ML12269A263

From kanterella
Jump to navigation Jump to search

Correction to Amendment No. 175, Emergency Plan Change to Relocate Alternate Emergency Operations Facility from 23 to 28 Miles from the Technical Support Center
ML12269A263
Person / Time
Site: River Bend Entergy icon.png
Issue date: 10/09/2012
From: Wang A
Plant Licensing Branch IV
To:
Entergy Operations
Wang A
References
TAC ME7181
Download: ML12269A263 (4)


Text

UNITED STATES NUCLEAR REGULATORY COMMISSION WASHINGTON. D.C. 20555-0001 October 9, 2012 Vice President, Operations Entergy Operations, Inc.

River Bend Station 5485 U.S. Highway 61N St. Francisville, LA 70775

SUBJECT:

RIVER BEND STATION, UNIT 1 -ISSUANCE OF AMENDMENT RE:

CORRECTION OF ERROR IN AMENDMENT NO. 175 (TAC NO. ME7181)

Dear Sir or Madam:

On September 24,2012 (Agencywide Documents Access and Management System (ADAMS)

Accession No. ML12240A180), the U.S. Nuclear Regulatory Commission (NRC) staff issued Amendment No. 175 to Facility Operating License No. NPF-47 for the River Bend Station, Unit 1. The NRC staff has noted an error on the cover letter. Specifically, page 1 of the cover letter was issued with the incorrect Task Assignment Control (TAC) number in the subject block.

The error was inadvertently introduced when the NRC staff was processing Amendment No. 175. Thus, according to the NRC's policy established by SECY-96-238 (ADAMS Accession No. 9611250030), this error can be corrected by a letter. Enclosed please find the replacement page 1 of the cover letter dated September 24,2012.

This correction does not change any of the conclusions in the safety evaluation associated with the amendment. We apologize if this error has caused you any inconvenience.

Sincerely,

~0~

Alan B. Wang, Project Manager Plant licensing Branch IV Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation Docket No. 50-458

Enclosure:

As stated cc w/encl: Distribution via Listserv

ENCLOSURE Revised page 1 of cover letter dated September 24, 2012 Amendment No. 175 for River Bend Station, Unit 1

UNITED STATES NUCLEAR REGULATORY COMMISSION WASHINGTON, D.C. 20555-0001 September 24, 2012 Vice President, Operations Entergy Operations, Inc.

River Bend Station 5485 U.S. Highway 61 N St. Francisville, LA 70775

SUBJECT:

RIVER BEND STATION, UNIT 1 -ISSUANCE OF AMENDMENT RELATED TO THE RELOCATION OF THE BACKUP EMERGENCY OPERATIONS FACILITY (TAC NO. ME7181)

Dear Sir or Madam:

The Commission has issued the enclosed Amendment No. 175 to Facility Operating License No. NPF-47 for the River Bend Station, Unit 1 (RBS). The amendment consist of a change to the Emergency Plan (EP) in response to your application dated September 12, 2011, as supplemented by letters dated October 13, 2011, March 22, 2012, and April 3, 2012.

The amendment approves a change to the site EP to relocate the existing backup emergency operations facility (BEOF) for RBS from its current location at the Entergy Operations-Baton Rouge Division Office, located at 1509 Government Street in Baton Rouge, Louisiana, approximately 23 miles southeast of RBS, to the Entergy Customer Service Center, located at 5564 Essen Lane in Baton Rouge, Louisiana, approximately 28 miles southeast of RBS. Based on the U.S. Nuclear Regulatory Commission (NRC) staff's review and walkthrough of the current and proposed BEOF locations, the NRC staff concludes that the proposed facility meets the functional guidelines for a BEOF contained in NUREG-0696, "Functional Criteria for Emergency Response Facilities," February 1981, and continues to meet or exceed the capabilities of the current BEOF facility.

October 9,2012 Vice President, Operations

. Entergy Operations, Inc.

River Bend Station 5485 U.S. Highway 61 N St. Francisville, LA 70775

SUBJECT:

RIVER BEND STATION, UNIT 1 -ISSUANCE OF AMENDMENT RE:

CORRECTION OF ERROR IN AMENDMENT NO. 175 (TAC NO. ME7181)

Dear Sir or Madam:

On September 24, 2012 (Agencywide Documents Access and Management System (ADAMS)

Accession No. ML12240A180), the U.S. Nuclear Regulatory Commission (NRC) staff issued Amendment No. 175 to Facility Operating License No. NPF-47 for the River Bend Station, Unit 1. The NRC staff has noted an error on the cover letter. Specifically, page 1 of the cover letter was issued with the incorrect Task Assignment Control (TAG) number in the subject block.

The error was inadvertently introduced when the NRC staff was processing Amendment No. 175. Thus, according to the NRC's policy established by SECY-96-238 (ADAMS Accession No. 9611250030), this error can be corrected by a letter. Enclosed please find the replacement page 1 of the cover letter dated September 24, 2012.

This correction does not change any of the conclusions in the safety evaluation associated with the amendment. We apologize if this error has caused you any inconvenience.

Sincerely, IRA!

Alan B. Wang, Project Manager Plant Licensing Branch IV Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation Docket No. 50-458

Enclosure:

As stated cc w/encl: Distribution via Listserv DISTRIBUTION:

LPLIV R/F RidsNrrLAJBurkhardt Resource PUBLIC RidsNrrPMRiverBend Resource RidsAcrsAcnw _MailCTR Resource RidsNsirDprDdep Resource RidsNrrOd Resource RidsOgcRp Resource RidsNrrDorlDpr Resource RidsRgn4MailCenter Resource RidsNrrDorlLpl4 Resource MNorris, NSIR ADAMS Accession No ML12269A263 OFFICE NRRIDORL/LPL4/PM NRR/DORULPL4/LA NRR/DORULPL4/BC NRR/DORULPL4/PM NAME ABWang JBurkhardt MMarkley LWilkins for ABWang DATE 10/3/12 10/3/12 10/9/12 10/9/12 OFFICIAL AGENCY RECORD