Public - Dam Safety and Operating Inspection Report TAC No. MD8547)
ML13165A089
Person / Time
Site: Harris Duke Energy icon.png
Issue date: 07/01/2013
From: Billoch-Colon A
Plant Licensing Branch II
To: Kapopoulos E
Progress Energy Carolinas
Billoch-Colon A, NRR/DORL/LPLII-2, 415
References
TAC MD8547
Download: ML13165A089 (2)


Text

OFFISIAL liSE OIIL¥ SESiiRif¥ RELATED INFORMATION UNJTED STATES NUCLEAR REGULATORY COMMISSION WASHINGTON, D.C. 205!5!5-IHJ01 Mr. Ernie Kapopoulos, Vice President Shearon Harris Nuclear Power Plant Progress Energy Carolinas, Inc...

P.O. Box 165, Mail Zone 1 New Hill, NC 27562-0165 July 1, 2013

SUBJECT:

SHEARON HARRIS NUCLEAR POWER PLANT, UNIT 1-DAM SAFETY AND OPERATION INSPECTION REPORT (TAG NO. MD8547)

Dear Mr. Kapopoulos:

Enclosed is a copy of the Dam Safety Inspection Report for the Auxiliary Reservoir Dam prepared by the Federal Energy Regulatory Commission (FERC) for the U.S. Nuclear Regulatory Commission. The enclosure contains the results of an inspection on April16, 2013, of the auxiliary reservoir dam at Shearon Harris Nuclear Power Plant, Unit 1. The inspection included the main section of the auxiliary earth dam, the concrete spillway, spillway outlet channel, the right section of the earth embankment, and the topographic features around the auxiliary dam and appurtenant structures. The separation dike was also inspected.

During this inspection, no conditions were observed that would adversely affect the safety of the dam or the nuclear facility. The maintenance of the auxiliary reservoir dam appeared to be satisfactory. At FERC's request, the enclosure is not being made publicly available since it contains critical energy infrastructure information.

If you have any questions regarding this matter. please feel free to contact me at (301) 415-3302.

Docket No. 50-400

Enclosure:

As stated cc w/o encl: Distribution via Ustserv Sincerely, Araceli T. Billoch Col6n, Project Manager Plant Licensing Branch 11-2 Division of Operating Reactor licensing Office of Nuclear Reactor Regulation The enclosure transmitted herewith contains Security-Related information. When separated from the enclosure, this document is decontrolled.

OFFICIAL lJSE ONLY SECURITY RELATED INFORMATION

BFFIGIAL 1,16E BNLY SEGI,IRITY RELME91NFBRMATIBN Mr. Emie Kapopoulos, Vice President Shearon Harris Nuclear Power Plant Progress Energy Carolinas, Inc.

P.O. Box 165, Mail Zone 1 New Hill, NC 27562-0165 July 1, 2013

SUBJECT:

SHEARON HARRIS NUCLEAR POWER PlANT, UNIT 1 -DAM SAFETY AND OPERATION INSPECTION REPORT (TAC NO. MD8547)

Dear Mr. Kapopoulos:

Enclosed is a copy of the Dam Safety Inspection Report for the Auxiliary Reservoir Dam prepared by the Federal Energy Regulatory Commission (FERC) for the U.S. Nuclear Regulatory Commission. The enclosure contains the results of an inspection on April16, 2013, of the auxiliary reservoir dam at Shearon Harris Nuclear Power Plant, Unit 1. The inspection included the main section of the auxiliary earth dam, the concrete spillway, spillway outlet channel, the right section of the earth embankment, and the topographic features around the auxiliary dam and appurtenant structures. The separation dike was also inspected.

During this inspection, no conditions were observed that would adversely affect the safety of the dam or the nuclear facility. The maintenance of the auxiliary reservoir dam appeared to be satisfactory. At FERC's request, the enclosure is not being made publicly available since it contains critical energy infrastructure information.

If you have any questions regarding this matter, please feel free to contact me at (301) 415-3302.

Sincerely, IRA!

Araceli T. Billoch ColOn, Project Manager Plant Licensing Branch 11-2 Division of Operating Reactor licensing Office of Nuclear Reactor Regulation Docket No. 50-400

Enclosure:

As stated cc wJo encl: Distribution via Listserv The enclosure transmitted herewith contains Security-Related infonnation. When separated from the enclosure, this document Is decontrolled.

DJSTRIBUTJON:

PUBLIC LPLII-2 Reading RidsNrrDeEmcb Resource RidsNrrDoriDpr Resource RidsNrrPMHarris Resource RidsNrrLABCJayton Resource KKarwoski, NRR RidsAcrsAcnw_MaiiCTR Resource RidsRgn2MaiiCenter Resource RidsNrrDorJLpl2-2 ADAMS Accession Nos.: PKG. ML13165A103 PUBLIC L TR ML13165A089 OFFICE NRRILPL2-2/PM NRRILPL2-2/LA NAME AB1llochCoJ6n BCiayton DATE 06125/13 06/25/13 NON-PUBLIC LTR. ML13165A098 FI:RC RPT ML1316!5A114 NRRIDEJEMCB NRRJLPL2-2JBC KKarwoski JQuichocho 06126/13 06/28113 OFFICIAL AGENCY RECORD BFFISIAL 1,16E QNLY SEGI,IRilY RELATEEliNFQRMATIBN NRRJLPL2-21PM ABillochCoJ6n 07/01/13