ML12339A221
| ML12339A221 | |
| Person / Time | |
|---|---|
| Site: | Braidwood |
| Issue date: | 11/16/2012 |
| From: | Delaney M Exelon Generation Co, Stevenson & Associates |
| To: | Office of Nuclear Reactor Regulation |
| References | |
| RS-12-159 12Q0108.10-R-001, Rev 0 | |
| Download: ML12339A221 (124) | |
Text
12Q0108.10-R-001 Rev. 0 Correspondence No.: RS-1 2-159 Sheet 1 of 3 Status: M N
U Seismic Walkdown Checklist (SWC)
Equipment ID No.:
1 FC8762B Equipment Class:
(0) Other Equipment
Description:
Ul SPENT FUEL PIT HX OUTLET VALVE Project:
Braidwood 1 SWEL Location (Bldg, Elev, Room/Area):
FH, 401.00 ft, ALL Manufacturer/Model:
Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results of judgments and findings. Additional space is provided at the end of this checklist for documenting other comments.
Anchorage
- 1. Is anchorage configuration verification required (i.e., is the item one of the 50%
of SWEL items requiring such verification)?
No
- 2.
Is the anchorage free of bent, broken, missing or loose hardware?
Not Applicable
- 3.
Is the anchorage free of corrosion that is more than mild surface oxidation?
- 4.
Is the anchorage free of visible cracks in the concrete near the anchors?
- 5.
Is the anchorage configuration consistent with plant documentation? (Note:
This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.)
Not Applicable Not Applicable Not Applicable
- 6.
Based on the above anchorage evaluations, is the anchorage free of potentially adverse seismic conditions?
Yes C-204
12QO108.1O-R-O01 Rev. 0 Correspondence No.: RS-12-159 Sheet 2 of 3 Status: M N
U Seismic Walkdown Checklist (SWC)
Equipment ID No.:
1 FC8762B Equipment Class:
(0) Other Equipment
Description:
Ul SPENT FUEL PIT HX OUTLET VALVE Interaction Effects
- 7.
Are soft targets free from impact by nearby equipment or structures?
- 8.
Are overhead equipment, distribution systems, ceiling tiles and lighting, and masonry block walls not likely to collapse onto the equipment?
- 9.
Do attached lines have adequate flexibility to avoid damage?
- 10.
Based on the above seismic interaction evaluations, is equipment free of potentially adverse seismic interaction effects?
Yes Yes Yes Yes Other Adverse Conditions
- 11.
Have you looked for and found no adverse seismic conditions that could Yes adversely affect the safety functions of the equipment?
Rugged and well-supported valve.
Comments Seismic walkdown performed week of 7/16/12 by M. Delaney & P. Gazda Evaluated by:
Marlene Delaney Date:
10/1/2012 Philip Gazda 10/1/2012 C-205
12Q0108.10-R-001 Rev. 0 Correspondence No.: RS-12-159 Sheet 3 of 3 Status: F N
U Seismic Walkdown Checklist (SWC)
Equipment ID No.:
Equipment Class:
Equipment
Description:
Photos 1 FC8762B (0) Other Ul SPENT FUEL PIT HX OUTLET VALVE I[-k;btbzb 1-16-IZ ut5b It-L;?JtbZt$ t-Id-IZ Ubt C-206
12Q0108.10-R-001 Rev. 0 Correspondence No.: RS-12-159 Sheet 1 of 3 Status: M N
U Seismic Walkdown Checklist (SWC)
Equipment ID No.:
1FC8766 Equipment Class:
(0) Other Equipment
Description:
SPENT FUEL PIT FLTR DEMIN LOOP RTRN TO U-1 RWST CHECK VLV Project:
Braidwood 1 SWEL Location (Bldg, Elev, Room/Area):
Auxiliary, 364.00 ft, ALL Manufacturer/Model:
Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results of judgments and findings. Additional space is provided at the end of this checklist for documenting other comments.
Anchorage
- 1.
Is anchorage configuration verification required (i.e., is the item one of the 50%
of SWEL items requiring such verification)?
No
- 2.
Is the anchorage free of bent, broken, missing or loose hardware?
Not Applicable
- 3.
Is the anchorage free of corrosion that is more than mild surface oxidation?
- 4.
Is the anchorage free of visible cracks in the concrete near the anchors?
- 5.
Is the anchorage configuration consistent with plant documentation? (Note:
This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.)
Not Applicable Not Applicable Not Applicable
- 6.
Based on the above anchorage evaluations, is the anchorage free of potentially adverse seismic conditions?
Yes C-207
12Q0108.10-R-001 Rev. 0 Correspondence No.: RS-12-159 Sheet 2 of 3 Status: r N
U Seismic Walkdown Checklist (SWC)
Equipment ID No.:
1 FC8766 Equipment Class:
(0) Other Equipment
Description:
SPENT FUEL PIT FLTR DEMIN'LOOP RTRN TO U-1 RWST CHECK VLV Interaction Effects
- 7.
Are soft targets free from impact by nearby equipment or structures?
Yes
- 8.
Are overhead equipment, distribution systems, ceiling tiles and lighting, and masonry block walls not likely to collapse onto the equipment?
Yes
- 9.
Do attached lines have adequate flexibility to avoid damage?
Yes
- 10.
Based on the above seismic interaction evaluations, is equipment free of potentially adverse seismic interaction effects?
Yes Other Adverse Conditions
- 11.
Have you looked for and found no adverse seismic conditions that could Yes adversely affect the safety functions of the equipment?
Support at check valve Comments Seismic walkdown performed week of 7/16/12 by M. Delaney & P. Gazda Evaluated by:
Marlene Delaney Date:
10/1/2012 Philip Gazda 10/1/2012 C-208
I 12Q0108.10-R-001 Rev. 0 Correspondence No.: RS-12-159 Sheet 3 of 3 Status: M N U Seismic Walkdown Checklist (SWC)
Equipment ID No.:
1FC8766 Equipment Class:
(0) Other Equipment
Description:
SPENT FUEL PIT FLTR DEMIN LOOP RTRN TO U-1 RWST CHECK VLV Photos FC8766 7-19-12 Group 2 008 C-209
12Q0108.10-R-001 Rev. 0 Correspondence No.: RS-12-159 Sheet 1 of 4 Status: M N
U Seismic Walkdown Checklist (SWC)
Equipment ID No.:
1FC8793 Equipment Class:
(0) Other Equipment
Description:
SPENT FUEL PIT PMP DISCH CHECK VALVE Project:
Braidwood 1 SWEL Location (Bldg, Elev, Room/Area):
FH, 401.00 ft, ALL Manufacturer/Model:
Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results of judgments and findings. Additional space is provided at the end of this checklist for documenting other comments.
Anchorage
- 1. Is anchorage configuration verification required (i.e., is the item one of the 50%
of SWEL items requiring such verification)?
No
- 2.
Is the anchorage free of bent, broken, missing or loose hardware?
Not Applicable
- 3.
Is the anchorage free of corrosion that is more than mild surface oxidation?
- 4.
Is the anchorage free of visible cracks in the concrete near the anchors?
- 5.
Is the anchorage configuration consistent with plant documentation? (Note:
This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.)
Not Applicable Not Applicable Not Applicable
- 6.
Based on the above anchorage evaluations, is the anchorage free of potentially adverse seismic conditions?
Yes C-210
12Q0108.10-R-001 Rev. 0 Correspondence No.: RS-12-159 Sheet 2 of 4 Status: F N U Seismic Walkdown Checklist (SWC)
Equipment ID No.:
1 FC8793 Equipment Class:
(0) Other Equipment
Description:
SPENT FUEL PIT PMP DISCH CHECK VALVE Interaction Effects
- 7.
Are soft targets free from impact by nearby equipment or structures?
- 8.
Are overhead equipment, distribution systems, ceiling tiles and lighting, and masonry block walls not likely to collapse onto the equipment?
- 9.
Do attached lines have adequate flexibility to avoid damage?
- 10.
Based on the above seismic interaction evaluations, is equipment free of potentially adverse seismic interaction effects?
Yes Yes Yes Yes Other Adverse Conditions
- 11.
Have you looked for and found no adverse seismic conditions that could Yes adversely affect the safety functions of the equipment?
Boric Acid leak identified on tag. No adverse seismic impact.
Comments Seismic walkdown performed week of 7/16/12 by M. Delaney & P. Gazda Evaluated by:
Marlene Delaney Date:
10/1/2012 C
Philip Gazda 10/1/2012 C-211
1200108.10-R-001 Rev. 0 Correspondence No.: RS-12-159 Sheet 3 of 4 Status: F N
U Seismic Walkdown Checklist (SWC)
Equipment ID No.:
1 FC8793 Equipment Class:
(0) Other Equipment
Description:
SPENT FUEL PIT PMP DISCH CHECK VALVE 1 FC8793 7-18-12 072 C-212
12Q0108.1O-R-0O1 Rev. 0 Correspondence No.: RS-12-159 Sheet 4 of 4 Status: M N U Seismic Walkdown Checklist (SWC)
Equipment ID No.:
1 FC8793 Equipment Class:
(0) Other Equipment
Description:
SPENT FUEL PIT PMP DISCH CHECK VALVE 1 FC8793 7-18-12 074 C-213
12Q0108.10-R-001 Rev. 0 Correspondence No.: RS-12-159 Sheet 1 of 3 Status: M N U Seismic Walkdown Checklist (SWC)
Equipment ID No.:
1FC8794 Equipment Class:
(0) Other Equipment
Description:
SPENT FUEL PIT FLTR DEMIN LOOP INLT ISOL VALVE Project:
Braidwood 1 SWEL Location (Bldg, Elev, Room/Area):
FH, 401.00 ft, ALL Manufacturer/Model:
Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results of judgments and findings. Additional space is provided at the end of this checklist for documenting other comments.
Anchorage
- 1.
Is anchorage configuration verification required (i.e., is the item one of the 50%
of SWEL items requiring such verification)?
No
- 2.
Is the anchorage free of bent, broken, missing or loose hardware?
Not Applicable
- 3.
Is the anchorage free of corrosion that is more than mild surface oxidation?
- 4.
Is the anchorage free of visible cracks in the concrete near the anchors?
- 5.
Is the anchorage configuration consistent with plant documentation? (Note:
This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.)
Not Applicable Not Applicable Not Applicable
- 6.
Based on the above anchorage evaluations, is the anchorage free of potentially adverse seismic conditions?
Yes C-214
12Q0108.10-R-001 Rev. 0 Correspondence No.: RS-12-159 Sheet 2 of 3 Status:
- N U
Seismic Walkdown Checklist (SWC)
Equipment ID No.:
1FC8794 Equipment Class:
(0) Other Equipment
Description:
SPENT FUEL PIT FLTR DEMIN LOOP INLT ISOL VALVE Interaction Effects
- 7.
Are soft targets free from impact by nearby equipment or structures?
Yes
- 8.
Are overhead equipment, distribution systems, ceiling tiles and lighting, and masonry, block walls not likely to collapse onto the equipment?
Yes
- 9.
Do attached lines have adequate flexibility to avoid damage?
Yes
- 10.
Based on the above seismic interaction evaluations, is equipment free of potentially adverse seismic interaction effects?
Yes Other Adverse Conditions
- 11.
Have you looked for and found no adverse seismic conditions that could Yes adversely affect the safety functions of the equipment?
Well-supported Comments Seismic walkdown performed week of 7/16/12 by M. Delaney & P. Gazda Evaluated by:
Marlene Delaney Date:
10/1/2012 Philip Gazda 10/1/2012 C-215
12Q0108.10-R-O01 Rev. 0 Correspondence No.: RS-12-159 Sheet 3 of 3 Status: M N
U Seismic Walkdown Checklist (SWC)
Equipment ID No.:
1FC8794 Equipment Class:
(0) Other Equipment
Description:
SPENT FUEL PIT FLTR DEMIN LOOP INLT ISOL VALVE Photos lIt-L~ltllV4 /f-Id-I' Wo/
11-L;WU4 I-10-1z utt)
C-216
12Q0108.10-R-001 Rev. 0 Correspondence No.: RS-12-159 Sheet 1 of 4 Status: M N
U Seismic Walkdown Checklist (SWC)
Equipment ID No.:
1FT-0121 Equipment Class:
(18) Instruments on Racks Equipment
Description:
CHARGING LINE DIP CELL FLOW XMITTR Project:
Braidwood 1 SWEL Location (Bldg, Elev, Room/Area):
Auxiliary, 364.00 ft, ALL Manufacturer/Model:
Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results of judgments and findings. Additional space is provided at the end of this checklist for documenting other comments.
Anchorage
- 1.
Is anchorage configuration verification required (i.e., is the item one of the 50%
of SWEL items requiring such verification)?
No
- 2.
Is the anchorage free of bent, broken, missing or loose hardware?
Not Applicable
- 3.
Is the anchorage free of corrosion that is more than mild surface oxidation?
- 4.
Is the anchorage free of visible cracks in the concrete near the anchors?
- 5.
Is the anchorage configuration consistent with plant documentation? (Note:
This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.)
Not Applicable Not Applicable Not Applicable
- 6.
Based on the above anchorage evaluations, is the anchorage free of potentially adverse seismic conditions?
Instrument supported on Panel 1PL97J which is well-supported and braced Yes C-217
12Q0108.10-R-001 Rev. 0 Correspondence No.: RS-12-159 Sheet 2 of 4 Status: M N
U Seismic WalkdownChecklist (SWC)
Equipment ID No.:
1FT-0121 Equipment Class:
(18) Instruments on Racks Equipment
Description:
CHARGING LINE DIP CELL FLOW XMITTR Interaction Effects
- 7.
Are soft targets free from impact by nearby equipment or structures?
- 8.
Are overhead equipment, distribution systems, ceiling tiles and lighting, and masonry block walls not likely to collapse onto the equipment?
Overhead components including fire protection piping are well-supported.
- 9.
Do attached lines have adequate flexibility to avoid damage?
- 10.
Based on the above seismic interaction evaluations, is equipment free of potentially adverse seismic interaction effects?
Yes Yes Yes Yes Other Adverse Conditions
- 11.
Have you looked for and found no adverse seismic conditions that could Yes adversely affect the safety functions of the equipment?
Comments Seismic walkdown performed week of 7/16/12 by M. Delaney & P. Gazda Evaluated by:
Marlene Delaney Date:
10/1/2012 C.
Philip Gazda 10/1/2012 C-218
12Q0108.1O-R-OO1 Rev. 0 Correspondence No.: RS-1 2-1 59 Sheet 3 of 4 Status: M N U Seismic Walkdown Checklist (SWC)
Equipment ID No.:
1FT-0121 Equipment Class:
(18) Instr.
Equipment
Description:
CHARGIIN Iments on Racks IG LINE DIP CELL FLOW XMITTR Photos Photos
-0121 (AWB - Housekeeping) 7-18-12 023 1 FT-0121 (AWB - Housekeeping)7-18-12 024 C-219
12Q0108.10-R-001 Rev. 0 Correspondence No.: RS-12-159 Sheet 4 of 4 Status: M N U Seismic Walkdown Checklist (SWC)
Equipment ID No.:
1FT-0121 Equipment Class:
(18) Instruments on Racks Eauipment
Description:
CHARGING LINE DIP CELL FLOW XMITTR 1FT-0121 7-18-12 022 C-220
12Q0108.1O-R-001 Rev. 0 Correspondence No.: RS-12-159 Sheet 1 of 3 Status: M N
U Seismic Walkdown Checklist (SWC)
Equipment ID No.:
1FT-0132 Equipment Class:
(18) Instruments on Racks Equipment
Description:
LETDOWN FLOW DIP CELL Project:
Braidwood 1 SWEL Location (Bldg, Elev, Room/Area):
Auxiliary, 383.00 ft, ALL Manufacturer/Model:
Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results of judgments and findings. Additional space is provided at the end of this checklist for documenting other comments.
Anchorage
- 1. Is anchorage configuration verification required (i.e., is the item one of the 50%
of SWEL items requiring such verification)?
No
- 2.
Is the anchorage free of bent, broken, missing or loose hardware?
Not Applicable
- 3.
Is the anchorage free of corrosion that is more than mild surface oxidation?
- 4.
Is the anchorage free of visible cracks in the concrete near the anchors?
- 5.
Is the anchorage configuration consistent with plant documentation? (Note:
This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.)
Not Applicable Not Applicable Not Applicable
- 6.
Based on the above anchorage evaluations, is the anchorage free of potentially adverse seismic conditions?
Yes C-221
12QO108.10-R-001 Rev. 0 Correspondence No.: RS-12-159 Sheet 2 of 3 Status:
N U
Seismic Walkdown Checklist (SWC)
Equipment ID No.:
1FT-0132 Equipment Class:
(18) Instruments on Racks Equipment
Description:
LETDOWN FLOW DIP CELL Interaction Effects
- 7.
Are soft targets free from impact by nearby equipment or structures?
- 8.
Are overhead equipment, distribution systems, ceiling tiles and lighting, and masonry block walls not likely to collapse onto the equipment?
Seismic block walls
- 9.
Do attached lines have adequate flexibility to avoid damage?
- 10.
Based on the above seismic interaction evaluations, is equipment free of potentially adverse seismic interaction effects?
Yes Yes Yes Yes Other Adverse Conditions
- 11.
Have you looked for and found no adverse seismic conditions that could Yes adversely affect the safety functions of the equipment?
minor discoloration and deterioration near equipment Comments Seismic walkdown performed week of 7/16/12 by M. Delaney & P. Gazda Evaluated by:
Marlene Delaney Date:
10/1/2012 Philip Gazda 10/1/2012 C-222
12Q0108.10-R-001 Rev. 0 Correspondence No.: RS-1 2-1 59 Sheet 3 of 3 Status: M N U Seismic Walkdown Checklist (SWC)
Equipment ID No.:
Equipment Class:
Equipment
Description:
IFT-01 32 (18) Instruments on Racks LETDOWN FLOW DIP CELL Photos 1t-I Y-U132 (AVVb concrete aamage) t-1 it-iz uuU 11-1 Y-UiJ32 1-1 U-1 2 OUtS C-223
12Q0108.10-R-001 Rev. 0 Correspondence No.: RS-12-159 Sheet 1 of 2 Status: F N U Seismic Walkdown Checklist (SWC)
Equipment ID No.:
1FT-AF014 Equipment Class:
(18) Instruments on Racks Equipment
Description:
AF TO SG 1B FLOW TRANSMITTER Project:
Braidwood 1 SWEL Location (Bldg, Elev, Room/Area):
Auxiliary, 364.00 ft, ALL Manufacturer/Model:
Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results of judgments and findings. Additional space is provided at the end of this checklist for documenting other comments.
Anchorage
- 1.
Is anchorage configuration verification required (i.e., is the item one of the 50%
of SWEL items requiring such verification)?
No
- 2.
Is the anchorage free of bent, broken, missing or loose hardware?
Not Applicable
- 3.
Is the anchorage free of corrosion that is more than mild surface oxidation?
- 4.
Is the anchorage free of visible cracks in the concrete near the anchors?
- 5.
Is the anchorage configuration consistent with plant documentation? (Note:
This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.)
Not Applicable Not Applicable Not Applicable
- 6.
Based on the above anchorage evaluations, is the anchorage free of potentially adverse seismic conditions?
Instrument is securely attached to Rack IPL84JB which is well-anchored and braced Yes C-224
12Q0108.10-R-001 Rev. 0 Correspondence No.: RS-12-159 Sheet 2 of 2 Status: F N
U Seismic Walkdown Checklist (SWC)
Equipment ID No.:
1FT-AF014 Equipment Class:
(18) Instruments on Racks Equipment
Description:
AF TO SG 1B FLOW TRANSMITTER Interaction Effects
- 7.
Are soft targets free from impact by nearby equipment or structures?
- 8.
Are overhead equipment, distribution systems, ceiling tiles and lighting, and masonry block walls not likely to collapse onto the equipment?
- 9.
Do attached lines have adequate flexibility to avoid damage?
- 10.
Based on the above seismic interaction evaluations, is equipment free of potentially adverse seismic interaction effects?
Yes Yes Yes Yes Other Adverse Conditions
- 11.
Have you looked for and found no adverse seismic conditions that could Yes adversely affect the safety functions of the equipment?
Comments Seismic walkdown performed week of 7/16/12 by M. Delaney & P. Gazda Evaluated by:
Marlene Delaney Date:
10/1/2012 Evaluated by:
Philip Gazda 10/1/2012 Photos None C-225
12Q0108.10-R-001 Rev. 0 Correspondence No.: RS-12-159 Sheet 1 of 3 Status:
Y N
U Seismic Walkdown Checklist (SWC)
Equipment ID No.:
1HS-FC001 Equipment Class:
(18) Instruments on Racks Equipment
Description:
SPENT FUEL PIT PUMP Project:
Braidwood 1 SWEL Location (Bldg, Elev, Room/Area):
FH, 401.00 ft, ALL Manufacturer/Model:
Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results of judgments and findings. Additional space is provided at the end of this checklist for documenting other comments.
Anchorage
- 1. Is anchorage configuration verification required (i.e., is the item one of the 50%
of SWEL items requiring such verification)?
No
- 2.
Is the anchorage free of bent, broken, missing or loose hardware?
Yes
- 3.
Is the anchorage free of corrosion that is more than mild surface oxidation?
Yes
- 4.
Is the anchorage free of visible cracks in the concrete near the anchors?
Yes
- 5.
Is the anchorage configuration consistent with plant documentation? (Note:
This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.)
Not Applicable
- 6.
Based on the above anchorage evaluations, is the anchorage free of potentially adverse seismic conditions?
Anchored to seismic block wall.
Yes C-226
12QO108.10-R-001 Rev. 0 Correspondence No.: RS-12-159 Sheet 2 of 3 Status: M N
U Seismic Walkdown Checklist (SWC)
Equipment ID No.:
1HS-FC001 Equipment Class:
(18) Instruments on Racks Equipment
Description:
SPENT FUEL PIT PUMP Interaction Effects
- 7.
Are soft targets free from impact by nearby equipment or structures?
- 8.
Are overhead equipment, distribution systems, ceiling tiles and lighting, and masonry block walls not likely to collapse onto the equipment?
- 9.
Do attached lines have adequate flexibility to avoid damage?
- 10.
Based on the above seismic interaction evaluations, is equipment free of potentially adverse seismic interaction effects?
Yes Yes Yes Yes Other Adverse Conditions
- 11.
Have you looked for and found no adverse seismic conditions that could Yes adversely affect the safety functions of the equipment?
Comments Seismic walkdown performed week of 7/16/12 by M. Delaney & P. Gazda Evaluated by:
Marlene Delaney Date:
10/1/2012 Philip Gazda 10/1/2012 C-227
12Q0108.10-R-001 Rev. 0 Correspondence No.: RS-12-159 Sheet 3 of 3 Status: M N U Seismic Walkdown Checklist (SWC)
Equipment ID No.:
1HS-FC001 Equipment Class:
(18) Instruments on Racks Equipment
Description:
SPENT FUEL PIT PUMP Photos C-228
12QO108.10-R-001 Rev. 0 Correspondence No.: RS-12-159 Sheet 1 of 3 Status: EY-N U Seismic Walkdown Checklist (SWC)
Equipment ID No.:
lIP02E Equipment Class:
(4) Transformers Equipment
Description:
INSTRUMENT BUS 112 TRANSFORMER - DIV. 12 Project:
Braidwood 1 SWEL Location (Bldg, Elev, Room/Area):
Auxiliary, 451.00 ft, ALL Manufacturer/Model:
Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results of judgments and findings. Additional space is provided at the end of this checklist for documenting other comments.
Anchorage
- 1.
Is anchorage configuration verification required (i.e., is the item one of the 50%
Yes of SWEL items requiring such verification)?
- 2.
Is the anchorage free of bent, broken, missing or loose hardware?
Yes
- 3.
Is the anchorage free of corrosion that is more than mild surface oxidation?
Yes
- 4.
Is the anchorage free of visible cracks in the concrete near the anchors?
Yes
- 5.
Is the anchorage configuration consistent with plant documentation? (Note:
Yes This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.)
Drawing 20E-0-3391K Revision AF
- 6.
Based on the above anchorage evaluations, is the anchorage free of Yes potentially adverse seismic conditions?
C-229
12Q0108.10-R-001 Rev. 0 Correspondence No.: RS-12-159 Sheet 2 of 3 Status:
Y-] N U Seismic Walkdown Checklist (SWC)
Equipment ID No.:
1 IP02E Equipment Class:
(4) Transformers Equipment
Description:
INSTRUMENT BUS 112 TRANSFORMER - DIV. 12 Interaction Effects
- 7.
Are soft targets free from impact by nearby equipment or structures?
- 8.
Are overhead equipment, distribution systems, ceiling tiles and lighting, and masonry block walls not likely to collapse onto the equipment?
Seismic block walls
- 9.
Do attached lines have adequate flexibility to avoid damage?
- 10.
Based on the above seismic interaction evaluations, is equipment free of potentially adverse seismic interaction effects?
Yes Yes Yes Yes Other Adverse Conditions
- 11.
Have you looked for and found no adverse seismic conditions that could Yes adversely affect the safety functions of the equipment?
Comments Seismic walkdown performed week of 7/16/12 by M. Delaney & P. Gazda Evaluated by:
Marlene Delaney Date:
10/1/2012 Evaluated by:
Philip Gazda 10/1/2012 C-230
12Q0108.10-R-001 Rev. 0 Correspondence No.: RS-12-159 Sheet 3 of 3 Status: M N U Seismic Walkdown Checklist (SWC)
Equipment ID No.:
Equipment Class:
Equipment
Description:
1 IP02E (4) Transformers INSTRUMENT BUS 112 TRANSFORMER - DIV. 12 Photos 11P0F1:E 7-1 U-1 2 U58 1IP02E 7-16-12 057 C-231
12Q0108.1O-R-001 Rev. 0 Correspondence No.: RS-12-159 Sheet 1 of 3 Status: M N
U Seismic Walkdown Checklist (SWC)
Equipment ID No.:. lIP02J Equipment Class:
(14) Distribution Panels Equipment
Description:
120 VAC INSTRUMENT BUS DISTRIBUTION PANEL 112-DIV. 12 Project:
Braidwood 1 SWEL Location (Bldg, Elev, Room/Area):
Auxiliary, 451.00 ft, ALL Manufacturer/Model:
Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results of judgments and findings. Additional space is provided at the end of this checklist for documenting other comments.
Anchoraqe
- 1.
Is anchorage configuration verification required (i.e., is the item one of the 50%
Yes of SWEL items requiring such verification)?
- 2.
Is the anchorage free of bent, broken, missing or loose hardware?
Yes
- 3.
Is the anchorage free of corrosion that is more than mild surface oxidation?
Yes
- 4.
Is the anchorage free of visible cracks in the concrete near the anchors?
Yes Attached to safety related block wall.
- 5.
Is the anchorage configuration consistent with plant documentation? (Note:
Yes This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.)
Drawing 20E-O-3391F Revision AN Detail 123
- 6.
Based on the above anchorage evaluations, is the anchorage free of Yes potentially adverse seismic conditions?
C-232
12Q0108.1O-R-OO1 Rev. 0 Correspondence No.: RS-12-159 Sheet 2 of 3 Status: M N
U Seismic Walkdown Checklist (SWC)
Equipment ID No.:
1 IP02J Equipment Class:
(14) Distribution Panels Equipment
Description:
120 VAC INSTRUMENT BUS DISTRIBUTION PANEL 112 - DIV. 12 Interaction Effects
- 7.
Are soft targets free from impact by nearby equipment or structures?
Yes
- 8.
Are overhead equipment, distribution systems, ceiling tiles and lighting, and masonry block walls not likely to collapse onto the equipment?
Seismic block walls
- 9.
Do attached lines have adequate flexibility to avoid damage?
Yes Yes
- 10.
