1 WBN2Public Resource From:
Poole, Justin Sent:
Friday, February 08, 2013 8:12 AM To:
Arent, Gordon Cc:
WBN2HearingFile Resource
Subject:
FW: Fire Protection Questions from January 31, 2013 Meeting
- Gordon, The staff agrees that these accurately capture the questions brought up during last weeks meeting. Thanks.
Justin C. Poole Sr. Project Manager NRR/DORL/LPL2-2 U.S. Nuclear Regulatory Commission (301)415-2048 email: Justin.Poole@nrc.gov From: Moulton, Charles Sent: Thursday, February 07, 2013 3:14 PM To: Poole, Justin Cc: Frumkin, Daniel; Cooper, Gary; WBN2HearingFile Resource
Subject:
RE: Fire Protection Questions from January 31, 2013 Meeting This looks good to us.
Chuck From: Poole, Justin Sent: Wednesday, February 06, 2013 4:07 PM To: Moulton, Charles Cc: Frumkin, Daniel; Cooper, Gary; WBN2HearingFile Resource
Subject:
FW: Fire Protection Questions from January 31, 2013 Meeting
- Chuck, Here is what TVA took away from the meeting we had with them last week. Let me know if you guys agree that this covers everything or if they missed characterized something. Thanks.
Justin C. Poole Sr. Project Manager NRR/DORL/LPL2-2 U.S. Nuclear Regulatory Commission (301)415-2048 email: Justin.Poole@nrc.gov From: Arent, Gordon [1]
Sent: Wednesday, February 06, 2013 3:54 PM To: Poole, Justin Cc: Crouch, William D; Arent, Gordon; Hilmes, Steven A
Subject:
Fire Protection Questions from January 31, 2013 Meeting Justin,
2 The following represent our interpretation of the questions raised by the Fire Protection reviewers at last weeks meeting (1/31/13). Please review and confirm with the Fire Protection folks that this properly captures their questions.
Provide clarification/resolution and proposed report revisions (if required) to address the following issues related to the Watts Bar dual unit Fire Protection Report (FPR):
- 1. Regarding the Reactor Coolant Pump Oil collection System Deviation (FPR Part VII, Section 2.8), provide the low oil level alarm setpoint and justification for why this minimizes the potential for oil accumulation.
- 2. Regarding the Reactor Coolant Pump Oil collection System Deviation (FPR Part VII, Section 2.8), state if WBN utilizes an on line oil makeup/filling process and justification for why this minimizes the potential for oil accumulation.
- 3. Regarding FPR Part VII, Section 7.1.3.2, either provide justification for acceptability of an OMA in the fire area for Room 713.0-A1A in 50 minutes (which is not consistent with the previous NRC acceptance of in less than approximately 60 minutes) or eliminate the requirement to enter the area.
- 4. Regarding Part VII, Section 7.0, retain the original context of the section(s) to be applicable to Unit 1 only and provide a separate discussion of the Unit 2 Operator Manual Actions (OMAs) in Room of Fire Origin.
- 5. Provide clarification as to where in the FPR the Unit 1 safe shutdown path OMAs are discussed. Where is the Unit 1 OMA calculation referenced in the FPR?
- 6. In Part II, Section 12.10.6, Paragraph B, there appears to be an error in the NRC accession number for a referenced July 1, 1994 TVA letter.
- 7. Part I, Table I-1 Fire Areas 18 and 19, Part VI, Fire Areas 18 and 19, Part VII, Section 2.4 - These locations are inconsistent with the requirements of 10 CFR 50, Appendix R, Section III.G.2 regarding the suppression system (manual versus automatic) and the applicability of the deviation in Part VII, Section 2.4. Additionally, Part I, Table I-1 Fire Areas 29, 30, 34, 35, 43, 44 and Part VI, Fire Areas 29, 30, 34, 35, 43, 44 (which contain rooms similar to those in Fire Areas 18 and 19) do not reference the Part VII, Section 2.4 deviation. Address this issue generically.
- 8. Part VI, Section 3.39.2.1 states that credit is taken for offsite power for seven minutes to prevent Refueling Water Storage Tank (RWST) drawdown; however, this credit is not discussed elsewhere in the FPR. Provide justification/basis for the availability of power as assumed. This change was introduced in the November 30, 2011 FPR submittal.
- 9. Part VI, Section 3.14.1 states under the Suppression paragraph that Fire Area 9-1 complies with Appendix R,Section III.G.1 but then states that the area contains redundant safe shutdown equipment which is inconsistent with the requirements of Section III.G.1. Part VI does not reference the Part VII, Section 7.0 Evaluations of OMAs in the room of fire origin.
- 10. Part II, Section 12.3 states In addition, the system can be manually operated via the electro-manual pilot valve for each hazard protected on the loss of power to the system. Explain the meaning of the phrase on the loss of power to the system.
Gordon P. Arent Senior Manager, Watts Bar Unit 2 Licensing Nuclear Construction Ph. 423-365-2004 Cell 865-567-0133 garent@tva.gov
Hearing Identifier:
Watts_Bar_2_Operating_LA_Public Email Number:
777 Mail Envelope Properties (19D990B45D535548840D1118C451C74D016D7955748F)
Subject:
FW: Fire Protection Questions from January 31, 2013 Meeting Sent Date:
2/8/2013 8:12:27 AM Received Date:
2/8/2013 8:12:27 AM From:
Poole, Justin Created By:
Justin.Poole@nrc.gov Recipients:
"WBN2HearingFile Resource" <WBN2HearingFile.Resource@nrc.gov>
Tracking Status: None "Arent, Gordon" <garent@tva.gov>
Tracking Status: None Post Office:
HQCLSTR02.nrc.gov Files Size Date & Time MESSAGE 4984 2/8/2013 8:12:27 AM Options Priority:
Standard Return Notification:
No Reply Requested:
No Sensitivity:
Normal Expiration Date:
Recipients Received: