ES-301 Administrative Topics Outline Form ES-301-1 Facility: Grand Gulf Nuclear Station Date of Examination: 5/8/2013 Examination Level: RO SRO Operating Test Number: LOT 2012-1 Administrative Topic Type Describe activity to be performed (see Note) Code*

Verify Surveillances Status for 03-1-01-5 Att. I GJPM-OPS-2012-1AS1 Conduct of Operations 2.1.25 (3.9/4.2), 2.1.36 (3.0/4.1), 2.1.40 (2.8/3.9),

R-N 2.1.42 (2.5/3.4)

Determine Firewatch Requirements Conduct of Operations R-D GJPM-OPS-2012-1AS3 2.1.2: (4.1/4.4); 2.1.8: (3.4/4.1); 2.2.22:

(4.0/4.7);2.1.25: (3.9/4.2); 2.4.25: (3.3/3.7)

Tagout Approval GJPM-OPS-2012-1AS3 Equipment Control R-N 2.2.13 (4.1/4.3), 2.2.15 (3.9/4.3), 2.2.41 (3.5/3.9),

2.2.40 (3.4/4.7)

Review Liquid Radwaste Discharge Permit GJPM-OPS-2012-1AS4 Radiation Control R-N 2.3.6: 3.1 Emergency Event Classification GJPM-OPS-2012-1AS5 Emergency Procedures/Plan S/R-N 2.4.41 - 2.9/4.6 NOTE: All items (5 total) are required for SROs. RO applicants require only 4 items unless they are retaking only the administrative topics, when all 5 are required.

  • Type Codes & Criteria: (C)ontrol room, (S)imulator, or Class(R)oom (D)irect from bank ( 3 for ROs; 4 for SROs & RO retakes)

(N)ew or (M)odified from bank ( 1)

(P)revious 2 exams ( 1; randomly selected)

ES-301 Control Room/In-Plant Systems Outline Form ES-301-2 Facility: GRAND GULF NUCLEAR STATION Date of Examination: 5/8/2013 Exam Level: RO SRO-I SRO-U Operating Test No.: LOT-2012-1 Control Room Systems@ (8 for RO); (7 for SRO-I); (2 or 3 for SRO-U, including 1 ESF)

System / JPM Title Type Code* Safety Function

a. 202001 A4.02 (3.5/3.4); 202002 A4.08 (3.3/3.3) / Reset Recirc S-M 1 FCV Runback, GJPM-OPS-2012-1CR1
b. 259001 A4.02 (3.9/3.7) / Reactor Feed Pump Startup, S-D-L 2 GJPM-OPS-2012-1CR4
c. 239001 A2.11.4.1/4.3, A2.12 4.2/4.3, A3.01 4.2/4.1, A4.01 A-N-S 3 4.2/4.0 / Perform MSIV Closure RPS Functional Test, GJPM-OPS-2012-1CR7
d. 202001 K1.21 (2.6/2.6), K3.07 (2.9/2.9), A2.04 (3.7/3.8) / Rapid S-L-N 4 Restart of RWCU Pumps, GJPM-OPS-2012-1CR5
e. 262001 A4.01 (3.4/3.7); A4.02 (3.4/3.4) / Align Buses 16AB and A-S-M 6 17AC to ESF Transformer 21, GJPM-OPS-2012-1CR2
f. 201005 A2.13 (3.8/3.8); A4.01 (3.7/3.7) / Control Rod A-S-M 7 Operability Surveillance, GJPM-OPS-2012-1CR3
g. 400000 K1.02 (3.2/3.4), A4.01 (3.1/3.0) / Align CCW to FPCCU A-S-D 8 Heat Exchanger A, GJPM-OPS-2012-1CR6 In-Plant Systems@ (3 for RO); (3 for SRO-I); (3 or 2 for SRO-U)
h. 203000 K4.14 (3.6/3.7)

D-E-L 4 295016 AA1.07 (4.2/4.3), AK2.02 (4.0/4.1),2.1.30 (4.4/4.0) /

Perform Attachment III of Shutdown from Remote Shutdown Panels ONEP, GJPM-OPS-2012-1PS1

i. 262001 A2.11 (3.2/3.6), 295003 AA1.01 (3.7/3.8), 2.1.30 D-E-R 6 (4.4/4.0)/ Reset UV Lockouts on BOP Buses GLP-OPS-2012-1PS2
j. 286000 A1.05 (3.2/3.2), 295031 EA1.08 (3.8/3.9); 2.1.30:

D-E-S-R 2 4.4/4.02.4.35 (3.8/4.0) / Align Fire Water to LPCS per EP Attachment 26, GLP-OPS-2012-1PS3

@ All RO and SRO-I control room (and in-plant) systems must be different and serve different safety functions; all 5 SRO-U systems must serve different safety functions; in-plant systems and functions may overlap those tested in the control room.

  • Type Codes Criteria for RO / SRO-I / SRO-U (A)lternate path 4-6 / 4-6 / 2-3 (C)ontrol room (D)irect from bank 9/8/4 (E)mergency or abnormal in-plant 1/1/1 (EN)gineered safety feature - / - / 1 (control room system)

(L)ow-Power / Shutdown 1/1/1 (N)ew or (M)odified from bank including 1(A) 2/2/1 (P)revious 2 exams 3 / 3 / 2 (randomly selected)

(R)CA 1/1/1 (S)imulator

ES-301 Transient and Event Checklist Form ES-301-5 Facility: GGNS Date of Exam: 5/08/13 Operating Test No.: LOT-2012-1 A E Scenarios P V 1 2 3 4 T M P E O I L N CREW CREW CREW CREW T N I T POSITION POSITION POSITION POSITION A I

M C S A B S A B S A B S A B L U A T R T O R T O R T O R T O M(*)

N Y O C P O C P O C P O C P R I U T P E

RX 0 1 1 1 NOR 0 1 1 1 I3 I/C 5 5 10 4 MAJ 1 1 2 2 TS 2 2 2 RX NOR I/C MAJ TS RX NOR I/C MAJ TS RX NOR I/C MAJ TS Instructions:

1. Check the applicant level and enter the operating test number and Form ES-D-1 event numbers for each event type; TS are not applicable for RO applicants. ROs must serve in both the at-the-controls (ATC) and balance-of-plant (BOP) positions; ( )Instant SROs must serve in both the SRO and the ATC positions, including at least two instrument or component (I/C) malfunctions and one major transient, in the ATC position. If an Instant SRO additionally serves in the BOP position, one I/C malfunction can be credited toward the two I/C malfunctions required for the ATC position.
2. Reactivity manipulations may be conducted under normal or controlled abnormal conditions (refer to Section D.5.d) but must be significant per Section C.2.a of Appendix D. (*) Reactivity and normal evolutions may be replaced with additional instrument or component malfunctions on a 1-for-1 basis.
3. Whenever practical, both instrument and component malfunctions should be included; only those that require verifiable actions that provide insight to the applicants competence count toward the minimum requirements specified for the applicants license level in the right-hand columns.

Rev 0 (2/28/12) Page 3 of 10

ES-301 Competencies Checklist Form ES-301-6 Facility: GGNS Date of Examination: 5/8/2013 Operating Test No.: 2012-1 APPLICANTS RO RO RO RO SRO-I SRO-I SRO-I SRO-I SRO-U SRO-U SRO-U SRO-U Competencies SCENARIO SCENARIO SCENARIO SCENARIO 1 2 3 4 1 2 3 4 1 2 3 4 1 2 3 4 Interpret/Diagnose 2,3 2,3 Events and Conditions 4,5 4,5 6,7 6,8 Comply With and 2,3 2,3 Use Procedures (1) 4,5 4,5 6

Operate Control 1,2 Boards (2) 4,6 Communicate 1,2 1,2 and Interact 3,4 3,4 5,7 5,6 8

Demonstrate 1,2 Supervisory Ability (3) 3,4 5,7 Comply With and 2,4 Use Tech. Specs. (3)

Notes:

(1) Includes Technical Specification compliance for an RO.

(2) Optional for an SRO-U.

(3) Only applicable to SROs.

Instructions:

Check the applicants license type and enter one or more event numbers that will allow the examiners to evaluate every applicable competency for every applicant.

Rev 0 (2/28/12) Page 4 of 10

Facility: Grand Gulf Nuclear Station Scenario No.: 1 Op-Test No.: LOT-2012-1 Examiners: ____________________________ Operators: _____________________________

Objectives: To evaluate the candidates ability to operate the facility in response to the following evolutions:

Surveillance 06-OP-1B33-Q-0003-01 Reactor Recirc System Quarterly Valve Test.

