Letter Sequence Other |
|---|
TAC:ME4470, Control Room Habitability, Deletion of E BAR Definition and Revision to RCS Specific Activity Tech Spec (Approved, Closed) TAC:ME4471, Control Room Habitability, Deletion of E BAR Definition and Revision to RCS Specific Activity Tech Spec (Approved, Closed) |
Initiation
- Request, Request, Request, Request, Request, Request, Request, Request, Request
- Acceptance, Acceptance, Acceptance, Acceptance
- Supplement, Supplement, Supplement, Supplement
|
MONTHYEARL-2009-133, License Amendment Request 196 Alternative Source Term and Conforming Amendment2009-06-25025 June 2009 License Amendment Request 196 Alternative Source Term and Conforming Amendment Project stage: Request L-2009-163, Transmittal of Meteorological Data Cd Supporting Alternative Source Term and Conforming License Amendment Request 196 - Supplemental Information2009-07-21021 July 2009 Transmittal of Meteorological Data Cd Supporting Alternative Source Term and Conforming License Amendment Request 196 - Supplemental Information Project stage: Supplement ML0920205292009-07-22022 July 2009 Supplemental Information Needed for Acceptance of Requested Licensing Action Alternate Source Term Amendment Request (LAR 196) (Tac Nos. ME1624 and ME1625) Project stage: Acceptance Review ML0922206962009-08-18018 August 2009 Supplemental Information Needed for Acceptance of Requested Licensing Action Alternate Source Term Amendment Request (LAR 196) Project stage: Acceptance Review L-2009-195, Response to Request for Additional Information on Proposed Amendments to Revise the Technical Specifications to Adopt Alternative Source Term2009-08-26026 August 2009 Response to Request for Additional Information on Proposed Amendments to Revise the Technical Specifications to Adopt Alternative Source Term Project stage: Response to RAI ML0926005302009-09-25025 September 2009 Acceptance Letter Regarding the Alternative Source Term License Amendment Request Project stage: Acceptance Review L-2009-297, Official Service List Title Change, St. Lucie, Turkey Point, Seabrook Station, Duane Arnold Energy Center, Point Beach2009-12-17017 December 2009 Official Service List Title Change, St. Lucie, Turkey Point, Seabrook Station, Duane Arnold Energy Center, Point Beach Project stage: Request ML0935006652009-12-17017 December 2009 RAI, Regarding Alternative Source Term Project stage: RAI L-2010-021, Response to Request for Additional Information Regarding Alternative Source Term Amendment Request2010-02-10010 February 2010 Response to Request for Additional Information Regarding Alternative Source Term Amendment Request Project stage: Response to RAI ML1005603882010-02-25025 February 2010 Request for Additional Information Regarding Request to Adopt the Alternate Source Term Project stage: RAI L-2010-048, Response to Request for Additional Information (RAI) Regarding Alternative Source Term (AST) License Amendment Request (LAR) 1962010-03-15015 March 2010 Response to Request for Additional Information (RAI) Regarding Alternative Source Term (AST) License Amendment Request (LAR) 196 Project stage: Response to RAI ML1007004462010-03-24024 March 2010 Request for Additional Information Regarding Request to Adopt the Alternate Source Team (TAC ME1624 & ME1625) Project stage: RAI L-2010-065, Response to Request for Additional Information (RAI) Regarding Alternative Source Tear (AST) License Amendment Request (LAR) 1962010-04-14014 April 2010 Response to Request for Additional Information (RAI) Regarding Alternative Source Tear (AST) License Amendment Request (LAR) 196 Project stage: Response to RAI L-2010-083, Supplement to License Amendment Request (LAR) 196 and 3/24/2010 Request for Additional Information (RAI) Regarding Alternative Source Term (AST)2010-05-21021 May 2010 Supplement to License Amendment Request (LAR) 196 and 3/24/2010 Request for Additional Information (RAI) Regarding Alternative Source Term (AST) Project stage: Supplement L-2010-121, Revised Meteorological Data for 2005-2009 Supporting Alternative Source Term and Conforming License Amendment Request 1962010-06-11011 June 2010 Revised Meteorological Data for 2005-2009 Supporting Alternative Source Term and Conforming License Amendment Request 196 Project stage: Request L-2010-131, Response to 5/28/2010 Request for Additional Information (RAI) Regarding Alternative Source Term (AST) License Amendment Request (LAR) 1962010-06-23023 June 2010 Response to 5/28/2010 Request for Additional Information (RAI) Regarding Alternative Source Term (AST) License Amendment Request (LAR) 196 Project stage: Request L-2010-137, Revised Radiological Dose Consequences for Alternative Source Term and Conforming License Amendment Request 1962010-06-25025 June 2010 Revised Radiological Dose Consequences for Alternative Source Term and Conforming License Amendment Request 196 Project stage: Request 05000250/LER-2010-002, For Turkey Point, Unit 3 Regarding Fuel Transfer Pump Failure Renders 3B Emergency Diesel Generator Inoperable2010-08-0505 August 2010 For Turkey Point, Unit 3 