March 4, 2013

SUBJECT:

ANNUAL ASSESSMENT LETTER FOR THE R.E. GINNA NUCLEAR POWER PLANT (REPORT 05000244/2012001)

Dear Mr. Pacher:

On February 15, 2013, the U.S. Nuclear Regulatory Commission (NRC) completed its end-of-cycle performance review of the R.E. Ginna Nuclear Power Plant (Ginna). The NRC reviewed the most recent quarterly performance indicators, in addition to inspection results and enforcement actions, from January 1, 2012 through December 31, 2012. This letter informs you of the NRCs assessment of your facility during this period and its plans for future inspections at your facility.

The NRC determined that overall, Ginna operated in a manner that preserved public health and safety and met all cornerstone objectives. The NRC determined the performance at Ginna during the most recent quarter was within the Licensee Response Column of the NRCs Reactor Oversight Process Action Matrix because all inspection findings had very low (i.e., Green) safety significance, and all performance indicators demonstrated that your performance was within the nominal, expected range (i.e., Green). Therefore, the NRC plans to conduct Reactor Oversight Process baseline inspections at your facility.

The enclosed inspection plan lists the inspections scheduled through June 30, 2014. Routine inspections performed by resident inspectors are not included in the inspection plan. The inspections listed during the last nine months of the inspection plan are tentative and may be revised at the mid-cycle performance review. In addition to baseline inspections, the NRC will perform Temporary Instruction (TI) 182, Review of the Implementation of the Industry Initiative to Control Degradation of Underground Piping and Tanks. The NRC provides the inspection plan to allow for the resolution of any scheduling conflicts and personnel availability issues. The NRC will contact you as soon as possible to discuss changes to the inspection plan should circumstances warrant any changes. This inspection plan does not include security related inspections, which will be sent via separate, non-publicly available correspondence. In accordance with Title 10 of the Code of Federal Regulations (10 CFR) Part 2.390 of the NRC=s ARules of Practice,@ a copy of this letter will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS)

component of the NRC's Agencywide Document Access and Management System (ADAMS).

ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).

Please contact me at (610) 337-5262 with any questions you have regarding this letter.

Sincerely,

/RA/

Daniel L. Schroeder, Chief, Branch 1 Division of Reactor Projects

Docket No:

50-244 License No:

DPR-18

Enclosure: Inspection Plan

cc w/encl: Distribution via ListServ

ML13059A326

SUNSI Review

Non-Sensitive Sensitive

Publicly Available

Non-Publicly Available OFFICE RI/DRP RI/DRP RI/DRP

NAME SShaffer NPerry/sws for DSchroeder

DATE 02/26/13 02/26/13 03/04/13

Page 1 of 2 02/27/2013 14:21:32 Report 22 Unit Number Planned Dates Start End Inspection Activity Title No. of Staff on Site Ginna Inspection / Activity Plan 01/01/2013 - 06/30/2014 71124

- RADIATION SAFETY INSPECTION

1 IP Radiological Hazard Assessment and Exposure Controls 71124.01 03/11/2013 03/15/2013

IP Occupational ALARA Planning and Controls 71124.02 03/11/2013 03/15/2013 71124

- RADIATION SAFETY INSPECTION

1 IP Radiological Environmental Monitoring Program 71124.07 07/15/2013 07/19/2013 7111121

- CDBI

1 IP Component Design Bases Inspection 7111121 07/22/2013 07/26/2013

IP Component Design Bases Inspection 7111121 08/05/2013 08/09/2013

IP Component Design Bases Inspection 7111121 08/19/2013 08/23/2013 EP EX

- EP EXERCISE EVALUATION

1 IP Exercise Evaluation - Hostile Action (HA) Event 7111407 09/16/2013 09/20/2013 71124

- RADIATION SAFETY INSPECTION

1 IP Radioactive Gaseous and Liquid Effluent Treatment 71124.06 12/09/2013 12/13/2013

IP Radiological Environmental Monitoring Program 71124.07 12/09/2013 12/13/2013

IP Occupational Exposure Control Effectiveness 71151-OR01 12/09/2013 12/13/2013 71152B

- PI&R BIENNIAL

1 IP Problem Identification and Resolution 71152B 02/24/2014 03/01/2014

IP Problem Identification and Resolution 71152B 03/10/2014 03/15/2014 71124

- RADIATION SAFETY INSPECTION

1 IP Radiological Hazard Assessment and Exposure Controls 71124.01 03/03/2014 03/07/2014

IP Occupational ALARA Planning and Controls 71124.02 03/03/2014 03/07/2014 71124.08

- RADWASTE

1 IP Radioactive Solid Waste Processing and Radioactive Material Handling, Storage, and Transportation 71124.08 03/31/2014 04/04/2014 7111108P

- INSERVICE INSPECTION

1 IP Inservice Inspection Activities - PWR 7111108P 04/28/2014 05/09/2014 HP

- HP OUTAGE INSPECTIONS

1 IP Radiological Hazard Assessment and Exposure Controls 71124.01 05/12/2014 05/16/2014

IP Occupational ALARA Planning and Controls 71124.02 05/12/2014 05/16/2014

IP In-Plant Airborne Radioactivity Control and Mitigation 71124.03 05/12/2014 05/16/2014

IP Occupational Dose Assessment 71124.04 05/12/2014 05/16/2014 71124

- RADIATION SAFETY INSPECTION

1 IP In-Plant Airborne Radioactivity Control and Mitigation 71124.03 06/02/2014 06/06/2014

IP Occupational Dose Assessment 71124.04 06/02/2014 06/06/2014 This report does not include INPO and OUTAGE activities.

This report shows only on-site and announced inspection procedures.

Page 2 of 2 02/27/2013 14:21:32 Report 22 Unit Number Planned Dates Start End Inspection Activity Title No. of Staff on Site Ginna Inspection / Activity Plan 01/01/2013 - 06/30/2014 TI 182

- DEGRAD UNDERGROUND PIPING - PHASE 2

1 IP Review of the Implementation of the Industry Initiative to Control Degradation of Underground Piping 2515/182 06/02/2014 06/06/2014 7111107T

- TRIENNIAL HEAT SINK

1 IP Heat Sink Performance 7111107T 06/23/2014 06/27/2014 This report does not include INPO and OUTAGE activities.

This report shows only on-site and announced inspection procedures.