Based on the above seismic interaction evaluations, is equipment free of potentially adverse seismic interaction effects?
Yes Other Adverse Conditions
- 11.
Have you looked for and found no adverse seismic conditions that could Yes adversely affect the safety functions of the equipment?
Comments Seismic walkdown performed week of 7/16/12 by M. Delaney & P. Gazda t l -A(
4d Evaluated by:
Marlene Delaney Date:
10/1/2012 C-Philip Gazda 10/1/2012 C-233
12Q0108.10-R-001 Rev. 0 Correspondence No.: RS-12-159 Sheet 3 of 3 Status:
T N U Seismic Walkdown Checklist (SWC)
Equipment ID No.:
Equipment Class:
Equipment
Description:
IlP02J (14) Distribution Panels 120 VAC INSTRUMENT BUS DISTRIBUTION PANEL 112 - DIV. 12 Photos None.
C-234
12QO108.10-R-001 Rev. 0 Correspondence No.: RS-12-159 Sheet 1 of 3 Status: M N
U Seismic Walkdown Checklist (SWC)
Equipment ID No.:
lIP06E Equipment Class:
(16) Battery Chargers and Inverters Equipment
Description:
INSTRUMENT BUS 112 INVERTER - DIV. 12 Project:
Braidwood 1 SWEL Location (Bldg, Elev, Room/Area):
Auxiliary, 451.00 ft, ALL Manufacturer/Model:
Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results of judgments and findings. Additional space is provided at the end of this checklist for documenting other comments.
Anchorage
- 1.
Is anchorage configuration verification required (i.e., is the item one of the 50%
Yes of SWEL items requiring such verification)?
- 2.
Is the anchorage free of bent, broken, missing or loose hardware?
Yes
- 3.
Is the anchorage free of corrosion that is more than mild surface oxidation?
Yes
- 4.
Is the anchorage free of visible cracks in the concrete near the anchors?
Yes
- 5.
Is the anchorage configuration consistent with plant documentation? (Note:
This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.)
Drawing 20E-O-3391BK Revision D Detail 19271
- 6.
Based on the above anchorage evaluations, is the anchorage free of potentially adverse seismic conditions?
Yes Yes C-235
12Q0108.10-R-O01 Rev. 0 Correspondence No.: RS-12-159 Sheet 2 of 3 Status: M N
U Seismic Walkdown Checklist (SWC)
Equipment ID No.:
lIP06E Equipment Class:
(16) Battery Chargers and Inverters Equipment
Description:
INSTRUMENT BUS 112 INVERTER - DIV. 12 Interaction Effects
- 7.
Are soft targets free from impact by nearby equipment or structures?
- 8.
Are overhead equipment, distribution systems, ceiling tiles and lighting, and masonry block walls not likely to collapse onto the equipment?
Seismic block walls
- 9.
Do attached lines have adequate flexibility to avoid damage?
- 10.
Based on the above seismic interaction evaluations, is equipment free of potentially adverse seismic interaction effects?
Yes Yes Yes Yes Other Adverse Conditions
- 11.
Have you looked for and found no adverse seismic conditions that could Yes adversely affect the safety functions of the equipment?
Comments Seismic walkdown performed week of 7/16/12 by M. Delaney & P. Gazda Evaluated by:
Marlene Delaney Date:
10/1/2012 Philip Gazda 10/1/2012 C-236
12Q0108.1O-R-OO1 Rev. 0 Correspondence No.: RS-1 2-1 59 Sheet 3 of 3 Status: FT N U
Seismic Walkdown Checklist (SWC)
Equipment ID No.:
Equipment Class:
Equipment
Description:
1IP06E (16) Battery Chargers and Inverters INSTRUMENT BUS 112 INVERTER - DIV. 12 Photos 11v-Uti-: f-lt0-lz Ub 1IlPU-. 7-16-12 054 C-237
12Q0108.10-R-001 Rev. 0 Correspondence No.: RS-12-159 Sheet 1 of 3 Status:
N U
Seismic Walkdown Checklist (SWC)
Equipment ID No.:
1 IP08E Equipment Class:
(16) Battery Chargers and Inverters Equipment
Description:
INSTRUMENT BUS 114 INVERTER - DIV. 12 Project:
Braidwood 1 SWEL Location (Bldg, Elev, Room/Area):
Auxiliary, 451.00 ft, ALL Manufacturer/Model:
Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results of judgments and findings. Additional space is provided at the end of this checklist for documenting other comments.
Anchorage
- 1.
Is anchorage configuration verification required (i.e., is the item one of the 50%
Yes of SWEL items requiring such verification)?
- 2.
Is the anchorage free of bent, broken, missing or loose hardware?
Yes
- 3.
Is the anchorage free of corrosion that is more than mild surface oxidation?
Yes
- 4.
Is the anchorage free of visible cracks in the concrete near the anchors?
Yes
- 5.
Is the anchorage configuration consistent with plant documentation? (Note:
Yes This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.)
Drawing 20E-O-3391BK Revision D Detail 19271
- 6.
Based on the above anchorage evaluations, is the anchorage free of Yes potentially adverse seismic conditions?
C-238
12Q0108.10-R-001 Rev. 0 Correspondence No.: RS-12-159 Sheet 2 of 3 Status: M N
U Seismic Walkdown Checklist (SWC)
Equipment ID No.:
lIP08E Equipment Class:
(16) Battery Chargers and Inverters Equipment
Description:
INSTRUMENT BUS 114 INVERTER - DIV. 12 Interaction Effects
- 7.
Are soft targets free from impact by nearby equipment or structures?
Yes
- 8.
Are overhead equipment, distribution systems, ceiling tiles and lighting, and masonry block walls not likely to collapse onto the equipment?
Seismic block walls
- 9.
Do attached lines have adequate flexibility to avoid damage?
- 10.
Based on the above seismic interaction evaluations, is equipment free of potentially adverse seismic interaction effects?
Yes Yes Yes Other Adverse Conditions
- 11.
Have you looked for and found no adverse seismic conditions that could Yes adversely affect the safety functions of the equipment?
Comments Seismic walkdown performed week of 7/16/12 by M. Delaney & P. Gazda Evaluated by:
Marlene Delaney Date:
10/1/2012 62 *Philip Gazda 10/1/2012 C-239
12Q0108.10-R-001 Rev. 0 Correspondence No.: RS-12-159 Sheet 3 of 3 Status: MI-N U
Seismic Walkdown Checklist (SWC)
Equipment ID No.:
lIP08E Equipment Class:
(16) Battery Chargers and Inverters Equipment
Description:
INSTRUMENT BUS 114 INVERTER - DIV. 12 Photos I11VUtIt f-1 b-1 z 00*
Il-UI:
[Fts
-1U-12z Ub.
C-240
12Q0108.10-R-001 Rev. 0 Correspondence No.: RS-1 2-159 Sheet 1 of 4 Status: M N
U Seismic Walkdown Checklist (SWC)
Equipment ID No.:
1 LT-0932 Equipment Class:
(18) Instruments on Racks Equipment
Description:
REF WTR STG TK LVL D/P XMTTR Project:
Braidwood 1 SWEL Location (Bldg, Elev, Room/Area):
Auxiliary, 379.00 ft, ALL Manufacturer/Model:
Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results of judgments and findings. Additional space is provided at the end of this checklist for documenting other comments.
Anchorage
- 1.
Is anchorage configuration verification required (i.e., is the item one of the 50%
of SWEL items requiring such verification)?
No
- 2.
Is the anchorage free of bent, broken, missing or loose hardware?
Not Applicable
- 3.
Is the anchorage free of corrosion that is more than mild surface oxidation?
- 4.
Is the anchorage free of visible cracks in the concrete near the anchors?
- 5.
Is the anchorage configuration consistent with plant documentation? (Note:
This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.)
Not Applicable Not Applicable Not Applicable
- 6.
Based on the above anchorage evaluations, is the anchorage free of potentially adverse seismic conditions?
Yes C-241
12Q0108.10-R-001 Rev. 0 Correspondence No.: RS-12-159 Sheet 2 of 4 Status: M N
U Seismic Walkdown Checklist (SWC)
Equipment ID No.:
1LT-0932 Equipment Class:
(18) Instruments on Racks Equipment
Description:
REF W"R STG TK LVL D/P XMTTR Interaction Effects
- 7.
Are soft targets free from impact by nearby equipment or structures?
- 8.
Are overhead equipment, distribution systems, ceiling tiles and lighting, and masonry block walls not likely to collapse onto the equipment?
- 9.
Do attached lines have adequate flexibility to avoid damage?
- 10.
Based on the above seismic interaction evaluations, is equipment free of potentially adverse seismic interaction effects?
Yes Yes Yes Yes Other Adverse Conditions
- 11.
Have you looked for and found no adverse seismic conditions that could Yes adversely affect the safety functions of the equipment?
See A WC 39 for discussion on water leak in tunnel Comments Seismic walkdown performed week of 7/16/12 by M. Delaney & P. Gazda Evaluated by:
Marlene Delaney Date:
10/1/2012 Philip Gazda 10/1/2012 C-242
12Q0108.10-R-OO1 Rev. 0 Correspondence No.: RS-12-159 Sheet 3 of 4 Status: M N
U Seismic Walkdown Checklist (SWC)
Equipment ID No.:
Equipment Class:
Equipment
Description:
1 LT-0932 (18) Instruments on Racks REF WTR STG TK LVL D/P XM1TR Photos
.Photos 1LT-0932 (AWB - water leak from hatch) 7-19-12 017 1LT-0932 7-19-12 015 C-243
12Q0108.10-R-001 Rev. 0 Correspondence No.: RS-12-159 Sheet 4 of 4 Status: M N U Seismic Walkdown Checklist (SWC)
Equipment ID No.:
lLT-0932 Equipment Class:
(18) Instruments on Racks EauiDment
Description:
REF WTR STG TK LVL DIP XMTTR 1LT-0932 7-19-12 016 C-244
12Q0108.10-R-001 Rev. 0 Correspondence No.: RS-12-159 Sheet 1 of 3 Status: j N U Seismic Walkdown Checklist (SWC)
Equipment ID No.:
1MS001A Equipment Class:
(7) Fluid-Operated Valves Equipment
Description:
MS ISOL VLV LOOP 1A ASMBLY; 30-1/4" Project:
Braidwood 1 SWEL Location (Bldg, Elev, Room/Area):
Auxiliary, 377.00 ft, ALL Manufacturer/Model:
Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results of judgments and findings. Additional space is provided at the end of this checklist for documenting other comments.
Anchorage
- 1.
Is anchorage configuration verification required (i.e., is the item one of the 50%
of SWEL items requiring such verification)?
No
- 2.
Is the anchorage free of bent, broken, missing or loose hardware?
Not Applicable
- 3.
Is the anchorage free of corrosion that is more than mild surface oxidation?
- 4.
Is the anchorage free of visible cracks in the concrete near the anchors?
- 5.
Is the anchorage configuration consistent with plant documentation? (Note:
This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.)
Not Applicable Not Applicable Not Applicable
- 6.
Based on the above anchorage evaluations, is the anchorage free of potentially adverse seismic conditions?
Yes C-245
12Q0108.10-R-001 Rev. 0 Correspondence No.: RS-12-159 Sheet 2 of 3 Status: M N
U Seismic Walkdown Checklist (SWC)
Equipment ID No.:
1MS001A Equipment Class:
(7) Fluid-Operated Valves Equipment
Description:
MS ISOL VLV LOOP 1A ASMBLY; 30-1/4" Interaction Effects
- 7.
Are soft targets free from impact by nearby equipment or structures?
- 8.
Are overhead equipment, distribution systems, ceiling tiles and lighting, and masonry block walls not likely to collapse onto the equipment?
- 9.
Do attached lines have adequate flexibility to avoid damage?
- 10.
Based on the above seismic interaction evaluations, is equipment free of potentially adverse seismic interaction effects?
Yes Yes Yes Yes Other Adverse Conditions
- 11.
Have you looked for and found no adverse seismic conditions that could Yes adversely affect the safety functions of the equipment?
Valve is robust.
Comments Seismic walkdown performed week of 7/16/12 by M. Delaney & P. Gazda Evaluated by:
Marlene Delaney Date:
10/1/2012 Philip Gazda 10/1/2012 C-246
i2QO1O8.1O-R-O01 Rev. 0 Correspondence No.: RS-12-159 Sheet 3 of 3 Status: MI N
U Seismic Walkdown Checklist (SWC)
Equipment ID No.:
1MS001A Equipment Class:
(7) Fluid-Operated Valves Equipment
Description:
MS ISOL VLV LOOP 1A ASMBLY; 30-1/4" Photos 1MS001A 7-17-12 011 1MS001A 7-17-12 012 C-247
12Q0108.10-R-001 Rev. 0 Correspondence No.: RS-12-159 Sheet 1 of 4 Status: M N
U Seismic Walkdown Checklist (SWC)
Equipment ID No.:
1MS018A Equipment Class:
(8) Motor-Operated and Solenoid-Operated Valves Equipment
Description:
S/G lA PORVASMBLY; 8" Project:
Braidwood 1 SWEL Location (Bldg, Elev, Room/Area):
Auxiliary, 401.00 ft, ALL Manufacturer/Model:
Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL, The space below each of the following questions may be used to record the results of judgments and findings. Additional space is provided at the end of this checklist for documenting other comments.
Anchorage
- 1.
Is anchorage configuration verification required (i.e., is the item one of the 50%
of SWEL items requiring such verification)?
No
- 2.
Is the anchorage free of bent, broken, missing or loose hardware?
Not Applicable
- 3.
Is the anchorage free of corrosion that is more than mild surface oxidation?
- 4.
Is the anchorage free of visible cracks in the concrete near the anchors?
- 5.
Is the anchorage configuration consistent with plant documentation? (Note:
This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.)
Not Applicable Not Applicable Not Applicable
- 6.
Based on the above anchorage evaluations, is the anchorage free of potentially adverse seismic conditions?