Regarding Fuel Transfer Pump Failure Renders 3B Emergency Diesel Generator Inoperable Project stage: Request ML1024400682010-08-27027 August 2010 Acceptance Review: Fuel Storage Criticality Analysis LAR (ME4470 and ME4471) Project stage: Acceptance Review L-2010-197, Response to Request for Additional Information Regarding Alternative Source Term License Amendment Request (LAR) 196 and Proposed Changes to Technical Specification (TS) 3/4.7.5 on Control Room Emergency Ventilation System2010-09-15015 September 2010 Response to Request for Additional Information Regarding Alternative Source Term License Amendment Request (LAR) 196 and Proposed Changes to Technical Specification (TS) 3/4.7.5 on Control Room Emergency Ventilation System Project stage: Response to RAI L-2010-226, Summary of NRC Public Meeting Discussion on Meteorological Data for Alternative Source Term and Conforming License Amendment Request 1962010-10-13013 October 2010 Summary of NRC Public Meeting Discussion on Meteorological Data for Alternative Source Term and Conforming License Amendment Request 196 Project stage: Meeting L-2010-293, Response to Request for Additional Information (RAI) Regarding Alternative Source Term (AST) License Amendment Request (LAR) No. 196 and Meteorological Data Sensitivity2010-12-14014 December 2010 Response to Request for Additional Information (RAI) Regarding Alternative Source Term (AST) License Amendment Request (LAR) No. 196 and Meteorological Data Sensitivity Project stage: Response to RAI ML1028710232010-12-16016 December 2010 Summary of Meeting with Florida Power & Light Company to Discuss Turkey Point, Units 3 and 4, Alternative Source Term License Amendment Request Project stage: Meeting ML1035500302011-01-19019 January 2011 Summary of Meeting with Florida Power & Light Company, Regarding Turkey Point, Units 3 & 4, Spent Fuel Criticality Analysis License Amendment Request Project stage: Meeting L-2011-141, Response to NRC Request for Additional Information Regarding Extended Power Uprate License Amendment Request No. 205 and Reactor Systems Issues2011-05-11011 May 2011 Response to NRC Request for Additional Information Regarding Extended Power Uprate License Amendment Request No. 205 and Reactor Systems Issues Project stage: Response to RAI L-2011-154, Response to NRC Request for Additional Information Regarding Fuel Storage Criticality Analysis License Amendment Request No. 2072011-05-20020 May 2011 Response to NRC Request for Additional Information Regarding Fuel Storage Criticality Analysis License Amendment Request No. 207 Project stage: Response to RAI ML1108006662011-06-23023 June 2011 Issuance of Amendments Regarding Alternative Source Term Project stage: Approval L-2011-277, Confirmatory Dose Assessment for Control Room Emergency Ventilation System Air Intake Modification to Satisfy Operating License Conditions 3.H.12011-08-11011 August 2011 Confirmatory Dose Assessment for Control Room Emergency Ventilation System Air Intake Modification to Satisfy Operating License Conditions 3.H.1 Project stage: Request ML11217A0032011-08-16016 August 2011 Request for Withholding Information from Public Disclosure Project stage: Withholding Request Acceptance L-2011-386, License Amendment Request No. 207, Fuel Storage Criticality Analysis Supplement 22011-09-14014 September 2011 License Amendment Request No. 207, Fuel Storage Criticality Analysis Supplement 2 Project stage: Supplement ML11229A1192011-09-23023 September 2011 Correction of Amendment Nos. 244 Ad 240 Regarding Alternative Source Term Project stage: Other ML11216A0572011-10-31031 October 2011 Issuance of Amendments Regarding Fuel Criticality Analysis Project stage: Approval L-2011-540, Safety Evaluation Report Review Supporting Fuel Storage Criticality Amendments 246 and 2422011-12-22022 December 2011 Safety Evaluation Report Review Supporting Fuel Storage Criticality Amendments 246 and 242 Project stage: Other L-2012-313, Administrative License Amendment Request No. 223 Regarding Control Room Emergency Ventilation System Technical Specification2012-08-0707 August 2012 Administrative License Amendment Request No. 223 Regarding Control Room Emergency Ventilation System Technical Specification Project stage: Request L-2012-314, License Amendment Request No. 224 Regarding Technical Specification 3/4.6.2.3 - Recirculation Ph Control System and Natb Basket Minimum Loading Requirement2012-09-0606 September 2012 License Amendment Request No. 224 Regarding Technical Specification 3/4.6.2.3 - Recirculation Ph Control System and Natb Basket Minimum Loading Requirement Project stage: Request L-2013-019, Supplement to Administrative License Amendment Request No. 217 Regarding Operating License Conditions and Technical Specifications2013-01-29029 January 2013 Supplement to Administrative License Amendment Request No. 217 Regarding Operating License Conditions and Technical Specifications Project stage: Supplement 2010-06-23
[Table View] |
Text
Florida Power & Light Company, 9760 S.W. 344 St., Homestead, FL 33035 DEC 2 2 2011 L-2011-540 FPL.
