 Issue dateTitleTopic
ML22034A39516 February 2022Enclosure 3 - IP 96001 CY2021 - IR 8 Baseline Inspection Completion
ML22034A39716 February 2022Enclosure 2 - IP 92707 CY2021 - IR 8 Baseline Inspection Completion
ML22034A39916 February 2022Enclosure 1 - IP 71130.03 Cy 2021 - IR 8 Baseline Inspection Completion
ML20135H17014 May 2020Public Notice of Application for Amendment to Renewed Facility Operating License
ML17005A10218 January 2017Attendance List for January 4, 2016, Meeting to Discussion STP - Response to Request for Additional Information the Revised Aluminum Bronze Selective Leaching Aging Management Program for All Potentially Susceptible Welds Throughout the FacAging Management
ML16347A3256 December 2016ASP Analysis-Reject-South Texas Manual Reactor Trip and Valid Auxiliary Feedwater System Actuation-LER 498-2015-001
ML16175A02125 July 2016June 21, 2016, Attendance List
ML16033A0118 February 2016Attendance List for the January 19, 2016, Public Meeting with STP to Discuss the Plant-Specific Aging Management Program, Selective Leaching of Aluminum Bronze, Associated with STP's License Renewal ApplicationAging Management
ML15246A12920 August 2015Attachment 2 - Requests for Exemptions for STP Piloted Risk-Informed Approach to Closure for GS1-191 Through 3-3 Technical Specifications Bases Page Markups (Information Only)Safe Shutdown
Ultimate heat sink
Safe Shutdown Earthquake
Probabilistic Risk Assessment
Coatings
Operating Basis Earthquake
Surveillance Frequency Control Program
Large early release frequency
Exemption Request
Maintenance Rule Program
Fuel cladding
Scaffolding
ML15182A22830 June 2015Supplemental Information for 7/2/15 Public Phone CallBoric Acid
Coatings
Surveillance Frequency Control Program
Large early release frequency
Exemption Request
ML14086A38617 March 2014STP Risk-Informed GSI-191 Aadb RAI 3 Response, Attachment 2Boric Acid
NOC-AE-13003043, Enclosure 5 - Response to NRC Supplemental Information Items13 November 2013Enclosure 5 - Response to NRC Supplemental Information ItemsBoric Acid
Time of Discovery
Mission time
Grab sample
Weld Overlay
Coatings
Exemption Request
Fuel cladding
Scaffolding
ML13140A26920 May 2013NRC Slides for 5/23/13 Meeting Regarding Risk - Informed GSI-191 Pilot Application Initial Review InsightsMission time
Probabilistic Risk Assessment
ML12145A46618 May 2012Loca-Hybrid-Final
ML12056A05212 March 2012Enclosure 6 - List of Power Reactor Licensees and Holders of Construction Permits in Active or Deferred Status
ML12061006329 February 2012Intro for March 8, 2012 Public Meeting to Discuss GSI-191Exemption Request
ML1130606062 November 2011Questions Associated with Loss-of-Coolant Accident (LOCA) Frequency AnalysisWeld Overlay
Probabilistic Risk Assessment
Earthquake
Dissimilar Metal Weld
ML1127702513 October 2011STP Responses to Questions Associated with LOCA Frequency AnalysisWeld Overlay
Probabilistic Risk Assessment
Earthquake
Dissimilar Metal Weld
ML11271003328 September 2011ROP Tabletop Examples and ResultsTime of Discovery
Mission time
Significance Determination Process
ML11263067620 September 2011NRC Staff Questions, Loss-of-Coolant Accident Frequency Analysis, Resolution Approach for Risk-Informed GSI-191, Assessment of Debris Accumulation on Pressurized-Water Reactor (PWR) Sump Performance.Probabilistic Risk Assessment
ML11256A05731 August 2011Documents to Support Review of the South Texas Project License Renewal Application, List of Transmitted Documents Including Copy of Each Document, Enclosure to NOC-AE-11002720
ML11088004931 March 201103/02/2011 List of Participants STP, Units 1 and 2, License Renewal Environmental Scoping Meetings
ML09268019024 September 2009Comments, Draft Request for Exemption from Certain Requirements of Revised 10 CFR 26.205(c) and (D) During Severe Weather ConditionsFitness for Duty
ML0925706922 September 2009Draft Request from Certain Requirements of the Fitness for Duty Rule for Managing FatigueFitness for Duty
ML08351025724 November 2008FEMA Region VI, Radiological Emergency Preparedness (Rep), South Texas Project (REP) Combined License Review, List of 55 RAIs
ML08080003613 March 2008List of Attendees, 03/13/2008 Summary of Meeting with Eight Operating Nuclear Power Plant Licensees to Discuss Emerging Metallurgical Issues Certain Welds in Reactor Coolant System for Pressurized-Water Reactors
ML07324002425 October 2007Examples of Max Thermal Power License Conditions
ML07263031914 September 2007P. Paquin Ltr Amendment to Certificate of Compliance No. 6574 for the Model No. 3-82B Package (TAC L24116)/ Register User List
ML07211043325 July 2007Questions from 1 Through 8Ultimate heat sink
Fuel cladding
ML06347059914 December 2006Plant Service List
ML06033061724 January 2006Safety Culture Survey with Slides
ML0503400257 February 20050POP01-ZO-0006, Rev. 13, Extended Allowed Outage TimeOffsite Dose Calculation Manual
Grace period
ML0503400227 February 2005OPGP03-ZA-0091Offsite Dose Calculation Manual
Probabilistic Risk Assessment
Maintenance Rule Program
Scaffolding
ML04261007213 September 2004Plant Engineering Branch Closed Items Interim Safety Basis
ML04077058913 April 2004Draft Information Request Response to RAI - Attachment 7Finite Element Analysis
ML04041049220 February 2004Order EA-03-009 Service List
ML04041065718 February 2004Meeting Summary of January 21, 2004 with STPNOC- Enclosure 4 - Stpnoc'S Response to NRC Staff'S Comments
ML04077059323 December 2003Draft Information Request PRA Analysis Assessment PRA-03-024, Rev. 0 - Attachment 6
ML0329401047 October 2003Riv Backfit StatusBackfit
ML03294009827 March 2003Riv Backfit StatusBackfit