12Q0108.10-R-001, Revision 0, Seismic Walkdown Report in Response to the 50.54(f) Information Request Regarding Fukushima Near-Term Task Force Recommendation 2.3: Seismic for the Braidwood Station, Unit 1. Part 3 of 5
ML12339A220
Person / Time
Site: Braidwood  Constellation icon.png
Issue date: 11/16/2012
From: Delaney M
Exelon Generation Co, Stevenson & Associates
To:
Office of Nuclear Reactor Regulation
References
RS-12-159 12Q0108.10-R-001, Rev 0
Download: ML12339A220 (73)


Text

12QO108.10-R-001 Rev. 0 Correspondence No.: RS-12-159 Sheet 1 of 3 Status: 7 N U Seismic Walkdown Checklist (SWC)Equipment ID No.: 1CV02SB Equipment Class: (21) Tanks and Heat Exchangers Equipment

==

Description:==

11B CENTRIFUGAL CHARGING PUMP GEAR COOLER Project: Braidwood 1 SWEL Location (Bldg, Elev, Room/Area):

Auxiliary, 364.00 ft, ALL Manufacturer/Model:

Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results of judgments and findings.

Additional space is provided at the end of this checklist for documenting other comments.Anchorage 1. Is anchorage configuration verification required (i.e., is the item one of the 50%of SWEL items requiring such verification)?

anchored to skid 2. Is the anchorage free of bent, broken, missing or loose hardware?No Not Applicable

3. Is the anchorage free of corrosion that is more than mild surface oxidation?
4. Is the anchorage free of visible cracks in the concrete near the anchors?5. Is the anchorage configuration consistent with plant documentation? (Note: This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.)

Not Applicable Not Applicable Not Applicable

6. Based on the above anchorage evaluations, is the anchorage free of potentially adverse seismic conditions?

Detail for skid mounting shown on Drawing 5-162-06-018-003 Revision 4.Well-secured to skid.Yes C-1 31 12Q0108.10-R-001 Rev. 0 Correspondence No.: RS-12-159 Sheet 2 of 3 Status: M N U Seismic Walkdown Checklist (SWC)Equipment ID No.: 1CV02SB Equipment Class: (21) Tanks and Heat Exchangers Equipment

==

Description:==

1B CENTRIFUGAL CHARGING PUMP GEAR COOLER Interaction Effects 7. Are soft targets free from impact by nearby equipment or structures?

Yes 8. Are overhead equipment, distribution systems, ceiling tiles and lighting, and masonry block walls not likely to collapse onto the equipment?

9. Do attached lines have adequate flexibility to avoid damage?Yes Yes Yes 10. Based on the above seismic interaction evaluations, is equipment free of potentially adverse seismic interaction effects?Other Adverse Conditions
11. Have you looked for and found no adverse seismic conditions that could Yes adversely affect the safety functions of the equipment?

Comments Seismic walkdown performed week of 7/16/12 by M. Delaney & P. Gazda Evaluated by: Marlene Delaney Date: 10/1/2012 Philip Gazda 10/1/2012 C-132 12Q0108.10-R-001 Rev. 0 Correspondence No.: RS-12-159 Sheet 3 of 3 Status: M N U Seismic Walkdown Checklist (SWC)Equipment ID No.: 1CV02SB Equipment Class: (21) Tanks and Heat Exchangers Equipment

==

Description:==

1B CENTRIFUGAL CHARGING PUMP GEAR COOLER Photos 1c C-133 12QO108.10-R-001 Rev. 0 Correspondence No.: RS-12-159 Sheet 1 of 3 Status: M N U Seismic Walkdown Checklist (SWC)Equipment ID No.: 1CV112D Equipment Class: (8) Motor-Operated and Solenoid-Operated Valves Equipment

==

Description:==

RWST TO CHG PMPS SUCT VLV (C/S AT 1 PM05J) ASMBLY; 8" Project: Braidwood 1 SWEL Location (Bldg, Elev, Room/Area):

Auxiliary, 364.00 ft, ALL Manufacturer/Model:

Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results of judgments and findings.

Additional space is provided at the end of this checklist for documenting other comments.Anchorage 1. Is anchorage configuration verification required (i.e., is the item one of the 50%of SWEL items requiring such verification)?

No 2. Is the anchorage free of bent, broken, missing or loose hardware?Not Applicable

3. Is the anchorage free of corrosion that is more than mild surface oxidation?
4. Is the anchorage free of visible cracks in the concrete near the anchors?5. Is the anchorage configuration consistent with plant documentation? (Note: This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.)

Not Applicable Not Applicable Not Applicable

6. Based on the above anchorage evaluations, is the anchorage free of potentially adverse seismic conditions?

Yes C-134 12QO108.10-R-001 Rev. 0 Correspondence No.: RS-12-159 Sheet 2 of 3 Status: T N U Seismic Walkdown Checklist (SWC)Equipment ID No.: 1CV112D Equipment Class: (8) Motor-Operated and Solenoid-Operated Valves Equipment

==

Description:==

RWST TO CHG PMPS SUCT VLV (C/S AT 1PM05J) ASMBLY; 8" Interaction Effects 7. Are soft targets free from impact by nearby equipment or structures?

Yes 8. Are overhead equipment, distribution systems, ceiling tiles and lighting, and masonry block walls not likely to collapse onto the equipment?

All overhead components are well-supported

9. Do attached lines have adequate flexibility to avoid damage?Yes Yes 10. Based on the above seismic interaction evaluations, is equipment free of potentially adverse seismic interaction effects?Yes Other Adverse Conditions
11. Have you looked for and found no adverse seismic conditions that could Yes adversely affect the safety functions of the equipment?

Visual from floor.Comments Seismic walkdown performed week of 7/16/12 by M. Delaney & P. Gazda Evaluated by: Marlene Delaney Date: 10/1/2012 Philip Gazda 10/1/2012 C-135 12Q0108.1O-R-001 Rev. 0 Correspondence No.: RS-12-159 Sheet 3 of 3 Status: M N U Seismic Walkdown Checklist (SWC)Equipment ID No.: 1CV112D Equipment Class: (8) Motor-Operated and Solenoid-Operated Valves Equipment

==

Description:==

RWST TO CHG PMPS SUCT VLV (C/S AT 1PM05J) ASMBLY; 8" Photos I L;VI I ZU 1-19-12 U36 C-1 36 12Q0108.10-R-001 Rev. 0 Correspondence No.: RS-12-159 Sheet 1 of 3 Status: M N U Seismic Walkdown Checklist (SWC)Equipment ID No.: 1CV112E Equipment Class: (8) Motor-Operated and Solenoid-Operated Valves Equipment

==

Description:==

RWST TO CHG PMPS SUCT VLV (C/S AT 1PM05J) ASMBLY; 8" Project: Braidwood 1 SWEL Location (Bldg, Elev, Room/Area):

Auxiliary, 364.00 ft, ALL Manufacturer/Model:

Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results of judgments and findings.

Additional space is provided at the end of this checklist for documenting other comments.Anchorage 1. Is anchorage configuration verification required (i.e., is the item one of the 50%of SWEL items requiring such verification)?

No 2. Is the anchorage free of bent, broken, missing or loose hardware?Not Applicable

3. Is the anchorage free of corrosion that is more than mild surface oxidation?
4. Is the anchorage free of visible cracks in the concrete near the anchors?5. Is the anchorage configuration consistent with plant documentation? (Note: This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.)

Not Applicable Not Applicable Not Applicable

6. Based on the above anchorage evaluations, is the anchorage free of potentially adverse seismic conditions?

Yes C-137 12Q0108.10-R-001 Rev. 0 Correspondence No.: RS-12-159 Sheet 2 of 3 Status: F N U Seismic Walkdown Checklist (SWC)Equipment ID No.: 1CV112E Equipment Class: (8) Motor-Operated and Solenoid-Operated Valves Equipment

==

Description:==

RWST TO CHG PMPS SUCT VLV (C/S AT 1PM05J) ASMBLY; 8" Interaction Effects 7. Are soft targets free from impact by nearby equipment or structures?

Yes 8. Are overhead equipment, distribution systems, ceiling tiles and lighting, and masonry block walls not likely to collapse onto the equipment?

Yes 9. Do attached lines have adequate flexibility to avoid damage?Yes 10. Based on the above seismic interaction evaluations, is equipment free of potentially adverse seismic interaction effects?Yes Other Adverse Conditions

11. Have you looked for and found no adverse seismic conditions that could Yes adversely affect the safety functions of the equipment?

Visual observation from floor. View is obstructed.

Comments Seismic walkdown performed week of 7/16/12 by M. Delaney & P. Gazda Evaluated by: Marlene Delaney *Date: 10/1/2012 Philip Gazda 10/1/2012 C-138 12Q0108.10-R-001 Rev. 0 Correspondence No.: RS-12-159 Sheet 3 of 3 Status: M N U Seismic Walkdown Checklist (SWC)Equipment ID No.: 1CV112E Equipment Class: (8) Motor-Operated and Solenoid-Operated Valves Equipment

==

Description:==

RWST TO CHG PMPS SUCT VLV (C/S AT 1PM05J) ASMBLY; 8" Photos None.C-139 12Q0108.10-R-001 Rev. 0 Correspondence No.: RS-12-159 Sheet 1 of 3 Status: M N U Seismic Walkdown Checklist (SWC)Equipment ID No.: 1CV8355A Equipment Class: (8) Motor-Operated and Solenoid-Operated Valves Equipment

==

Description:==

RCP 1A SEAL INJECTION ISOL VLV (C/S AT 1PM05J) ASMBLY; 2" Project: Braidwood 1 SWEL Location (Bldg, Elev, Room/Area):

Auxiliary, 401.00 ft, ALL Manufacturer/Model:

Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results of judgments and findings.

Additional space is provided at the end of this checklist for documenting other comments.Anchorage 1. Is anchorage configuration verification required (i.e., is the item one of the 50%of SWEL items requiring such verification)?

No 2. Is the anchorage free of bent, broken, missing or loose hardware?Not Applicable

3. Is the anchorage free of corrosion that is more than mild surface oxidation?
4. Is the anchorage free of visible cracks in the concrete near the anchors?5. Is the anchorage configuration consistent with plant documentation? (Note: This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.)

Not Applicable Not Applicable Not Applicable

6. Based on the above anchorage evaluations, is the anchorage free of potentially adverse seismic conditions?

Yes C-140 12Qo108.10-R-001 Rev. 0 Correspondence No.: RS-12-159 Sheet 2 of 3 Status: M N U Seismic Walkdown Checklist (SWC)Equipment ID No.: 1CV8355A Equipment Class: (8) Motor-Operated and Solenoid-Operated Valves Equipment

==

Description:==

RCP 1A SEAL INJECTION ISOL VLV (C/S AT 1PM05J) ASMBLY; 2" Interaction Effects 7. Are soft targets free from impact by nearby equipment or structures?

Yes 8. Are overhead equipment, distribution systems, ceiling tiles and lighting, and masonry block walls not likely to collapse onto the equipment?

9. Do attached lines have adequate flexibility to avoid damage?Yes Yes Yes 10. Based on the above seismic interaction evaluations, is equipment free of potentially adverse seismic interaction effects?Other Adverse Conditions
11. Have you looked for and found no adverse seismic conditions that could Yes adversely affect the safety functions of the equipment?

Piping is well-supported.

Rugged valve.Comments Seismic walkdown performed week of 7/16/12 by M. Delaney & P. Gazda Evaluated by: Marlene Delaney Date: 10/1/2012 r " .Philip Gazda 10/1/2012 C-141 12Q0108.10-R-001 Rev. 0 Correspondence No.: RS-12-159 Sheet 3 of 3 Status: M N U Seismic Walkdown Checklist (SWC)Equipment ID No.: Equipment Class: Equipment

==

Description:==

1 CV8355A (8) Motor-Operated and Solenoid-Operated Valves RCP 1A SEAL INJECTION ISOL VLV (C/S AT 1 PM05J) ASMBLY; 2" Photos 1CV8355A 7-19-12 Group 2 002 C-142 12Q0108.10-R-001 Rev. 0 Correspondence No.: RS-12-159 Sheet 1 of 4 Status: ; N U Seismic Walkdown Checklist (SWC)Equipment ID No.: 1DCO1E Equipment Class: (15) Batteries on Racks Equipment

==

Description:==

125V BATTERY 111 DIV. 11 Project: Braidwood 1 SWEL Location (Bldg, Elev, Room/Area):

Auxiliary, 451.00 ft, ALL Manufacturer/Model:

Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results of judgments and findings.

Additional space is provided at the end of this checklist for documenting other comments.Anchorage 1. Is anchorage configuration verification required (i.e., is the item one of the 50% Yes of SWEL items requiring such verification)?

2. Is the anchorage free of bent, broken, missing or loose hardware?

Yes 3. Is the anchorage free of corrosion that is more than mild surface oxidation?

Yes 4. Is the anchorage free of visible cracks in the concrete near the anchors? Yes 5. Is the anchorage configuration consistent with plant documentation? (Note: Yes This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.)

Drawing 20E-0-3391BE Revision C Detail 19172 6. Based on the above anchorage evaluations, is the anchorage free of Yes potentially adverse seismic conditions?

C-143 12Q0108.10-R-001 Rev. 0 Correspondence No.: RS-12-159 Sheet 2 of 4 Status: M N U Seismic Walkdown Checklist (SWC)Equipment ID No.: 1DC01E Equipment Class: (15) Batteries on Racks Equipment

==

Description:==

125V BATTERY 111 DIV. 11 Interaction Effects 7. Are soft targets free from impact by nearby equipment or structures?

8. Are overhead equipment, distribution systems, ceiling tiles and lighting, and masonry block walls not likely to collapse onto the equipment?

Seismic block walls, overhead lights have closed S-hooks and bulb guards.Subsequent to initial walkdown, NRC identified open S-hooks in this room. IR 1395981 was written. Unlikely that lights would fall on equipment since the S-hooks are not completely open and not all S-hooks for a light are open.9. Do attached lines have adequate flexibility to avoid damage?10. Based on the above seismic interaction evaluations, is equipment free of potentially adverse seismic interaction effects?Yes Yes Yes Yes Other Adverse Conditions

11. Have you looked for and found no adverse seismic conditions that could Yes adversely affect the safety functions of the equipment?

Comments Seismic walkdown performed week of 7/16/12 by M. Delaney & P. Gazda Evaluated by: Marlene Delaney Date: 10/1/2012 Philip Gazda 10/1/2012 C-144 12Q01 08. 1O-R-OO1 Rev. 0 Correspondence No.: RS-12-159 Sheet 3 of 4 Status: M N U Seismic Walkdown Checklist (SWC)Equipment ID No.: Equipment Class: Equipment

==

Description:==

1OCO1E (15) Batteries on Racks 125V BATTERY 111 DIV. 11 Photos 1DC01E 7-16-12 040 C-145 12Q0108.10-R-001 Rev. 0 Correspondence No.: RS-12-159 Sheet 4 of 4 Status: M N U Seismic Walkdown Checklist (SWC)Equipment ID No.: 1DCO1E Equipment Class: (15) Batteries on Racks Equipment

==

Description:==

125V BATTERY 111 DIV. 11 1DC01E 7-16-12 042 C-146 12Q0108.10-R-001 Rev. 0 Correspondence No.: RS-12-159 Sheet 1 of 3 Status: M N U Seismic Walkdown Checklist (SWC)Equipment ID No.: 1 DC02E Equipment Class: (15) Batteries on Racks Equipment

==

Description:==

125V BATTERY 112 DIV. 12 Project: Braidwood 1 SWEL Location (Bldg, Elev, Room/Area):

Auxiliary, 451.00 ft, ALL Manufacturer/Model:

Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results of judgments and findings.

Additional space is provided at the end of this checklist for documenting other comments.Anchorage 1. Is anchorage configuration verification required (i.e., is the item one of the 50% Yes of SWEL items requiring such verification)?

2. Is the anchorage free of bent, broken, missing or loose hardware?

Yes 3. Is the anchorage free of corrosion that is more than mild surface oxidation?

Yes 4. Is the anchorage free of visible cracks in the concrete near the anchors? Yes 5. Is the anchorage configuration consistent with plant documentation? (Note: Yes This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.)

Drawing 20E-O-3391BE Revision C Detail 19172.Bolt with excessive projection however noted on Drawing 20E-0-339 1BE so acceptable.

6. Based on the above anchorage evaluations, is the anchorage free of Yes potentially adverse seismic conditions?

C-147 12QO108.10-R-001 Rev. 0 Correspondence No.: RS-12-159 Sheet 2 of 3 Status: r N U Seismic Walkdown Checklist (SWC)Equipment ID No.: 1DC02E Equipment Class: (15) Batteries on Racks Equipment

==

Description:==

125V BATTERY 112 DIV. 12 Interaction Effects 7. Are soft targets free from impact by nearby equipment or structures?

Yes 8. Are overhead equipment, distribution systems, ceiling tiles and lighting, and masonry block walls not likely to collapse onto the equipment?

Overhead lights on chains with closed S-hooks (base not always visible).Subsequent it was noted that one top S-hook is open on one light. IR 1395992 was written. Unlikely that lights would fall and damage equipment since the S-hook is not completely open and not all S-hooks on light are open.Light bulbs have guards.Seismic block walls 9. Do attached lines have adequate flexibility to avoid damage?Yes Yes 10. Based on the above seismic interaction evaluations, is equipment free of potentially adverse seismic interaction effects?Yes Other Adverse Conditions

11. Have you looked for and found no adverse seismic conditions that could Yes adversely affect the safety functions of the equipment?

Comments Seismic walkdown performed week of 7/16/12 by M. Delaney & P. Gazda C-148 12Q0108.1O-R-OO1 Rev. 0 Correspondence No.: RS-1 2-1 59 Sheet 3 of 3 Status: F N U Seismic Walkdown Checklist (SWC)Equipment ID No.: Equipment Class: Equipment

==

Description:==

1 DC02E (15) Batteries on Racks 125V BATTERY 112 DIV. 12 Evaluated by: Marlene Delaney Date: 10/1/2012 Philip Gazda 10/1/2012 Photos 1IDC02E 7-16-12 061 1 DC02E 7-16-12 062 C-149 12Q0108.10-R-001 Rev. 0 Correspondence No.: RS-12-159 Sheet I of 4 Status: M N U Seismic Walkdown Checklist (SWC)Equipment ID No.: 1DC04E Equipment Class: (16) Battery Chargers and Inverters r-#,;, r % t-;r OATT-r V OUIADt"2_CD 1 -1) r')lXl 11)%A IUIJ III P1 L/IJLU I Iu I,-r'l I /. IV I.Project: Braidwood 1 SWEL Location (Bldg, Elev, Room/Area):

Auxiliary, 451.00 ft, ALL Manufacturer/Model:

Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results of judgments and findings.

Additional space is provided at the end of this checklist for documenting other comments.Anchorage 1. Is anchorage configuration verification required (i.e., is the item one of the 50% Y of SWEL items requiring such verification)?

es 2. Is the anchorage free of bent, broken, missing or loose hardware?3. Is the anchorage free of corrosion that is more than mild surface oxidation?

4. Is the anchorage free of visible cracks in the concrete near the anchors?5. Is the anchorage configuration consistent with plant documentation? (Note: This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.)

Drawing 20E-O-3391N Revision AH Detail 8745 6. Based on the above anchorage evaluations, is the anchorage free of potentially adverse seismic conditions?

Yes Yes Yes Yes Yes C-150 12QO108.10-R-01 Rev. 0 Correspondence No.: RS-12-159 Sheet 2 of 4 Status: r] N U Seismic Walkdown Checklist (SWC)Equipment ID No.: 1DC04E Equipment Class: (16) Battery Chargers and Inverters Equipment

==

Description:==

BATTERY CHARGER 112 DIV. 12 Interaction Effects 7. Are soft targets free from impact by nearby equipment or structures?

8. Are overhead equipment, distribution systems, ceiling tiles and lighting, and masonry block walls not likely to collapse onto the equipment?

Seismic block wall 9. Do attached lines have adequate flexibility to avoid damage?10. Based on the above seismic interaction evaluations, is equipment free of potentially adverse seismic interaction effects?Yes Yes Yes Yes Other Adverse Conditions

11. Have you looked for and found no adverse seismic conditions that could Yes adversely affect the safety functions of the equipment?

See A WC 8 for discussion on small crack in wall near equipment.

Comments Seismic walkdown performed week of 7/16/12 by M. Delaney & P. Gazda Evaluated by: Marlene Delaney Date: 10/1/2012 Evaluated by: Philip Gazda 10/1/2012 C-151 12Q0108.1O-R-OOI Rev. 0 Correspondence No.: RS-12-159 Sheet 3 of 4 Status: M N U Seismic Walkdown Checklist (SWC)Equipment ID No.: Equipment Class: Equipment

==

Description:==

Photos 1DC04E (16) Battery Chargers and Inverters BATTERY CHARGER 112 DIV. 12 1DC04E 7-16-12 059 1DC04E 7-16-12 060 1DC04E 7-16-12 064 C-1 52 12Q0108.10-R-001 Rev. 0 Correspondence No.: RS-12-159 Sheet 4 of 4 Status: M N U Seismic Walkdown Checklist (SWC)Equipment ID No.: lDC04E Equipment Class: (16) Battery Chargers and Inverters Eauibment

==

Description:==

BATTERY CHARGER 112 DIV. 12 11);U04t 1-l7-1.2 Ub C-153 12Q0108.10-R-001 Rev. 0 Correspondence No.: RS-12-159 Sheet 1 of 4 Status: r N U Seismic Walkdown Checklist (SWC)Equipment ID No.: 1DC06E Equipment Class: (14) Distribution Panels Equipment

==

Description:==

125V DC ESF DIST CENTER 112 Project: Braidwood 1 SWEL Location (Bldg, Elev, Room/Area):

Auxiliary, 451.00 ft, ALL Manufacturer/Model:

Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results of judgments and findings.

Additional space is provided at the end of this checklist for documenting other comments.Anchorage 1. Is anchorage configuration verification required (i.e., is the item one of the 50% Yes of SWEL items requiring such verification)?

2. Is the anchorage free of bent, broken, missing or loose hardware?

Yes 3. Is the anchorage free of corrosion that is more than mild surface oxidation?

Yes 4. Is the anchorage free of visible cracks in the concrete near the anchors? Yes 5. Is the anchorage configuration consistent with plant documentation? (Note: Yes This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.)

Drawing 20E-0-3391C Rev BM specifies 1 1/2" @ 12, actual weld exceeds drawing requirements

6. Based on the above anchorage evaluations, is the anchorage free of Yes potentially adverse seismic conditions?

C-1 54 12Q0108.10-R-001 Rev. 0 Correspondence No.: RS-12-159 Sheet 2 of 4 Status: T N U Seismic Walkdown Checklist (SWC)Equipment ID No.: 1 DC06E Equipment Class: (14) Distribution Panels Equipment

==

Description:==

125V DC ESF DIST CENTER 112 Interaction Effects 7. Are soft targets free from impact by nearby equipment or structures?

Yes 8. Are overhead equipment, distribution systems, ceiling tiles and lighting, and masonry block walls not likely to collapse onto the equipment?

No bulb guards on lights but if the lights fell they would not damage equipment.

S&L Standard EE-103 does not require guards on fluorescent fixtures.9. Do attached lines have adequate flexibility to avoid damage?Yes Yes Yes 10. Based on the above seismic interaction evaluations, is equipment free of potentially adverse seismic interaction effects?Other Adverse Conditions

11. Have you looked for and found no adverse seismic conditions that could Yes adversely affect the safety functions of the equipment?

Comments Seismic walkdown performed week of 7/16/12 by M. Delaney & P. Gazda Evaluated by: Marlene Delaney Date: 10/1/2012 Philip Gazda 10/1/2012 C-155 1200108.1O-R-OO1 Rev. 0 Correspondence No.: RS-12-159 Sheet 3 of 4 Status: M N U Seismic Walkdown Checklist (SWC)Equipment ID No.: 1DC06E Equipment Class: (14) Distribution Panels Equipment

==

Description:==

125V DC ESF DIST CENTER 112 Photos 1DC06E 7-16-12 050 1DC06E 7-16-12 051 C-1 56 12Q0108.10-R-001 Rev. 0 Correspondence No.: RS-12-159 Sheet 4 of 4 Status: r N U Seismic Walkdown Checklist (SWC)Equipment ID No.: 1 DC06E Equipment Class: (14) Distribution Panels EauiDment

==

Description:==

125V DC ESF DIST CENTER 112 I UUUbt [-I b-1Z uOz C-157 12Q0108.10-R-001 Rev. 0 Correspondence No.: RS-12-159 Sheet 1 of 3 Status: M N U Seismic Walkdown Checklist (SWC)Equipment ID No.: 1DC10J-Equipment Class: (14) Distribution Panels Equipment

==

Description:==

125V DC FUSE PANEL -DIV. 11 Project: Braidwood 1 SWEL Location (Bldg, Elev, Room/Area):

Auxiliary, 451.00 ft, ALL Manufacturer/Model:

Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results of judgments and findings.

Additional space is provided at the end of this checklist for documenting other comments.Anchorage 1. Is anchorage configuration verification required (i.e., is the item one of the 50% Yes of SWEL items requiring such verification)?

2. Is the anchorage free of bent, broken, missing or loose hardware?

Yes 3. Is the anchorage free of corrosion that is more than mild surface oxidation?

Yes 4. Is the anchorage free of visible cracks in the concrete near the anchors? Yes 5. Is the anchorage configuration consistent with plant documentation? (Note: Yes This question only applies if the item is one of the 50% for which an anchorage configuration verification is required:)

Drawing 20E-O-3391AH Rev A V Detail 10030 6. Based on the above anchorage evaluations, is the anchorage free of Yes potentially adverse seismic conditions?

C-158 12Q0108.10-R-001 Rev. 0 Correspondence No.: RS-1 2-159 Sheet 2 of 3 Status: Y N U Seismic Walkdown Checklist (SWC)Equipment ID No.: lDC10J Equipment Class: (14) Distribution Panels Equipment

==

Description:==

125V DC FUSE PANEL -DIV. 11 Interaction Effects 7. Are soft targets free from impact by nearby equipment or structures?

Yes 8. Are overhead equipment, distribution systems, ceiling tiles and lighting, and masonry block walls not likely to collapse onto the equipment?

overhead lighting is adequate 9. Do attached lines have adequate flexibility to avoid damage?Yes Yes 10. Based on the above seismic interaction evaluations, is equipment free of potentially adverse seismic interaction effects?Yes Other Adverse Conditions

11. Have you looked for and found no adverse seismic conditions that could Yes adversely affect the safety functions of the equipment?

Comments Seismic walkdown performed week of 7/16/12 by M. Delaney & P. Gazda Evaluated by: Marlene Delaney Date: 10/1/2012 Philip Gazda 10/1/2012 C-159 12Q0108.1O-R-001 Rev. 0 Correspondence No.: RS-12-159 Sheet 3 of 3 Status: M N U Seismic Walkdown Checklist (SWC)Equipment ID No.: 1DC10J Equipment Class: Equipment

==

Description:==

(14) Distribution Panels 125V DC FUSE PANEL -DIV. 11 Photos 1DC1OJ 7-16-12 043 1DC1OJ 7-16-12 044 C-160 12Q0108.1O-R-001 Rev. 0 Correspondence No.: RS-12-159 Sheet 1 of 4 Status: M N U Seismic Walkdown Checklist (SWC)Equipment ID No.: 1DC11J Equipment Class: (14) Distribution Panels Equipment

==

Description:==

125V DC FUSE PANEL -DIV. 12 Project: Braidwood 1 SWEL Location (Bldg, Elev, Room/Area):

Auxiliary, 451.00 ft, ALL Manufacturer/Model:

Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results of judgments and findings.

Additional space is provided at the end of this checklist for documenting other comments.Anchorage 1. Is anchorage configuration verification required (i.e., is the item one of the 50% Yes of SWEL items requiring such verification)?

2. Is the anchorage free of bent, broken, missing or loose hardware?

Yes 3. Is the anchorage free of corrosion that is more than mild surface oxidation?

Yes 4. Is the anchorage free of visible cracks in the concrete near the anchors? Yes 5. Is the anchorage configuration consistent with plant documentation? (Note: Yes This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.)

Drawing 20E-0-3391K Rev AF 6. Based on the above anchorage evaluations, is the anchorage free of Yes potentially adverse seismic conditions?

C-161 12Q0108.1O-R-001 Rev. 0 Correspondence No.: RS-12-159 Sheet 2 of 4 Status: M N U Seismic Walkdown Checklist (SWC)Equipment ID No.: 1DC11J Equipment Class: (14) Distribution Panels Equipment

==

Description:==

125V DC FUSE PANEL -DIV. 12 Interaction Effects 7. Are soft targets free from impact by nearby equipment or structures?

8. Are overhead equipment, distribution systems, ceiling tiles and lighting, and masonry block walls not likely to collapse onto the equipment?
9. Do attached lines have adequate flexibility to avoid damage?10. Based on the above seismic interaction evaluations, is equipment free of potentially adverse seismic interaction effects?Yes Yes Yes Yes Other Adverse Conditions
11. Have you looked for and found no adverse seismic conditions that could Yes adversely affect the safety functions of the equipment?

Comments Seismic walkdown performed week of 7/16/12 by M. Delaney & P. Gazda Evaluated by: Marlene Delaney Date: 10/1/2012 Philip Gazda 10/1/2012 C-162 12Q01 08.1O-R-0-1 Rev. 0 Correspondence No.: RS-12-159 Sheet 3 of 4 Status: M N U Seismic Walkdown Checklist (SWC)Equipment ID No.: lDC11J Equipment Class: (14) Distribution Panels Equipment

==

Description:==

125V DC FUSE PANEL -DIV. 12 Photos 1DC11J 7-16-12 047 1DC11J 7-16-12 048 C-1 63 12Q0108.10-R-001 Rev. 0 Correspondence No.: RS-12-159 Sheet 4 of 4 Status: M N U Seismic Walkdown Checklist (SWC)Equipment ID No.: 1DC11J Equipment Class: (14) Distribution Panels Eauioment

==

Description:==

125V DC FUSE PANEL -DIV. 12 a- aft 1DC11J 7-16-12 049 C-164 12Q0108.10-R-001 Rev. 0 Correspondence No.:'RS-12-159 Sheet 1 of 6 Status: M N U Seismic Walkdown Checklist (SWC)Equipment ID No.: 1DG01KB Equipment Class: (17) Engine-Generators Equipment

==

Description:==

1B DIESEL GENERATOR Project: Braidwood 1 SWEL Location (Bldg, Elev, Room/Area):

Auxiliary, 401.00 ft, ALL Manufacturer/Model:

Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results of judgments and findings.

Additional space is provided at the end of this checklist for documenting other comments.Anchorage 1. Is anchorage configuration verification required (i.e., is the item one of the 50% Yes of SWEL items requiring such verification)?

2. Is the anchorage free of bent, broken, missing or loose hardware?

Yes 3. Is the anchorage free of corrosion that is more than mild surface oxidation?

Yes 4. Is the anchorage free of visible cracks in the concrete near the anchors? Yes 5. Is the anchorage configuration consistent with plant documentation? (Note: Yes This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.)

M-1222 Sheet 11 Revision D See A WC 11 for thread engagement of heat exchanger skid.6. Based on the above anchorage evaluations, is the anchorage free of Yes potentially adverse seismic conditions?

C-165 12Q0108.10-R-001 Rev. 0 Correspondence No.: RS-12-159 Sheet 2 of 6 Status: M N U Seismic Walkdown Checklist (SWC)Equipment ID No.: 1DG01KB Equipment Class: (17) Engine-Generators Equipment

==

Description:==

1B DIESEL GENERATOR Interaction Effects 7. Are soft targets free from impact by nearby equipment or structures?

8. Are overhead equipment, distribution systems, ceiling tiles and lighting, and masonry block walls not likely to collapse onto the equipment?

Overhead, trolley beam is well-supported.

9. Do attached lines have adequate flexibility to avoid damage?10. Based on the above seismic interaction evaluations, is equipment free of potentially adverse seismic interaction effects?Yes Yes Yes Yes Other Adverse Conditions
11. Have you looked for and found no adverse seismic conditions that could Yes adversely affect the safety functions of the equipment?

Comments Seismic walkdown performed week of 7/16/12 by M. Delaney & P. Gazda Evaluated by: Marlene Delaney Date: 10/1/2012 Philip Gazda 10/1/2012 C-166 12Q0108.10-R-001 Rev. 0 Correspondence No.: RS-12-159 Sheet 3 of 6 Status: M N U Seismic Walkdown Checklist (SWC)Equipment ID No.: lDG01KB Equipment Class: (17) Engine-Generators Equipment

==

Description:==

1 B DIESEL GENERATOR Photos 1 UDU1 KB (AVVB -thread engagement) 7-18-12 050 1DG01KB (AWB -thread engagement) 7-18-12 051 C-167 12Q0108.10-R-001 Rev. 0 Correspondence No.: RS-12-159 Sheet 4 of 6 Status: M N U Seismic Walkdown Checklist (SWC)Equipment ID No.: lDG01KB Equipment Class: (17) Engine-Generators Equipment

==

Description:==

1B DIESEL GENERATOR 1 DG01 KB (AWB -thread engagement) 7-18-12 052 1 DG01 KB (AWB -thread engagement) 7-18-12 053 C-168 12Q0108.10-R-0O1 Rev. 0 Correspondence No.: RS-12-159 Sheet 5 of 6 Status: M N U Seismic Walkdown Checklist (SWC)Equipment ID No.: 1DG01KB Equipment Class: (17) Engine-Generators tion: 1B DIESEL GENERATOR 1 uLuui Kts (1Avv -tnreaa engagement)

(-1 ts-1 z uo4 I LJ(jU1 KU 1-1 b-1 Z U54 C-169 12Q0108.10-R-001 Rev. 0 Correspondence No.: RS-12-159 Sheet 6 of 6 Status: M N U Seismic Walkdown Checklist (SWC)Equipment ID No.: lDG01KB Equipment Class: (17) Engine-Generators Equipment

==

Description:==

1 B DIESEL GENERATOR 1DG01KB 7-16-12 085 1DG01KB 7-16-12 086 C-1 70 12QO108.10-R-001 Rev. 0 Correspondence No.: RS-12-159 Sheet 1 of 8 Status: N U Seismic Walkdown Checklist (SWC)Equipment ID No.: 1DO01TB Equipment Class: (21) Tanks and Heat Exchangers Equipment

==

Description:==

DIESEL OIL STORAGE TANK 1B Project: Braidwood 1 SWEL Location (Bldg, Elev, Room/Area):

Auxiliary, 373.00 ft, ALL Manufacturer/Model:

Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results of judgments and findings.

Additional space is provided at the end of this checklist for documenting other comments.Anchorage 1. Is anchorage configuration verification required (i.e., is the item one of the 50% Yes of SWEL items requiring such verification)?

2. Is the anchorage free of bent, broken, missing or loose hardware?

Yes 3. Is the anchorage free of corrosion that is more than mild surface oxidation?

Yes 4. Is the anchorage free of visible cracks in the concrete near the anchors? Yes 5. Is the anchorage configuration consistent with plant documentation? (Note: Yes This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.)

Drawing M-1214 Sheet 3 Revision Z 4 of 12 anchor bolts have hairline cracks in the 1'thick foundation pad that do not extend into the base slab. A review of the design drawings was performed.

The tank locations are shown on Drawing M- 1216 Sheet 1 Revision W The anchor bolt locations and details are shown on Drawing M-1214 Sheet 3 Revision Z. The anchor bolts are embedded 1 '-3 Y2" in the base slab. The approximate total length of the anchor bolts is 3-9". The pad is shown on section G-G shows a #6 reinforcing bar outside of the anchor bolt that will provide confinement to the anchor.C-1 71 12QO108.10-R-001 Rev. 0 Correspondence No.: RS-12-159 Sheet 2 of 8 Status: M N U Seismic Walkdown Checklist (SWC)Equipment ID No.: 1DO01TB Equipment Class: (21) Tanks and Heat Exchangers Equipment

==

Description:==

DIESEL OIL STORAGE TANK 1B Since the anchor bolt is founded in the base slab and the pad has reinforcing across the hairline cracks, this cracking isjudged to not impact the strength of the anchors. IR 1389743 was written.6. Based on the above anchorage evaluations, is the anchorage free of Yes potentially adverse seismic conditions?

Interaction Effects 7. Are soft targets free from impact by nearby equipment or, structures?

Yes 8. Are overhead equipment, distribution systems, ceiling tiles and lighting, and Yes masonry block walls not likely to collapse onto the equipment?

9. Do attached lines have adequate flexibility to avoid damage? Yes 10. Based on the above seismic interaction evaluations, is equipment free of Yes potentially adverse seismic interaction effects?Other Adverse Conditions
11. Have you looked for and found no adverse seismic conditions that could Yes adversely affect the safety functions of the equipment?

