ML12355A163
ML12355A163 | |
Person / Time | |
---|---|
Site: | Zion File:ZionSolutions icon.png |
Issue date: | 12/19/2012 |
From: | Christine Lipa NRC/RGN-III/DNMS/MCID |
To: | Daly P ZionSolutions |
Rodriguez L | |
References | |
Download: ML12355A163 (5) | |
Text
December 19, 2012 Mr. Patrick T. Daly, Senior Vice President and General Manager ZionSolutions, LLC 101 Shiloh Boulevard Zion, IL 60099
SUBJECT:
INFORMATION REQUEST TO SUPPORT UPCOMING PROBLEM IDENTIFICATION AND RESOLUTION INSPECTION AT ZION NUCLEAR POWER STATION
Dear Mr. Daly:
This letter is to request information to support the U.S. Nuclear Regulatory Commissions (NRCs)
Problem Identification and Resolution (PI&R) inspection beginning January 22, 2013, at the permanently shut down Zion Nuclear Power Station, as discussed with Mr. Patrick Thurman on December 11, 2012. This inspection will be performed using NRC Inspection Procedure (IP)
Nos. 71152 and 40801.
Experience has shown that these inspections are resource intensive both for the NRC inspectors and licensee staff. In order to minimize the impact that the inspection has on the site and to ensure a productive inspection, we have enclosed a list of documents required to support the inspection effort.
The documents requested are copies of condition reports, procedures, self-assessment and audit reports, safety culture surveys and other information relevant to our evaluation of your corrective action program and Zion Station safety culture. The documents are necessary to ensure the NRC inspection team is provided with information sufficient to conduct an effective inspection. We request that the information be available in both hard copy format and electronically for our inspection team on January 22, 2013. We do not request that this information be provided in advance of the onsite inspection.
If there are any questions about the material requested, or the inspection, please do not hesitate to contact Mr. James Neurauter, the lead inspector for this effort. Mr. Neurauter can be reached at 630-829-9828 or at james.neurauter@nrc.gov. Mr. Wayne Slawinski can also be contacted at 630-829-9820 or at wayne.slawinski@nrc.gov should Mr. Neurauter be unavailable.
This letter does not contain new or amended information collection requirements subject to the Paperwork Reduction Act of 1995 (44 U.S.C. 3501 et seq.). Existing information collection requirements were approved by the Office of Management and Budget, Control Number 3150-0011.
The NRC may not conduct or sponsor, and a person is not required to respond to, a request for information or an information collection requirement unless the requesting document displays a currently valid Office of Management and Budget control number.
P. Daly In accordance with 10 CFR 2.390 of the NRC's "Rules of Practice," a copy of this letter and its enclosure will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records System (PARS) component of NRC's Agencywide Documents Access and Management System (ADAMS), accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).
Sincerely,
/RA By Wayne J Slawinski Acting for/
Christine Lipa, Chief Materials Control, ISFSI and Decommissioning Branch Division of Nuclear Materials Safety Docket Nos. 05000295; 05000304 License Nos. DPR-39; DPR-48
Enclosure:
Requested Information to Support PI&R Inspection cc w/encl: ZionSolutions Service List Suzi Schmidt, Illinois General Assembly JoAnn D. Osmond, Illinois General Assembly Barry A. Burton, Lake County Administrator Mark C. Curran, Jr., Lake County Sheriff Laurie Cvengros, Village Clerk, Village of Beach Park, Illinois Willard R. Helander, Lake County Clerk Jana Lee, Village Clerk, Village of Winthrop Harbor, Illinois Judy L. Mackey, City Clerk, City of Zion, Illinois Irene T. Pierce, Lake County, Illinois
P. Daly In accordance with 10 CFR 2.390 of the NRC's "Rules of Practice," a copy of this letter and its enclosure will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records System (PARS) component of NRC's Agencywide Documents Access and Management System (ADAMS), accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).