1B33F019 RW Process Sampling Outboard Isolation Valve failure to reopen during stroke testing.

Component Cooling Water temperature control valve fails partially closed, requiring isolating CCW to RWCU and power reduction.

Jet pumps 5/6 failure Loss of Offsite Power followed by an unisolable LOCA in the Drywell.

Div 2 Load Shedding and Sequencing system failure.

RHR A logic power failure (LPCS available by manual action).

Emergency Depressurization required due to low reactor water level.

Initial Conditions: Plant is operating at 100% power.

Inoperable Equipment: Division 3 AOT in progress with High Pressure Core Spray system and Division 3 Diesel Generator unavailable Turnover:

  • Plant is in steady state operation at 100% power.
  • The Division 3 AOT in progress with High Pressure Core Spray system and Division 3 Diesel Generator out of service for maintenance. Division 3 is scheduled to remain unavailable for the next 19 hours2.199074e-4 days <br />0.00528 hours <br />3.141534e-5 weeks <br />7.2295e-6 months <br />.
  • Following shift briefing, perform 06-OP-1B33-Q-0003, Attachment 1, Reactor Recirc System Quarterly Valve Test.

Scenario Notes:

This is a new scenario.

Validation Time (60-90 min): 80 min Rev 0 (2/28/12) Page 5 of 10

Event Malf. No. Event Type Event No. Description Reactor Recirc System Quarterly Valve Test (06-OP-1B33-Q-1 N (ATC) 0003, Attachment 1).

1B33F019 RW Process Sampling Outboard Isolation Valve C (ATC) failure to reopen during stroke testing (06-OP-1B33-Q-0003, 2 b33f019_i TS (CRS) Alarm Response Instruction 04-1-02-1H13-P601-19A-G3, TS 3.6.5.3, TR SR 6.4.1.5).

A (CREW) Component Cooling Water temperature control valve fails 3 p42R016 R(ATC) partially closed, requiring isolating CCW to RWCU and power C (ATC) reduction (05-1-02-V-1 Loss of Component Cooling Water).

A (CREW) Jet pumps 5/6 rams head failure (05-1-02-III-6 Jet Pump 4 rr011c C (ATC) Anomalies, 05-1-02-III-3 Reduction in Recirculation System TS (CRS) Flow Rate, TS 3.4.3).

Loss of Offsite Power followed by an unisolable LOCA in the Drywell (EP-2 RPV Control, EP-3 Containment Control, 05 02-I-1 Reactor Scram, 05-1-02-I-2 Turbine and Generator Trips, r21135 05-1-02-I-4 Loss of AC Power).

5 M(CREW) rr063a When reactor water level decreases to -160 (TAF), the crew opens 8 SRVs per EP-2 step ED-4. (At least seven SRVs must be open before RPV level drops to -217.)

I(BOP) Div 2 Load Shedding and Sequencing system failure (Alarm 6 r21218 Response Instruction 04-1-02-1H13-P864-2A-H1).

RHR A logic power failure (LPCS and RHR A available by manual action)

The crew restores reactor water level to above -160 following emergency depressurization using LPCS and/or RHR A per 7 r21220 I(ATC/BOP) EP-2 step L-14. (LPCS pump must be started prior to emergency depressurization and/or 1E12F053A, RHR A Shutdown Cooling Return to Feedwater must be opened prior to reactor pressure going below 125 psig during Emergency Depressurization.)

Rev 0 (2/28/12) Page 6 of 10

(N)ormal, (R)eactivity, (I)nstrument, (C)omponent, (M)ajor, (A)bnormal (TS) Tech Spec

  • Critical Task (As defined in NUREG 1021 Appendix D)

Quantitative Attributes Table Normal Events 1 Abnormal Events 2 Reactivity Manipulations 1 Total Malfunctions 7 Instrument/Component Failures 5 EP Entries (Requiring substantive action) 1 Major Transients 1 EP Contingencies 1 Tech Spec Calls 2 Critical Tasks 2 Rev 0 (2/28/12) Page 7 of 10