Comments Seismic walkdown performed week of 7/16/12 by M. Delaney & P. Gazda C-172 12001 08.10O-R-OO1 Rev. 0 Correspondence No. RS-1 2-159 Sheet 3 of 8 Status: Mi N U Seismic Walkdown Checklist (SWC)Equipment ID No.: 1DO01TB Equipment Class: (21) Tanks and Heat Exchangers Equipment

==

Description:==

DIESEL OIL STORAGE TANK 1B Evaluated by: Marlene Delaney Date: 10/1/2012 Philip Gazda 10/1/2012 Photos 1DO01TB 7-16-12 091 C-173 12Q0108.10-R-001 Rev. 0 Correspondence No.: RS-12-159 Sheet 4 of 8 Status: N U Seismic Walkdown Checklist (SWC)Equipment ID No.: IDO01TB Equipment Class: (21) Tanks and Heat Exchangers Equipment

==

Description:==

DIESEL OIL STORAGE TANK 11B 1uU(U11 bi 1 (- 12 U9JJ 1UOUU Ilb (-1j-1Z U934 C-174 12Q0108.10-R-001 Rev. 0 Correspondence No.: RS-12-159 Sheet 5 of 8 Status: N U Seismic Walkdown Checklist (SWC)Equipment ID No.: 1DO01TB Equipment Class: (21) Tanks and Heat Exchangers Equipment

==

Description:==

DIESEL OIL STORAGE TANK 1 B 1DO01TB 7-16-12 095 1DO01TB 7-17-12 013 C-175 12Q0108.10-R-001 Rev. 0 Correspondence No.: RS-12-159 Sheet 6 of 8 Status: [ N U Seismic Walkdown Checklist (SWC)Equipment ID No.: 1DO01TB Equipment Class: (21) Tanks and Heat Exchangers Equipment

==

Description:==

DIESEL OIL STORAGE TANK 1B 1DOO1TB 7-17-12 014 1DO01TB 7-17-12 015 C-176 12Q0108.10-R-001 Rev. 0 Correspondence No.: RS-12-159 Sheet 7 of 8 Status: N U Seismic Walkdown Checklist (SWC)Equipment ID No.: Equipment Class: Equipment

==

Description:==

1DOO1TB (21) Tanks and Heat Exchangers OIL STORAGE TANK 1 B 1DO01TB 7-17-12 016 1DO01TB 7-17-12 017 C-177 12QO108.10-R-001 Rev. 0 Correspondence No.: RS-12-159 Sheet 8 of 8 Status: F N U Seismic Walkdown Checklist (SWC)Equipment ID No.: 1DO01TB Equipment Class: (21) Tanks and Heat Exchangers Eauipment

==

Description:==

DIESEL OIL STORAGE TANK 1B 1DO01TB 7-17-12 018 C-178 12Q0108.10-R-001 Rev. 0 Correspondence No.: RS-12-159 Sheet 1 of 5 Status: M N U Seismic Walkdown Checklist (SWC)Equipment ID No.: 1DO10T Equipment Class: (21) Tanks and Heat Exchangers Equipment

==

Description:==

500 GAL DIESEL OIL DAY TANK Project: Braidwood 1 SWEL Location (Bldg, Elev, Room/Area):

Auxiliary, 383.00 ft, ALL Manufacturer/Model:

Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results of judgments and findings.

Additional space is provided at the end of this checklist for documenting other comments.Anchorage 1. Is anchorage configuration verification required (i.e., is the item one of the 50%of SWEL items requiring such verification)?

Yes 2. Is the anchorage free of bent, broken, missing or loose hardware?Yes 3. Is the anchorage free of corrosion that is more than mild surface oxidation?

Yes 4. Is the anchorage free of visible cracks in the concrete near the anchors?5. Is the anchorage configuration consistent with plant documentation? (Note: This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.)

Drawing M-1220 Sheet 5 Revision Y 6. Based on the above anchorage evaluations, is the anchorage free of potentially adverse seismic conditions?

Yes Yes Yes C-179 12Q0108.10-R-001 Rev. 0 Correspondence No.: RS-12-159 Sheet 2 of 5 Status: [-Y N U Seismic Walkdown Checklist (SWC)Equipment ID No.: IDO10T Equipment Class: (21) Tanks and Heat Exchangers Equipment

==

Description:==

500 GAL DIESEL OIL DAY TANK Interaction Effects 7. Are soft targets free from impact by nearby equipment or structures?

8. Are overhead equipment, distribution systems, ceiling tiles and lighting, and masonry block walls not likely to collapse onto the equipment?

Seismic block walls 9. Do attached lines have adequate flexibility to avoid damage?10. Based on the above seismic interaction evaluations, is equipment free of potentially adverse seismic interaction effects?Yes Yes Yes Yes Other Adverse Conditions

11. Have you looked for and found no adverse seismic conditions that could Yes adversely affect the safety functions of the equipment?

Comments Seismic walkdown performed week of 7/16/12 by M. Delaney & P. Gazda Evaluated by: Marlene Delaney Date: 10/1/2012 Philip Gazda 10/1/2012 C-180 12Q0108.10-R-001 Rev. 0 Correspondence No.: RS-12-159 Sheet 3 of 5 Status: F N U Seismic Walkdown Checklist (SWC)Equipment ID No.: 1DO10T Equipment Class: (21) Tanks and Heat Exchangers Equipment

==

Description:==

500 GAL DIESEL OIL DAY TANK Photos 1DO1OT 7-17-12 Group 2 011 C-1 81 12Q0108.10-R-001 Rev. 0 Correspondence No.: RS-12-159 Sheet 4 of 5 Status: [M N U Seismic Walkdown Checklist (SWC)Equipment ID No.: Equipment Class: Equipment

==

Description:==

1DO1OT (21) Tanks and Heat Exchangers 500 GAL DIESEL OIL DAY TANK 1DO1OT 7-17-12 Group 2 012 1DO1OT 7-17-12 Group 2 013 C-182 12Q0108.1O-R-OO1 Rev. 0 Correspondence No.: RS-12-159 Sheet 5 of 5 Status: M N U Seismic Walkdown Checklist (SWC)Equipment ID No.: Equipment Class: Equipment

==

Description:==

1 D0 I OT (21) Tanks and Heat Exchangers 500 GAL DIESEL OIL DAY TANK IDO1OT 7-17-12 Group 2 014 C-183 12Q0108.10-R-001 Rev. 0 Correspondence No.: RS-12-159 Sheet 1 of 3 Status: M N U Seismic Walkdown Checklist (SWC)Equipment ID No.: 1FC010 Equipment Class: (0) Other REFUELING WTR PURIF PMP SUCT FROM U-1 REFUEL CAV CNMT ISOL Equipment

==

Description:==

VALVE Project: Braidwood 1 SWEL Location (Bldg, Elev, Room/Area):

Auxiliary, 364.00 ft, ALL Manufacturer/Model:

Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results of judgments and findings.

Additional space is provided at the end of this checklist for documenting other comments.Anchorage 1. Is anchorage configuration verification required (i.e., is the item one of the 50% No of SWEL items requiring such verification)?

2. Is the anchorage free of bent, broken, missing or loose hardware?Not Applicable
3. Is the anchorage free of corrosion that is more than mild surface oxidation?
4. Is the anchorage free of visible cracks in the concrete near the anchors?5. Is the anchorage configuration consistent with plant documentation? (Note: This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.)

Not Applicable Not Applicable Not Applicable

6. Based on the above anchorage evaluations, is the anchorage free of potentially adverse seismic conditions?

Yes C-184 12Q0108.10-R-001 Rev. 0 Correspondence No.: RS-12-159 Sheet 2 of 3 Status: M N U Seismic Walkdown Checklist (SWC)Equipment ID No.: 1FC010 Equipment Class: (0) Other REFUELING WFR PURIF PMP SUCT FROM U-1 REFUEL CAV CNMT ISOL Equipment

==

Description:==

VALVE Interaction Effects 7. Are soft targets free from impact by nearby equipment or structures?

