ML13023A006
| ML13023A006 | |
| Person / Time | |
|---|---|
| Site: | Palisades, Indian Point, Grand Gulf, Pilgrim, Arkansas Nuclear, River Bend, Vermont Yankee, Waterford, FitzPatrick |
| Issue date: | 12/18/2012 |
| From: | Mccann J Entergy Nuclear Operations, Entergy Operations |
| To: | Document Control Desk, NRC/FSME, Office of Nuclear Reactor Regulation |
| Shared Package | |
| ML130230023 | List: |
| References | |
| CNRO-2012-00013, ENOC-2012-00038 | |
| Download: ML13023A006 (13) | |
Text
Entergy Nuclear Operations, Inc.
White Plains, NY 10601 914-272-3370 John F. McCann Vice President, Nuclear Safety, Emergency Planning and Licensing CNRO-2012-00013 ENOC-2012-00038 December 18, 2012 U. S. Nuclear Regulatory Commission ATTN: Document Control Desk 11555 Rockville Pike Rockville, MD 20852-2738
SUBJECT:
Evacuation Time Estimate Reports for Plants Operated by Entergy Nuclear Operations, Inc. and Entergy Operations, Inc. - 10 CFR 50.4 Enterqy Nuclear Operations, Inc.
Indian Point Nuclear Generating Stations 1, 2 and 3 Docket Nos. 50-3, 50-247 and 50-286 Vermont Yankee Nuclear Power Station Docket No. 50-271 Pilgrim Nuclear Power Station Docket No. 50-293 James A. FitzPatrick Nuclear Power Plant Docket No. 50-333 Palisades Nuclear Plant Docket No. 50-255 Entergy Operations, Inc.
Arkansas Nuclear One, Units 1 & 2 Docket Nos. 50-313 and 50-368 Grand Gulf Nuclear Station Docket No. 50-416 River Bend Station Unit 1 Docket No. 50-458 Waterford 3 Steam Electric Station Docket No. 50-382
Dear Sir or Madam:
This correspondence is submitted in accordance with 10 CFR Part 50, Appendix E, section IV.4, which requires licensees to submit an Evacuation Time Estimate (ETE) analysis using decennial census data from the U.S. Census Bureau, within 365 days of the later of the date of availability of the census data or December 23, 2012. Enclosed are 9 Compact Discs (CDs), each contains the aforementioned power plants' Evacuation Time Estimate analysis submitted in accordance with 10 CFR 50.4.
_-L.
2
,fj
CNRO-2012-00013 ENOC-2012-00038 The ETEs were developed in accordance with the Federal guidance in NUREG/CR-7002 (SAND2010-0016P), "Criteria for the Development of Evacuation Time Estimate Studies" published November 2011. The enclosed ETEs provide the methods used to derive, for planning purposes, the time for public evacuation.
This letter does not contain any new commitments.
If there are any questions, please contact Michael Miele, at 914-271-7100.
