiate AFIS 1A SG Digital Channels 1 and 2
  • Select OFF for 1A MDEFDW Pump (CT-17)

Note: Overcooling must be stopped prior to violating NDT limits.

Note: The critical task is to stop feeding the affected SG which occurs when AFIS is manually initiated

  • Trip both Main FDW pumps
2. Verify 1 TD EFDW PUMP operating.

RNO: IF MD EFDWP for the intact SG is operating, THEN GO TO Step 5.

5. Verify 1B SG is an affected SG.

RNO: GO TO Step 7

7. WHEN overcooling is stopped, THEN adjust steaming of unaffected SG to maintain CETCs constant using either:
  • Dispatch two operators to perform Encl 5.24 (Operation of ADVs)

CAUTION Thermal shock conditions may develop if HPI is NOT throttled and RCS pressure NOT controlled.

8. WHEN all exist:

__ Core SCM >0° F

__ Rx Pwr 1%

__ Pzr Level increasing, THEN continue

9. Verify ES HPI actuated
10. Place Diverse HPI in BYPASS This event is complete when the SRO reaches step 42 of the EHT Tab, or as directed by the Lead Examiner.

Page 17 of 38

Appendix D Required Operator Actions Form ES-D-2 ILT43 June 10, 2013 Op-Test No.: ILT43 Scenario No.: 2 Event No.: 7 Page 3 of 12 Event

Description:

1A MSLB inside RB & AFIS fails to actuate Time Position Applicant's Actions or Behavior EOP Rule 5 (continued)

Examiner Note: The ODD voter will be placed to OVERRIDE and will be done here or in Enclosure 5.1 (whichever comes first).

11. Place ES CH 1 and ES CH 2 in MANUAL OATC/BOP RNO: 1. IF ES CH 1 fails to go to MANUAL, THEN place ODD voter in OVERRIDE.
2. IF ES CH 2 fails to go to MANUAL, THEN place EVEN voter in OVERRIDE.
12. Perform the following to stabilize RCS P/T:
  • Reduce 1HP-120 setpoint to > 100 (180 ACC)
  • Adjust steaming of unaffected SG (1B SG) to maintain CETCs constant
13. WHEN CETCs have stabilized, THEN resume use of TC for RCS temperature control
14. Ensure Rule 3 (Loss of Main or Emergency FDW) is in progress or complete (see next page)

Examiner Note: Conditions should not meet either of the entry conditions from Rule 8 below, so no actions are taken in Rule 8.

NOTE This rule is invoked under either of the following conditions:

  • A cooldown below 400°F Tc at > 100 °F/hr has occurred.
  • HPI has injected through an open or throttled open 1HP-26, 27, 409, 410 with all RCPs OFF.
15. Ensure Rule 8 (Pressurized Thermal Shock (PTS)) is in progress or complete
16. WHEN directed by CR SRO, THEN EXIT this rule This event is complete when the SRO reaches step 42 of the EHT Tab, or as directed by the Lead Examiner.

Page 18 of 38

Appendix D Required Operator Actions Form ES-D-2 ILT43 June 10, 2013 Op-Test No.: ILT43 Scenario No.: 2 Event No.: 7 Page 4 of 12 Event

Description:

1A MSLB inside RB & AFIS fails to actuate Time Position Applicant's Actions or Behavior Crew Response:

OATC/BOP EOP Rule 3

1. Verify loss of Main FDW/EFDW is due to Turbine Building Flooding RNO: GO TO Step 3
3. IAAT NO SGs can be fed with FDW (Main/CBP/Emergency),

AND any of the following exist:

  • RCS pressure reaches 2300 psig OR NDT limit
  • Pzr level reaches 375 [340 acc]

THEN PERFORM Rule 4 (Initiation of HPI Forced Cooling)

4. Start operable EFDW pumps, as required, to feed all intact SGs
5. Verify any EFDW pump operating.
6. GO TO Step 37
37. IAAT an EFDW valve CANNOT control in AUTO OR manual operation if EFDW valve is desired to control flow/level, THEN perform Steps 38-42 RNO: GO TO step 43
38. Place EFDW valve in MANUAL.
39. Control EFDW flow with EFDW valve in MANUAL
40. GO TO Step 43
43. Verify any SCM 0°F RNO: IF overcooling or exceeding limits in Rule 7, THEN throttle EFDW as necessary.
44. IAAT Unit 1 EFDW is in operation, THEN initiate Encl 5.9 (Extended EFDW Operation) (see next page)
45. WHEN directed by CR SRO, THEN EXIT this rule This event is complete when the SRO reaches step 42 of the EHT Tab, or as directed by the Lead Examiner.

Page 19 of 38

Appendix D Required Operator Actions Form ES-D-2 ILT43 June 10, 2013 Op-Test No.: ILT43 Scenario No.: 2 Event No.: 7 Page 5 of 12 Event

Description:

1A MSLB inside RB & AFIS fails to actuate Time Position Applicant's Actions or Behavior Crew Response:

OATC/BOP EOP Enclosure 5.9 (Extended EFDW Operation)

1. Monitor EFDW parameters on EFW graphic display
2. IAAT UST level is < 4, THEN GO TO Step 117
3. IAAT feeding both SGs with one MD EFDWP is desired, THEN perform Steps 4-7 RNO: GO TO Step 8
8. Perform the following as required to maintain UST level > 7.5

__ Makeup with demin water

__ Place CST pumps in AUTO

9. IAAT all the following exist:

__ Rapid cooldown NOT in progress

__ MD EFDWP operating for each available SG

__ EFDW flow in each header < 600 gpm THEN place 1 TD EFDW PUMP switch in PULL TO LOCK 10 Verify 1 TD EFDW PUMP operating RNO: GO TO Step 12 NOTE

  • Loss of the condensate system for 25 minutes results in cooling down to LPI using the ADVs. If NO HWPs are operating, continuing this enclosure to restore the condensate system is a priority unless the CR SRO deems EOP activities higher priority. The 25 minute criterion is satisfied when a HWP is started and 1C-10 is 10% open.
  • If the condensate system is operating, the remaining guidance establishes FDW recirc, monitors and maintains UST, and transfers EFDW suction to the hotwell if required.
12. Notify CR SRO to set priority based on the NOTE above and EOP activities Note: The SRO should determine that restoring the secondary side of the plant is not a priority at this time and direct the RO to continue in Rule 3.

This event is complete when the SRO reaches step 42 of the EHT Tab, or as directed by the Lead Examiner.

Page 20 of 38

Appendix D Required Operator Actions Form ES-D-2 ILT43 June 10, 2013 Op-Test No.: ILT43 Scenario No.: 2 Event No.: 7 Page 6 of 12 Event

Description:

1A MSLB inside RB & AFIS fails to actuate Time Position Applicant's Actions or Behavior Crew Response:

EOP Enclosure 5.1 (ES Actuation)

OATC/BOP

1. Determine all ES channels that should have actuated based on RCS pressure and RB pressure.
  • RB 3 psig: Channels 1, 2, 3, 4, 5 & 6
  • RB 10 psig: Channels 7 & 8
2. Verify all expected ES digital channels have actuated.
3. IAAT additional ES actuation setpoints are exceeded, THEN perform Steps 1-2.
4. Place Diverse HPI in BYPASS Examiner Note: The ODD voter will be placed to OVERRIDE and will be done here or in Rule 5 (whichever comes first).
5. Place ES CH 1 and ES CH 2 in MANUAL RNO: 1. IF ES CH 1 fails to go to MANUAL, THEN place ODD voter in OVERRIDE.
2. IF ES CH 2 fails to go to MANUAL, THEN place EVEN voter in OVERRIDE.
6. Verify Rule 2 in progress or complete.

RNO: GO TO Step 73

73. Open 1HP-24 and 1HP-25
74. Ensure at least two HPI pumps are operating
75. Verify 1HP-26 and 1HP-27 are open
76. IAAT at least two HPI pumps are operating, AND HPI flow in any header that has NOT been intentionally throttled is in the Unacceptable Region of Figure 1, THEN open the following in the affected header:

1A Header 1B Header 1HP 410 1HP-409

77. Verify any RCP operating
78. Open 1HP-20 and 1HP-21
79. IAAT all exist:

__ Voter associated with ES channel is in OVERRIDE

__ An ES channel is manually actuated

__ Components on that channel required manipulation THEN depress RESET on the required channel This event is complete when the SRO reaches step 42 of the EHT Tab, or as directed by the Lead Examiner.

Page 21 of 38

Appendix D Required Operator Actions Form ES-D-2 ILT43 June 10, 2013 Op-Test No.: ILT43 Scenario No.: 2 Event No.: 7 Page 7 of 12 Event

Description:

1A MSLB inside RB & AFIS fails to actuate Time Position Applicant's Actions or Behavior OATC/BOP EOP Enclosure 5.1 (ES Actuation) (continued)

EXAMINER NOTE: ES-3 through ES-6 may not actuate, depending on how quickly AFIS is actuated in Rule 5

80. IAAT any RCP is operating, AND ES Channels 5 and 6 actuate, THEN perform Steps 81-84
81. Place ES CH 5 and ES CH 6 in MANUAL
82. Open:

__ 1CC-7

__ 1CC-8

__ 1LPSW-15

__ 1LPSW-6

83. Ensure only one CC pump operating
84. Ensure Standby CC pump in AUTO
85. IAAT ES Channels 3 & 4 are actuated, THEN GO TO Step 86
86. Place Diverse LPI in BYPASS
87. Place ES CH 3 and ES CH 4 in MANUAL CAUTION LPI pump damage may occur if operated in excess of 30 minutes against shutoff head
88. IAAT any LPI pump is operating against shutoff head, THEN at the CR SROs discretion, stop affected LPI pumps
89. IAAT RCS pressure is < LPI pump shutoff head, THEN perform Steps 90-91 RNO: GO TO Step 92
92. IAAT 1A and 1B LPI PUMPs are off/tripped, AND all of the following exists..

RNO: GO TO Step 95

95. IAAT 1A LPI PUMP fails while operating, AND 1B LPI PUMP is operating, THEN close 1LP-17
99. IAAT 1B LPI PUMP fails while operating, AND 1A LPI PUMP is operating, THEN close 1LP-18
97. Start A and B OUTSIDE AIR BOOSTER FANS
98. Notify Unit 3 to start 3A and 3B OUTSIDE AIR BOOSTER FANS This event is complete when the SRO reaches step 42 of the EHT Tab, or as directed by the Lead Examiner.

Page 22 of 38

Appendix D Required Operator Actions Form ES-D-2 ILT43 June 10, 2013 Op-Test No.: ILT43 Scenario No.: 2 Event No.: 7 Page 8 of 12 Event

Description:

1A MSLB inside RB & AFIS fails to actuate Time Position Applicant's Actions or Behavior OATC/BOP EOP Enclosure 5.1 (ES Actuation) (continued)

99. Verify 1CF-1 and 1CF-2 are open 100. Verify 1HP-410 closed 101. Secure makeup to the LDST 102. Verify all ES channel 1-4 components are in the ES position 103. Verify Unit 2 turbine tripped RNO: GO TO Step 106 106. Close 1LPSW-139 107. Place 1LPSW-251 and 1LPSW-252 FAIL SWITCH in FAIL OPEN 108. Start all available LPSW pumps 109. Verify either:

__ Three LPSW pumps operating

__ Two LPSW pumps operating when TS only requires two operable RNO: GO TO step 111 110. Open 1LPSW-4 and 1LPSW-5 111. IAAT BWST level 19, THEN initiate Encl 5.12 (ECCS Suction Swap to RBES) 112. Dispatch an operator to perform Encl 5.2 (Placing RB Hydrogen Analyzers In Service) (PS) 113. Select DECAY HEAT LOW FLOW ALARM SELECT switch to ON 114. IAAT ES channels 5 & 6 have actuated, THEN perform Step 115 115. Verify all ES channel 5 & 6 components in the ES position RNO: Notify SRO to evaluate components NOT in ES position and initiate action to place in ES position if desired 116. IAAT ES channels 7 & 8 have actuated, THEN perform Step 117 -

118.

RNO: GO TO Step 119 119. Notify U2 CR SRO that SSF is inoperable due to OTS1-1 open.

120. Ensure any turnover sheet compensatory measures for ES actuation are complete as necessary.

121. IAAT conditions causing ES actuation have cleared, THEN initiate Encl 5.41 (ES Recovery) 122. WHEN CR SRO approves, THEN EXIT this enclosure This event is complete when the SRO reaches step 42 of the EHT Tab, or as directed by the Lead Examiner.

Page 23 of 38

Appendix D Required Operator Actions Form ES-D-2 ILT43 June 10, 2013 Op-Test No.: ILT43 Scenario No.: 2 Event No.: 7 Page 9 of 12 Event

Description:

1A MSLB inside RB & AFIS fails to actuate Time Position Applicant's Actions or Behavior Crew Response:

SRO EOP Excessive Heat Transfer Tab (EHT)

Examiner Note: See page 27 for Parallel Actions page actions.

1. Verify any SG pressure < 550 psig
2. Ensure Rule 5 (Main Steam Line Break) in progress or complete
3. Place the following in HAND and decrease demand to zero on all affected SGs:
4. Close the following on all affected SGs:
5. Verify level in both SGs < 96% O.R.
6. IAAT core SCM is > 0°F, THEN perform Steps 7 and 8
7. Throttle HPI per Rule 6 (HPI) (CT-5)

Note: HPI flow must be throttled and RCS temperature controlled to prevent a solid Pzr and subsequent operation of the PORV.

8. Verify letdown in service RNO: IF desired to restore letdown, THEN initiate Encl 5.5 (Pzr and LDST Level Control) (see page 28)
9. Verify any SG has an intact secondary boundary (intact SG is B)
10. Open the following on all intact SGs
11. Start MDEFDWP associated with all intact SGs
  • 1B MD EFDWP (already running)
12. Feed and steam all intact SGs to stabilize RCS P/T using either of the following:
  • Dispatch two operators to perform Encl 5.24 (Operation of the ADVs
13. GO TO Step 32
32. Verify any of the following:

__ HPI has operated in the injection mode while NO RCPs were operating

__ A cooldown below 400°F at > 100°F/hr has occurred RNO: GO TO Step 34 This event is complete when the SRO reaches step 42 of the EHT Tab, or as directed by the Lead Examiner.