Yes 8. Are overhead equipment, distribution systems, ceiling tiles and lighting, and masonry block walls not likely to collapse onto the equipment?

Yes 9. Do attached lines have adequate flexibility to avoid damage?Yes 10. Based on the above seismic interaction evaluations, is equipment free of potentially adverse seismic interaction effects?Yes Other Adverse Conditions

11. Have you looked for and found no adverse seismic conditions that could Yes adversely affect the safety functions of the equipment?

Strut near valve, well-supported.

Comments Seismic walkdown performed week of 7/16/12 by M. Delaney & P. Gazda Evaluated by: Marlene Delaney Date: 10/1/2012 Philip Gazda 10/1/2012 C-185 12Q0108.10-R-001 Rev. 0 Correspondence No.: RS-12-159 Sheet 3 of 3 Status: FTN U Seismic Walkdown Checklist (SWC)Equipment ID No.: 1FC010 Equipment Class: Equipment

==

Description:==

(0) Other REFUELING WTR PURIF PMP SUCT FROM U-1 REFUEL CAV CNMT ISOL VALVE Photos Photos 1FC010 7-19-12 Group 2 001 C-186 12Q0108.10-R-001 Rev. 0 Correspondence No.: RS-12-159 Sheet 1 of 4 Status: FY] N U Seismic Walkdown Checklist (SWC)Equipment ID No.: 1FC01A Equipment Class: (21) Tanks and Heat Exchangers Equipment

==

Description:==

SPENT FUEL PIT HEAT EXCHANGER Project: Braidwood 1 SWEL Location (Bldg, Elev, Room/Area):

FH, 401.00 ft, ALL Manufacturer/Model:

Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results of judgments and findings.

Additional space is provided at the end of this checklist for documenting other comments.Anchorage 1. Is anchorage configuration verification required (i.e., is the item one of the 50%of SWEL items requiring such verification)?

Yes 2. Is the anchorage free of bent, broken, missing or loose hardware?Yes 3. Is the anchorage free of corrosion that is more than mild surface oxidation?

Yes 4. Is the anchorage free of visible cracks in the concrete near the anchors?Yes 5. Is the anchorage configuration consistent with plant documentation? (Note: This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.)

Drawing M-1222 Sheet 4 Revision AM Detail 80A 6. Based on the above anchorage evaluations, is the anchorage free of potentially adverse seismic conditions?

Yes Yes C-187 12QO108.1O-R-001 Rev. 0 Correspondence No.: RS-12-159 Sheet 2 of 4 Status: M N U Seismic Walkdown Checklist (SWC)Equipment ID No.: IFC01A Equipment Class: (21) Tanks and Heat Exchangers Equipment

==

Description:==

  • SPENT FUEL PIT HEAT EXCHANGER Interaction Effects 7.. Are soft targets free from impact by nearby equipment or structures?
8. Are overhead equipment, distribution systems, ceiling tiles and lighting, and masonry block walls not likely to collapse onto the equipment?
9. Do attached lines have adequate flexibility to avoid damage?10. Based on the above seismic interaction evaluations, is equipment free of potentially adverse seismic interaction effects?Yes Yes Yes Yes Other Adverse Conditions
11. Have you looked for and found no adverse seismic conditions that could Yes adversely affect the safety functions'of the equipment?

Comments Seismic walkdown performed week of 7/16/12 by M. Delaney & P. Gazda Evaluated by: Marlene Delaney Date: 10/1/2012 Philip Gazda 10/1/2012 C-188 12Q0108.1O-R-OO1 Rev. 0 Correspondence No.: RS-1 2-1 59 Sheet 3 of 4 Status: M N U Seismic Walkdown Checklist (SWC)Equipment ID No.: Equipment Class: Equipment

==

Description:==

1FC01A (21) Tanks and Heat Exchangers SPENT FUEL PIT HEAT EXCHANGER Photos IFCO1A 7-18-12 070 C-189 12Q0108.10-R-001 Rev. 0 Correspondence No.: RS-12-159 Sheet 4 of 4 Status: M N U Seismic Walkdown Checklist (SWC)Equipment ID No.: IFC01A Equipment Class: (21) Tanks and Heat Exchangers Equipment

==

Description:==

SPENT FUEL PIT HEAT EXCHANGER 1FC01A 7-18-12 071 C-190 12Q0108.10-R-001 Rev. 0 Correspondence No.: RS-12-159 Sheet 1 of 4 Status: 7 N U Seismic Walkdown Checklist (SWC)Equipment ID No.: 1FC01P Equipment Class: (5) Horizontal Pumps Equipment

==

Description:==

U-1 FUEL POOL COOLING PUMP Project: Braidwood 1 SWEL Location (Bldg, Elev, Room/Area):

Auxiliary, 401.00 ft, ALL Manufacturer/Model:

Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results of judgments and findings.

Additional space is provided at the end of this checklist for documenting other comments.Anchorage 1. Is anchorage configuration verification required (i.e., is the item one of the 50%of SWEL items requiring such verification)?

No 2. Is the anchorage free of bent, broken, missing or loose hardware?Yes 3. Is the anchorage free of corrosion that is more than mild surface oxidation?

Yes 4. Is the anchorage free of visible cracks in the concrete near the anchors?Yes 5. Is the anchorage configuration consistent with plant documentation? (Note: This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.)

Not Applicable

6. Based on the above anchorage evaluations, is the anchorage free of potentially adverse seismic conditions?

Yes C-191 12Q0108.10-R-001 Rev. 0 Correspondence No.: RS-12-159 Sheet 2 of 4 Status: [ N U Seismic Walkdown Checklist (SWC)Equipment ID No.: 1FC01P Equipment Class: (5) Horizontal Pumps Equipment

==

Description:==

U-1 FUEL POOL COOLING PUMP Interaction Effects 7. Are soft targets free from impact by nearby equipment or structures?

8. Are overhead equipment, distribution systems, ceiling tiles and lighting, and masonry block walls not likely to collapse onto the equipment?

Seismic block walls 9. Do attached lines have adequate flexibility to avoid damage?10. Based on the above seismic interaction evaluations, is equipment free of potentially adverse seismic interaction effects?Yes Yes Yes Yes Other Adverse Conditions

11. Have you looked for and found no adverse seismic conditions that could Yes adversely affect the safety functions of the equipment?

Crack in slab -not a structural/seismic issue.Comments Seismic walkdown performed week of 7/16/12 by M. Delaney & P. Gazda Evaluated by: Marlene Delaney Date: 10/1/2012 Philip Gazda 10/1/2012 C-192 I 12Q0108.10-R-001 Rev. 0 Correspondence No.: RS-12-159 Sheet 3 of 4 Status: M N U Seismic Walkdown Checklist (SWC)Equipment ID No.: Equipment Class: Equipment

==

Description:==

1 FC01 P (5) Horizontal Pumps U-I FUEL POOL COOLING PUMP Photos 1FC01P (6695 -cracked concrete) 7-18-12 077 1FC01P 7-18-12 059 C-193 12Q0108.10-R-001 Rev. 0 Correspondence No.: RS-12-159 Sheet 4 of 4 Status: M N U Seismic Walkdown Checklist (SWC)Equipment ID No.: Equipment Class: F-m iinmant 1 FCoi P (5) Horizontal Pumps U-1 FUEL POOL COOLING PUMP 1FCO1P 7-19-12 010 C-194 12Q0108.10-R-001 Rev. 0 Correspondence No.: RS-12-159 Sheet 1 of 3 Status: M N U Seismic Walkdown Checklist (SWC)Equipment ID No.: 1FC8756 Equipment Class: (0) Other Equipment

==

Description:==

Ul SPENT FUEL PIT PMP SUCTION ISOL VALVE Project: Braidwood 1 SWEL Location (Bldg, Elev, Room/Area):

FH, 401.00 ft, ALL Manufacturer/Model:

Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results of judgments and findings.