Yes C-248
12Q0108.10-R-001 Rev. 0 Correspondence No.: RS-12-159 Sheet 2 of 4 Status: F N
U Seismic Walkdown Checklist (SWC)
Equipment ID No.:
1MS018A Equipment Class:
(8) Motor-Operated and Solenoid-Operated Valves Equipment
Description:
S/G 1A PORVASMBLY; 8" Interaction Effects
- 7.
Are soft targets free from impact by nearby equipment or structures?
- 8.
Are overhead equipment, distribution systems, ceiling tiles and lighting, and masonry block walls not likely to collapse onto the equipment?
- 9.
Do attached lines have adequate flexibility to avoid damage?
- 10.
Based on the above seismic interaction evaluations, is equipment free of potentially adverse seismic interaction effects?
Yes Yes Yes Yes Other Adverse Conditions
- 11.
Have you looked for and found no adverse seismic conditions that could Yes adversely affect the safety functions of the equipment?
Valve is robust.
Comments Seismic walkdown performed week of 7/16/12 by M. Delaney & P. Gazda Evaluated by:
Marlene Delaney Date:
10/1/2012 Philip Gazda 10/1/2012 C-249
12Q0108.10-R-001 Rev. 0 Correspondence No.: RS-12-159 Sheet 3 of 4 Status: M N U Seismic Walkdown Checklist (SWC)
Equipment ID No.:
lMS018A Equipment Class:
(8) Motor-Operated and Solenoid-Operated Valves Equipment
Description:
S/G lA PORVASMBLY; 8" Photos 1MSO18A 7-17-12 008 C-250
1200108.1O-R-001 Rev. 0 Correspondence No.: RS-1 2-1 59 Sheet 4 of 4 Status: F-] N U Seismic Walkdown Checklist (SWC)
Equipment ID No.:
Equipment Class:
Fnuinm~nt Dnsqcrintinn:
1MS018A (8) Motor-Operated and Solenoid-Operated Valves S/G 1A PORV ASMBLY; 8" C-251
12Q0108.10-R-001 Rev. 0 Correspondence No.: RS-12-159 Sheet 1 of 4 Status: M N
U Seismic Walkdown Checklist (SWC)
Equipment ID No.:
1MS018B Equipment Class:
(8) Motor-Operated and Solenoid-Operated Valves Equipment
Description:
S/G 1 B PORV ASMBLY; 8" Project:
Braidwood 1 SWEL Location (Bldg, Elev, Room/Area):
Auxiliary, 401.00 ft, ALL Manufacturer/Model:
Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results of judgments and findings. Additional space is provided at the end of this checklist for documenting other comments.
Anchorage
- 1.
Is anchorage configuration verification required (i.e., is the item one of the 50%
of SWEL items requiring such verification)?
01o
- 2.
Is the anchorage free of bent, broken, missing or loose hardware?
Not Applicable
- 3.
Is the anchorage free of corrosion that is more than mild surface oxidation?
- 4.
Is the anchorage free of visible cracks in the concrete near the anchors?
- 5.
Is the anchorage configuration consistent with plant documentation? (Note:
This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.)
Not Applicable Not Applicable Not Applicable
- 6.
Based on the above anchorage evaluations, is the anchorage free of potentially adverse seismic conditions?
Yes C-252
12Q0108.10-R-001 Rev. 0 Correspondence No.: RS-12-159 Sheet 2 of 4 Status:
Y N U Seismic Walkdown Checklist (SWC)
Equipment ID No.:
1MS018B Equipment Class:
(8) Motor-Operated and Solenoid-Operated Valves Equipment
Description:
S/G 1 B PORV ASMBLY; 8" Interaction Effects
- 7.
Are soft targets free from impact by nearby equipment or structures?
- 8.
Are overhead equipment, distribution systems, ceiling tiles and lighting, and masonry block walls not likely to collapse onto the equipment?
Scaffolding near equipment is well-supported.
All overhead components are well-supported.
- 9.
Do attached lines have adequate flexibility to avoid damage?
- 10.
Based on the above seismic interaction evaluations, is equipment free of potentially adverse seismic interaction effects?
Yes Yes Yes Yes Other Adverse Conditions
- 11.
Have you looked for and found no adverse seismic conditions that could Yes adversely affect the safety functions of the equipment?
Rugged valve Comments Seismic walkdown performed week of 7/16/12 by M. Delaney & P. Gazda Evaluated by:
Marlene Delaney Date:
10/11/2012 Philip Gazda 10/1/2012 C-253
1200108.10-R-001 Rev. 0 Correspondence No.: RS-12-159 Sheet 3 of 4 Status: M N U Seismic Walkdown Checklist (SWC)
Equipment ID No.:
Equipment Class:
Equipment
Description:
1MS018B (8) Motor-Operated and Solenoid-Operated Valves S/G 1B PORV ASMBLY; 8" Photos 1MSO18B 7-17-12 004 1MS018B 7-17-12 005 C-254
12QO108.10-R-001 Rev. 0 Correspondence No.: RS-12-159 Sheet 4 of 4 Status: M N U Seismic Walkdown Checklist (SWC)
Equipment ID No.:
lMS018B Equipment Class:
(8) Motor-Operated and Solenoid-Operated Valves Equipment
Description:
S/G 1 B PORV ASMBLY; 8" 1MSO18B 7-17-12 006 IMS018B 7-17-12 007 C-255
12QO108.10-R-001 Rev. 0 Correspondence No.: RS-12-159 Sheet 1 of 4 Status:
N U
Seismic Walkdown Checklist (SWC)
Equipment ID No.:
1PA01J Equipment Class: " (20) Instrumentation and Control Panels and Cabinets Equipment
Description:
PROTECTION SYSTEM CABINET (l&E Prot. Cab. CH 1)
Project:
Braidwood 1 SWEL Location (Bldg, Elev, Room/Area):
Auxiliary, 451.00 ft, ALL Manufacturer/Model:
Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results of judgments and findings. Additional space is provided at the end of this checklist for documenting other comments.
Anchorage
- 1.
Is anchorage configuration verification required (i.e., is the item one of the 50%
Yes of SWEL items requiring such verification)?
- 2.
Is the anchorage free of bent, broken, missing or loose hardware?
Yes Welded detail
- 3.
Is the anchorage free of corrosion that is more than mild surface oxidation?
Yes
- 4.
Is the anchorage free of visible cracks in the concrete near the anchors?
Yes Floor is tile so cracks can't be seen exterior to cabinet. Details are welded.
- 5.
Is the anchorage configuration consistent with plant documentation? (Note:
Yes This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.)
Drawing 20E-0-3391C Revision BM Detail for miscellaneous racks
- 6.
Based on the above anchorage evaluations, is the anchorage free of Yes potentially adverse seismic conditions?
C-256
12Q0108.1O-R-001 Rev. 0 Correspondence No.: RS-12-159 Sheet 2 of 4 Status: M N
U Seismic Walkdown Checklist (SWC)
Equipment ID No.:
1PA01J Equipment Class:
(20) Instrumentation and Control Panels and Cabinets Equipment
Description:
PROTECTION SYSTEM CABINET (I&E Prot. Cab. CH 1)
Interaction Effects
- 7.
Are soft targets free from impact by nearby equipment or structures?
Yes
- 8.
Are overhead equipment, distribution systems, ceiling tiles and lighting, and masonry block walls not likely to collapse onto the equipment?
- 9.
Do attached lines have adequate flexibility to avoid damage?
Yes Yes Yes
- 10.
Based on the above seismic interaction evaluations, is equipment free of potentially adverse seismic interaction effects?
Other Adverse Conditions
- 11.
Have you looked for and found no adverse seismic conditions that could Yes adversely affect the safety functions of the equipment?
Comments Seismic walkdown performed week of 7/16/12 by M. Delaney & P. Gazda Evaluated by:
Marlene Delaney Date:
10/1/2012 Philip Gazda 10/1/2012 C-257
12Q0108.10-R-O01 Rev. 0 Correspondence No.: RS-12-159 Sheet 3 of 4 Status: M N U Seismic Walkdown Checklist (SWC)
Equipment ID No.:
1PA01J Equipment Class:
(20) Instrumentation and Control Panels and Cabinets Equipment
Description:
PROTECTION SYSTEM CABINET (I&E Prot. Cab. CH 1)
Photos 1PA01J 7-16-12 009 I VAUIJ I-Ib-U UUtS C-258
12Q0108.10-R-001 Rev. 0 Correspondence No.: RS-12-159 Sheet 4 of 4 Status: M N
U Seismic Walkdown Checklist (SWC)
Equipment ID No.:
Equipment Class:
FIauinmpnt Descrintion:
1 PAO1 J (20) Instrumentation and Control Panels and Cabinets PROTECTION SYSTEM CABINET (I&E Prot. Cab. CH 1) 1PA01J 7-16-12 010 C-259
12Q0108.10-R-001 Rev. 0 Correspondence No.: RS-12-159 Sheet 1 of 4 Status:
N U Seismic Walkdown Checklist (SWC)
Equipment ID No.:
1PA03J Equipment Class:
(20) Instrumentation and Control Panels and Cabinets Equipment
Description:
PROTECTION SYSTEM CABINET (I&E Prot. Cab. CH 3)
Project:
Braidwood 1 SWEL Location (Bldg, Elev, Room/Area):
Auxiliary, 451.00 ft, ALL Manufacturer/Model:
Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results of judgments and findings. Additional space is provided at the end of this checklist for documenting other comments.
Anchorage
- 1.
Is anchorage configuration verification required (i.e., is the item one of the 50%
Yes of SWEL items requiring such verification)?
- 2.
is the anchorage free of bent, broken, missing or loose hardware?
Yes Welded detail
- 3.
Is the anchorage free of corrosion that is more than mild surface oxidation?
Yes
- 4.
Is the anchorage free of visible cracks in the concrete near the anchors?
Yes Tile floor
- 5.
Is the anchorage configuration consistent with plant documentation? (Note:
Yes This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.)
Drawing 20E-0-339 IC Revision BM Detail for miscellaneous racks
- 6.
Based on the above anchorage evaluations, is the anchorage free of Yes potentially adverse seismic conditions?
C-260
12Q0108.1O-R-001 Rev. 0 Correspondence No.: RS-12-159 Sheet 2 of 4 Status: E-Y] N U
Seismic Walkdown Checklist (SWC)
Equipment ID No.:
1PA03J Equipment Class:
(20) Instrumentation and Control Panels and Cabinets Equipment
Description:
PROTECTION SYSTEM CABINET (I&E Prot. Cab. CH 3)
Interaction Effects
- 7.
Are soft targets free from impact by nearby equipment or structures?
Yes
- 8.
Are overhead equipment, distribution systems, ceiling tiles and lighting, and masonry block walls not likely to collapse onto the equipment?
Yes
- 9.
Do attached lines have adequate flexibility to avoid damage?
Yes
- 10.
Based on the above seismic interaction evaluations, is equipment free of potentially adverse seismic interaction effects?
Yes Other Adverse Conditions
- 11.
Have you looked for and found no adverse seismic conditions that could Yes adversely affect the safety functions of the equipment?
Comments Seismic walkdown performed week of 7/16/12 by M. Delaney & P. Gazda Evaluated by:
Marlene Delaney Date:
10/1/2012 Philip Gazda 10/1/2012 C-261
12Q0108.10-R-001 Rev. 0 Correspondence No.: RS-12-159 Sheet 3 of 4 Status: M N U Seismic Walkdown Checklist (SWC)
Equipment ID No.:
Equipment Class:
Equipment
Description:
1 PA03J (20) Instrumentation and Control Panels and Cabinets PROTECTION SYSTEM CABINET (I&E Prot. Cab. CH 3)
Photos 1PA03J 7-16-12 011 1PA03J 7-16-12 012 C-262
12Q0108.10-R-001 Rev. 0 Correspondence No.: RS-12-159 Sheet 4 of 4 Status: M N
U Seismic Walkdown Checklist (SWC)
Equipment ID No.:
Equipment Class:
EauiDment
Description:
1 PA03J (20) Instrumentation and Control Panels and Cabinets PROTECTION SYSTEM CABINET (I&E Prot. Cab. CH 3) 1PA03J 7-16-12 013 C-263
12Q0108.10-R-001 Rev. 0 Correspondence No.: RS-12-159 Sheet 1 of 3 Status: 7 N
U Seismic Walkdown Checklist (SWC)
Equipment ID No.:
1PA07J Equipment Class:
(20) Instrumentation and Control Panels and Cabinets Equipment
Description:
PROC I&C RACK CONT GRP 3 CAB 7 Project:
Braidwood 1 SWEL Location (Bldg, Elev, Room/Area):
Auxiliary, 451.00 ft, ALL Manufacturer/Model:
Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results of judgments and findings. Additional space is provided at the end of this checklist for documenting other comments.
Anchorage
- 1.
Is anchorage configuration verification required (i.e., is the item one of the 50%
Yes of SWEL items requiring such verification)?
- 2.
Is the anchorage free of bent, broken, missing or loose hardware?
Yes
- 3.
Is the anchorage free of corrosion that is more than mild surface oxidation?
Yes
- 4.
Is the anchorage free of visible cracks in the concrete near the anchors?
Yes
- 5.
Is the anchorage configuration consistent with plant documentation? (Note:
Yes This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.)
Drawing 20E-0-3391C Revision BM Detail for miscellaneous racks
- 6.
Based on the above anchorage evaluations, is the anchorage free of Yes potentially adverse seismic conditions?
C-264
12Q0108.1O-R-001 Rev. 0 Correspondence No.: RS-12-159 Sheet 2 of 3 Status: M N U
Seismic Walkdown Checklist (SWC)
Equipment ID No.:
1 PA07J Equipment Class:
(20) Instrumentation and Control Panels and Cabinets Equipment
Description:
PROC I&C RACK CONT GRP 3 CAB 7 Interaction Effects
- 7.
Are soft targets free from impact by nearby equipment or structures?
- 8.
Are overhead equipment, distribution systems, ceiling tiles and lighting, and masonry block walls not likely to collapse onto the equipment?
- 9.
Do attached lines have adequate flexibility to avoid damage?
- 10.
Based on the above seismic interaction evaluations, is equipment free of potentially adverse seismic interaction effects?