Page 24 of 38

Appendix D Required Operator Actions Form ES-D-2 ILT43 June 10, 2013 Op-Test No.: ILT43 Scenario No.: 2 Event No.: 7 Page 10 of 12 Event

Description:

1A MSLB inside RB & AFIS fails to actuate Time Position Applicant's Actions or Behavior EOP Excessive Heat Transfer Tab (continued)

SRO/OATC/ 34. Verify 1MS-24 and 1MS-33 are closed BOP RNO: 1. IF an unaffected Unit 1 SG is available to supply aux steam, THEN:

A. Open aux steam supply from unaffected SG:

  • 1MS-33 B. Close aux steam supply from affected SG:
35. Open 1AS-8
36. Close 1SSH-9
37. Perform the following notifications:
  • Notify Chemistry to determine RCS boron concentration
  • Notify Secondary Chemistry to check for indications of SGTR
  • Notify RP to check for indications of a SGTR
38. IAAT RCS boron is determined to be insufficient for adequate SDM, THEN initiate Encl 5.11 (RCS Boration)
39. IAAT all the following exist:
  • ES Bypass Permit satisfied
  • All SCMs > 0°F
  • RCS pressure controllable THEN bypass ES as necessary RNO: GO TO Step 41
41. Verify any SG is dry NOTE:

Minimizing SCM reduces tensile stress on the SG.

PORV should be used if Pzr spray is not available.

Procedure progression may continue when actions to minimize SCM are in progress.

42. Minimize SCM using the following methods as necessary:

__ De-energize all Pzr heaters

__ Use Pzr spray

__ Throttle HPI to maintain Pzr level > 100 [180 acc]

__ Use PORV This event is complete when the SRO reaches step 42 of the EHT Tab, or as directed by the Lead Examiner.

Page 25 of 38

Appendix D Required Operator Actions Form ES-D-2 ILT43 June 10, 2013 Op-Test No.: ILT43 Scenario No.: 2 Event No.: 7 Page 11 of 12 Event

Description:

1A MSLB inside RB & AFIS fails to actuate Time Position Applicant's Actions or Behavior EOP Excessive Heat Transfer Tab (continued)

SRO/OATC/ 43. Verify any RCP operating BOP 44. Maintain RCP NPSH

  • OAC
  • Encl 5.18 (p/T Curves)

Examiner Note: SG tube to shell T is not approaching either limit so the crew enters Encl 5.16 and then immediately Exits.

45. Initiate Encl 5.16 (SG Tube-to-Shell T Control)
46. IAAT all exist:
  • < one RCP operating in any loop
  • All SCMs > 0°F
  • RCP available in an idle loop THEN initiate Encl 5.6 (RCP Restart) to start one RCP in each idle loop.
47. IAAT all exist:
  • RB pressure < 10 psig
48. IAAT Tcold approaches 470°F, AND all RCPs are operating, THEN ensure < four RCPs are operating.
49. IAAT BWST level is 19',

THEN initiate Encl 5.12 (ECCS Suction Swap to RBES).

50. Verify all SCMs > 0°F
51. Verify indications of SGTR 25 gpm.

RNO: GO TO Step 53

53. Verify required RCS makeup flow within normal makeup capability.
54. Verify either:
  • Any SG isolated
  • Any SG has an unisolable steam leak
55. GO TO FCD Tab This event is complete when the SRO reaches step 42 of the EHT Tab, or as directed by the Lead Examiner.

Page 26 of 38

Appendix D Required Operator Actions Form ES-D-2 ILT43 June 10, 2013 Op-Test No.: ILT43 Scenario No.: 2 Event No.: 7 Page 12 of 12 Event

Description:

1A MSLB inside RB & AFIS fails to actuate Time Position Applicant's Actions or Behavior EOP Excessive Heat Transfer Tab (continued)

Parallel Actions page SRO/OATC/

BOP

1. PR NIs 5% FP OR NIs NOT decreasing GO TO UNPP tab. UNPP
2. All 4160V SWGR de-energized GO TO Blackout tab.
3. Core SCM indicates superheat GO TO ICC tab.
4. Any SCM = 0°F, AND HPI forced cooling NOT in progress GO TO LOSCM tab.
5. Both SGs intentionally isolated to stop excessive heat transfer after EHT tab initiated RETURN TO beginning of EHT tab.
6. Loss of heat transfer AND at least one SG NOT isolated GO TO LOHT tab.
7. Indications of excessive heat transfer in another SG after EHT tab initiated RETURN TO beginning of EHT tab.
8. Inadvertent ES actuation occurred Initiate AP/1/A/1700/042 (Inadvertent ES Actuation).
9. Valid ES actuation has occurred or should have occurred Initiate Encl 5.1 (ES Actuation).
10. Power lost to all 4160V SWGR and any 4160V SWGR re-energized
  • Initiate AP/11 (Recovery from Loss of Power).
  • IF Encl 5.1 (ES Actuation) has been initiated, THEN reinitiate Encl 5.1.
11. RCS leakage > 160 gpm wth letdown isolated OR SGTR > 25 gpm Notify plant staff that Emergency Dose Limits are in affect using PA system.
12. Individual available to make notifications
  • Announce plant conditions using PA system.

This event is complete when the SRO reaches step 42 of the EHT Tab, or as directed by the Lead Examiner.

Page 27 of 38

Appendix D Required Operator Actions Form ES-D-2 ILT43 June 10, 2013 Page 1 of 8 NOTE At any time during this scenario the operator may choose to use Enclosure 5.5 to maintain RCS inventory control. See below.

ENCLOSURE 5.5 ACTION/EXPECTED RESPONSE RESPONSE NOT OBTAINED NOTE Maintaining Pzr level >100 [180 acc] will ensure Pzr heater bundles remain covered.

1. __ Utilize the following as necessary to __ IF 1HP-26 will NOT open, maintain desired Pzr level: THEN throttle 1HP-410 to maintain
  • 1A HPI Pump desired Pzr level.
2. __ IAAT makeup to the LDST is desired, THEN makeup from 1A BHUT.
3. __ IAAT it is desired to secure makeup to LDST, THEN secure makeup from 1A BHUT.
4. __ IAAT it is desired to bleed letdown flow to 1A BHUT, THEN perform the following:

A. Open:

__ 1CS-26

__ 1CS-41 B. __ Position 1HP-14 to BLEED.

C. __ Notify SRO.

5. __ IAAT letdown bleed is NO longer desired, THEN position 1HP-14 to NORMAL.

Page 28 of 38

Appendix D Required Operator Actions Form ES-D-2 ILT43 June 10, 2013 Page 2 of 8 ENCLOSURE 5.5 (cont.)

ACTION/EXPECTED RESPONSE RESPONSE NOT OBTAINED

6. __ IAAT 1C HPI PUMP is required, __ GO TO Step 10.

THEN perform Steps 7 - 9.

7. __ Open: 1. __ IF both BWST suction valves

B. __ Start 1B LPI PUMP.

C. Open:

__ 1LP-15

__ 1LP-16

__ 1LP-9

__ 1LP-10

__ 1LP-6

__ 1LP-7 D. __ IF two LPI Pumps are running only to provide HPI pump suction, THEN secure one LPI pump.

E. __ Dispatch an operator to open 1HP-363 (Letdown Line To LPI Pump Suction Block) (A-1-119, U1 LPI Hatch Rm, N end).

F. __ GO TO Step 8.

2. __ IF only one BWST suction valve (1HP-24 or 1HP-25) is open, THEN perform the following:

A. __ IF three HPI pumps are operating, THEN secure 1B HPI PUMP.

B. __ IF < 2 HPI pumps are operating, THEN start HPI pumps to obtain two HPI pump operation, preferably in opposite headers.

C. __ GO TO Step 9.

Page 29 of 38

Appendix D Required Operator Actions Form ES-D-2 ILT43 June 10, 2013 Page 3 of 8 ENCLOSURE 5.5 (cont.)

ACTION/EXPECTED RESPONSE RESPONSE NOT OBTAINED

8. __ Start 1C HPI PUMP. __ IF at least two HPI pumps are operating, THEN throttle 1HP-409 to maintain desired Pzr level.
9. Throttle the following as required to maintain 1. __ IF at least two HPI pumps are operating, desired Pzr level: AND 1HP-26 will NOT open, THEN throttle 1HP-410 to maintain

__ 1HP-26 desired Pzr level.

__ 1HP-27

2. __ IF 1A HPI PUMP and 1B HPI PUMP are operating, AND 1HP-27 will NOT open, THEN throttle 1HP-409 to maintain desired Pzr level.

Page 30 of 38

Appendix D Required Operator Actions Form ES-D-2 ILT43 June 10, 2013 Page 4 of 8 ENCLOSURE 5.5 (cont.)

ACTION/EXPECTED RESPONSE RESPONSE NOT OBTAINED

10. __ IAAT LDST level CANNOT be __ GO TO Step 12.

maintained, THEN perform Step 11.

11. __ Perform the following: 1. __ IF both BWST suction valves

A. __ Start 1A LPI PUMP.

B. __ Start 1B LPI PUMP.

C. Open:

__ 1LP-15

__ 1LP-16

__ 1LP-9

__ 1LP-10

__ 1LP-6

__ 1LP-7 D. __ IF two LPI Pumps are running only to provide HPI pump suction, THEN secure one LPI pump.

E. __ Dispatch an operator to open 1HP-363 (Letdown Line To LPI Pump Suction Block) (A-1-119, U1 LPI Hatch Rm, N end).

F. __ GO TO Step 12.

2. __ IF only one BWST suction valve (1HP-24 or 1HP-25) is open, AND three HPI pumps are operating, THEN secure 1B HPI PUMP.

Page 31 of 38

Appendix D Required Operator Actions Form ES-D-2 ILT43 June 10, 2013 Page 5 of 8 ENCLOSURE 5.5 (cont.)

ACTION/EXPECTED RESPONSE RESPONSE NOT OBTAINED

12. __ IAAT additional makeup flow to LDST is desired, AND 1A BLEED TRANSFER PUMP is operating, THEN dispatch an operator to close 1CS-48 (1A BHUT Recirc) (A-1-107, Unit 1 RC Bleed Transfer Pump Rm.).
13. __ IAAT two Letdown Filters are desired, THEN perform the following:

__ Open 1HP-17.

__ Open 1HP-18

14. __ IAAT all of the following exist: __ GO TO Step 34.

__ Letdown isolated

__ LPSW available

__ Letdown restoration desired THEN perform Steps 15 - 33. {41}

15. Open: 1. __ Notify CR SRO that letdown CANNOT be

__ 1CC-7 restored due to inability to restart the CC

__ 1CC-8 system.

2. __ GO TO Step 34.
16. __ Ensure only one CC pump running.
17. __ Place the non-running CC pump in AUTO.
18. Verify both are open: 1. __ IF 1HP-1 is closed due to 1HP-3 failing to

__ 1HP-1 close,

__ 1HP-2 THEN GO TO Step 20.

2. __ IF 1HP-2 is closed due to 1HP-4 failing to close, THEN GO TO Step 20.
19. __ GO TO Step 22.

NOTE Verification of leakage requires visual observation of East Penetration Room.

20. __ Verify letdown line leak in East __ GO TO Step 22.

Penetration Room has occurred.

21. __ GO TO Step 34.

Page 32 of 38

Appendix D Required Operator Actions Form ES-D-2 ILT43 June 10, 2013 Page 6 of 8 ENCLOSURE 5.5 (cont.)

ACTION/EXPECTED RESPONSE RESPONSE NOT OBTAINED

22. __ Monitor for unexpected conditions while restoring letdown.
23. __ Verify both letdown coolers to be placed 1. __ IF 1A letdown cooler is to be placed in in service. service, THEN open:

__1HP-1

__1HP-3

2. __ IF 1B letdown cooler is to be placed in service, THEN open:

__1HP-2

__1HP-4

3. __ GO TO Step 25.
24. Open:

__ 1HP-1

__ 1HP-2

__ 1HP-3

__ 1HP-4

25. __ Verify at least one letdown cooler is Perform the following:

aligned. A. __ Notify CR SRO of problem.

B. __ GO TO Step 34.

26. __ Close 1HP-6.
27. __ Close 1HP-7.
28. __ Verify letdown temperature < 125°F. 1. __ Open 1HP-13.
2. Close:

__1HP-8

__1HP-9&11

3. __ IF any deborating IX is in service, THEN perform the following:

A. __Select 1HP-14 to NORMAL.

B. __Close 1HP-16.

4. __ Select LETDOWN HI TEMP INTLK BYP switch to BYPASS.

Page 33 of 38

Appendix D Required Operator Actions Form ES-D-2 ILT43 June 10, 2013 Page 7 of 8 ENCLOSURE 5.5 (cont.)

ACTION/EXPECTED RESPONSE RESPONSE NOT OBTAINED

29. __ Open 1HP-5.
30. __ Adjust 1HP-7 for 20 gpm letdown.
31. __ WHEN letdown temperature is

< 125°F, THEN place LETDOWN HI TEMP INTLK BYP switch to NORMAL.

32. __ Open 1HP-6.
33. __ Adjust 1HP-7 to control desired letdown flow.

NOTE AP/32 (Loss of Letdown) provides direction to cool down the RCS to offset increasing pressurizer level.

34. __ IAAT it is determined that letdown is unavailable due to equipment failures or letdown system leakage, THEN notify CR SRO to initiate AP/32 (Loss of Letdown).
35. __ IAAT > 1 HPI pump is operating, AND additional HPI pumps are NO longer needed, THEN perform the following:

A. __ Obtain SRO concurrence to reduce running HPI pumps.

B. __ Secure the desired HPI pumps.

C. __ Place secured HPI pump switch in AUTO, if desired.

36. __ IAAT all the following conditions exist:

__ Makeup from BWST NOT required

__ LDST level > 55

__ All control rods inserted

__ Cooldown Plateau NOT being used THEN close:

__ 1HP-24

__ 1HP-25 Page 34 of 38

Appendix D Required Operator Actions Form ES-D-2 ILT43 June 10, 2013 Page 8 of 8 ENCLOSURE 5.5 (cont.)

ACTION/EXPECTED RESPONSE RESPONSE NOT OBTAINED

37. __ Verify 1CS-48 (1A BHUT Recirc) has __ GO TO Step 39.

been closed to provide additional makeup flow to LDST.

38. __ WHEN 1CS-48 (1A BHUT Recirc) is NO longer needed to provide additional makeup flow to LDST, THEN perform the following:

A. __ Stop 1A BLEED TRANSFER PUMP.

B. __ Locally position 1CS-48 (1A BHUT Recirc) one turn open (A-1-107, Unit 1 RC Bleed Transfer Pump Rm.).

C. __ Close 1CS-46.

D. __ Start 1A BLEED TRANSFER PUMP.

E. __ Locally throttle 1CS-48 (1A BHUT Recirc) to obtain 90 - 110 psig discharge pressure.

F. __ Stop 1A BLEED TRANSFER PUMP.

39. __ Verify two Letdown Filters in service, __ GO TO Step 41.

AND only one Letdown filter is desired.

40. Perform one of the following:

__ Place 1HP-17 switch to CLOSE.

__ Place 1HP-18 switch to CLOSE.

41. __ WHEN directed by CR SRO, THEN EXIT this enclosure.
  • *
  • END
  • Page 35 of 38

Appendix D Required Operator Actions Form ES-D-2 ILT43 June 10, 2013 CRITICAL TASKS

1. Stop Overcooling (CT-17) (page 17)

Isolate the affected (overcooling) SG during EHT to prevent approach to NDT limits (stopped feeding the A SG by turning off the 1A MDEFDW pump).

2. Throttle HPI per Rule 6 (HPI) (CT-5) (page 24)

Done to prevent overpressurization of the RCS when SCM exists by keeping the RCS pressure below the RV P-T limit, while maintaining HPI flow above minimum allowable (EHT mitigation).

Page 36 of 38

Appendix D Scenario Outline Form ES-D-1 ILT43 June 10, 2013 SAFETY: Take a Minute UNIT 0 (OSM)

SSF Operable: No KHU's Operable: U1 - OH, U2 - UG LCTs Operable: 2 Fuel Handling: No UNIT STATUS (CR SRO)

Unit 1 Simulator Other Units Mode: 1 Unit 2 Unit 3 Reactor Power: 70% Mode: 1 Mode: 5 Gross MWE: 660 100% Power 0% Power (shutdown)

RCS Leakage: 0.024 gpm EFDW Backup: Yes EFDW Backup: No RBNS Rate: 0.01 gpm Technical Specifications/SLC Items (CR SRO)

Component/Train OOS Restoration Required TS/SLC #

Date/Time Date/Time SSF 48 hours5.555556e-4 days <br />0.0133 hours <br />7.936508e-5 weeks <br />1.8264e-5 months <br /> ago 5 days from now TS 3.10.1 Shift Turnover Items (CR SRO)

Primary

  • Holding power at 70% following FDW heater repairs. Rx Engineering evaluating return to power maneuvering plan. Anticipate power increase next shift. No water additions for reactivity control required this shift.
  • 1B CFT Pressure high. In-leakage has been identified and repaired. Reduce 1B CFT pressure to below the High Pressure alarm setpoint
  • No water additions for reactivity control required this shift.

Secondary

  • 1MS-82 and 1MS-84 closed in support of maintenance. TDEFWP supply from AS only.
  • Unit 2 has the Aux Steam Header Reactivity Management (CR SRO)

RCS Boron: 85 ppmB Gp 7 Rod Position: 66%

Human Performance Emphasis (OSM)

Procedure Use and Adherence

Appendix D Required Operator Actions Form ES-D-2 ILT43 June 10, 2013 Attachment 1 Page 38 of 38

Facility: Oconee Scenario No.: 3 Op-Test No.: 1 Examiners: ________________________ Operators: ________________________SRO

________________________ ________________________OATC

________________________ ________________________BOP Initial Conditions:

  • Reactor Power = 3% Stable Turnover:
  • Holding power at 3% at step 3.42 of OP/1/A/1102/001 (Controlling Procedure for Unit Startup)

Encl. 4.7 (Unit Startup from 532°F/2155 psig to Mode 1) while.PT/1/A/0630/001 (Mode Change Verification) Enclosure 13.10 (Prior To Entry Into MODE 1) is being performed.

  • Per Rx Engineering, use OP/1/A/1103/004A (RCS Boration) Encl. 4.1 (RCS Boration from CBAST with CBAST Pump) and add approximately 50 gal CBAST with 1A CBAST Pump in Manual and flush with approximately 50 gal of DW. Should result in approximately 15% rod withdrawal on Gp 7 over next 2 hrs.
  • Both Letdown filters are in service and Chemistry has requested they both be left in service until the plant reaches 100% power.
  • 1MS-82 and 1MS-84 closed in support of maintenance. TDEFWP supply from AS only.
  • Unit 2 has AS header Event Malfunction Event Event Type* Description No. No.

0a MPI300 Block all Rx trips except Manual 0b Override 1HP-25 failed closed 0c Override 1HP-20 fails to close 1 R: OATC, SRO RCS Boration From CBAST 2 MSS200 C, BOP, SRO Vacuum Leak 3 MPS090 C: OATC SRO 1HP-120 fails closed (concurrent with Event 2)

C: OATC, BOP, 4 Override Inadvertent ES Channel 2 actuation SRO(TS) 5 MPS400 C: BOP, SRO (TS) 60 gpm RCS leak 6 MCR070 C: OATC, SRO Group 1 Rods drop into core requiring Manual Rx Trip SBLOCA 7 MPS400 M: All

  • (N)ormal, (R)eactivity, (I)nstrument, (C)omponent, (M)ajor

Appendix D Scenario Outline Form ES-D-2 ILT43 June 10, 2013 Op-Test No.: ILT43 Scenario No.: 3 Event No.: 1 Page 1 of 5 Event

Description:

RCS Boration From CBAST Time Position Applicant's Actions or Behavior OP/1/A/1103/004A, Encl 4.1 (RCS Boration From CBAST With CBAST Pump)

SRO/OATC NOTE:

O P /1/A/1103/004 (S oluble P ois on Control) provide s guida nce for RCS boron change calculation or computer calculation for determining required volumes.

(R.M.)

LDS T te m pe ra ture m a y incre a s e from a dding CBAS T be ca us e of CBAS T temperature.

50 ga l flus h m us t be pe rform e d to e ns ure ca lcula te d volum e of CBAS T is added.

Main process piping between CBAST and LDST contains

{16}

If RCS bora tion is for a Forced Outage, targeted boron should not exceed 200 ppm above the required SDM to prevent excessive RCS boration. The 200 ppm above required SDM will borate the Pressurizer to the required SDM since the Pressurizer usually lags the RCS by approximately 200 ppm.

Section 2: Procedure 2.1 Determine required volume of CBAST needed for desired RCS boron changes. (R.M.)

  • 50 gal of DW added due to flushing must be included in determination
  • Volume required ____________gallons.

2.2 CBAST required volume approved (SRO). (R.M.)

NOTE:

Placing an idle Letdown Filter in service can change RCS boron by adding 60 gals of w aterto RCS at different boron (negligible for RCS boration). {10}

(R.M.)

2.3 IF two Letdown Filters are available, perform the following:

  • Ensure open 1HP-17 (1A LETDOWN FILTER INLET)
  • Ensure open 1HP-18 (1B LETDOWN FILTER INLET) 2.4 Ensure open 1CS-64 (CBAST OUTLET).

2.5 Open 1CS-72 (CBAST Header to Letdown Filter Inlet). (A-2 LDST Hatch area)

This event is complete when the 50 gallon piping flush is complete or as directed by the Lead Examiner.

Page 2 of 50

Appendix D Scenario Outline Form ES-D-2 ILT43 June 10, 2013 Op-Test No.: ILT43 Scenario No.: 3 Event No.: 1 Page 2 of 5 Event

Description:

RCS Boration From CBAST Time Position Applicant's Actions or Behavior SRO/OATC OP/1/A/1103/004A, Encl 4.1 (continued) 2.6 Ensure 1HP-15 Controller reset for Normal Operations.

2.7 WHILE RCS boration in progress, monitor the following indication: {19}

  • Appropriate Range NIs
  • Primary Tank Levels
  • CRD position (if applicable)
  • Neutron error (if applicable)

NOTE:

If RCS Boration is being performed during a unit shutdown, CBAST pump should NOT be started until directed by OP/1/A/1102/010 (Controlling Procedure For Unit Shutdown).

2.8 IF desired, operate the 1A CBAST pump in manual per Section 3 (Make-Up With 1A CBAST Pump In Manual). (see page 5)

NOTE:

If a Deborating IX is in service the CBAST pump must be operated in manual.

2.9 IF desired, operate the 1A CBAST pump in auto per Section 4 (Make-Up With 1A CBAST Pump In Auto) N/A NOTE:

50 gal flush must be performed to ensure calculated volume of CBAST is added. (R.M.)

2.10 Perform piping flush per Section 6 (Piping Flush From CBAST)(see page 6).

2.11 IF a Deborating IX is NOT in service, verify closed 1HP-16 (LDST MAKEUP ISOLATION) (R.M.)

NOTE:

If during RCS makeup the wrong volume is added an SRO should evaluate the effect on reactivity and take action to minimize reactivity management events.

(R.M.)

2.12 Perform one of the following: (R.M.)

  • Verify correct volume added
  • Notify appropriate SRO This event is complete when the 50 gallon piping flush is complete or as directed by the Lead Examiner.

Page 3 of 50

Appendix D Scenario Outline Form ES-D-2 ILT43 June 10, 2013 Op-Test No.: ILT43 Scenario No.: 3 Event No.: 1 Page 3 of 5 Event

Description:

RCS Boration From CBAST Time Position Applicant's Actions or Behavior SRO/OATC OP/1/A/1103/004A, Encl 4.1 (continued) 2.13 Ensure 1HP-15 Controller reset for Normal Operation 2.14 IF "Continuous Boron Dilution Bypass Keyswitch" was bypassed, place "Continuous Boron Dilution Bypass Keyswitch" to "Normal" (Cable Rm).

(Continue) 2.15 Close 1CS-72 (CBAST to Letdown Filter Inlet). (A-2 LDST Hatch area)

(R.M.)

2.16 Record RCS make-up volume in Auto Log.

2.17 IF desired, request RCS and Pzr sample for boron. (R.M.)

Person Notified Date NOTE:

1B Letdown Filter is the preferred filter to leave in service for ALARA.

EXAMINER CUE: If asked, inform the candidate it is not desired to remove one letdown filter from service.

2.18 IF desired, remove one Letdown Filter from service by performing the following:

2.18.1 Verify > 10 minutes since RCS makeup was secured. {7} (R.M.)

2.18.2 Position one of the following:

  • 1HP-17 (1A LETDOWN FILTER INLET) switch to "CLOSE"
  • 1HP-18 (1B LETDOWN FILTER INLET) switch to "CLOSE" 2.18.3 Record current RCS boron in Component Boron Log for OOS Letdown Filter. {10} (R.M.)

This event is complete when the 50 gallon piping flush is complete or as directed by the Lead Examiner.

Page 4 of 50

Appendix D Scenario Outline Form ES-D-2 ILT43 June 10, 2013 Op-Test No.: ILT43 Scenario No.: 3 Event No.: 1 Page 4 of 5 Event

Description:

RCS Boration From CBAST Time Position Applicant's Actions or Behavior SRO/OATC OP/1/A/1103/004A, Encl 4.1 (continued)

Section 3. Make-Up With 1A CBAST Pump In Manual 3.1 Perform the following:

  • IF "BLEED" is NOT required for makeup, open 1HP-16 (LDST MAKEUP ISOLATION)
  • IF 1SA-2/D-10 (CRD Continuous Boron Dilute Inhibit) in alarm AND "BLEED" required during makeup, perform one of the following:
1. Ensure open 1HP-16 (LDST Makeup Isolation) (Waste Disposal Panel)
2. Perform the following:

A. Place "Continuous Boron Dilution Bypass Keyswitch" to "Bypass" (Cable Rm)

B. Ensure open 1HP-16 (LDST MAKEUP ISOLATION) 3.2 Verify open 1CS-64 (CBAST OUTLET).

3.3 Ensure 1A CBAST pump to "MAN".

NOTE:

LDST temperature may increase from adding CBAST because of CBAST temperature.

3.4 Place 1A CBAST pump to "ON". (R.M.)

NOTE:

Increased makeup flow may be required during RCS boration, ZPPT, etc. {9}

3.5 IF AT ANY TIME increased makeup flow is required, perform Section 5 (Throttling 1CS-70 For Increased Make-up Flow). {9}

NOTE:

Selecting STOP / "START" on 1HP-15 Controller will reset 1HP-15 batch.

3.6 IF volume of > 5500 gallons is desired, reset 1HP-15 batch size between 5000-5500 gallons by selecting "STOP" / "START".

NOTE:

CBAST should NOT be pumped < 6" using 1A CBAST pump. {6}

3.7 WHEN desired volume is added, position 1A CBAST pump to "OFF".

(R.M.)

3.8 Ensure 1HP-15 Controller reset for Normal Operations.

3.9 IF a Deborating IX is NOT in service, close 1HP-16 (LDST MAKEUP ISOLATION). (R.M.)

3.10 WHEN desired return to next step in Section 2 (Procedure) (page 3).

This event is complete when the 50 gallon piping flush is complete or as directed by the Lead Examiner.