Additional space is provided at the end of this checklist for documenting other comments.Anchorage 1. Is anchorage configuration verification required (i.e., is the item one of the 50%of SWEL items requiring such verification)?

No 2. Is the anchorage free of bent, broken, missing or loose hardware?Not Applicable

3. Is the anchorage free of corrosion that is more than mild surface oxidation?
4. Is the anchorage free of visible cracks in the concrete near the anchors?5. Is the anchorage configuration consistent with plant documentation? (Note: This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.)

Not Applicable Not Applicable Not Applicable

6. Based on the above anchorage evaluations, is the anchorage free of potentially adverse seismic conditions?

Yes C-195 12Q0108.1O-R-001 Rev. 0 Correspondence No.: RS-12-159 Sheet 2 of 3 Status: M N U Seismic Walkdown Checklist (SWC)Equipment ID No.: 1FC8756 Equipment Class: (0) Other Equipment

==

Description:==

Ul SPENT FUEL PIT PMP SUCTION ISOL VALVE Interaction Effects 7. Are soft targets free from impact by nearby equipment or structures?'

8. Are overhead equipment, distribution systems, ceiling tiles and lighting, and masonry block walls not likely to collapse onto the equipment?
9. Do attached lines have adequate flexibility to avoid damage?10. Based on the above seismic interaction evaluations, is equipment free of potentially adverse seismic interaction effects?Yes Yes Yes Yes Other Adverse Conditions
11. Have you looked for and found no adverse seismic conditions that could Yes adversely affect the safety functions of the equipment?

Rugged valve and well-supported Comments Seismic walkdown performed week of 7/16/12 by M. Delaney & P. Gazda Evaluated by: Marlene Delaney Date: 10/1/2012 Philip Gazda 10/1/2012 C-196 1200108.10-R-001 Rev. 0 Correspondence No.: RS-1 2-1 59 Sheet 3 of 3 Status: M N U Seismic Walkdown Checklist (SWC)Equipment ID No.: Equipment Class: Equipment

==

Description:==

1FC8756 (0) Other U1 SPENT FUEL PIT PMP SUCTION ISOL VALVE Photos It-ut$foo wz 1 FC8756 7-18-12 063 C-197 12QO108.10-R-001 Rev. 0 Correspondence No.: RS-12-159 Sheet 1 of 3 Status: M N U Seismic Walkdown Checklist (SWC)Equipment ID No.: 1FC8758 Equipment Class: (0) Other Equipment

==

Description:==

REFUELING WTR PURIF PMP SUCT FROM U-1 RWST VALVE Project: Braidwood 1 SWEL Location (Bldg, Elev, Room/Area):

Auxiliary, 364.00 ft, ALL Manufacturer/Model:

Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results of judgments and findings.

Additional space is provided at the end of this checklist for documenting other comments.Anchorage 1. Is anchorage configuration verification required (i.e., is the item one of the 50% No of SWEL items requiring such verification)?

2. Is the anchorage free of bent, broken, missing or loose hardware?Not Applicable
3. Is the anchorage free of corrosion that is more than mild surface oxidation?
4. Is the anchorage free of visible cracks in the concrete near the anchors?5. Is the anchorage configuration consistent with plant documentation? (Note: This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.)

Not Applicable Not Applicable Not Applicable

6. Based on the above anchorage evaluations, is the anchorage free of potentially adverse seismic conditions?

Yes C-198 12Q0108.10-R-001 Rev. 0 Correspondence No.: RS-12-159 Sheet 2 of 3 Status: M N U Seismic Walkdown Checklist (SWC)Equipment ID No.: 1FC8758 Equipment Class: (0) Other Equipment

==

Description:==

REFUELING WTR PURIF PMP SUCT FROM U-1 RWST VALVE Interaction Effects 7. Are soft targets free from impact by nearby equipment or structures?

Yes 8. Are overhead equipment, distribution systems, ceiling tiles and lighting, and masonry block walls not likely to collapse onto the equipment?

Yes 9. Do attached lines have adequate flexibility to avoid damage?Yes 10. Based on the above seismic interaction evaluations, is equipment free of potentially adverse seismic interaction effects?Yes Other Adverse Conditions

11. Have you looked. for and found no adverse seismic conditions that could Yes adversely affect the safety functions of the equipment?

Inspection from floor.Comments Seismic walkdown performed week of 7/16/12 by M. Delaney & P. Gazda Evaluated by: Marlene Delaney Date: 10/1/2012 Philip Gazda 10/1/2012 C-199 12Q0108.10-R-001 Rev. 0 Correspondence No.: RS-12-159 Sheet 3 of 3 Status: M N U Seismic Walkdown Checklist (SWC)Equipment ID No.: 1FC8758 Equipment Class: (0) Other Equipment

==

Description:==

REFUELING WTR PURIF PMP SUCT FROM U-1 RWST VALVE Photos C-200 12Q0108.10-R-001 Rev. 0 Correspondence No.: RS-12-159 Sheet 1 of 3 Status: Ei N U Seismic Walkdown Checklist (SWC)Equipment ID No.: 1FC8762A Equipment Class: (0) Other Equipment

==

Description:==

SPENT FUEL PIT HX INLET VALVE Project: Braidwood 1 SWEL Location (Bldg, Elev, Room/Area):

FH, 401.00 ft, ALL Manufacturer/Model:

Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results of judgments and findings.

Additional space is provided at the end of this checklist for documenting other comments.Anchorage 1. Is anchorage configuration verification required (i.e., is the item one of the 50%of SWEL items requiring such verification)?

No 2. Is the anchorage free of bent, broken, missing or loose hardware?Not Applicable

3. Is the anchorage free of corrosion that is more than mild surface oxidation?
4. Is the anchorage free of visible cracks in the concrete near the anchors?5. Is the anchorage configuration consistent with plant documentation? (Note: This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.)

Not Applicable Not Applicable Not Applicable

6. Based on the above anchorage evaluations, is the anchorage free of potentially adverse seismic conditions?

Yes C-201 12Q0108.10-R-001 Rev. 0 Correspondence No.: RS-12-159 Sheet 2 of 3 Status: M N U Seismic Walkdown Checklist (SWC)Equipment ID No.: 1FC8762A Equipment Class: (0) Other Equipment

==

Description:==

SPENT FUEL PIT HX INLET VALVE Interaction Effects 7. Are soft targets free from impact by nearby equipment or structures?

8. Are overhead equipment, distribution systems, ceiling tiles and lighting, and masonry block walls not likely to collapse onto the equipment?

Seismic block walls 9. Do attached lines have adequate flexibility to avoid damage?10. Based on the above seismic interaction evaluations, is equipment free of potentially adverse seismic interaction effects?Yes Yes Yes Yes Other Adverse Conditions

11. Have you looked for and found no adverse seismic conditions that could Yes adversely affect the safety functions of the equipment?

Rugged, well-supported valve Comments Seismic walkdown performed week of 7/16/12 by M. Delaney & P. Gazda Evaluated by: Marlene Delaney Date: 10/1/2012 Philip Gazda 10/1/2012 C-202 12Q0108.10-R-001 Rev. 0 Correspondence No.: RS-12-159 Sheet 3 of 3 Status: FY] N U Seismic Walkdown Checklist (SWC)Equipment ID No.: 1 FC8762A Equipment Class: (0) Other Equipment

==

Description:==

SPENT FUEL PIT HX INLET VALVE Photos 1 FC8762A 7-18-12 064 1FC8762A 7-18-12 065 C-203