Facility: Grand Gulf Nuclear Station Scenario No.: 2 Op-Test No.: LOT-2012-1 Examiners: ____________________________ Operators: _____________________________

Objectives: To evaluate the candidates ability to operate the facility in response to the following evolutions:

  • Remove Heater Drain Pump A from service.
  • Heater Drain Pump B trip when Heater Drain Pump A is secured.
  • RPS/NSSSS pressure trip unit B21N678C fails high.
  • Reactor Recirc Pump B trip.
  • Condenser boot seal leak, slow loss of vacuum
  • Manual scram, hydraulic block ATWS, power greater than 5%, Condenser boot seal tear, rapid loss of vacuum.
  • Wide range level indication Channel A fails as-is Initial Conditions: Plant is operating at 83.5% power.

Inoperable Equipment: None Turnover:

  • Power has been reduced to 83.5% per 03-1-01-2 Att. VIII, Temporary Downpower, to remove Heater Drain Pump A from service for an emergent maintenance window scheduled for 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br />.
  • Following shift briefing, secure Heater Drain Pump A per 04-1-01-N23-1 section 4.6.

Scenario Notes:

This is a new scenario.

Validation Time (60-90 min): 85 min Rev 0 (2/28/12) Page 8 of 10

Event Malf. No. Event Type Event No. Description Remove Heater Drain Pump A from service (04-1-01-N23-1 1 N (ATC) section 4.6).

Heater Drain Pump B trip when Heater Drain Pump A is C (ATC) secured (Alarm Response Instruction 04-1-02-1H13-P680-1A-2 fw231b R(ATC) A8, 05-1-02-V-5 Loss of Feedwater Heating, 05-1-02-III-3 Reduction in Recirculation System Flow Rate).

RPS/NSSSS pressure trip unit B21N678C fails high (Alarm ptb21n078c I (ATC) Response Instructions 04-1-02-1H13-P680-5A-B2/7A-A2/4A2-3

_a TS (CRS) D4, Section Procedure 17-S-06-5 Technical Specification Instrumentation Loop Logic, TS 3.3.1.1, TS 3.3.6.1).

C (ATC) Reactor Recirc Pump B trip (Alarm Response Instructions 04-4 rr012b A(CREW) 1-02-1H13-P680-3A-B10, 05-1-02-III-3 Reduction in TS (CRS) Recirculation System Flow Rate, TS 3.4.1, TR 3.4.1).

C (ATC) Condenser boot seal leak, slow loss of vacuum (05-1-02-V-8 5 fw163c A(CREW) Loss of Condenser Vacuum)

Manual Scram, hydraulic block ATWS, power > 5%,

Condenser boot seal tear, rapid loss of vacuum, level/power control (05-1-02-V-8 Loss of Condenser Vacuum, 05-1-02-I-1 Reactor Scram, 05-1-02-I-2 Turbine and Generator Trips, EP-2A ATWS RPV Control, EP-3 Containment Control)

When Suppression Pool temperature reaches 110°F, crew terminates and prevents Condensate/ Feedwater and ECCS injection per EP-2A step L-8.

fw264c M (CREW) 6 c11164 When power decreases to below 5% or reactor water level drops to -167 on compensated fuel zone, crew restores injection using Condensate/Feedwater to maintain level between the point to which level was lowered in step L-8 and -191 per EP-2A step L-9.

Following the ATWS, crew directs installation of EP Attachments 18, 19, and 20 and inserts control rods by manual scram and/or normal rod insertion per EP-2A step Q-1.

c41329 lo-7 C(BOP) Standby Liquid Control suction valves failure to open 1c41f031_r 1c41f031_g 8 rr041a I(ATC) Wide range level indication Channel A fails as-is Rev 0 (2/28/12) Page 9 of 10

(N)ormal, (R)eactivity, (I)nstrument, (C)omponent, (M)ajor, (A)bnormal (TS) Tech Spec

  • Critical Task (As defined in NUREG 1021 Appendix D)

Quantitative Attributes Table Normal Events 1 Abnormal Events 2 Reactivity Manipulations 1 Total Malfunctions 7 Instrument/Component Failures 6 EP Entries (Requiring substantive action) 2 Major Transients 1 EP Contingencies 1 Tech Spec Calls 2 Critical Tasks 3 Rev 0 (2/28/12) Page 10 of 10