IPRenewal NPEmails From: Green, Kimberly Sent: Tuesday, June 18, 2013 1:10 PM To: rwater1@entergy.com Cc: IPRenewal NPEmails

Subject:

Draft RAI on RVI Attachments: Draft RAI on RVI.docx

Roger, As mentioned during our telephone conference call on June 4, the staff has drafted an RAI relative to MRP 227-A, Action Item 1, in anticipation of the EPRI document that is currently scheduled to be issued at the end of June. We understand that Entergy will not be able to answer an RAI until the EPRI document has been issued and licensees have had a chance to review the document. However, we wanted to provide you with the draft RAI so that you can review it to see if any clarification is needed at this time. My hope is that in the absence of any needed clarification, we can issue the RAI to you formally shortly after the issuance of the EPRI document. Please note that we may need to adjust the RAI based on the issuance of the final EPRI document; however, should that be the case, I will notify you of the need to do so.

Please let me know if Entergy would like to have a teleconference call on this draft RAI.

Thanks, Kim 1

Hearing Identifier: IndianPointUnits2and3NonPublic_EX Email Number: 4244 Mail Envelope Properties (F5A4366DF596BF458646C9D433EA37D7FF26B32950)

Subject:

Draft RAI on RVI Sent Date: 6/18/2013 1:10:00 PM Received Date: 6/18/2013 1:10:02 PM From: Green, Kimberly Created By: Kimberly.Green@nrc.gov Recipients:

"IPRenewal NPEmails" <IPRenewal.NPEmails@nrc.gov>

Tracking Status: None "rwater1@entergy.com" <rwater1@entergy.com>

Tracking Status: None Post Office: HQCLSTR01.nrc.gov Files Size Date & Time MESSAGE 978 6/18/2013 1:10:02 PM Draft RAI on RVI.docx 15005 Options Priority: Standard Return Notification: No Reply Requested: No Sensitivity: Normal Expiration Date:

Recipients Received:

D-RAI 6-A As discussed in References 1 and 2, provide the following information related to verification of the applicability of MRP-227-A to IP2 and IP3:

1. Do the IP2 or IP3 RVI have non-weld or bolting austenitic stainless steel components with 20 percent cold work or greater, and if so, do the affected components have operating stresses greater than 30 ksi? If so, perform a plant-specific evaluation to determine the aging management requirements for the affected components.
2. Has IP2 or IP3 ever utilized atypical fuel design or fuel management that could make the assumptions of MRP-227-A regarding core loading/core design non-representative for that unit, including power changes/uprates? If so, describe how the differences were reconciled with the assumptions of MRP-227-A, or provide a plant-specific aging management program for affected components as appropriate.

References

1. Meeting Summary EPRI-Westinghouse January 22-23, 2013, February 21, 2013 (ADAMS Accession No. ML13042A048)
2. 2/25/2013 Summary of Telecom with EPRI and Westinghouse Electric Company, March 15, 2013 (ADAMS Accession No. ML13067A262)