Yes Yes Yes Yes Other Adverse Conditions
- 11.
Have you looked for and found no adverse seismic conditions that could Yes adversely affect the safety functions of the equipment?
Comments Seismic walkdown performed week of 7/16/12 by M. Delaney & P. Gazda Evaluated by:
Marlene Delaney Date:
10/1/2012 Philip Gazda 10/1/2012 C-265
12Q0108.10-R-001 Rev. 0 Correspondence No.: RS-12-159 Sheet 3 of 3 Status: M N
U Seismic Walkdown Checklist (SWC)
Equipment ID No.:
1PA07J Equipment Class:
(20) Instrumentation and Control Panels and Cabinets Equipment
Description:
PROC I&C RACK CONT GRP 3 CAB 7 Photos 1PA07J 7-16-12 014 1PA07J 7-16-12 015 C-266
12Q0108.10-R-001 Rev. 0 Correspondence No.: RS-12-159 Sheet 1 of 4 Status:
N U Seismic Walkdown Checklist (SWC)
Equipment ID No.:
1PA14J Equipment Class:
(20) Instrumentation and Control Panels and Cabinets Equipment
Description:
ESF SEQUENCING & ACTUATION CABINET TRAIN B Project:
Braidwood 1 SWEL Location (Bldg, Elev, Room/Area):
Auxiliary, 451.00 ft, ALL Manufacturer/Model:
Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be-used to record the results of judgments and findings. Additional space is provided at the end of this checklist for documenting other comments.
Anchorage
- 1.
Is anchorage configuration verification required (i.e., is the item one of the 50%
Yes of SWEL items requiring such verification)?
- 2.
Is the anchorage free of bent, broken, missing or loose hardware?
Yes
- 3.
Is the anchorage free of corrosion that is more than mild surface oxidation?
Yes
- 4.
Is the anchorage free of visible cracks in the concrete near the anchors?
Yes Tile floor so cracks can't be seen
- 5.
Is the anchorage configuration consistent with plant documentation? (Note:
Yes This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.)
Drawing 20E-0-3391C Revision BM Mounting of Sequencing & Act. Cabinet IPA14J Weld exceeds drawing requirements
- 6.
Based on the above anchorage evaluations, is the anchorage free of Yes potentially adverse seismic conditions?
C-267
12QO108.10-R-O01 Rev. 0 Correspondence No.: RS-12-159 Sheet 2 of 4 Status: M N
U Seismic Walkdown Checklist (SWC)
Equipment ID No.:
1PA14J Equipment Class:
(20) Instrumentation and Control Panels and Cabinets Equipment
Description:
ESF SEQUENCING & ACTUATION CABINET TRAIN B Interaction Effects
- 7.
Are soft targets free from impact by nearby equipment or structures?
- 8.
Are overhead equipment, distribution systems, ceiling tiles and lighting, and masonry block walls not likely to collapse onto the equipment?
- 9.
Do attached lines have adequate flexibility to avoid damage?
- 10.
Based on the above seismic interaction evaluations, is equipment free of potentially adverse seismic interaction effects?
Yes Yes Yes Yes Other Adverse Conditions
- 11.
Have you looked for and found no adverse seismic conditions that could Yes adversely affect the safety functions of the equipment?
Comments Seismic walkdown performed week of 7/16/12 by M. Delaney & P. Gazda Evaluated by:
Marlene Delaney Date:
10/1/2012 Philip Gazda 10/1/2012 C-268
12Q0108.10-R-001 Rev. 0 Correspondence No.: RS-12-159 Sheet 3 of 4 Status:
T N
U Seismic Walkdown Checklist (SWC)
Equipment ID No.:
1PA14J Equipment Class:
(20) Instrumentation and Control Panels and Cabinets Equipment
Description:
ESF SEQUENCING & ACTUATION CABINET TRAIN B Photos 1PA14J 7-16-12 016 1PA14J 7-16-12 017 C-269
12Q0108.10-R-001 Rev. 0 Correspondence No.: RS-12-159 Sheet 4 of 4 Status: M N
U Seismic Walkdown Checklist (SWC)
Equipment ID No.:
1PA14J Equipment Class:
(20) Instrumentation and Control Panels and Cabinets Equipment
Description:
ESF SEQUENCING & ACTUATION CABINET TRAIN B 1PAI4J 7-16-12 018 C-270
12Q0108.10-R-001 Rev. 0 Correspondence No.: RS-12-159 Sheet 1 of 4 Status: EY-N U
Seismic Walkdown Checklist (SWC)
Equipment ID No.:
1PA28J Equipment Class:
(20) Instrumentation and Control Panels and Cabinets Equipment
Description:
AUX SAFEGUARD RELAY CABINET (B)
Project:
Braidwood 1 SWEL Location (Bldg, Elev, Room/Area):
Auxiliary, 451.00 ft, ALL Manufacturer/Model:
Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results of judgments and findings. Additional space is provided at the end of this checklist for documenting other comments.
Anchorage
- 1.
Is anchorage configuration verification required (i.e., is the item one of the 50%
Yes of SWEL items requiring such verification)?
- 2.
Is the anchorage free of bent, broken, missing or loose hardware?
Yes
- 3.
Is the anchorage free of corrosion that is more than mild surface oxidation?
Yes
- 4.
Is the anchorage free of visible cracks in the concrete near the anchors?
Yes
- 5.
Is the anchorage configuration consistent with plant documentation? (Note:
Yes This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.)
Weld exceeds drawing dimensions. Drawing 20E-0-3391C Revision BM Mounting Detail for Miscellaneous Racks
- 6.
Based on the above anchorage evaluations, is the anchorage free of Yes potentially adverse seismic conditions?
C-271
12QO108.10-R-001 Rev. 0 Correspondence No.: RS-12-159 Sheet 2 of 4 Status: j N
U Seismic Walkdown Checklist (SWC)
Equipment ID No.:
1PA28J Equipment Class:
(20) Instrumentation and Control Panels and Cabinets Equipment
Description:
AUX SAFEGUARD RELAY CABINET (B)
Interaction Effects
- 7.
Are soft targets free from impact by nearby equipment or structures?
- 8.
Are overhead equipment, distribution systems, ceiling tiles and lighting, and masonry block walls not likely to collapse onto the equipment?
- 9.
Do attached lines have adequate flexibility to avoid damage?
- 10.
Based on the above seismic interaction evaluations, is equipment free of potentially adverse seismic interaction effects?
Yes Yes Yes Yes Other Adverse Conditions
.11.
Have you looked for and found no adverse seismic conditions that could Yes adversely affect the safety functions of the equipment?
Comments Seismic walkdown performed week of 7/16/12 by M. Delaney & P. Gazda Evaluated by:
Marlene Delaney Date:
10/1/2012 Philip Gazda 10/1/2012 C-272
1200108.10-R-001 Rev. 0 Correspondence No.: RS-12-159 Sheet 3 of 4 Status: M N U Seismic Walkdown Checklist (SWC)
Equipment ID No.:
1PA28J Equipment Class:
(20) Instrumentation and Control Panels and Cabinets Equipment
Description:
AUX SAFEGUARD RELAY CABINET (B)
Photos 1 VAZWJ 7-1( U1 9 1FA2.6J 7-1(j-1Z 020 C-273
12Q0108.10-R-001 Rev. 0 Correspondence No.: RS-12-159 Sheet 4 of 4 Status: FTN U Seismic Walkdown Checklist (SWC)
Equipment ID No.:
1PA28J Equipment Class:
(20) Instrumentation and Control Panels and Cabinets Equipment
Description:
AUX SAFEGUARD RELAY CABINET (B) 1PA28J 7-16-12 021 C-274
12Q0108.10-R-001 Rev. 0 Correspondence No.: RS-12-159 Sheet 1 of 4 Status: M N U Seismic Walkdown Checklist (SWC)
Equipment ID No.:
1PA34J Equipment Class:
(20) Instrumentation and Control Panels and Cabinets Equipment
Description:
CONTROL SYSTEM CABINET ESF DIV. 12 Project:
Braidwood 1 SWEL Location (Bldg, Elev, Room/Area):
Auxiliary, 451.00 ft, ALL Manufacturer/Model:
Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results of judgments and findings. Additional space is provided at the end of this checklist for documenting other comments.
Anchorage
- 1. Is anchorage configuration verification required (i.e., is the item one of the 50%
Yes of SWEL items requiring such verification)?
- 2.
Is the anchorage free of bent, broken, missing or loose hardware?
Yes
- 3.
Is the anchorage free of corrosion that is more than mild surface oxidation?
Yes
- 4.
Is the anchorage free of visible cracks in the concrete near the anchors?
Yes
- 5.
Is the anchorage configuration consistent with plant documentation? (Note:
Yes This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.)
Weld exceeds drawing dimensions. Drawing 20E-0-3391C Revision BM Mounting Detail for Misc. Racks
- 6.
Based on the above anchorage evaluations, is the anchorage free of Yes potentially adverse seismic conditions?
C-275
12Q0108.10-R-001 Rev. 0 Correspondence No.: RS-12-159 Sheet 2 of 4 Status: M N
U Seismic Walkdown Checklist (SWC)
Equipment ID No.:
1PA34J Equipment Class:
(20) Instrumentation and Control Panels and Cabinets Equipment
Description:
CONTROL SYSTEM CABINET ESF DIV. 12 Interaction Effects
- 7.
Are soft targets free from impact by nearby equipment or structures?
See A WC 3 for discussion on test cabinet.
- 8.
Are overhead equipment, distribution systems, ceiling tiles and lighting, and masonry block walls not likely to collapse onto the equipment?
Overhead lights on rods and secure.
- 9.
Do attached lines have adequate flexibility to avoid damage?
- 10.
Based on the above seismic interaction evaluations, is equipment free of potentially adverse seismic interaction effects?
Yes Yes Yes Yes Other Adverse Conditions
- 11.
Have you looked for and found no adverse seismic conditions that could Yes adversely affect the safety functions of the equipment?
Comments Seismic walkdown performed week of 7/16/12 by M. Delaney & P. Gazda Evaluated by:
Marlene Delaney Date:
10/1/2012 Philip Gazda 10/1/2012 C-276
12Q0108.10-R-O01 Rev. 0 Correspondence No.: RS-12-159 Sheet 3 of 4 Status: M N U Seismic Walkdown Checklist (SWC)
Equipment ID No.:
Equipment Class:
Equipment
Description:
1 PA34J (20) Instrumentation and Control Panels and Cabinets CONTROL SYSTEM CABINET ESF DIV. 12 Photos 1 PA34J (AWB Test Panel) 7-16-12 024 1 PA34J (AWB Test Panel)7-16-12 025 C-277
12Q0108.10-R-001 Rev. 0 Correspondence No.: RS-12-159 Sheet 4 of 4 Status: MI N
U Seismic Walkdown Checklist (SWC)
Equipment ID No.:
1PA34J Equipment Class:
(20) Instrumentation and Control Panels and Cabinets Equipment
Description:
CONTROL SYSTEM CABINET ESF DIV. 12 1PA34J 7-16-12 022 1PA34J 7-16-12 023 C-278
12Q0108.1O-R-O01 Rev. 0 Correspondence No.: RS-12-159 Sheet 1 of 3 Status: F N
U Seismic Walkdown Checklist (SWC)
Equipment ID No.:
1PI-0627 Equipment Class:
(18) Instruments on Racks Equipment
Description:
GAUGE; PRESSURE, U.S. GAUGE CO.,0-160 PSIG Project:
Braidwood 1 SWEL Location (Bldg, Elev, Room/Area):
FH, 401.00 ft, ALL Manufacturer/Model:
Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results of judgments and findings. Additional space is provided at the end of this checklist for, documenting other comments.
Anchorage
- 1. Is anchorage configuration verification required (i.e., is the item one of the 50%
of SWEL items requiring such verification)?
No
- 2.
Is the anchorage free of bent, broken, missing or loose hardware?
Not Applicable
- 3.
Is the anchorage free of corrosion that is more than mild surface oxidation?
- 4.
Is the anchorage free of visible cracks in the concrete near the anchors?
- 5.
Is the anchorage configuration consistent with plant documentation? (Note:
This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.)
Not Applicable Not Applicable Not Applicable
- 6.
Based on the above anchorage evaluations, is the anchorage free of potentially adverse seismic conditions?
Yes C-279
12Q0108.1O-R-O01 Rev. 0 Correspondence No.: RS-12-159 Sheet 2 of 3 Status: M N
U Seismic Walkdown Checklist (SWC)
Equipment ID No.:
1PI-0627 Equipment Class:
(18) Instruments on Racks Equipment
Description:
GAUGE; PRESSURE, U.S. GAUGE CO.,0-160 PSIG Interaction Effects
- 7.
Are soft targets free from impact by nearby equipment or structures?
- 8.
Are overhead equipment, distribution systems, ceiling tiles and lighting, and masonry block walls not likely to collapse onto the equipment?
- 9.
Do attached lines have adequate flexibility to avoid damage?
- 10.
Based on the above seismic interaction evaluations, is equipment free of potentially adverse seismic interaction effects?
Yes Yes Yes Yes Other Adverse Conditions
- 11.
Have you looked for and found no adverse seismic conditions that could Yes adversely affect the safety functions of the equipment?
Comments Seismic walkdown performed week of 7/16/12 by M. Delaney & P. Gazda Evaluated by:
Marlene Delaney Date:
10/1/2012 Philip Gazda 10/1/2012 C-280
12Q0108.10-R-001 Rev. 0 Correspondence No.: RS-12-159 Sheet 3 of 3 Status: M N
U Seismic Walkdown Checklist (SWC)
Equipment ID No.:
1PI-0627 Equipment Class:
(18) Instruments on Racks Equipment
Description:
GAUGE; PRESSURE, U.S. GAUGE CO.,0-160 PSIG Photos None.
C-281
12Q0108.10-R-001 Rev. 0 Correspondence No.: RS-12-159 Sheet 1 of 3 Status: FT N U
Seismic Walkdown Checklist (SWC)
Equipment ID No.:
1PI-0633 Equipment Class:
(18) Instruments on Racks Equipment
Description:
SPENT FUEL PIT PUMP SUCTION PRESSURE INDICATO Project:
Braidwood 1 SWEL Location (Bldg, Elev, Room/Area):
FH, 401.00 ft, ALL Manufacturer/Model:
Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results of judgments and findings. Additional space is provided at the end of this checklist for documenting other comments.
Anchorage
- 1.
Is anchorage configuration verification required (i.e., is the item one of the 50%
of SWEL items requiring such verification)?
No
- 2.
Is the anchorage free of bent, broken, missing or loose hardware?
Not Applicable
- 3.
Is the anchorage free of corrosion that is more than mild surface oxidation?
- 4.
Is the anchorage free of visible cracks in the concrete near the anchors?
- 5.
Is the anchorage configuration consistent with plant documentation? (Note:
This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.)
Not Applicable Not Applicable Not Applicable
- 6.
Based on the above anchorage evaluations, is the anchorage free of potentially adverse seismic conditions?
Instrument attached a rack that is well-anchored to the wall.
Yes C-282
12QO108.1O-R-001 Rev. 0 Correspondence No.: RS-12-159 Sheet 2 of 3 Status: M N
U Seismic Walkdown Checklist (SWC)
Equipment ID No.:
1PI-0633 Equipment Class:
(18) Instruments on Racks Equipment
Description:
SPENT FUEL PIT PUMP SUCTION PRESSURE INDICATO Interaction Effects
- 7.
Are soft targets free from impact by nearby equipment or structures?
Yes
- 8.
Are overhead equipment, distribution systems, ceiling tiles and lighting, and masonry block walls not likely to collapse onto the equipment?
See A WC 30 for discussion on seismic housekeeping issue
- 9.
Do attached lines have adequate flexibility to avoid damage?
Yes Yes
- 10.
Based on the above seismic interaction evaluations, is equipment free of potentially adverse seismic interaction effects?
Yes Other Adverse Conditions
- 11.
Have you looked for and found no adverse seismic conditions that could Yes adversely affect the safety functions of the equipment?
Comments Seismic walkdown performed week of 7/16/12 by M. Delaney & P. Gazda Evaluated by:
Marlene Delaney Date:
10/1/2012 Philip Gazda 10/1/2012 C-283
12Q0108.10-R-001 Rev. 0 Correspondence No.: RS-12-159 Sheet 3 of 3 Status: M-* N U
Seismic Walkdown Checklist (SWC)
Equipment ID No.:
1PI-0633 Equipment Class:
(18) Instruments on Racks Equipment
Description:
SPENT FUEL PIT PUMP SUCTION PRESSURE INDICATO Photos 1 PI-0633 (AVVB - housekeeping) 7-18-12 080 1 PI-0633 7-18-12 079 C-284
12QO108.10-R-001 Rev. 0 Correspondence No.: RS-12-159 Sheet 1 of 4 Status: M N
U Seismic Walkdown Checklist (SWC)
Equipment ID No.:
1PL08J Equipment Class:
(20) Instrumentation and Control Panels and Cabinets Equipment
Description:
1B DG CONTROL PANEL Project:
Braidwood 1 SWEL Location (Bldg, Elev, Room/Area):
Auxiliary, 401%00 ft, ALL Manufacturer/Model:
Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results of judgments and findings. Additional space is provided at the end of this checklist for documenting other comments.
Anchorage
- 1. Is anchorage configuration verification required (i.e., is the item one of the 50%
of SWEL items requiring such verification)?
No
- 2.
Is the anchorage free of bent, broken, missing or loose hardware?
Yes welded at base
- 3.
Is the anchorage free of corrosion that is more than mild surface oxidation?
Yes
- 4.
Is the anchorage free of visible cracks in the concrete near the anchors?
Yes
- 5.
Is the anchorage configuration consistent with plant documentation? (Note:
This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.)
Not Applicable
- 6.
Based on the above anchorage evaluations, is the anchorage free of potentially adverse seismic conditions?
Yes C-285
12Q0108.10-R-001 Rev. 0 Correspondence No.: RS-12-159 Sheet 2 of 4 Status: M N
U Seismic Walkdown Checklist (SWC)
Equipment ID No.:
1PL08J Equipment Class:
(20) Instrumentation and Control Panels and Cabinets Equipment
Description:
1B DG CONTROL PANEL Interaction Effects
- 7. Are soft targets free from impact by nearby equipment or structures?
- 8.
Are overhead equipment, distribution systems, ceiling tiles and lighting, and masonry block walls not-likely to collapse onto the equipment?
- 9.
Do attached lines have adequate flexibility to avoid damage?
- 10.
Based on the above seismic interaction evaluations, is equipment free of potentially adverse seismic interaction effects?
Yes Yes Yes Yes Other Adverse Conditions
- 11.
Have you looked for and found no adverse seismic conditions that could Yes adversely affect the safety functions of the equipment?
Comments Seismic walkdown performed week of 7/16/12 by M. Delaney & P. Gazda Evaluated by:
Marlene Delaney Date:
10/1/2012 Philip Gazda 10/1/2012 C-286
12Q0108.10-R-001 Rev. 0 Correspondence No.: RS-12-159 Sheet 3 of 4 Status: M N U Seismic Walkdown Checklist (SWC)
Equipment ID No.:
1 PL08J Equipment Class:
(20) Instrumentation and Control Panels and Cabinets Equipment
Description:
1B DG CONTROL PANEL Photos 1PL08J 7-16-12 081 1PLOJ 7-16-12 082 C-287
12Q0108.10-R-001 Rev. 0 Correspondence No.: RS-12-159 Sheet 4 of 4 Status: F N U Seismic Walkdown Checklist (SWC)
Equipment ID No.:
Equipment Class:
P:ni iinmant r)Pczf.rintinn-1 PL08J (20) Instrumentation and Control Panels and Cabinets 1B DG CONTROL PANEL 1PL08J 7-16-12 083 C-288
12Q0108.1O-R-001 Rev. 0 Correspondence No.: RS-12-159 Sheet 1 of 4 Status: M N
U Seismic Walkdown Checklist (SWC)
Equipment ID No.:
1PM05J Equipment Class:
(20) Instrumentation and Control Panels and Cabinets Equipment
Description:
MAIN CONTROL BOARD Project:
Braidwood 1 SWEL Location (Bldg, Elev, Room/Area):
Auxiliary, 451.00 ft, ALL Manufacturer/Model:
Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results of judgments and findings. Additional space is provided at the end of this checklist for documenting other comments.
Anchorage
- 1.
Is anchorage configuration verification required (i.e., is the item one of the 50%
Yes of SWEL items requiring such verification)?
- 2.
Is the anchorage free of bent, broken, missing or loose hardware?
Yes
- 3.
Is the anchorage free of corrosion that is more than mild surface oxidation?
Yes
- 4.
Is the anchorage free of visible cracks in the concrete near the anchors?
Yes Exterior to panel is carpeted so cracking cannot be seen.
- 5.
Is the anchorage configuration consistent with plant documentation? (Note:
Yes This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.)
Back of panel opened at all locations and weld detail verified. Front of panel, one cabinet opened due to accessibility issues. Outer cabinet weld detail could be verified based on exterior visual inspection. Based on the inspection, the anchorage is acceptable.
Drawing 20E-O-3391AT Revision V
- 6.
Based on the above anchorage evaluations, is the anchorage free of Yes potentially adverse seismic conditions?
C-289
12Q0108.1O-R-001 Rev. 0 Correspondence No.: RS-12-159 Sheet 2 of 4 Status: M N
U Seismic Walkdown Checklist (SWC)
Equipment ID No.:
lPM05J Equipment Class:
(20) Instrumentation and Control Panels and Cabinets Equipment
Description:
MAIN CONTROL BOARD Interaction Effects
- 7.
Are soft targets free from impact by nearby equipment or structures?
Adjacent cabinets (1PMO5J and IPMO6J) are bolted together.
- 8.
Are overhead equipment, distribution systems, ceiling tiles and lighting, and masonry block walls not likely to collapse onto the equipment?
See Area Walk-by 2.
- 9.
Do attached lines have adequate flexibility to avoid damage?
- 10.
Based on the above seismic interaction evaluations, is equipment free of potentially adverse seismic interaction effects?
Yes Yes Yes Yes Other Adverse Conditions.
- 11.
Have you looked for and found no adverse seismic conditions that could Yes adversely affect the safety functions of the equipment?
Comments Seismic walkdown performed week of 7/16/12 by M. Delaney & P. Gazda C-290
12Q0108.1O-R-001 Rev. 0 Correspondence No.: RS-1 2-1 59 Sheet 3 of 4 Status: FYC k N Seismic Walkdown Checklist (SWC)
U Equipment ID No.:
lPM05J Equipment Class:
(20) Instrumentation and Control Panels and Cabinets Equipment
Description:
MAIN CONTROL BOARD 12Q0108.10-R-001 Rev. 0 Correspondence No.: RS-12-159 Sheet 3 of 4 Evaluated by:
Marlene Delaney Date:
10/1/2012 Philip Gazda 10/1/2012 Photos 1PMO5J 7-16-12 005 1PM05J 7-16-12 006 C-291
12Q0108.1O-R-001 Rev. 0 Correspondence No.: RS-12-159 Sheet 4 of 4 Status: M N U Seismic Walkdown Checklist (SWC)
Equipment ID No.:
lPM05J Equipment Class:
(20) Instrumentation and Control Panels and Cabinets Eauioment Descriotion:
MAIN CONTROL BOARD ItImuoi I-10-1Z uut C-292
12QO108.10-R-001 Rev. 0 Correspondence No.: RS-12-159 Sheet 1 of 3 Status: M N
U Seismic Walkdown Checklist (SWC)
Equipment ID No.:
1PT-0516 Equipment Class:
(18) Instruments on Racks Equipment
Description:
S/G LOOP 1A STM PRESS XMTTR Project:
Braidwood 1 SWEL Location (Bldg, Elev, Room/Area):
Auxiliary, 377.00 ft, ALL Manufacturer/Model:
Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results of judgments and findings. Additional space is provided at the end of this checklist for documenting other comments.
Anchorage
- 1.
Is anchorage configuration verification required (i.e., is the item one of the 50%
of SWEL items requiring such verification)?
No
- 2.
Is the anchorage free of bent, broken, missing or loose hardware?
Not Applicable
- 3.
Is the anchorage free of corrosion that is more than mild surface oxidation?
- 4.
Is the anchorage free of visible cracks in the concrete near the anchors?
- 5.
Is the anchorage configuration consistent with plant documentation? (Note:
This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.)
Not Applicable Not Applicable Not Applicable
- 6.
Based on the above anchorage evaluations, is the anchorage free of potentially adverse seismic conditions?
Instrument mounted to rack with detail specified on Drawing M-33 Sheet 108.
Rack is well-anchored.
Yes C-293
12Q0108.10-R-001 Rev. 0 Correspondence No.: RS-12-159 Sheet 2 of 3 Status: M N
U Seismic Walkdown Checklist (SWC)
Equipment ID No.:
1PT-0516 Equipment Class:
(18) Instruments on Racks Equipment
Description:
S/G LOOP 1A STM PRESS XMTTR Interaction Effects
- 7.
Are soft targets free from impact by nearby equipment or structures?
Yes
- 8.
Are overhead equipment, distribution systems, ceiling tiles and lighting, and masonry block walls not likely to collapse onto the equipment?
Nearby scaffolding is tied off to prevent contact. Other plant components prevent scaffold from impacting instrument.
- 9.
Do attached lines have adequate flexibility to avoid damage?
Yes Yes Yes
- 10.
Based on the above seismic interaction evaluations, is equipment free of potentially adverse seismic interaction effects?
Other Adverse Conditions
- 11.
Have you looked for and found no adverse seismic conditions that could Yes adversely affect the safety functions of the equipment?
Comments Seismic walkdown performed week of 7/16/12 by M. Delaney & P. Gazda Evaluated by:
Marlene Delaney Date:
10/1/2012 Philip Gazda 10/1/2012 C-294
12Q0108.10-R-001 Rev. 0 Correspondence No.: RS-12-159 Sheet 3 of 3 Status: M N
U Seismic Walkdown Checklist (SWC)
Equipment ID No.:
1PT-0516 Equipment Class:
(18) Instruments on Racks Equipment
Description:
S/G LOOP 1A STM PRESS XMTTR Photos None.
C-295
12Q0108.10-R-O01 Rev. 0 Correspondence No.: RS-12-159 Sheet 1 of 3 Status:
N U
Seismic Walkdown Checklist (SWC)
Equipment ID No.:
1RHO1PB Equipment Class:
(6) Vertical Pumps Equipment
Description:
PUMP,1B RESIDUAL HEAT REMOVAL ASMBLY Project:
Braidwood 1 SWEL Location (Bldg, Elev, Room/Area):
Auxiliary, 364.00 ft, ALL Manufacturer/Model:
Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results of judgments and findings. Additional space is provided at the end of this checklist for documenting other comments.
Anchorage
- 1.
Is anchorage configuration verification required (i.e., is the item one of the 50%
Yes of SWEL items requiring such verification)?
- 2.
Is the anchorage free of bent, broken, missing or loose hardware?
Yes
- 3.
Is the anchorage free of corrosion that is more than mild surface oxidation?
Yes
- 4.
Is the anchorage free of visible cracks in the concrete near the anchors?
Yes
- 5.
Is the anchorage configuration consistent with plant documentation? (Note:
Yes This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.)
Drawing M-1219 Sheet 2 Revision Y
- 6.
Based on the above anchorage evaluations, is the anchorage free of Yes potentially adverse seismic conditions?
C-296
12Q0108.1O-R-0O1 Rev. 0 Correspondence No.: RS-12-159 Sheet 2 of 3 Status: M N
U Seismic Walkdown Checklist (SWC)
Equipment ID No.:
1RH01PB Equipment Class:
(6) Vertical Pumps Equipment
Description:
PUMP,1B RESIDUAL HEAT REMOVAL ASMBLY Interaction Effects
- 7.