Page 5 of 50

Appendix D Scenario Outline Form ES-D-2 ILT43 June 10, 2013 Op-Test No.: ILT43 Scenario No.: 3 Event No.: 1 Page 5 of 5 Event

Description:

RCS Boration From CBAST Time Position Applicant's Actions or Behavior SRO/OATC OP/1/A/1103/004A, Encl 4.1 (continued)

Section 6. Piping Flush from CBAST NOTE:

Flush prevents boron from crystallizing in piping if heat tracing fails.

50 gal flush must be performed to ensure calculated volume of CBAST is added. (R.M.)

Fa ilure to properly position valves could affect CBAST boron. (R.M.)

6.1 After CBAST make-up flush header:

6.1.1 Ensure 1A CBAST pump is "OFF".

6.1.2 Ensure DW make-up stopped to all units UST(s) (ensures adequate DW pressure).

6.1.3 Close 1CS-64 (CBAST OUTLET). (R.M.)

6.1.4 Ensure closed 1CS-70 (CBAST Recirc). (Unit 1 CBAST Rm)

(R.M.)

6.1.5 Ensure open 1HP-16 (LDST MAKEUP ISOLATION).

6.1.6 Throttle 1DW-87 (DW To 1A CBAST Pump Suction) to establish flow. (Unit 1 CBAST Rm) 6.1.7 Flush 50 gallons. (R .M .)

6.1.8 Close 1DW-87 (DW To 1A CBAST Pump Suction). (Unit 1 CBAST Rm) (R.M.)

6.1.9 Open 1CS-70 (CBAST Recirc). (Unit 1 CBAST Rm) (R.M.)

6.1.10 Open 1CS-64 (CBAST OUTLET).

6.1.11 IF a Deborating IX is NOT in service, close 1HP-16 (LDST MAKEUP ISOLATION). (R.M.)

6.2 IF make-up from CBAST is no longer needed, continue with Step 2.11 for normal alignment (page 3).

This event is complete when the 50 gallon piping flush is complete or as directed by the Lead Examiner.

Page 6 of 50

Appendix D Scenario Outline Form ES-D-2 ILT43 June 10, 2013 Op-Test No.: ILT43 Scenario No.: 3 Event No.: 2 Page 1 of 1 Event

Description:

Vacuum Leak Time Position Applicant's Actions or Behavior Plant Response:

  • 1SA-3/A-6, Condenser Vacuum Low (25 Hg)

Crew response:

1SA-3/A-6, Condenser Vacuum Low 3.1 Refer to AP/2/A/1700/027 AP/1/A/1700/027 (Loss of Condenser Vacuum)

SRO/BOP 4.1 Announce AP entry using the PA system.

4.2 IAAT both of the following apply:

__ Condenser vacuum 22 Hg

__ MODE 1 or 2 THEN trip the Rx.

4.3 Dispatch operators to perform the following:

__ Perform Encl 5.1 (Main Vacuum Pump Alignment)

__ Look for vacuum leaks 4.4 Ensure all available Main Vacuum Pumps operating (A, B, & C)

Booth Cue: After all MVPs are running, using TIME COMPRESSION, call the Control Room to notify the operator that the Main Vacuum Pumps are aligned to Unit 1.

4.5 Ensure 1V-186 is closed 4.6 Ensure Steam to Steam Air Ejector A, B, C > 255 psig 4.7 Verify Steam Seal Header Press > 1.5 psig 4.8 Ensure all available CCW pumps operating Booth Cue: Call Control Room as the NEO sent out to look for vacuum leaks and report that a leak was found on the 1B Main FDW Pump pumping trap sight glass.

Examiner Note: The leak will be removed after the control room directs the NEO to isolate the sight glass.

4.9 Verify Condensate flow 2300 gpm 4.10 WHEN condenser vacuum is stable, AND Encl 5.1 (Main Vacuum Pump Alignment) is complete, THEN EXIT this procedure This event is complete when SRO reaches Step 4.10 of AP/027, or as directed by the lead examiner.

Page 7 of 50

Appendix D Scenario Outline Form ES-D-2 ILT43 June 10, 2013 Op-Test No.: ILT43 Scenario No.: 3 Event No.: 3 Page 1 of 3 Event

Description:

1HP-120 fails closed Time Position Applicant's Actions or Behavior Plant Response:

  • RCS makeup flow goes to 10 gpm (HPI Warming Flow)
  • PZR level begins to decrease
  • LDST level begins to increase
  • Valve position demand for 1HP-120 begins to increase to the 100%

demand value and valve position indication will indicate closed (green light)

  • 1SA-02/ B-1, HP LETDOWN TANK LEVEL HIGH/LOW, will illuminate after several minute time delay Crew Response:

Examiner Note: If the 1HP-120 failure is recognized before the LDST statalarm actuates, the SRO will make a direct entry into AP/14 (next page). Otherwise they may perform the ARG and OP below and enter AP/14 when the SRO determines the entry conditions are met The crew may refer to ARG 1SA-02/B-1, HP LETDOWN TANK LEVEL SRO/OATC HIGH/LOW and perform the required actions.

3.1 Instrument Failed:

3.1.1 Compare alternate channels to verify alarm validity:

  • O1A1042 LDST LEVEL 1
  • O1A1043 LDST LEVEL 2 3.2 Verify LDST pressure does not exceed LDST level/pressure operability requirement per OP/1/A/1104/002, (HPI System).

3.3 IF High Level alarm is received:

3.3.1 Bleed as required by OP/1/A/1103/004 (Soluble Poison Concentration Control).

EXAMINER NOTE: The crew may perform Enclosure 4.8 as necessary to reduce inventory. Enclosure 4.6 is performed to makeup/batch.

OATC OP/1/A/1103/004, Soluble Poison Concentration Control (Enclosure 4.8 Reducing RCS Inventory) 2.1 Verify HPI System operating.

2.2 Ensure open 1CS-26 (LETDOWN TO RC BHUT).

2.3 Ensure open 1CS-41 (1A RC BHUT INLET).

2.4 Position 1HP-14 (LDST BYPASS) to BLEED.

2.5 WHEN desired LDST level achieved, position 1HP-14 to NORMAL.

This event is complete when normal HPI makeup and letdown flow have been restored, or as directed by the Lead Examiner.

Page 8 of 50

Appendix D Scenario Outline Form ES-D-2 ILT43 June 10, 2013 Op-Test No.:ILT43 Scenario No.: 3 Event No.: 3 Page 2 of 3 Event

Description:

1HP-120 fails closed Time Position Applicant's Actions or Behavior Examiner Note: The crew may initiate EOP Encl 5.5 for RCS inventory control due LDST level increase (see page 41)

Crew Response:

SRO/OATC/ AP/1/A/1700/014, Loss of Normal Makeup and/or RCP Seal Injection BOP 3.1 IAAT RCP seal injection flow is lost, AND Component Cooling is lost, THEN perform the following:

A. Trip the Rx B. Stop all RCPs C. Initiate AP/25 (SSF EOP) 3.2 IAAT loss of suction to operating HPI pumps is indicated:

  • Motor amps low or cycling
  • Discharge pressure low or cycling
  • Abnormal LDST level trend THEN GO TO Step 3.3 RNO: GO TO Step 4.7 4.7 Announce AP entry using PA System 4.8 Verify any HPI pump operating 4.9 Verify RCP seal injection or HPI makeup line leak indicated by any of the following:
  • Report of line leak
  • Abnormal LDST level decrease
  • RB RIAs in alarm
  • Abnormal RBNS level increase
  • Abnormal LAWT or HAWT level increase RNO: GO TO Step 4.11 4.11 Verify RCP seal injection flow exists to any RCP 4.12 Verify 1HP-120 operable in AUTO RNO: 1. Attempt to operate 1HP-120 in HAND
2. IF 1HP-120 fails to operate, THEN GO TO Step 4.176 4.176 Perform the following as necessary to maintain Pzr level > 200
  • Throttle 1HP-26 This event is complete when normal HPI makeup and letdown flow have been restored, or as directed by the Lead Examiner.

Page 9 of 50

Appendix D Scenario Outline Form ES-D-2 ILT43 June 10, 2013 Op-Test No.:ILT43 Scenario No.: 3 Event No.: 3 Page 3 of 3 Event

Description:

1HP-120 fails closed Time Position Applicant's Actions or Behavior SRO/OATC/ AP/14, Loss of Normal Makeup and/or RCP Seal Injection (continued)

BOP 4.177 Place 1HP-120 in HAND and close 4.178 Notify SPOC to investigate and repair 1HP-120 4.179 WHEN 1HP-120 is repaired, THEN slowly re-establish flow through 1HP-120 Booth Cue: Fire Timer 12 to remove 1HP-120 failure, then call the CR and inform them that, using time compression, 1HP-120 has been repaired.

4.180 Place 1HP-120 in AUTO.

4.181 Close 1HP-26.

4.182 Verify 1HP-122 (RC VOLUMECONTROL BYPASS) throttled.

RNO: GO TO Step 4.184 4.184 Verify 1HP-5 open.

4.185 Verify 1HP-6 open.

RNO: 1. Throttle 1HP-7 for 20 gpm letdown flow.

2. Open 1HP-6.

4.186 Adjust 1HP-7 for desired letdown 4.187 WHEN conditions permit, THEN EXIT this procedure.

This event is complete when normal HPI makeup and letdown flow have been restored, or as directed by the Lead Examiner.

Page 10 of 50

Appendix D Scenario Outline Form ES-D-2 ILT43 June 10, 2013 Op-Test No.: ILT43 Scenario No.: 3 Event No.: 4 Page 1 of 5 Event

Description:

Inadvertent ES Channel 2 Actuation (TS)

Time Position Applicant's Actions or Behavior Plant response:

1SA-1/B-10 ES 2 Trip 1SA-16/B-2 EL CT-4 SB Bus 2 Breaker Closed 2SA-17/A-5 KEOWEE STATALARM PANEL ALARM 2SA-17/C-1 KHU 1 EMERGENCY START INITIATED 2SA-18/C-1 KHU 2 EMERGENCY START INITIATED 1SA-6/A-5, B-5, C-5, D-5, RC Pump Seal Cavity Press Hi/Low ( 1 min later) 1SA-6/D-7, E-5, E-6, E-7 RC Pump Seal Return Temp High Both Keowee Hydro Units Emergency Start Examiner Note: Over time, rods may withdraw in response to BWST water injecting into the core.

The SRO should enter TS 3.4.9 if PZR level increases to > 260. The BOP may use Enclosure 5.5 for inventory control (page 41).

Crew Response:

The SRO will initiate AP/1/A/1700/042 Inadvertent ES Actuation 4.1 Verify any of the following have inadvertently actuated:

SRO/OATC/

BOP __ Diverse HPI (not actuated)

__ ES Channel 1 (not actuated)

__ ES Channel 2 4.2 Perform the following on all inadvertently actuated system(s):

__ Ensure DIVERSE HPI BYPASS is in BYPASS (does not apply)

__ Ensure ES CH-1 is in MANUAL (does not apply)

__ Ensure ES CH-2 is in MANUAL 4.3 Throttle HPI, as required, to maintain desired Pzr level 4.4 Verify any of the following have inadvertently actuated:

__ ES Channel 5 (not actuated)

__ ES Channel 6 (not actuated)

RNO: 1. IF ES Channel 1, ES Channel 2, or Diverse HPI have inadvertently actuated, AND it is desired to restore letdown, THEN initiate AP/42 Encl 5.2 (Letdown Restoration) (see page 14)

2. GO TO Step 4.10 4.10 Close 1HP-24 and 1HP-25 This event is complete when the SRO has referred to TS at step 4.25, or as directed by the Lead Examiner.

Page 11 of 50

Appendix D Scenario Outline Form ES-D-2 ILT43 June 10, 2013 Op-Test No.: ILT43 Scenario No.: 3 Event No.: 4 Page 2 of 5 Event

Description:

Inadvertent ES Channel 2 Actuation (TS)

Time Position Applicant's Actions or Behavior AP/1/A/1700/042 (cont)

SRO/OATC/ 4.11 Ensure AP/42 Encl 5.1 (Required Operator Actions) is in progress BOP (see page 13) 4.12 Verify any of the following have inadvertently actuated:

__ Diverse LPI

__ ES Channel 3

__ ES Channel 4 RNO: GO TO Step 4.17 4.17 Verify the Rx is critical 4.18 Verify ICS in Auto Examiner Note: Rods will not go outside the desired control band. If the crew chooses to go to AP/39 see page 15.

4.19 Verify control rods are outside the desired control band RNO: GO TO Step 4.21 4.21 Verify any of the following have inadvertently actuated:

__ ES Channel 1

__ Diverse HPI RNO: GO TO Step 4.24 4.24 Notify SPOC to investigate and repair the cause of the inadvertent ES actuation, as necessary 4.25 Initiate logging TS/SLC Entry/Exit, as applicable, IAW Encl 5.4 (TS/SLC Requirements) (See page 15 for detailed TS information) 4.26 WHEN all of the following exist:

__ Reason for inadvertent ES Channel or Diverse HPI/LPI actuation has been resolved

__ ES Channel or Diverse HPI/LPI reset is desired

__ OSM concurs THEN continue This event is complete when the SRO has referred to TS at step 4.25, or as directed by the Lead Examiner.

