Text

Risk-Informed GSI-191 Pilot Application Initial Review Insights Mayy 23, 2013

Objective:

Provide high level review insights regarding the risk-informed portion of STPs pilot submittal, consistent with the intent of Regulatory Guide 1 1.200.

200 2

Review Area Regulatory Guidance

1. Risk-informed applications RG 1.174 states that data, should include a complete list of methods, and assessment criteria changes made to the PRA in used to support regulatory support of an application, application decisionmaking must be well including but not limited to: documented and available for public review.

- Changes to basic event values

- Changes to mission times

- Application-specific Human Reliability Analysis (HRA) summary

- Key Assumptions 3

Review Area Regulatory Guidance

2. Risk-informed applications Modified PRA should meet should include a summary of all guidance in Regulatory Guide Facts and Observations (F&Os) 1.200.

identified by full or focused scope peer reviews and their resolution.

4

Review Area Regulatory Guidance

3. Risk-informed applications Regulatory Guide 1.174 states should address all hazard groups that the risk from a hazard group (e.g., seismic) and operational may be treated qualitatively if the modes modes. licensee can demonstrate that the risk contributions from the hazard A technical justification should be group would not affect the provided if a particular hazard decision.

group or operating mode is not germane to the application. Regulatory Guide 1.200, Section 1.2.5 provides acceptable methods for screening seismic and other external hazards from further analysis.

5

Review Area Regulatory Guidance

4. Risk-informed applications pp LIC-101 states that NRC staff should clearly identify and must obtain all relevant describe all methods that have not information needed to make a been previously reviewed and regulatory decision on a license accepted by the NRC.

NRC amendment request that is fully informed, technically correct, and Documents referenced in a legally defensible.

submittal but not previously reviewed and approved by the NRC staff should be submitted.

6

References

1. An Approach for Using Probabilistic Risk Assessment in Risk-Informed Decisions on Plant-Specific Changes to the Licensing Basis. Regulatory Guide 1 1.174, 174 Revision 22. May 2011 2011.

(ML100910006)

2. An Approach for Determining the Technical Adequacy of Probabilistic Risk Assessment Results for Risk-Informed Activities.

Activities Regulatory Guide 1 1.200, 200 Revision 2. March 2009.

(ML090410014) 3

3. NRR License Amendment Review Procedures Procedures. LIC-101 LIC 101, Revision 4
4. May 2012.