Are soft targets free from impact by nearby equipment or structures?
- 8.
Are overhead equipment, distribution systems, ceiling tiles and lighting, and masonry block walls not likely to collapse onto the equipment?
- 9.
Do attached lines have adequate flexibility to avoid damage?
- 10.
Based on the above seismic interaction evaluations, is equipment free of potentially adverse seismic interaction effects?
Yes Yes Yes Yes Other Adverse Conditions
- 11.
Have you looked for and found no adverse seismic conditions that could Yes adversely affect the safety functions of the equipment?
Comments Seismic walkdown performed week of 7/16/12 by M. Delaney & P. Gazda Evaluated by:
Marlene Delaney Date:
10/1/2012 Philip Gazda 10/11/2012 C-297
12Q0108.10-R-001 Rev. 0 Correspondence No.: RS-12-159 Sheet 3 of 3 Status: M N U Seismic Walkdown Checklist (SWC)
Equipment ID No.:
1RH01PB Equipment Class:
(6) Vertical Pumps Equipment
Description:
PUMP,1B RESIDUAL HEAT REMOVAL ASMBLY Photos 1RH01PB 7-19-12 001 1RH01PB 7-19-12 002 C-298
12Q0108.10-R-001 Rev. 0 Correspondence No.: RS-12-159 Sheet 1 of 3 Status: M N
U Seismic Walkdown Checklist (SWC)
Equipment ID No.:
1RH01PB-A Equipment Class:
(21) Tanks and Heat Exchangers Equipment
Description:
RH PUMP 1 B SEAL COOLER VALVE Project:
Braidwood 1 SWEL Location (Bldg, Elev, Room/Area):
Auxiliary, 346.00 ft, ALL Manufacturer/Model:
Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results of judgments and findings. Additional space is provided at the end of this checklist for documenting other comments.
Anchorage
- 1. Is anchorage configuration verification required (i.e., is the item one of the 50%
of SWEL items requiring such verification)?
Component is a valve
- 2.
Is the anchorage free of bent, broken, missing or loose hardware?
No Not Applicable
- 3.
Is the anchorage free of corrosion that is more than mild surface oxidation?
- 4.
Is the anchorage free of visible cracks in the concrete near the anchors?
- 5.
Is the anchorage configuration consistent with plant documentation? (Note:
This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.)
Not Applicable Not Applicable Not Applicable
- 6. -Based on the above anchorage evaluations, is the anchorage free of potentially adverse seismic conditions?
Yes C-299
12Q0108.10-R-O01 Rev. 0 Correspondence No.: RS-12-159 Sheet 2 of 3 Status: M N
U Seismic Walkdown Checklist (SWC)
Equipment ID No.:
1 RH0l1PB-A Equipment Class:
(21) Tanks and Heat Exchangers Equipment
Description:
RH PUMP 1B SEAL COOLER VALVE Interaction Effects
- 7.
Are soft targets free from impact by nearby equipment or structures?
Yes
- 8.
Are overhead equipment, distribution systems, ceiling tiles and lighting, and masonry block walls not likely to collapse onto the equipment?
Yes
- 9.
Do attached lines have adequate flexibility to avoid damage?
Yes
- 10.
Based on the above seismic interaction evaluations, is equipment free of potentially adverse seismic interaction effects?
Yes Other Adverse Conditions
- 11.
Have you looked for and found no adverse seismic conditions that could Yes adversely affect the safety functions of the equipment?
Comments Seismic walkdown performed week of 7/16/12 by M. Delaney & P. Gazda Evaluated by:
Marlene Delaney Date:
10/1/2012 Philip Gazda 10/1/2012 C-300
12Q0108.1O-R-001 Rev. 0 Correspondence No.: RS-12-159 Sheet 3 of 3 Status: M N U Seismic Walkdown Checklist (SWC)
Equipment ID No.:
1RH01PB-A Equipment Class:
(21) Tanks and Heat Exchangers Equipment
Description:
RH PUMP 1B SEAL COOLER VALVE Photos 1 RHO1 PB-A 7-19-12 006 C-301
12Q0108.10-R-001 Rev. 0 Correspondence No.: RS-12-159 Sheet 1 of 3 Status: M N
U Seismic Walkdown Checklist (SWC)
Equipment ID No.:
1 RH607 Equipment Class:
(7) Fluid-Operated Valves Equipment
Description:
RESIDUAL HEAT REMOVAL HX 11B FLOW CONT VLV ASMBLY; 8" Project:
Braidwood 1 SWEL Location (Bldg, Elev, Room/Area):
Auxiliary, 357.00 ft, ALL Manufacturer/Model:
Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results of judgments and findings. Additional space is provided at the end of this checklist for documenting other comments.
Anchorage
- 1.
Is anchorage configuration verification required (i.e., is the item one of the 50%
of SWEL items requiring such verification)?
No
- 2.
Is the anchorage free of bent, broken, missing or loose hardware?
Not Applicable
- 3.
Is the anchorage free of corrosion that is more than mild surface oxidation?
- 4.
Is the anchorage free of visible cracks in the concrete near the anchors?
- 5.
Is the anchorage configuration consistent with plant documentation? (Note:
This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.)
Not Applicable Not Applicable Not Applicable
- 6.
Based on the above anchorage evaluations, is the anchorage free of potentially adverse seismic conditions?
Yes C-302
12Q0108.10-R-001 Rev. 0 Correspondence No.: RS-12-159 Sheet 2 of 3 Status:
V N
U Seismic Walkdown Checklist (SWC)
Equipment ID No.:
1RH607 Equipment Class:
(7) Fluid-Operated Valves Equipment
Description:
RESIDUAL HEAT REMOVAL HX 1 B FLOW CONT VLV ASMBLY; 8" Interaction Effects
- 7.
Are soft targets free from impact by nearby equipment or structures?
- 8.
Are overhead equipment, distribution systems, ceiling tiles and lighting, and masonry block walls not likely to collapse onto the equipment?
overhead well-supported including tube track directly above valve seismic block walls
- 9.
Do attached lines have adequate flexibility to avoid damage?
- 10.
Based on the above seismic interaction evaluations, is equipment free of potentially adverse seismic interaction effects?
Yes Yes Yes Yes Other Adverse Conditions
- 11.
Have you looked for and found no adverse seismic conditions that could Yes adversely affect the safety functions of the equipment?
Comments Seismic walkdown performed week of 7/16/12 by M. Delaney & P. Gazda Evaluated by:
Marlene Delaney Date:
10/1/2012 62/A Philip Gazda 10/1/2012 C-303
12Q0108.10-R-001 Rev. 0 Correspondence No.: RS-12-159 Sheet 3 of 3 Status: [T N U Seismic Walkdown Checklist (SWC)
Equipment ID No.:
Equipment Class:
Equipment
Description:
1 RH607 (7) Fluid-Operated Valves RESIDUAL HEAT REMOVAL HX 1 B FLOW CONT VLV ASMBLY; 8" Photos iKHtiu1 (-ThJ-1Z UU(
I1KHMU 17-19-12 M5*
C-304
12Q0108.10-R-001 Rev. 0 Correspondence No.: RS-12-159 Sheet 1 of 4 Status: M-* N U
Seismic Walkdown Checklist (SWC)
Equipment ID No.:
1SIO1T Equipment Class:
(21) Tanks and Heat Exchangers Equipment
Description:
REFUELING WATER STORAGE TANK Project:
Braidwood 1 SWEL Location (Bldg, Elev, Room/Area):
FH Out, 401.00 ft, ALL Manufacturer/Model:
Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results of judgments and findings. Additional space is provided at the end of this checklist for documenting other comments.
Anchorage
- 1.
Is anchorage configuration verification required (i.e., is the item one of the 50%
No of SWEL items requiring such verification)?
The RWST is a reinforced concrete tank that is anchored into a reinforced concrete pad via reinforcing steel dowels. No anchorage can be verified for this component. Details shown on Drawing S-1402 Revision J and S-1404 Revision W
- 2.
Is the anchorage free of bent, broken, missing or loose hardware?
Yes
- 3.
Is the anchorage free of corrosion that is more than mild surface oxidation?
Yes
- 4.
Is the anchorage free of visible cracks in the concrete near the anchors?
Yes
- 5.
Is the anchorage configuration consistent with plant documentation? (Note:
Not Applicable This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.)
- 6.
Based on the above anchorage evaluations, is the anchorage free of Yes potentially adverse seismic conditions?
C-305
12QO108.10-R-O01 Rev. 0 Correspondence No.: RS-12-159 Sheet 2 of 4 Status: M N
U Seismic Walkdown Checklist (SWC)
Equipment ID No.:
1SI01T Equipment Class:
(21) Tanks and Heat Exchangers Equipment
Description:
REFUELING WATER STORAGE TANK Interaction Effects
- 7.
Are soft targets free from impact by nearby equipment or structures?
- 8.
Are overhead equipment, distribution systems, ceiling tiles and lighting, and masonry block walls not likely to collapse onto the equipment?
Scaffolding adjacent to the tank is well-supported. Would not adversely impact robust tank if scaffold fell.
- 9.
Do attached lines have adequate flexibility to avoid damage?
- 10.
Based on the above seismic interaction.evaluations, is equipment free of potentially adverse seismic interaction effects?
Yes Yes Yes Yes Other Adverse Conditions
- 11.
Have you looked for and found no adverse seismic conditions that could Yes adversely affect the safety functions of the equipment?
Comments Seismic walkdown performed week of 7/16/12 by M. Delaney & P. Gazda Evaluated by:
Marlene Delaney Date:
10/1/2012 Philip Gazda 10/1/2012 C-306
12Q0108.10-R-001 Rev. 0 Correspondence No.: RS-12-159 Sheet 3 of 4 Status: M N U Seismic Walkdown Checklist (SWC)
Equipment ID No.:
1SI01T Equipment Class:
(21) Tanks and Heat Exchangers Equipment
Description:
REFUELING WATER STORAGE TANK Photos 1SI01T 7-17-12 001 ISIO0T 7-17-12 002 C-307
12Q0108.10-R-001 Rev. 0 Correspondence No.: RS-12-159 Sheet 4 of 4 Status: M-J N U
Seismic Walkdown Checklist (SWC)
Equipment ID No.:
Equipment Class:
Equipment
Description:
ISIQIT (21) Tanks and Heat Exchangers REFUELING WATER STORAGE TANK C-308
12Q0108.10-R-O01 Rev. 0 Correspondence No.: RS-12-159 Sheet 1 of 3 Status: M N
U Seismic Walkdown Checklist (SWC)
Equipment ID No.:
1S18801B Equipment Class:
(7) Fluid-Operated Valves CHG PMP TO COLD LEGS INJECTION ISOL VLV (C/S AT 1 PM05J)
Equipment
Description:
ASMBLY; 4" Project:
Braidwood 1 SWEL Location (Bldg, Elev, Room/Area):
Auxiliary, 375.00 ft, ALL Manufacturer/Model:
Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results of judgments and findings. Additional space is provided at the end of this checklist for documenting other comments.
Anchorage
- 1.
Is anchorage configuration verification required (i.e., is the item one of the 50%
of SWEL items requiring such verification)?
No
- 2.
Is the anchorage free of bent, broken, missing or loose hardware?
Not Applicable
- 3.
Is the anchorage free of corrosion that is more than mild surface oxidation?
- 4.
Is the anchorage free of visible cracks in the concrete near the anchors?
- 5.
Is the anchorage configuration consistent with plant documentation? (Note:
This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.)
Not Applicable Not Applicable Not Applicable
- 6.
Based on the above anchorage evaluations, is the anchorage free of potentially adverse seismic conditions?
Yes C-309
12Q0108.10-R-001 Rev. 0 Correspondence No.: RS-12-159 Sheet 2 of 3 Status: M N
U Seismic Walkdown Checklist (SWC)
Equipment ID No.:
1S18801B Equipment Class:
(7) Fluid-Operated Valves CHG PMP TO COLD LEGS INJECTION ISOL VLV (C/S AT 1PM05J)
Equipment
Description:
ASMBLY; 4" Interaction Effects
- 7.
Are soft targets free from impact by nearby equipment or structures?
- Yes,
- 8.
Are overhead equipment, distribution systems, ceiling tiles and lighting, and masonry block walls not likely to collapse onto the equipment?
- 9.
Do attached lines have adequate flexibility to avoid damage?
Yes Yes Yes
- 10.
Based on the above seismic interaction evaluations, is equipment free of potentially adverse seismic interaction effects?
Other Adverse Conditions
- 11.
Have you looked for and found no adverse seismic conditions that could Yes adversely affect the safety functions of the equipment?
Rugged valve Comments Seismic walkdown performed week of 7/16/12 by M. Delaney & P. Gazda Evaluated by:
Marlene Delaney Date:
10/1/2012 Philip Gazda 10/1/2012 C-310
12Q0108.10-R-O01 Rev. 0 Correspondence No.: RS-12-159 Sheet 3 of 3 Status: M N U Seismic Walkdown Checklist (SWC)
EquipmentID No.:
1S18801B Equipment Class:
(7) Fluid-Operated Valves CHG PMP TO COLD LEGS INJECTION ISOL VLV (C/S AT 1 PM05J)
Equipment
Description:
ASMBLY; 4" Photos 1S18801B 7-19-12 Group 2 005 1S18801B 7-19-12 Group 2 006 C-311
12Q0108.10-R-O01 Rev. 0 Correspondence No.: RS-12-159 Sheet 1 of 4 Status: M N
U Seismic Walkdown Checklist (SWC)
Equipment ID No.:
1S18804B Equipment Class:
(8) Motor-Operated and Solenoid-Operated Valves Equipment
Description:
ASSY - MOV lB RH HX TO 1B SI PP SUCT HDR ISOL VLV Project:
Braidwood 1 SWEL Location (Bldg, Elev, Room/Area):
Auxiliary, 364.00 ft, ALL Manufacturer/Model:
Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results of judgments and findings. Additional space is provided at the end of this checklist for documenting other comments.
Anchorage
- 1. Is anchorage configuration verification required (i.e., is the item one of the 50%
of SWEL items requiring such verification)?