Sincerely,
/RA By Wayne J Slawinski Acting for/
Christine Lipa, Chief Materials Control, ISFSI and Decommissioning Branch Division of Nuclear Materials Safety Docket Nos. 05000295; 05000304 License Nos. DPR-39; DPR-48
Enclosure:
Requested Information to Support PI&R Inspection cc w/encl: ZionSolutions Service List Suzi Schmidt, Illinois General Assembly JoAnn D. Osmond, Illinois General Assembly Barry A. Burton, Lake County Administrator Mark C. Curran, Jr., Lake County Sheriff Laurie Cvengros, Village Clerk, Village of Beach Park, Illinois Willard R. Helander, Lake County Clerk Jana Lee, Village Clerk, Village of Winthrop Harbor, Illinois Judy L. Mackey, City Clerk, City of Zion, Illinois Irene T. Pierce, Lake County, Illinois DISTRIBUTION:
Bruce Watson Harral Logaras Tammy Tomczak John Hickman Alan Barker MCID Branch Anne Boland Carol Ariano DRSIII Jared Heck Linda Linn ADAMS Accession Number: ML12355A163 DOCUMENT NAME: G:\DNMSIII\Work in progress\Zion PI&R Info Request.docx Publicly Available Non-Publicly Available Sensitive Non-Sensitive To receive a copy of this document, indicate in the concurrence box "C" = Copy without attach/encl "E" = Copy with attach/encl "N" = No copy OFFICE DRS RIII DNMS RIII DNMS RIII N DNMS RIII NAME JNeurauter:jc*JEN WSlawinski*WJS LRodriguez*LR CLipa*WJS for DATE 12/19/12 12/19/12 12/19/12 12/19/12 OFFICIAL RECORD COPY
Requested Information to Support Problem Identification and Resolution (PI&R) Inspection
- 1. A copy of administrative procedure(s) for the corrective action program (CAP), trending program, quality assurance audit program, self-assessment program, corrective action effectiveness review program, and the operating experience review program, as applicable.
- 2. A copy of the Employee Concerns Program (ECP) administrative procedure, and the procedure that governs the activities of the Management Review Committee (MRC).
- 3. A copy of quality assurance (QA) audits of the CAP completed since January 2011, and the plan for audits of the CAP in 2013.
- 4. A list of all currently open condition reports (CRs) irrespective of the date initiated, sorted by significance level and initiation date. Include a description of the issue, system or program area affected, the significance level, the priority level and the assigned department.
- 5. A list of all CRs closed since January 2012, sorted by significance level. Include the date initiated and closed, a description of the issue, the significance level, the priority level, and the assigned department.
- 6. A list of CRs initiated since January 2012 that involve inadequate or ineffective corrective actions. Include the date initiated, a brief description, status, significance level of the issue, priority level and the assigned department.
- 7. A list of CRs initiated since January 2012, which identify conditions adverse to quality (and/or are important to the defueled condition). Include the date initiated, a brief description, status, significance level, priority level for each item and the assigned department.
- 8. A list of all outstanding corrective actions sorted by significance level and initiation date.
Include a description of the issue, the significance level, the priority level and the assigned department.
- 9. A list of root cause evaluations, common cause evaluations and apparent cause evaluations completed since January 2011, with a brief description of each evaluation.
- 10. A copy of self-assessments of the CAP completed since January 2011, and the plan for self-assessments of the CAP in 2013.
- 11. Copies of corrective action closeout package for all NRC identified findings and licensee identified violations since January 2011.
- 12. A list of operating experience (OPEX) documents received since January 2011, and any associated CRs generated to review the OPEX issue(s).
- 13. A copy of the most recent operating experience program effectiveness review, as applicable.
Enclosure
- 14. A copy of the latest Zion Nuclear Power Station organizational chart, phone listing and MRC membership.
- 15. Description of safety culture/safety conscious work environment surveys completed since January 2011, and a copy of associated tabulation reports and trend data.
- 16. Copy of CAP training documents (management and staff) including Lesson Plans, training dates and population (groups) trained.
Other Documents requested to be available on-site during the inspection:
- a. Updated Defueled Safety Analysis Report.
- b. Technical Specifications.
- c. Procedure index.
- d. Copies of self-assessments and associated CRs generated in preparation for this inspection.
- e. A copy of the QA manual.
- f. A list of issues brought to the ECP since 2011, and a summary of the actions taken for resolution.
2