Page 12 of 50

Appendix D Scenario Outline Form ES-D-2 ILT43 June 10, 2013 Op-Test No.: ILT43 Scenario No.: 3 Event No.: 4 Page 3 of 5 Event

Description:

Inadvertent ES Channel 2 Actuation (TS)

Time Position Applicant's Actions or Behavior Crew Response:

AP/1/A/1700/042 Enclosure 5.1 Required Operator Actions SRO/OATC/

1 Initiate announcement of AP entry using the PA system BOP 2 Verify any of the following have inadvertently actuated:

__ Diverse HPI (not actuated)

__ ES Channel 1 (not actuated)

__ ES Channel 2 3 Open the following:

__ 1HP-20

__ 1HP-21 4 Open the following for operating RCPs:

__ 1HP-228 (1A1)

__ 1HP-226 (1A2)

__ 1HP-232 (1B1)

__ 1HP-230 (1B2) 5 Verify any of the following have inadvertently actuated:

__ ES Channel 7 (not actuated)

__ ES Channel 8 (not actuated)

RNO: GO TO Step 9 9 Perform the following:

A. Open the following to restore RB RIAs:

__ 1PR-7

__ 1PR-8

__ 1PR-9

__ 1PR-10 B. From the ENABLE CONTROLS screen on the RIA View Node, perform the following:

1. Select OFF for RB RIA sample pump
2. Start the RB RIA sample pump
10. Verify any of the following have inadvertently actuated:

__ Diverse HPI

__ ES Channel 1 RNO: GO TO Step 12

12. EXIT this enclosure This event is complete when the SRO has referred to TS at step 4.25, or as directed by the Lead Examiner.

Page 13 of 50

Appendix D Scenario Outline Form ES-D-2 ILT43 June 10, 2013 Op-Test No.: ILT43 Scenario No.: 3 Event No.: 4 Page 4 of 5 Event

Description:

Inadvertent ES Channel 2 Actuation (TS)

Time Position Applicant's Actions or Behavior Crew Response:

SRO/OATC/ AP/1/A/1700/042 Enclosure 5.2 Letdown Restoration BOP 1 Verify a CC pump operating 2 Verify letdown is isolated 3 Close 1HP-5

4. Verify it is desired to place both letdown coolers in service (1B only)

RNO: 1. __ IF desired to place the 1A Letdown Cooler in service, THEN open the following:

A. 1HP-1 B. 1HP-3

2. __ IF desired to place the 1B Letdown Cooler in service, THEN open the following:

A. 1HP-2 B. 1HP-4

3. __ GO TO Step 6.
6. Close 1HP-6
7. Close 1HP-7
8. Verify letdown temperature < 135°F
9. Open 1HP-5
10. Adjust 1HP-7 for 20 gpm letdown
11. WHEN letdown temperature < 130°F, THEN place LETDOWN HI TEMP INTLK BYP switch in NORMAL
12. Open 1HP-6
13. Adjust 1HP-7 to control desired letdown flow
14. IAAT it is desired to bleed letdown flow to 1A BHUT, THEN perform the following:

A. Open the following:

__ 1CS-26

__ 1CS-41 B. Position 1HP-14 to BLEED C. Notify SRO

15. IAAT letdown bleed is NO longer desired, THEN position 1HP-14 to NORMAL
16. WHEN SRO approves, THEN EXIT this enclosure This event is complete when the SRO has referred to TS at step 4.25, or as directed by the Lead Examiner.

Page 14 of 50

Appendix D Scenario Outline Form ES-D-2 ILT43 June 10, 2013 Op-Test No.: ILT43 Scenario No.: 3 Event No.: 4 Page 5 of 5 Event

Description:

Inadvertent ES Channel 2 Actuation (TS)

Time Position Applicant's Actions or Behavior Crew Response:

AP/1/A/1700/042 Enclosure 5.4 (TS/SLC Requirements)

Any ES Channel SRO

  • TS 3.3.7 (Engineered Safeguards Protective System (ESPS) Digital Automatic Actuation Logic Channels) due to the automatic actuation logic being blocked if any ES channel is in MANUAL or ES Voters in OVERRIDE Condition A. 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br /> completion time.

ES Channel 1 or 2

  • TS 3.4.15 (RCS Leakage Detection Instrumentation) due to Rx Bldg RIAs being out of service (Applies until RIAs are returned to service.)

Condition B (24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> for grab samples) (30 days)

  • TS 3.10.1 (Standby Shutdown Facility(SSF)) for SSF inoperability due to the SSF power loss (ES Channel 1 only)

Conditions A through E all apply (7 days)

  • TS 3.4.9 (Pressurizer) if PZR level is > 260 (Applies if Pzr exceeds 260.)

Condition A (1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br />)

EXAMINER NOTE: If the crew decides they meet the entry conditions for AP/39 they may trip the reactor based on the below direction.

AP/1/A/1700/039, Unintentional Boration CAUTION Do NOT add demin water to counter the boration until RCS boron concentration stabilizes to prevent a positive reactivity event.

4.1 Announce AP entry using PA system.

4.2 IAAT CTP < 6%,

THEN perform the following:

A. Trip the Rx.

B. GO TO Unit 1 EOP.

This event is complete when the SRO has referred to TS at step 4.25, or as directed by the Lead Examiner.

Page 15 of 50

Appendix D Scenario Outline Form ES-D-2 ILT43 June 10, 2013 Op-Test No.: ILT43 Scenario No.: 3 Event No.: 5 Page 1 of 6 Event

Description:

60 gpm RCS Leak Time Position Applicant's Actions or Behavior Plant Response:

Alarms:

  • 1SA-8/B-9 (RM Process Monitor Radiation HIGH)
  • 1SA-8/A-9 (RM Area Monitor Radiation High)

Control Board Indications

  • PZR and LDST level deceasing
  • RC makeup flow increasing
  • RB normal sump level increasing Crew Response:

SRO The SRO may refer to TS 3.4.13 (RCS Operational Leakage) and determine that Condition A, Reduce leakage to within limits within 4 hours4.62963e-5 days <br />0.00111 hours <br />6.613757e-6 weeks <br />1.522e-6 months <br /> and Condition B, Be in MODE 3 in 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> are in effect. This is for an unidentified leak > 1 gpm.

Examiners Note: SRO may not refer to TS during the scenario due to other events occurring.

The crew may determine that Immediate Manual Action Step 3.2 of AP/02 applies and close 1HP-5 prior to the SRO entering AP/02.

SRO enters AP/02 (Excessive RCS Leakage)

AP/02 Immediate Manual Actions 3.1 Verify HPI operating 3.2 IAAT RC makeup flow is > 100 gpm, AND Pzr level is decreasing, SRO/BOP THEN close 1HP-5 This event is complete when the 1B RBCU is started or as directed by the lead Examiner.

Page 16 of 50

Appendix D Scenario Outline Form ES-D-2 ILT43 June 10, 2013 Op-Test No.: ILT43 Scenario No.: 3 Event No.: 5 Page 2 of 6 Event

Description:

60 gpm RCS Leak Time Position Applicant's Actions or Behavior Crew response:

SRO/BOP AP/02 (Excessive RCS Leakage) IMAs (continued) 3.3 IAAT all the following exist: (should not apply)

  • HPI flow is > NORMAL MAKEUP CAPABILITY ( 160 gpm) with letdown isolated
  • Pzr level decreasing
  • SG Tube Leakage NOT indicated
  • LPI DHR NOT providing core cooling THEN perform the following:

A. Ensure Rx is tripped B. Initiate Unit 1 EOP AP/02 Subsequent Actions 4.1 Initiate Pzr and LDST level makeup using Unit 1 EOP Encl 5.5, as necessary (see page 41)

Booth Cue: If requested by crew, use Manual Valves to close 1CS-48 and report that using time compression, 1CS-48 is closed.

4.2 Announce AP entry using the PA system 4.3 IAAT LPI DHR in service, AND RCS leakage > LDST makeup capability ( 50 gpm)

THEN GO TO AP/26 (Loss of Decay Heat Removal) 4.4 Initiate the following notifications:

OSM to reference the following:

  • RP/1000/001 (Emergency Classification)
  • OMP 1-14 (Notifications)
  • Encl 5.9 (Oversight Guidelines)

STA and RP This event is complete when the 1B RBCU is started or as directed by the lead Examiner.

Page 17 of 50

Appendix D Scenario Outline Form ES-D-2 ILT43 June 10, 2013 Op-Test No.: ILT43 Scenario No.: 3 Event No.: 5 Page 3 of 6 Event

Description:

60 gpm RCS Leak Time Position Applicant's Actions or Behavior Crew response:

4.5 Monitor the following trends to determine leak area (AB or RB) and trend SRO/BOP for degradation:

  • T6 AP02
  • T6 WASTE
  • RIAs Examiner/Booth Note: AP/1/A/1700/018 entry conditions will also be met due to RB RIA alarms. If the crew asks, Unit 2 will perform AP/18 (Abnormal Release of Radioactivity) actions.

4.6 Verify specific leak location is identified RNO: Notify WCC SRO to initiate Encl 5.2 (Primary Leak Check) and of the leak area (AB or RB), if known.

Examiner Note: Crew should determine that the leak is in the Reactor Building due to RB RIAs increasing, RBNS rate increasing, and NO RCP seal failure indications 4.7 Initiate Encl 5.1 (Leak Rate Determination)

(See page 21 for actions of Encl 5.1) 4.8 WHEN leak area/failure is identified, THEN GO TO applicable step that best fits leak area/failure Area/ Symptoms Step Failure Rx Bldg RB RIAs 4.53 RBNS rate NO RCP seal failure indications 4.53 IAAT in MODE 1 AND leak is > LDST makeup capability from 1A BHUT, THEN initiate a shutdown using AP/29 (Rapid Unit Shutdown)

Examiner Note: Not in Mode 1 nor is 60 gpm leak greater than LDST makeup capability from 1A BHUT.

This event is complete when the 1B RBCU is started or as directed by the lead Examiner.

Page 18 of 50

Appendix D Scenario Outline Form ES-D-2 ILT43 June 10, 2013 Op-Test No.: ILT43 Scenario No.: 3 Event No.: 5 Page 4 of 6 Event

Description:

60 gpm RCS Leak Time Position Applicant's Actions or Behavior Crew response:

4.54 IAAT leak rate is 10 gpm, SRO/BOP THEN discontinue pumping RBNS.

4.55 IAAT either of the following conditions exist:

  • RCS pressure 50 psig and RCS leakage 10 gpm
  • RCS pressure > 50 psig and RCS leakage 1 gpm THEN perform Steps 4.56 - 4.59 4.56 Verify the RB is occupied. (It is not)

RNO: GO TO Step 4.58

4. 58 Verify LPI DHR in service (It is not)

RNO: GO TO Step 4.60 4.60 Verify RB pressure > 3 psig.

Examiner Note: Starting the 1B RBCU will automatically fire a timer to initiate the next event.

RNO: Maximize RB Cooling by performing the following:

  • Ensure all available RBCUs operating in HIGH.

4.61 IAAT RB is accessible to locate the leak, THEN GO TO Step 4.62 RNO: GO TO Step 4.77 4.77 Verify 1HP-5 is closed (May have been closed as part of IMAs) 4.78 Place standby CC pump switch in OFF This event is complete when the 1B RBCU is started or as directed by the lead Examiner.

Page 19 of 50

Appendix D Scenario Outline Form ES-D-2 ILT43 June 10, 2013 Op-Test No.: ILT43 Scenario No.: 3 Event No.: 5 Page 5 of 6 Event

Description:

60 gpm RCS Leak Time Position Applicant's Actions or Behavior NOTE Statalarm, 1SA-9C-1 (CC COMP COOLING RETURN FLOW LOW) will alarm when the letdown coolers are isolated SRO/BOP 4.79 Close the following:

  • 1CC-2/1HP-2 4.80 Verify leak is isolated (it will not be).

SRO/OATC RNO:1. Perform the following to shutdown and depressurize the RCS:

A. Initiate shutdown by one of the following as necessary:

  • AP/29 (Rapid Unit Shutdown)
  • OP/1/A/1102/004 (Operation at Power)

B. Initiate OP/1/A/1102/010 (Controlling Procedure For Unit Shutdown) to continue shutdown and depressurization.

2. WHEN conditions permit, THEN EXIT this procedure.

This event is complete when the 1B RBCU is started or as directed by the lead Examiner.

Page 20 of 50

Appendix D Scenario Outline Form ES-D-2 ILT43 June 10, 2013 Op-Test No.: ILT43 Scenario No.: 3 Event No.: 5 Page 6 of 6 Event

Description:

60 gpm RCS Leak Time Position Applicant's Actions or Behavior AP/02 Enclosure 5.1 (Leak Rate Determination)

1. Stabilize RCS Temperature BOP/OATC
2. Notify WCC to secure all primary draining/RB washdown evolutions if applicable.

NOTE Depending on leak location, leakage may NOT be detected by all the formulas. One or more of the following methods may be necessary to determine RCS leak rate.

3. Calculate leak rate using the following, as required:

Examiners Note: There are several other methods to calculate leakage rate. While one of the two below will most likely be used, depending on plant conditions they may not be the only correct methods available.

Method #1: Calculation of RCS Volume Loss:

Leak Rate = ______ + ______ - ______ - ______ = ______

MU SI LD TSR Where: MU = makeup Flow SI = Seal Inlet Hdr Flow LD = Letdown Flow TSR = Total Seal Return Flow Method #2: LDST Level Change:

Leak Rate = (LDST level change) x (31 gal/inch) + BTP Flowrate (gpm)

(minutes)

Leak Rate = ( inches) x 31 gal/inch + ______ gpm = _________ gpm

_____minutes

4. Notify OSM and SRO of calculated leak rate.

This event is complete when the 1B RBCU is started or as directed by the lead Examiner.

Page 21 of 50

Appendix D Scenario Outline Form ES-D-2 ILT43 June 10, 2013 Op-Test No.: ILT43 Scenario No.: 3 Event No.: 6 Page 1 of 2 Event

Description:

Group 1 Rods drop into core requiring Manual Rx Trip Time Position Applicant's Actions or Behavior Plant Response:

Group 1 control rods will drop into the core which will cause Reactor power to decrease Crew Response:

The OATC should manually trip the reactor Examiner Note: The SBLOCA (Event #7) will be triggered when the rods hit the bottom after the Reactor is manually tripped.