10 CFR 50.90 U. S. Nuclear Regulatory Commission Attn.: Document Control Desk Washington, D.C. 20555-0001 Re: Turkey Point Units 3 and 4 Docket Nos. 50-250 and 50-251 Safety Evaluation Report Review Supporting Fuel Storage Criticality Amendments 246 and 242
References:
(1) M. Kiley (FPL) to U. S. Nuclear Regulatory Commission (L-2010-169), "License Amendment Request No. 207 Fuel Storage Criticality Analysis," Accession No. ML102220022, August 5, 2010.
(2) J. Paige (NRC) to M. Nazar (FPL), "Turkey Point Units 3 and 4 - "Issuance of Amendments Regarding Fuel Criticality Analysis (TAC Nos. ME4470 and ME4471)," Accession No. ML11216A057, October 31, 2011.
By letter L-2010-169 dated August 5, 2010 [Reference 1], Florida Power and Light Company (FPL) requested to amend Renewed Facility Operating Licenses DPR-31 and DPR-41 and revise the Turkey Point Units 3 and 4 Technical Specifications (TS). The amendments proposed to revise TS 5.5.1 Fuel Storage - Criticality, to include new spent fuel storage patterns that account for both the increase in fuel maximum enrichment from 4.5 wt% U-235 to 5.0 wt% U-235 and the impact on the fuel of higher power operation proposed under the Extended Power Uprate (EPU) project.
On October 31, 2011, the U.S. Nuclear Regulatory Commission (NRC) issued Amendment No.
246 to Renewed Facility Operating License No. DPR-31 and Amendment No. 242 to Renewed Facility Operating License No. DPR-41 for the Turkey Point Nuclear Plant, Units Nos. 3 and 4, respectively, with a supporting Safety Evaluation Report (SER) [Reference 2]. After completion of a review of the SER, FPL offers the following two comments:
- 1. On page 1 of Enclosure 1 to Reference 2 titled "Amendment No. 246 to DPR-3 1," two of the supplemental letters dated September 14, 2011 and September 22, 2011 have been omitted in the Unit 3 amendment letter while both letters have been included in the Unit 4 amendment letter on page 1 of Enclosure 2 to Reference 2 titled "Amendment No. 242 to DPR-4 1."
- 2. On the bottom of page 4 and top of page 5 in the SER, it states the following:
"Hafnium Vessel Flux Depression (HVFD) absorbers are used in a few highly burned fuel assemblies on the core periphery during the third cycle of operation.
These absorber inserts are present only near the mid-plane of the fuel assembly's axial length to reduce the fluence at critical weld locations along the core vessel.
The associated burnup profiles of those assemblies that contain HVFD are limiting, since the HVFDs push the neutron flux out of the middle of the core and toward the ends of the fuel during fuel depletion. The selection of limiting axial burnup profiles for pre-EPU fuel includes shapes from assemblies with HVFDs. These absorbers have not been in use since Cycle 24, and they are not used in EPU fuel."
Turkey Point Units 3 and 4 L-2011-540 Docket Nos. 50-250 and 50-251 Page 2 of 2 Contrary to the above, the associated burnup profiles of those assemblies that contain HVFDs are typically not limiting (see Section 4.2.2.3 of WCAP-1 7094-P, Rev. 3, "Turkey Point Units 3 and 4 New Fuel Storage Rack and Spent Fuel Pool Criticality Analysis"). The reactivity of the heavily burned fuel is predominantly dictated by the upper end region of the fuel. Since the HVFDs push the neutron flux out of the middle of the core and toward the ends of the fuel during fuel depletion, those assemblies accrue more burnup in the region important to reactivity therefore producing non-limiting axial burnup profiles. Although the overall conclusions are correct, FPL recommends that the text be modified to better describe the basis as follows:
Hafnium Vessel Flux Depression (HVFD) absorbers are used in a few highly burned fuel assemblies on the core periphery during the third cycle of operation.
These absorber inserts are present only near the mid-plane of the fuel assembly's axial length to reduce the fluence at critical weld locations along the core vessel.
While the selection of limiting axial burnup profiles for pre-EPU fuel included shapes from assemblies with HVFDs, those profiles proved to be non-limiting because the HVFDs push the neutron flux out of the middle of the core and toward the ends of the fuel during fuel depletion. These absorbers have not been in use since Cycle 24, and they are not used in EPU fuel.
In accordance with 10 CFR 50.91 (b)(1), a copy of this letter is being forwarded to the State Designee of Florida.
Should you have any questions regarding this submittal, please contact Mr. Robert J. Tomonto, Licensing Manager, at (305) 246-7327.
I declare under penalty of perjury that the foregoing is true and correct.
Executed on December '22-_, 2011.
Very truly yours, Michael Kiley Site Vice President Turkey Point Nuclear Plant cc:
USNRC Regional Administrator, Region II USNRC Project Manager, Turkey Point Nuclear Plant USNRC Senior Resident Inspector, Turkey Point Nuclear Plant William Passetti, Florida Department of Health