No
- 2.
Is the anchorage free of bent, broken, missing or loose hardware?
Not Applicable
- 3.
Is the anchorage free of corrosion that is more than mild surface oxidation?
- 4.
Is the anchorage free of visible cracks in the concrete near the anchors?
- 5.
Is the anchorage configuration consistent with plant documentation? (Note:
This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.)
Not Applicable Not Applicable Not Applicable
- 6.
Based on the above anchorage evaluations, is the anchorage free of potentially adverse seismic conditions?
Yes C-312
12QO108.10-R-001 Rev. 0 Correspondence No.: RS-12-159 Sheet 2 of 4 Status: M N
U Seismic Walkdown Checklist (SWC)
Equipment ID No.:
1S18804B Equipment Class:
(8) Motor-Operated and Solenoid-Operated Valves Equipment
Description:
ASSY - MOV lB RH HX TO lB SI PP SUCT HDR ISOL VLV Interaction Effects
- 7.
Are soft targets free from impact by nearby equipment or structures?
- 8.
Are overhead equipment, distribution systems, ceiling tiles and lighting, and masonry block walls not likely to collapse onto the equipment?
Seismic block walls Overhead components are well-supported
- 9.
Do attached lines have adequate flexibility to avoid damage?
- 10.
Based on the above seismic interaction evaluations, is equipment free of potentially adverse seismic interaction effects?
Yes Yes Yes Yes Other Adverse Conditions
- 11.
Have you looked for and found no adverse seismic conditions that could Yes adversely affect the safety functions of the equipment?
Pipe is well-supported Comments Seismic walkdown performed week of 7/16/12 by M. Delaney & P. Gazda Evaluated by:
Marlene Delaney Date:
10/1/2012 Philip Gazda 10/1/2012 C-313
12Q0108.10-R-001 Rev. 0 Correspondence No.: RS-12-159 Sheet 3 of 4 Status: M N
U Seismic Walkdown Checklist (SWC)
Equipment ID No.:
1S18804B Equipment Class:
(8) Motor-Operated and Solenoid-Operated Valves Equipment
Description:
ASSY - MOV 1B RH HX TO 1B SI PP SUCT HDR ISOL VLV Photos 1S18804B 7-19-12 011 1S18804B 7-19-12 012 C-314
12Q0108.10-R-001 Rev. 0 Correspondence No.: RS-12-159 Sheet 4 of 4 Status: r-71 N U Seismic Walkdown Checklist (SWC)
Equipment ID No.:
1S18804B Equipment Class:
(8) Motor-Operated and Solenoid-Operated Valves Equipment
Description:
ASSY - MOV 1 B RH HX TO 1 B SI PP SUCT HDR ISOL VLV 1ZSItJt$U4t$ (-19-12 U13 IbWtMU4tS (-ThJ-1 U14 C-315
12Q0108.10-R-001 Rev. 0 Correspondence No.: RS-12-159 Sheet 1 of 3 Status: M N
U Seismic Walkdown Checklist (SWC)
Equipment ID No.:
1S18809B Equipment Class:
(8) Motor-Operated and Solenoid-Operated Valves Equipment
Description:
RH TO COLD LEGS 11B/1C ISOL VLV (1PM06J) ASMBLY; 8" Project:
Braidwood 1 SWEL Location (Bldg, Elev, Room/Area):
Auxiliary, 364.00 ft, ALL Manufacturer/Model:
Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results of judgments and findings. Additional space is provided at the end of this checklist for documenting other comments.
Anchorage
- 1. Is anchorage configuration verification required (i.e., is the item one of the 50%
of SWEL items requiring such verification)?
No
- 2.
Is the anchorage free of bent, broken, missing or loose hardware?
Not Applicable
- 3.
Is the anchorage free of corrosion that is more than mild surface oxidation?
- 4.
Is the anchorage free of visible cracks in the concrete near the anchors?
- 5.
Is the anchorage configuration consistent with plant documentation? (Note:
This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.)
Not Applicable Not Applicable Not Applicable
- 6.
Based on the above anchorage evaluations, is the anchorage free of potentially adverse seismic conditions?
Yes C-316
12Q0108.10-R-001 Rev. 0 Correspondence No.: RS-12-159 Sheet 2 of 3 Status:
T N
U Seismic Walkdown Checklist (SWC)
Equipment ID No.:
1S18809B Equipment Class:
(8) Motor-Operated and Solenoid-Operated Valves Equipment
Description:
RH TO COLD LEGS 1B/iC ISOL VLV (1PM06J) ASMBLY; 8" Interaction Effects
- 7. Are soft targets free from impact by nearby equipment or structures?
- 8.
Are overhead equipment, distribution systems, ceiling tiles and lighting, and masonry block walls not likely to collapse onto the equipment?
- 9.
Do attached lines have adequate flexibility to avoid damage?
- 10.
Based on the above seismic interaction evaluations, is equipment free of potentially adverse seismic interaction effects?
Yes Yes Yes Yes Other Adverse Conditions
- 11.
Have you looked for and found no adverse seismic conditions that could Yes adversely affect the safety functions of the equipment?
Comments Seismic walkdown performed week of 7/16/12 by M. Delaney & P. Gazda Evaluated by:
Marlene Delaney Date:
10/1/2012 Philip Gazda 10/1/2012 C-317
12QO108.10-R-001 Rev. 0 Correspondence No.: RS-12-159 Sheet 3 of 3 Status: M N U Seismic Walkdown Checklist (SWC)
Equipment ID No.:
Equipment Class:
Equipment
Description:
I S18809B (8) Motor-Operated and Solenoid-Operated Valves RH TO COLD LEGS 1 B/1 C ISOL VLV (1 PM06J) ASMBLY; 8" Photos izil dbuub t-19-IZ Uroupz UU/
C-318
12QO108.10-R-O01 Rev. 0 Correspondence No.: RS-12-159 Sheet 1 of 3 Status:
T N U Seismic Walkdown Checklist (SWC)
Equipment ID No.:
1SX004 Equipment Class:
(8) Motor-Operated and Solenoid-Operated Valves Equipment
Description:
CC HX 1 iNLT VLVASMBLY; 30" Project:
Braidwood 1 SWEL Location (Bldg, Elev, Room/Area):
Auxiliary, 330.00 ft, ALL Manufacturer/Model:
Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results of judgments and findings. Additional space is provided at the end of this checklist for documenting other comments.
Anchorage
- 1. Is anchorage configuration verification required (i.e., is the item one of the 50%
of SWEL items requiring such verification)?
No
- 2.
Is the anchorage free of bent, broken, missing or loose hardware?
Not Applicable
- 3.
Is the anchorage free of corrosion that is more than mild surface oxidation?
- 4.
Is the anchorage free of visible cracks in the concrete near the anchors?
- 5.
Is the anchorage configuration consistent with plant documentation? (Note:
This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.)
Not Applicable Not Applicable Not Applicable
- 6.
Based on the above anchorage evaluations, is the anchorage free of potentially adverse seismic conditions?
Yes C-319
12Q0108.1O-R-OO1 Rev. 0 Correspondence No.: RS-12-159 Sheet 2 of 3 Status: M N
U Seismic Walkdown Checklist (SWC)
Equipment ID No.:
1SX004 Equipment Class:
(8) Motor-Operated and Solenoid-Operated Valves Equipment
Description:
CC HX 1 INLT VLV ASMBLY; 30" Interaction Effects
- 7.
Are soft targets free from impact by nearby equipment or structures?
- 8.
Are overhead equipment, distribution systems, ceiling tiles and lighting, and masonry block walls not likely to collapse onto the equipment?
above components are well-supported
- 9.
Do attached lines have adequate flexibility to avoid damage?
- 10.
Based on the above seismic interaction evaluations, is equipment free of potentially adverse seismic interaction effects?
Yes Yes Yes Yes Other Adverse Conditions
- 11.
Have you looked for and found no adverse seismic conditions that could Yes adversely affect the safety functions of the equipment?
Pipe well-supported near valve Comments Seismic walkdown performed week of 7/16/12 by M. Delaney & P. Gazda Evaluated by:
Marlene Delaney Date:
10/1/2012 Philip Gazda 10/1/2012 C-320
12Q01 08.10O-R-001 Rev. 0 Correspondence No.: RS-12-159 Sheet 3 of 3 Status: MI N
U Seismic Walkdown Checklist (SWC)
Equipment ID No.:
Equipment Class:
Equipment
Description:
1SX004 (8) Motor-Operated and Solenoid-Operated Valves CC HX 1 INLT VLV ASMBLY; 30" Photos Photos 1SX004 7-18-12 049 C-321
12Q0108.10-R-001 Rev. 0 Correspondence No.: RS-12-159 Sheet 1 of 3 Status: F N U Seismic Walkdown Checklist (SWC)
Equipment ID No.:
1SX005 Equipment Class:
(8) Motor-Operated and Solenoid-Operated Valves Equipment
Description:
U-0 CC HX INLT VLV ASMBLY; 30" Project:
Braidwood 1 SWEL Location (Bldg, Elev, Room/Area):
Auxiliary, 330.00 ft, ALL Manufacturer/Model:
Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results of judgments and findings. Additional space is provided at the end of this checklist for documenting other comments.
Anchorage
- 1.
Is anchorage configuration verification required (i.e., is the item one of the 50%
No of SWEL items requiring such verification)?
- 2.
Is the anchorage free of bent, broken, missing or loose hardware?
Not Applicable
- 3.
Is the anchorage free of corrosion that is more than mild surface oxidation?
- 4.
Is the anchorage free of visible cracks in the concrete near the anchors?
- 5.
Is the anchorage configuration consistent with plant documentation? (Note:
This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.)
Not Applicable Not Applicable Not Applicable
- 6.
Based on the above anchorage evaluations, is the anchorage free of potentially adverse seismic conditions?
Yes C-322
12Q0108.10-R-001 Rev. 0 Correspondence No.: RS-12-159 Sheet 2 of 3 Status:
N U Seismic Walkdown Checklist (SWC)
Equipment ID No.:
1SX005 Equipment Class:
(8) Motor-Operated and Solenoid-Operated Valves Equipment
Description:
U-0 CC HX INLT VLV ASMBLY; 30" Interaction Effects
- 7.
Are soft targets free from impact by nearby equipment or structures?
- 8.
Are overhead equipment, distribution systems, ceiling tiles and lighting, and masonry block walls not likely to collapse onto the equipment?
well-supported fire protection piping
- 9.
Do attached lines have adequate flexibility to avoid damage?
- 10.
Based on the above seismic interaction evaluations, is equipment free of potentially adverse seismic interaction effects?
Yes Yes Yes Yes Other Adverse Conditions
- 11.
Have you looked for and found no adverse seismic conditions that could Yes adversely affect the safety functions of the equipment?
pipe is well-supported Comments Seismic walkdown performed week of 7/16/12 by M. Delaney & P. Gazda Evaluated by:
Marlene Delaney Date:
10/1/2012 Philip Gazda 10/1/2012 C-323
12Q0108.10-R-001 Rev. 0 Correspondence No.: RS-12-159 Sheet 3 of 3 Status: FTN U Seismic Walkdown Checklist (SWC)
Equipment ID No.:
1SX005 Equipment Class:
(8) Motor-Operated and Solenoid-Operated Valves Equipment
Description:
U-0 CC HX INLT VLV ASMBLY; 30" Photos 115AUU0:)/-*I UJU 1)AUU0 1-1qi-Lu4U C-324
12Q0108.1O-R-001 Rev. 0 Correspondence No.: RS-12-159 Sheet 1 of 3 Status: M N
U Seismic Walkdown Checklist (SWC)
Equipment ID No.:
1SX01FB Equipment Class:
(0) Other Equipment
Description:
1B SX PP DSCH STRN Project:
Braidwood 1 SWEL Location (Bldg, Elev, Room/Area):
Auxiliary, 330.00 ft, ALL Manufacturer/Model:
Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results of judgments and findings. Additional space is provided at the end of this checklist for documenting other comments.
Anchorage
- 1.
Is anchorage configuration verification required (i.e., is the item one of the 50%
Yes of SWEL items requiring such verification)?
- 2.
Is the anchorage free of bent, broken, missing or loose hardware?
Yes
- 3.
Is the anchorage free of corrosion that is more than mild surface oxidation?
Yes
- 4.
Is the anchorage free of visible cracks in the concrete near the anchors?
Yes
- 5.
Is the anchorage configuration consistent with plant documentation? (Note:
Yes This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.)
Drawing M-1218 Revision AA
- 6.
Based on the above anchorage evaluations, is the anchorage free of Yes potentially adverse seismic conditions?
C-325
12QO108.10-R-001 Rev. 0 Correspondence No.: RS-12-159 Sheet 2 of 3 Status: M N
U Seismic Walkdown Checklist (SWC)
Equipment ID No.:
1SX01FB Equipment Class:
(0) Other Equipment
Description:
1B SX PP DSCH STRN Interaction Effects
- 7.
Are soft targets free from impact by nearby equipment or structures?
- 8.
Are overhead equipment, distribution systems, ceiling tiles and lighting, and masonry block walls not likely to collapse onto the equipment?
Yes Yes
- 9.
Do attached lines have adequate flexibility to avoid damage?
Yes
- 10.
Based on the above seismic interaction evaluations, is equipment free of potentially adverse seismic interaction effects?
Yes Other Adverse Conditions
- 11.
Have you looked for and found no adverse seismic conditions that could Yes adversely affect the safety functions of the equipment?
Comments Seismic walkdown performed week of 7/16/12 by M. Delaney & P. Gazda Evaluated by:
Marlene Delaney Date:
10/1/2012 Philip Gazda 10/1/2012 C-326
12QO108.1O-R-OO1 Rev. 0 Correspondence No.: RS-12-159 Sheet 3 of 3 Status: F N U Seismic Walkdown Checklist (SWC)
Equipment ID No.:
1SX01FB Equipment Class:
(0) Other Equipment
Description:
1 B SX PP DSCH STRN Photos 1SXOIFB 7-18-12 032 C-327