Sincerely, JFM/CDF/aye
Enclosures:
9 CDs, as described above cc: all w/o attachments USNRC Regional Administrator, Region I USNRC Regional Administrator, Region III USNRC Regional Administrator, Region IV USNRC Project Manager, Indian Point 1 USNRC Project Manager, Indian Point 2 & 3 USNRC Project Manager, FitzPatrick USNRC Project Manager, Vermont Yankee USNRC Project Manager, Pilgrim USNRC Project Manager, Palisades USNRC Project Manager, Big Rock Point USNRC Project Manager, ANO USNRC Project Manager, GGNS USNRC Project Manager, RBS USNRC Project Manager, WF3 USNRC Resident Inspector, Indian Point 2 USNRC Resident Inspector, Indian Point 3 USNRC Resident Inspector, FitzPatrick USNRC Resident Inspector, Vermont Yankee USNRC Resident Inspector, Pilgrim USNRC Resident Inspector, Palisades USNRC Resident Inspector, Cooper USNRC Resident Inspector, ANO USNRC Resident Inspector, GGNS USNRC Resident Inspector, RBS USNRC Resident Inspector, WF3 2
CNRO-2012-00013 ENOC-2012-00038 cc (continued):
Mr. Bernard R. Bevill Arkansas Department of Health Radiation Control Section 4815 West Markham Street Slot #30 Little Rock, AR 72205 State Health Officer Mississippi Department of Health P. O. Box 1700 Jackson, MS 39215-1700 Louisiana Department of Environmental Quality Office of Environmental Compliance Emergency and Radiological Services Division P. 0. Box 4312 Baton Rouge, LA 70821-4312 Ms. Bridget Frymire New York State Department of Public Service 3 Empire State Plaza, 101h Floor Albany, NY 12223 Mr. Francis J. Murray Jr., President New York State Energy and Research Development Authority 17 Columbia Circle Albany, NY 12203-6399 Mr. John Giarrusso, Planning and Preparedness Division Chief Mass Emergency Management Agency (MEMA) 400 Worcester Road Framingham, MA 01702 Director, Massachusetts Department of Public Health (MDPH)
Radiation Control Program Commonwealth of Massachusetts 529 Main Street, Suite 1 M2A Charlestown, MA 02129-1121 Ms. Elizabeth Miller, Commissioner VT Department of Public Service 112 State Street - Drawer 20 Montpelier, Vermont 05620-2601 3
CNRO-2012-00013 ENOC-2012-00038 Michigan Department of Environmental Quality Resource Management Division Radiological Protection Section, Attn: K.Yale Constitution Hall, Lower-Level North 525 West Allegan Street, PO Box 30241 Lansing, MI 48909 Mr. J. A. Aluise (L-ENT)
Mr. Bill Dennis (WPO)
Mr. M. A. Balduzzi (ECH)
Mr. S. J. Bethay (ECH)
Mr. J. S. Forbes (ECH)
Mr. L. Jager Smith (Wise, Carter - ECH) 4
CNRO-2012-00013 ENOC-2012-00038 Entergy Nuclear Operations, Inc.
Entergy Operations, Inc.
Evacuation Time Estimates Indian Point Nuclear Generating Stations 1, 2 and 3 Evacuation Time Estimates 6
CNRO-2012-00013 ENOC-2012-00038 Entergy Nuclear Operations, Inc.
Entergy Operations, Inc.
Vermont Yankee Nuclear Power Station Evacuation Time Estimates 7
CNRO-2012-00013 ENOC-2012-00038 Entergy Nuclear Operations, Inc.
Entergy Operations, Inc.
Pilgrim Nuclear Power Station Evacuation Time Estimates 8
CNRO-2012-00013 ENOC-2012-00038 Entergy Nuclear Operations, Inc.
Entergy Operations, Inc.
James A. FitzPatrick Nuclear Power Plant Evacuation Time Estimates 9
CNRO-2012-00013 ENOC-2012-00038 Entergy Nuclear Operations, Inc.
Entergy Operations, Inc.
Palisades Nuclear Plant & Big Rock Point Evacuation Time Estimates 10
CNRO-2012-00013 ENOC-2012-00038 Entergy Nuclear Operations, Inc.
Entergy Operations, Inc.
Arkansas Nuclear One, Units 1 & 2 Evacuation Time Estimates 11
CNRO-2012-00013 ENOC-2012-00038 Entergy Nuclear Operations, Inc.
Entergy Operations, Inc.
Grand Gulf Nuclear Station Evacuation Time Estimates 12
CNRO-2012-00013 ENOC-2012-00038 Entergy Nuclear Operations, Inc.
Entergy Operations, Inc.
River Bend Station Unit 1 Evacuation Time Estimates 13
CNRO-2012-00013 ENOC-2012-00038 Entergy Nuclear Operations, Inc.
Entergy Operations, Inc.
Waterford 3 Steam Electric Station Evacuation Time Estimates 14