ML21081A03822 March 2021Probabilistic Risk Assessment (PRA) Lessons from Storms and Floods
ML20239A83521 September 2020Results of the ROP Self-Assessment Effectiveness Review of the Cross-Cutting Issues Program
ML18135A10920 June 2018Qualitative PRA Insights from Operational Events
ML18173A02619 June 2018M180619: Transcript - Briefing on Results of the Agency Action Review Meeting (Public)
ML18158A1307 June 2018PilgrimEvaluation - Memorandum Regarding Licensee Event Report Safety Significance Review in Response to Findings Associated with Inspection Procedure 95003; Evaluation of NRC Assessment and Inspection Processes at Pilgrim Nuclear Power Station
ML15273A4561 October 2015PilgrimProblem Identification and Resolution Inspection Report and Notices of Violation 05000293/2015010
ML15218A2805 August 2015PilgrimRegion I Reply - W. Maurer (Citizen) Email White Finding SRVs
ML15208A4608 July 2015PilgrimSlides of Regulatory Conference for July 8, 2015
ML14168A21610 June 2014PilgrimEntergy Comments on Pilgrim Nuclear Power Plant-Preliminary Accident Sequence Precursor Analysis (TAC No. K81136)
ML14139A37615 May 2014PilgrimAnnual Radiological Environmental Operating Report for January 1 Through December 31, 2013
ML14139A47515 May 2014PilgrimAnnual Radioactive Effluent Release Report for January 1 Through December 31, 2013
ML14241A01815 May 2014PilgrimAnnual Radioactive Effluent Release Report for January 1 Through December 31, 2013
ML14245A19615 May 2014PilgrimAnnual Radiological Environmental Operating Report for January 1 Through December 31, 2013
ML14136A35014 May 2014PilgrimSummary of Annual Assessment Meeting for Pilgrim Nuclear Power Station on 5/1/2014 (W/Nrc Presentation Slides)
IR 05000293/201300820 November 2013PilgrimIR 05000293-13-008; 09/16/2013 - 10/03/2013; Pilgrim Nuclear Power Station; Biennial Baseline Inspection of Problem Identification and Resolution (Public)
IR 05000293/201300414 November 2013PilgrimIR 05000293-13-004; 07/01/2013 - 09/30/2013; Pilgrim Nuclear Power Station; Problem Identification and Resolution
IR 05000293/20130028 May 2013PilgrimIR 05000293-13-002, 01/01/2013 - 03/31/2013, Pilgrim Nuclear Power Station, Routine Integrated Inspection Report
IR 05000443/20130021 May 2013SeabrookIR 05000443-13-002; Seabrook Station Unit 1 - NRC Integrated Inspection Report (01-01-13 - 03-31-13)
PNO-I-13-001, D - Update: Pilgrim Station: Unusual Event Declared Due to Loss of Offsite Power During Winter Storm Nemo19 February 2013PilgrimPNO-I-13-001D - Update: Pilgrim Station: Unusual Event Declared Due to Loss of Offsite Power During Winter Storm Nemo
ML13050011912 February 2013PilgrimG20130119/LTR-13-0138 - Ltr. Margaret Sheehan Requests the Proper NRC Oversight of the Construction of a High Level Nuclear Waste Facility at the Site of the Pilgrim Nuclear Power Station in Plymouth, Ma
ENS 4874311 February 2013 19:35:00PilgrimLoss of Emergency Response Capability - Joint Information Center (Jic) Unavailable
ML13042A33311 February 2013PilgrimPNO-I-13-001C - Update: Pilgrim Station: Unusual Event Declared Due to Loss of Offsite Power During Winter Storm Nemo
ML13042A32310 February 2013PilgrimPNO-I-13-001B - Update: Pilgrim Station: Unusual Event Declared Due to Loss of Offsite Power During Winter Storm Nemo
ML13042A3099 February 2013PilgrimPNO-I-13-001A - Update: Pilgrim Station: Unusual Event Declared Due to Loss of Offsite Power During Winter Storm Nemo
ML13042A3029 February 2013PilgrimPNO-I-13-001 - Pilgrim Station: Unusual Event Declared Due to Loss of Offsite Power During Winter Storm Nemo