OATC The SRO will direct the OATC to perform Immediate Manual Actions:

  • Verify reactor power < 5% FP and decreasing
  • Verify all turbine stop valves closed
  • Verify RCP seal injection available BOP The SRO will direct the BOP to perform a Symptoms Check
  • Reactivity Control Power Range NIs < 5% and decreasing
  • ICC/Loss of Subcooling Margin (SCM)

If any SCM 0°F, perform Rule 2

  • Loss of Heat Transfer (LOHT)

Loss of Main and Emergency FDW (including unsuccessful manual initiation of EFDW)

  • Excessive Heat Transfer (EHT)

Uncontrolled Main Steam Line(s) pressure decrease

  • Steam Generator Tube Rupture CSAE off-gas alarms, process RIAs (RIA-40, 59, 60), area RIAs (RIA-16/17)

Examiner Note: The BOP may report indications of a SBLOCA, but depending on the size and the timing the SRO may or may not have time to perform any of the Subsequent Actions on the next page prior to the ES actuation or LOSCM, which will initiate the next event (Event #7).

This event is complete when reactor is tripped, or as directed by the Lead Examiner.

Page 22 of 50

Appendix D Scenario Outline Form ES-D-2 ILT43 June 10, 2013 Op-Test No.: ILT43 Scenario No.: 3 Event No.: 6 Page 2 of 2 Event

Description:

Group 1 Rods drop into core requiring Manual Rx Trip Time Position Applicant's Actions or Behavior Verify Immediate Manual Actions with the OATC SRO Transfer to Subsequent Actions 4.1 Verify all control rods in Groups 1 - 7 fully inserted.

4.2 Verify Main FDW in operation.

4.3 Verify either of the following:

__ Main FDW overfeeding causing excessive temperature decrease.

__ Main FDW underfeeding causing SG level decrease below setpoint.

RNO GO TO Step 4.5.

4.5 IAAT Main FDW is operating, AND level in any SG is > 96% on the Operating Range, THEN perform Steps 4.6 - 4.8.

RNO GO TO Step 4.9.

4.9 IAAT TBVs CANNOT control SG pressure at desired setpoint, THEN manually control pressure in affected SGs using either of the following:

__ TBVs

__ Dispatch two operators to perform Encl 5.24 4.10 Verify 1RIA-40 operable with CSAE OFF-GAS BLOWER operating.

Once the BOP reports the SCM 0°F and initiating Rule 2, proceed to the next event This event is complete when reactor is tripped, or as directed by the Lead Examiner.

Page 23 of 50

Appendix D Scenario Outline Form ES-D-2 ILT43 June 10, 2013 Op-Test No.: ILT43 Scenario No.: 3 Event No.: 7 Page 1 of 17 Event

Description:

SBLOCA Time Position Applicant's Actions or Behavior Plant response:

Control board indications:

  • 1SA-2/D-3 (RC PRESS HI/LOW)
  • RCS Pressure and PZR level decreasing
  • ES 1-6 actuate
  • RCS subcooling margin will indicate 0°F Crew response:
  • The SRO will direct the OATC to perform IMAs and the BOP a OATC/BOP symptom check.
  • OATC will perform IMAs per Event 6
  • The BOP will perform a symptom check per Event 6 Examiners Note: The SRO will transfer to the Subsequent Actions Tab and then use the Parallel Actions page transfer to go to the LOSCM tab to direct crew activities. LOSCM tab begins on page 38.

Once the RCS saturates, one of the ROs will perform Rule 2 which begins SRO on next page. Rule 2 will direct performing Rule 3 which will direct performing Enclosure 5.9.

OATC/BOP The RO not performing Rule 2 will begin performing Enclosure 5.1 due to ES actuation. Enclosure 5.1 begins on page 30.

This event is complete when the SRO goes to the LOCA CD Tab or as directed by the lead examiner.

Page 24 of 50

Appendix D Scenario Outline Form ES-D-2 ILT43 June 10, 2013 Op-Test No.: ILT43 Scenario No.: 3 Event No.: 7 Page 2 of 17 Event

Description:

SBLOCA Time Position Applicant's Actions or Behavior Rule 2 ( Loss of SCM)

OATC/BOP 1. IAAT all the following exist:

  • Any SCM 0°F
  • Rx power 1%
  • 2 minutes elapsed since loss of SCM THEN perform steps 2 & 3
2. Stop all RCPs CT-1: (Trip ALL RCPs within 2 minutes)
3. Notify CR SRO of RCP status
4. Verify Blackout exists.

RNO: GO TO Step 6 Examiner Note: 1HP-25 failed closed as par t of the scenario

6. Open 1HP-24 & 25 RNO: 1. IF both BWST suction valves (1HP-24 and 1HP-25) are closed, THEN: N/A
2. GO TO Step 9
9. Verify all (3) HPI pumps operating.
10. Place Diverse HPI in Bypass
11. Place ES CH 1 & CH 2 in MANUAL EXAMINER NOTE: Only 2 HPI pumps are allowed due to failure of 1HP-25 to open
12. Secure 1B HPI Pump
13. Open 1HP-26 & 27
14. Verify at least two HPI pumps are operating using two diverse indications.
15. IAAT > 2 HPI pumps operating and HPI flow in any header is in Unacceptable Region of Fig. 1, THEN perform Steps 16-21.

RNO: GO TO Step 17

17. IAAT flow limits are exceeded THEN perform Steps 18 - 20 RNO: GO TO Step 21
21. Notify CR SRO of HPI status.
22. Verify RCS pressure >550 psig This event is complete when the SRO goes to the LOCA CD Tab or as directed by the lead examiner.

Page 25 of 50

Appendix D Scenario Outline Form ES-D-2 ILT43 June 10, 2013 Op-Test No.: ILT43 Scenario No.: 3 Event No.: 7 Page 3 of 17 Event

Description:

SBLOCA Time Position Applicant's Actions or Behavior Rule 2 (continued)

OATC/BOP 23. IAAT either of the following exists:

LPI FLOW TRAIN A plus LPI FLOW TRAIN B 3400 gpm Only one LPI header in operation with header flow 2900 gpm THEN GO TO Step 24.

RNO: GO TO Step 35

35. IAAT TBV's are unavailable, THEN A Dispatch two operators to perform Encl 5.24 (Operation of ADVs)

B Notify CR SRO the ADVs are being aligned for use.

36/37. Select OFF on both Digital Channels on AFIS HEADER A&B if not actuated

38. Verify any EFDW pump operating.
39. Start MD EFDW pumps on all intact SGs:
  • 1A MD EFDWP
  • 1B MD EFDWP
40. Verify any EFDW pump operating.
41. Verify both SGs intact.
42. Establish 300 gpm EFDW flow to each SG
43. Verify both MD EFDWPs operating.
44. Place TD EFDW PUMP in PULL TO LOCK.
45. Trip both Main FDW pumps.
46. Place FDW block valve switches in CLOSE:
47. Utilize Rule 7 (SG Feed Control) to feed all intact SGs to the appropriate SG Level Control Point using available feed sources; EFDW/Main FDW.
48. IAAT SG Level Control Point is reached, Then maintain SG Level Control Point by feeding and steaming as necessary.
49. Notify CR SRO of SG feed status.

This event is complete when the SRO goes to the LOCA CD Tab or as directed by the lead examiner.

Page 26 of 50

Appendix D Scenario Outline Form ES-D-2 ILT43 June 10, 2013 Op-Test No.: ILT43 Scenario No.: 3 Event No.: 7 Page 4 of 17 Event

Description:

SBLOCA Time Position Applicant's Actions or Behavior Rule 2 (continued)

CAUTION If 1 TD EFDW PUMP is being used for SG feed and Unit 1 is supplying the Auxiliary Steam header, reducing SG pressure below 250 psig can result in reduced pumping capability.

OATC/BOP 50. IAAT SG pressure is > RCS pressure, THEN reduce SG pressure <

RCS pressure using either:

  • Dispatch two operators to perform Encl 5.24 (operation of the ADVs)
51. Verify any Main FDW pump operating.

RNO: GO TO Step 58.

58. Ensure Rule 3 (Loss of Main or Emergency FDW) is in progress or complete. (next page)
59. WHEN directed by CR SRO, THEN EXIT this rule.

This event is complete when the SRO goes to the LOCA CD Tab or as directed by the lead examiner.

Page 27 of 50

Appendix D Scenario Outline Form ES-D-2 ILT43 June 10, 2013 Op-Test No.: ILT43 Scenario No.: 3 Event No.: 7 Page 5 of 17 Event

Description:

SBLOCA Time Position Applicant's Actions or Behavior Rule 3 due to loss of Main Feedwater as directed by Rule 2 OATC/BOP 1. Verify loss of Main FDW/EFDW is due to Turbine Building Flooding.

RNO: GO TO Step 3

3. IAAT NO SGs can be fed with FDW (Main/CBP/Emergency), AND any of the following exist:
  • RCS pressure reaches 2300 psig OR NDT limit
  • Pzr level reaches 375 [340 acc]

THEN PERFORM Rule 4 (Initiation of HPI Forced Cooling).

4. Start operable EFDW pumps, as required, to feed all intact SGs.
5. Verify any EFDW pump operating.
6. GO TO Step 37.
37. IAAT an EFDW valve CANNOT control in AUTO...

RNO: GO TO Step 43

43. Verify any SCM 0°F.
44. IAAT Unit 1 EFDW is in operation, THEN initiate Encl 5.9 (Extended EFDW Operation). (next page)
45. WHEN directed by CR SRO, THEN EXIT this rule.

This event is complete when the SRO goes to the LOCA CD Tab or as directed by the lead examiner.

Page 28 of 50

Appendix D Scenario Outline Form ES-D-2 ILT43 June 10, 2013 Op-Test No.: ILT43 Scenario No.: 3 Event No.: 7 Page 6 of 17 Event

Description:

SBLOCA Time Position Applicant's Actions or Behavior Encl 5.9 (Extended EFDW Operation) as directed by Rule 3 OATC/BOP 1. Monitor EFDW parameters on EFW graphic display.

2 IAAT UST level is < 4', THEN GO TO Step 120 3 IAAT feeding both SGs with one MD EFDWP is desired, THEN perform Steps 4 - 7.

RNO: GO TO Step 8

8. Perform the following as required to maintain UST level > 7.5':
  • Makeup with demin water.
  • Place CST pumps in AUTO.
9. IAAT all the following exist:
  • Rapid cooldown NOT in progress
  • MD EFDWP operating for each available SG
  • EFDW flow in each header < 600 gpm THEN place 1 TD EFDW PUMP switch in PULL TO LOCK.
10. Verify 1 TD EFDW PUMP operating.

RNO: GO TO Step 12 NOTE

  • Loss of the condensate system for 25 minutes results in cooling down to LPI using the ADVs. If NO HWPs are operating, continuing this enclosure to restore the condensate system is a priority unless the CR SRO deems EOP activities higher priority. The 25 minute criterion is satisfied when a HWP is started and 1C-10 is 10% open.
  • If the condensate system is operating, the remaining guidance establishes FDW recirc, monitors and maintains UST, and transfers EFDW suction to the hotwell if required.
12. Notify CR SRO to set priority based on the NOTE above and EOP activities.

This event is complete when the SRO goes to the LOCA CD Tab or as directed by the lead examiner.

Page 29 of 50

Appendix D Scenario Outline Form ES-D-2 ILT43 June 10, 2013 Op-Test No.: ILT43 Scenario No.: 3 Event No.: 7 Page 7 of 17 Event

Description:

SBLOCA Time Position Applicant's Actions or Behavior Crew Response:

EXAMINER NOTE: ES 1 and 2 will actuate when RCS pressure decreases below 1600 psig. When RB pressure increases to > 3 psig, ES Channels 3-6 will actuate. The path through Encl. 5.1 is dependent on timing of ES 3-6. If the RO reaches Step 15 prior to ES 3&4 actuation, they go to Step 53. When ES Channels 3&4 actuate, the RO should review IAAT Steps 3, 9, 10, and 15 and perform any required actions.

EOP Enclosure 5.1, ES Actuation OATC/BOP 1. Determine all ES channel that should have actuated based on RCS pressure and RB pressure:

Actuation Setpoint (psig) Associated ES Channel 1600 (RCS) 1&2 550 (RCS) 3&4 3 (RB) 1, 2, 3, 4, 5, & 6 10 (RB) 7&8

2. Verify all ES channels associated with actuation setpoints have actuated
3. IAAT additional ES actuation setpoints are exceeded, THEN perform Steps 1 - 2
4. Place Diverse HPI in BYPASS
5. Perform both:
  • Place ES CH 1 in MANUAL
  • Place ES CH 2 in MANUAL Examiner Note: If subcooling has not yet been lost at step 6, crew will proceed to step 73 as directed by step 6 RNO.
6. Verify Rule 2 in progress or complete.

RNO: GO TO step 73 (see page 34)

7. Verify any RCP operating RNO: GO TO Step 9
9. IAAT all exist:
  • Voter associated with ES channel is in OVERRIDE
  • An ES channel is manually actuated
  • Components on that channel require manipulation THEN depress RESET on the required channel
10. IAAT any RCP is operating, AND ES Channels 5 and 6 actuate, THEN perform Steps 11-14 RNO: GO TO Step 15 This event is complete when the SRO goes to the LOCA CD Tab or as directed by the lead examiner.

Page 30 of 50

Appendix D Scenario Outline Form ES-D-2 ILT43 June 10, 2013 Op-Test No.: ILT43 Scenario No.: 3 Event No.: 7 Page 8 of 17 Event

Description:

SBLOCA Time Position Applicant's Actions or Behavior EOP Enclosure 5.1, ES Actuation (continued)

OATC/BOP 15. IAAT ES Channels 3 & 4 are actuated, THEN GO TO Step 16 RNO: GO TO Step 53 (Step 53 is on page 33 if that direction is taken)

16. Place Diverse LPI in BYPASS
17. Perform both:
  • Place ES CH 3 in MANUAL
  • Place ES CH 4 in MANUAL
18. IAAT any LPI pump is operating against a shutoff head, THEN at the CR SROs discretion, stop affected LPI pumps
19. IAAT RCS pressure is < LPI pump shutoff head, THEN perform Steps 20 - 21 RNO: GO TO Step 22
22. IAAT 1A and 1B LPI PUMPs are off / tripped, AND all of the following exist:
  • RCS pressure < LPI pump shutoff head
  • 1LP-20 closed THEN perform Steps 23 - 24 RNO: GO TO Step 25
25. IAAT 1A LPI PUMP fails while operating, AND 1B LPI PUMP is operating, THEN close 1LP-17
26. IAAT 1B LPI PUMP fails while operating, AND 1A LPI PUMP is operating, THEN close 1LP-18
27. Start A and B OUTSIDE AIR BOOSTER FANs (CT-27) (Must be started within 30 minutes of LOCA)
28. Notify Unit 3 to start 3A and 3B OUTSIDE AIR BOOSTER FANs
29. Verify 1CF-1 and 1CF-2 are open
30. Verify 1HP-410 closed
31. Secure makeup to the LDST Examiner Note: 1HP-5 may not be in its ES position because it failed earlier in the scenario and was manually opened to restore Letdown. An operator should be dispatched to close 1HP-5, unless it was already closed to isolate letdown in.

Examiner Note: 1HP-20 is not in its ES position and no RCPs are operating (secured during Rule 2), so step 32 RNO 3 (below) must be performed.

This event is complete when the SRO goes to the LOCA CD Tab or as directed by the lead examiner.

Page 31 of 50

Appendix D Scenario Outline Form ES-D-2 ILT43 June 10, 2013 Op-Test No.: ILT43 Scenario No.: 3 Event No.: 7 Page 9 of 17 Event

Description:

SBLOCA Time Position Applicant's Actions or Behavior EOP Enclosure 5.1, ES Actuation OATC/BOP 32. Verify all ES channel 1 - 4 components are in the ES position RNO: 1. IF 1HP-3 fails to close, THEN close 1HP-1

2. IF 1HP-4 fails to close, THEN close 1HP-2
3. IF 1HP-20 fails to close and no RCPs operating, THEN close 1HP-228, 1HP-226, 1HP-232, & 1HP-230
4. Notify SRO to evaluate components NOT is ES position and initiate action to place in ES position if desired
33. Verify Unit 2 turbine tripped RNO: GO TO Step 36
36. Close 1LPSW-139
37. Place in FAIL OPEN:

__ 1LPSW-251 FAIL SWITCH

__ 1LPSW-252 FAIL SWITCH

38. Start all available LPSW pumps
39. Verify either:

__ Three LPSW pumps operating

__ Two LPSW pumps operating when Tech Specs only requires two operable

40. Open 1LPSW-4 and 1LPSW-5
41. IAAT BWST level 19, THEN initiate Encl 5.12 (ECCS Suction Swap to RBES)
42. Dispatch an operator to perform Encl 5.2 (Placing RB Hydrogen Analyzers In Service) (PS)
43. Select DECAY HEAT LOW FLOW ALARM SELECT switch to ON
44. IAAT ES channels 5 & 6 have actuated THEN perform Step 45 Note: RBCU transfer to low speed will NOT occur until 3 minute time delay is satisfied.
45. Verify all ES channel 5 & 6 components are in the ES position
46. IAAT ES channels 7 & 8 have actuated, THEN perform Step 47-48 RNO: GO TO Step 49
49. Notify U2 CR SRO that SSF is inoperable due to OTS1-1 open 50 Ensure any turnover sheet compensatory measures for ES actuation are complete as necessary.

This event is complete when the SRO goes to the LOCA CD Tab or as directed by the lead examiner.

Page 32 of 50

Appendix D Scenario Outline Form ES-D-2 ILT43 June 10, 2013 Op-Test No.: ILT43 Scenario No.: 3 Event No.: 7 Page 10 of 17 Event

Description:

SBLOCA Time Position Applicant's Actions or Behavior EOP Enclosure 5.1, ES Actuation OATC/BOP 51. IAAT conditions causing ES actuation have cleared, THEN initiate Encl 5.41 (ES Recovery)

52. WHEN CR SRO approves, THEN EXIT this enclosure.

EXAMINER NOTE: If the RO reaches Step 15 prior to ES 3&4 actuation, the procedure directs performing steps 53 - 72 below.

When ES Channel 3&4 actuate, the RO should return to IAAT Steps 3, and perform any required actions (see page 30).

53. Start A and B OUTSIDE AIR BOOSTER FANS. (CT-27) (Must be started within 30 minutes of LOCA)
54. Notify Unit 3 to start 3A and 3B OUTSIDE AIR BOOSTER FANS
55. Verify 1CF-1 and 1CF-2 are open
56. Verify 1HP-410 closed
57. Secure makeup to the LDST Examiner Note: 1HP-5 may not be in its ES position because it failed earlier in the scenario and was manually opened to restore Letdown.

An operator should be dispatched to close 1HP-5, unless it was already closed to isolate letdown.

Examiner Note: 1HP-20 is not in its ES position and no RCPs are operating, so step 58 RNO 3 below must be performed.

58. Verify all ES channel 1&2 components are in the ES position RNO: 1. IF 1HP-3 fails to close, THEN close 1HP-1
2. IF 1HP-4 fails to close, THEN close 1HP-2
3. IF 1HP-20 fails to close and no RCPs operating, THEN close 1HP-228, 1HP-226, 1HP-232, & 1HP-230
4. Notify SRO to evaluate components NOT is ES position and initiate action to place in ES position if desired
59. Verify Unit 2 turbine tripped RNO: GO TO Step 62
62. Close 1LPSW-139
63. Place in FAIL OPEN:
64. Start all available LPSW pumps.

This event is complete when the SRO goes to the LOCA CD Tab or as directed by the lead examiner.

Page 33 of 50

Appendix D Scenario Outline Form ES-D-2 ILT43 June 10, 2013 Op-Test No.: ILT43 Scenario No.: 3 Event No.: 7 Page 11 of 17 Event

Description:

SBLOCA Time Position Applicant's Actions or Behavior EOP Enclosure 5.1, ES Actuation OATC/BOP 65. Verify either:

  • Three LPSW pumps operating
  • Two LPSW pumps operating when Tech Specs only requires two operable
66. Open:

__ 1LPSW-4

__ 1LPSW-5

67. IAAT BWST level 19',

THEN initiate Encl 5.12 (ECCS Suction Swap to RBES).

68. Dispatch an operator to perform Encl 5.2 (Placing RB Hydrogen Analyzers In Service). (PS )
69. Notify U2 CR SRO that SSF is inoperable due to OTS1-1 open.

70 Ensure any turnover sheet compensatory measures for ES actuation are complete as necessary.

71. IAAT conditions causing ES actuation have cleared, THEN initiate Encl 5.41 (ES Recovery).
72. WHEN CR SRO approves, THEN EXIT this enclosure.
73. Open 1HP-24 and 1HP-25
74. Ensure at least two HPI pumps are operating
75. Verify 1HP-26 and 1HP-27 are open
76. IAAT at least two HPI pumps are operating, AND HPI flow in any header that has NOT been intentionally throttled is in the Unacceptable Region of Figure 1, THEN open the following in the affected header:

1A Header 1B Header 1HP 410 1HP-409

77. Verify any RCP operating
78. Open 1HP-20 and 1HP-21
79. IAAT all exist:

__ Voter associated with ES channel is in OVERRIDE

__ An ES channel is manually actuated

__ Components on that channel required manipulation THEN depress RESET on the required channel This event is complete when the SRO goes to the LOCA CD Tab or as directed by the lead examiner.

Page 34 of 50

Appendix D Scenario Outline Form ES-D-2 ILT43 June 10, 2013 Op-Test No.: ILT43 Scenario No.: 3 Event No.: 7 Page 12 of 17 Event

Description:

SBLOCA Time Position Applicant's Actions or Behavior EOP Enclosure 5.1, ES Actuation

80. IAAT any RCP is operating, AND ES Channels 5 and 6 actuate, OATC/BOP THEN perform Steps 81-84
81. Place ES CH 5 and ES CH 6 in MANUAL
82. Open:

__ 1CC-7

__ 1CC-8

__ 1LPSW-15

__ 1LPSW-6

83. Ensure only one CC pump operating
84. Ensure Standby CC pump in AUTO
85. IAAT ES Channels 3 & 4 are actuated, THEN GO TO Step 86
86. Place Diverse LPI in BYPASS
87. Place ES CH 3 and ES CH 4 in MANUAL CAUTION LPI pump damage may occur if operated in excess of 30 minutes against shutoff head
88. IAAT any LPI pump is operating against shutoff head, THEN at the CR SROs discretion, stop affected LPI pumps
89. IAAT RCS pressure is < LPI pump shutoff head, THEN perform Steps 90-91 RNO: GO TO Step 92
92. IAAT 1A and 1B LPI PUMPs are off/tripped, AND all of the following exists..

RNO: GO TO Step 95

95. IAAT 1A LPI PUMP fails while operating, AND 1B LPI PUMP is operating, THEN close 1LP-17
99. IAAT 1B LPI PUMP fails while operating, AND 1A LPI PUMP is operating, THEN close 1LP-18
97. Start A and B OUTSIDE AIR BOOSTER FANS(CT-27) (Must be started within 30 minutes of LOCA)
98. Notify Unit 3 to start 3A and 3B OUTSIDE AIR BOOSTER FANS This event is complete when the SRO goes to the LOCA CD Tab or as directed by the lead examiner.

Page 35 of 50

Appendix D Scenario Outline Form ES-D-2 ILT43 June 10, 2013 Op-Test No.: ILT43 Scenario No.: 3 Event No.: 7 Page 13 of 17 Event

Description:

SBLOCA Time Position Applicant's Actions or Behavior EOP Enclosure 5.1, ES Actuation OATC/BOP 99. Verify 1CF-1 and 1CF-2 are open 100. Verify 1HP-410 closed 101. Secure makeup to the LDST Examiner Note: 1HP-5 may not be in its ES position because it failed earlier in the scenario and was manually opened to restore Letdown. An operator should be dispatched to close 1HP-5, unless it was already closed to isolate letdown in.

Examiner Note: 1HP-20 is not in its ES position and no RCPs are operating (secured during Rule 2), so step 102 RNO 3 (below) must be performed.

102. Verify all ES channel 1-4 components are in the ES position RNO: 1. IF 1HP-3 fails to close, THEN close 1HP-1

2. IF 1HP-4 fails to close, THEN close 1HP-2
3. IF 1HP-20 fails to close and no RCPs operating, THEN close 1HP-228, 1HP-226, 1HP-232, & 1HP-230
4. Notify SRO to evaluate components NOT is ES position and initiate action to place in ES position if desired 103. Verify Unit 2 turbine tripped RNO: GO TO Step 106 106. Close 1LPSW-139 107. Place 1LPSW-251 and 1LPSW-252 FAIL SWITCH in FAIL OPEN 108. Start all available LPSW pumps 109. Verify either:

__ Three LPSW pumps operating

__ Two LPSW pumps operating when TS only requires two operable 110. Open 1LPSW-4 and 1LPSW-5 111. IAAT BWST level 19, THEN initiate Encl 5.12 (ECCS Suction Swap to RBES) 112. Dispatch an operator to perform Encl 5.2 (Placing RB Hydrogen Analyzers In Service) (PS) 113. Select DECAY HEAT LOW FLOW ALARM SELECT switch to ON 114. IAAT ES channels 5 & 6 have actuated, THEN perform Step 115 Note: RBCU transfer to low speed will NOT occur until 3 minute time delay is satisfied.

This event is complete when the SRO goes to the LOCA CD Tab or as directed by the lead examiner.

Page 36 of 50

Appendix D Scenario Outline Form ES-D-2 ILT43 June 10, 2013 Op-Test No.: ILT43 Scenario No.: 3 Event No.: 7 Page 14 of 17 Event

Description:

SBLOCA Time Position Applicant's Actions or Behavior EOP Enclosure 5.1, ES Actuation 115. Verify all ES channel 5 & 6 components in the ES position OATC/BOP 116. IAAT ES channels 7 & 8 have actuated, THEN perform Step 117 - 118.

RNO: GO TO Step 119 119. Notify U2 CR SRO that SSF is inoperable due to OTS1-1 open.

120. Ensure any turnover sheet compensatory measures for ES actuation are complete as necessary.

121. IAAT conditions causing ES actuation have cleared, THEN initiate Encl 5.41 (ES Recovery) 122. WHEN CR SRO approves, THEN EXIT this enclosure This event is complete when the SRO goes to the LOCA CD Tab or as directed by the lead examiner.

Page 37 of 50

Appendix D Scenario Outline Form ES-D-2 ILT43 June 10, 2013 Op-Test No.: ILT43 Scenario No.: 32 Event No.: 7 Page 15 of 17 Event

Description:

SBLOCA Time Position Applicant's Actions or Behavior SRO SRO will transfer to the LOSCM tab.

LOSCM tab SRO/OATC 1. Ensure Rule 2 (Loss of SCM) is in progress or complete.

/BOP 2. Verify Station ASW feeding any SG.

RNO: GO TO Step 4

4. Verify LOSCM caused by excessive heat transfer.

RNO: GO TO Step 6

6. IAAT either of the following exists:

LPI FLOW TRAIN A plus LPI FLOW TRAIN B 3400 gpm Only one LPI header in operation with header flow 2900 gpm THEN GO TO LOCA CD tab.

7. Verify SSF activated per AP/25 with both of the following systems required:
  • SSF RC Makeup
9. Verify all of the following exist:
  • Adequate total HPI flow per LOSCM Tab Figure 1 (Total Required HPI Flow)
10. GO TO Step 89.

Unit Status All SCMs are > 0°F OR all the following conditions exist:

  • Adequate total HPI flow
89. Open 1AS-40 while closing 1MS-47.
90. Verify HPI forced cooling in progress.

RNO: Close 1RC-4

91. Close 1GWD-17, 1HP-1, 1HP-2, and 1RC-3 This event is complete when the SRO goes to the LOCA CD Tab or as directed by the lead examiner.

Page 38 of 50

Appendix D Scenario Outline Form ES-D-2 ILT43 June 10, 2013 Op-Test No.: ILT43 Scenario No.: 3 Event No.: 7 Page 16 of 17 Event

Description:

SBLOCA Time Position Applicant's Actions or Behavior SRO LOSCM tab (continued)

92. Verify either of the following:

SRO/OATC

  • Core superheated

/BOP

  • Rx vessel head level at 0 RNO: GO TO Step 94
94. IAAT BWST level is 19', THEN initiate Encl 5.12 (ECCS Suction Swap to RBES).

CAUTION If TDEFDWP is being used for SG feed, reducing SG pressure below 250 psig can result in reduced pumping capability 95 Maintain SG pressure < RCS pressure utilizing either:

__TBVs

__ADVs 96 Verify any SG available for feeding/steaming.

97 Initiate Encl 5.16 (SG Tube-to-Shell T Control).

98 Verify indications of SGTR exist.

RNO: GO TO Step 101 101 Verify HPI forced cooling in progress.

RNO: GO TO Step 103 103 Verify CETCs trend decreasing.

104 Verify primary to secondary heat transfer is excessive.

RNO: GO TO Step 106 106 Verify indications of SGTR 25 gpm.

RNO: GO TO Step 108 108 Verify required RCS makeup flow within normal makeup capability.

RNO: GO TO LOCA CD tab (next page)

This event is complete when the SRO goes to the LOCA CD Tab or as directed by the lead examiner.

Page 39 of 50

Appendix D Scenario Outline Form ES-D-2 ILT43 June 10, 2013 Op-Test No.: ILT43 Scenario No.: 3 Event No.: 7 Page 17 of 17 Event

Description:

SBLOCA Time Position Applicant's Actions or Behavior SRO LOCA CD Tab 1 IAAT BWST level is 19',

THEN initiate Encl 5.12 (ECCS Suction Swap to RBES).

SRO/OATC

/BOP 2 Verify ES actuated.

3 GO TO Step 7.

7 Perform the following:

  • Ensure all RBCUs in low speed.

8 Initiate Encl 5.35 (Containment Isolation).

9 Start all RB Aux Fans This event is complete when the SRO goes to the LOCA CD Tab or as directed by the lead examiner.

Page 40 of 50

Appendix D Scenario Outline Form ES-D-2 ILT43 June 10, 2013 Page 1 of 8 NOTE At any time during this scenario the operator may choose to use Enclosure 5.5 to maintain RCS inventory control. See below.

ENCLOSURE 5.5 ACTION/EXPECTED RESPONSE RESPONSE NOT OBTAINED NOTE Maintaining Pzr level >100 [180 acc] will ensure Pzr heater bundles remain covered.

1. Utilize the following as necessary to maintain __ IF 1HP-26 will NOT open, desired Pzr level: THEN throttle 1HP-410 to maintain
  • 1A HPI Pump desired Pzr level.
2. IAAT makeup to the LDST is desired, THEN makeup from 1A BHUT.
3. IAAT it is desired to secure makeup to LDST, THEN secure makeup from 1A BHUT.
4. IAAT it is desired to bleed letdown flow to 1A BHUT, THEN perform the following:

A. Open:

__ 1CS-26

__ 1CS-41 B. Position 1HP-14 to BLEED.

C. Notify SRO.

5. IAAT letdown bleed is NO longer desired, THEN position 1HP-14 to NORMAL.

Page 41 of 50

Appendix D Scenario Outline Form ES-D-2 ILT43 June 10, 2013 Page 2 of 8 ENCLOSURE 5.5 (cont.)

ACTION/EXPECTED RESPONSE RESPONSE NOT OBTAINED

6. IAAT 1C HPI PUMP is required, __ GO TO Step 10.

THEN perform Steps 7 - 9.

7. Open: 1. __ IF both BWST suction valves

B. __ Start 1B LPI PUMP.

C. Open:

__ 1LP-15

__ 1LP-16

__ 1LP-9

__ 1LP-10

__ 1LP-6

__ 1LP-7 D. __ IF two LPI Pumps are running only to provide HPI pump suction, THEN secure one LPI pump.

E. __ Dispatch an operator to open 1HP-363 (Letdown Line To LPI Pump Suction Block) (A-1-119, U1 LPI Hatch Rm, N end).

F. __ GO TO Step 8.

2. __ IF only one BWST suction valve (1HP-24 or 1HP-25) is open, THEN perform the following:

A. __ IF three HPI pumps are operating, THEN secure 1B HPI PUMP.

B. __ IF < 2 HPI pumps are operating, THEN start HPI pumps to obtain two HPI pump operation, preferably in opposite headers.

C. __ GO TO Step 9.

Page 42 of 50

Appendix D Scenario Outline Form ES-D-2 ILT43 June 10, 2013 Page3 of 8 ENCLOSURE 5.5 (cont.)

ACTION/EXPECTED RESPONSE RESPONSE NOT OBTAINED

8. Start 1C HPI PUMP. __ IF at least two HPI pumps are operating, THEN throttle 1HP-409 to maintain desired Pzr level.
9. Throttle the following as required to 1. __ IF at least two HPI pumps are operating, maintain desired Pzr level: AND 1HP-26 will NOT open, THEN throttle 1HP-410 to maintain
2. __ IF 1A HPI PUMP and 1B HPI PUMP are operating, AND 1HP-27 will NOT open, THEN throttle 1HP-409 to maintain desired Pzr level.

Page 43 of 50

Appendix D Scenario Outline Form ES-D-2 ILT43 June 10, 2013 Page 4 of 8 ENCLOSURE 5.5 (cont.)

ACTION/EXPECTED RESPONSE RESPONSE NOT OBTAINED

10. IAAT LDST level CANNOT be __ GO TO Step 12.

maintained, THEN perform Step 11.

11. Perform the following: 1. __ IF both BWST suction valves

A. __ Start 1A LPI PUMP.

B. __ Start 1B LPI PUMP.

C. Open:

__ 1LP-15

__ 1LP-16

__ 1LP-9

__ 1LP-10

__ 1LP-6

__ 1LP-7 D. __ IF two LPI Pumps are running only to provide HPI pump suction, THEN secure one LPI pump.

E. __ Dispatch an operator to open 1HP-363 (Letdown Line To LPI Pump Suction Block) (A-1-119, U1 LPI Hatch Rm, N end).

F. __ GO TO Step 12.

2. __ IF only one BWST suction valve (1HP-24 or 1HP-25) is open, AND three HPI pumps are operating, THEN secure 1B HPI PUMP.

Page 44 of 50

Appendix D Scenario Outline Form ES-D-2 ILT43 June 10, 2013 Page 5 of 8 ENCLOSURE 5.5 (cont.)

ACTION/EXPECTED RESPONSE RESPONSE NOT OBTAINED

12. IAAT additional makeup flow to LDST is desired, AND 1A BLEED TRANSFER PUMP is operating, THEN dispatch an operator to close 1CS-48 (1A BHUT Recirc) (A-1-107, Unit 1 RC Bleed Transfer Pump Rm.).
13. IAAT two Letdown Filters are desired, THEN perform the following:
14. IAAT all of the following exist: __ GO TO Step 34.
  • Letdown isolated
  • Letdown restoration desired THEN perform Steps 15 - 33. {41}
15. Open: 1. __ Notify CR SRO that letdown CANNOT be
  • 1CC-7 restored due to inability to restart the CC
2. __ GO TO Step 34.
16. Ensure only one CC pump running.
17. Place the non-running CC pump in AUTO.
18. Verify both are open: 1. __ IF 1HP-1 is closed due to 1HP-3 failing to
  • 1HP-2 THEN GO TO Step 20.
2. __ IF 1HP-2 is closed due to 1HP-4 failing to close, THEN GO TO Step 20.
19. GO TO Step 22.

NOTE Verification of leakage requires visual observation of East Penetration Room.

20. Verify letdown line leak in East __ GO TO Step 22.

Penetration Room has occurred.

21. GO TO Step 34.

Page 45 of 50

Appendix D Scenario Outline Form ES-D-2 ILT43 June 10, 2013 Page 6 of 8 ENCLOSURE 5.5 (cont.)

ACTION/EXPECTED RESPONSE RESPONSE NOT OBTAINED

22. Monitor for unexpected conditions while restoring letdown.
23. Verify both letdown coolers to be placed 1. __ IF 1A letdown cooler is to be placed in in service. service, THEN open:

__1HP-1

__1HP-3

2. __ IF 1B letdown cooler is to be placed in service, THEN open:

__1HP-2

__1HP-4

3. __ GO TO Step 25.
24. Open:
25. Verify at least one letdown cooler is Perform the following:

aligned. A. __ Notify CR SRO of problem.

B. __ GO TO Step 34.

26. Close 1HP-6.
27. Close 1HP-7.
28. Verify letdown temperature < 125°F. 1. __ Open 1HP-13.
2. Close:

__1HP-8

__1HP-9&11

3. __ IF any deborating IX is in service, THEN perform the following:

A. __Select 1HP-14 to NORMAL.

B. __Close 1HP-16.

4. __ Select LETDOWN HI TEMP INTLK BYP switch to BYPASS.

Page 46 of 50

Appendix D Scenario Outline Form ES-D-2 ILT43 June 10, 2013 Page 7 of 8 ENCLOSURE 5.5 (cont.)

ACTION/EXPECTED RESPONSE RESPONSE NOT OBTAINED

29. Open 1HP-5.
30. Adjust 1HP-7 for 20 gpm letdown.
31. WHEN letdown temperature is < 125°F, THEN place LETDOWN HI TEMP INTLK BYP switch to NORMAL.
32. Open 1HP-6.
33. Adjust 1HP-7 to control desired letdown flow.

NOTE AP/32 (Loss of Letdown) provides direction to cool down the RCS to offset increasing pressurizer level.

34. IAAT it is determined that letdown is unavailable due to equipment failures or letdown system leakage, THEN notify CR SRO to initiate AP/32 (Loss of Letdown).
35. IAAT > 1 HPI pump is operating, AND additional HPI pumps are NO longer needed, THEN perform the following:

A. Obtain SRO concurrence to reduce running HPI pumps.

B. Secure the desired HPI pumps.

C. Place secured HPI pump switch in AUTO, if desired.

36. IAAT all the following conditions exist:
  • Makeup from BWST NOT required
  • LDST level > 55
  • Cooldown Plateau NOT being used THEN close:

Appendix D Scenario Outline Form ES-D-2 ILT43 June 10, 2013 Page 8 of 8 ENCLOSURE 5.5 (cont.)

ACTION/EXPECTED RESPONSE RESPONSE NOT OBTAINED

37. Verify 1CS-48 (1A BHUT Recirc) has __ GO TO Step 39.

been closed to provide additional makeup flow to LDST.

38. WHEN 1CS-48 (1A BHUT Recirc) is NO longer needed to provide additional makeup flow to LDST, THEN perform the following:

A. Stop 1A BLEED TRANSFER PUMP.

B. Locally position 1CS-48 (1A BHUT Recirc) one turn open (A-1-107, Unit 1 RC Bleed Transfer Pump Rm.).

C. Close 1CS-46.

D. Start 1A BLEED TRANSFER PUMP.

E. Locally throttle 1CS-48 (1A BHUT Recirc) to obtain 90 - 110 psig discharge pressure.

F. Stop 1A BLEED TRANSFER PUMP.

39. Verify two Letdown Filters in service, __ GO TO Step 41.

AND only one Letdown filter is desired.

40. Perform one of the following:
41. WHEN directed by CR SRO, THEN EXIT this enclosure.
  • *
  • END
  • Page 48 of 50

Appendix D Scenario Outline Form ES-D-2 ILT43 June 10, 2013 CRITICAL TASKS

1. Trip all RCPs CT-1: (page 25)

Required to Trip ALL RCPs within 2 minutes of loss of SCM (Rule 2).

2. Start A and B OUTSIDE AIR BOOSTER FANs (CT-27) (page 31, 33, or 35 depending on procedure path through Enclosure 5.1). Must be started within 30 minutes of LOCA to maintain Control Room habitability.

Page 49 of 50

SAFETY: Take a Minute UNIT 0 (OSM)

SSF Operable: No KHU's Operable: U1 - OH, U2 - UG LCTs Operable: 2 Fuel Handling: No UNIT STATUS (CR SRO)

Unit 1 Simulator Other Units Mode: 2 Unit 2 Unit 3 Reactor Power: CTP = 3% Mode: 1 Mode: 1 Gross MWE: N/A 100% Power 100% Power RCS Leakage: 0.024 gpm EFDW Backup: Yes EFDW Backup: Yes RBNS Rate: 0.01 gpm Technical Specifications/SLC Items (CR SRO)

Component/Train OOS Restoration Required TS/SLC #

Date/Time Date/Time 6 days 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br /> from SSF 18 hours2.083333e-4 days <br />0.005 hours <br />2.97619e-5 weeks <br />6.849e-6 months <br /> ago TS 3.10.1 now Shift Turnover Items (CR SRO)

Primary

  • Tave = 543°F
  • Holding power at 3% at step 3.42 of OP/1/A/1102/001 (Unit Startup from 532°F/2155 psig to Mode 1) while.PT/1/A/0630/001 (Mode Change Verification) Enclosure 13.10 "Prior To Entry Into MODE 1 is being performed.
  • Per Rx Engineering, use OP/1/A/1103/004A (RCS Boration) Encl. 4.1 (RCS Boration from CBAST with CBAST Pump) and add approximately 50 gal CBAST with 1A CBAST Pump in Manual and flush with approximately 50 gal of DW. Should result in approximately 15% rod withdrawal on Gp 7 over next 2 hrs.
  • Both Letdown filters are in service and Chemistry has requested they both be left in service until the plant reaches 100% power.
  • SRO to direct the OATC to perform the 50 gal CBAST addition.

Secondary

  • 1AS-35 throttled per Secondary Chemist to provide steam to E heaters for secondary O2 removal.

Reactivity Management (CR SRO)

R2 Reactivity management controls RCS Boron = 1756 Rod position Gp 7 5% WD established in the Control Room per SOMP ppmb 01-02 Human Performance Emphasis (OSM)

Procedure Use and Adherence