MONTHYEARML24009A1152024-01-29029 January 2024 Exemption from Select Requirements of 10 CFR Part 73 (EPID L 2023 LLE-0043 (Security Notifications, Reports, and Recordkeeping and Suspicious Activity Reporting)) L-2024-010, Point Units 3 and 4, Seabrook, Duane Arnold, and Point Beach Units 1 and 2, Nuclear Property Insurance - 10 CFR 50.54(w)(3)2024-01-25025 January 2024 Point Units 3 and 4, Seabrook, Duane Arnold, and Point Beach Units 1 and 2, Nuclear Property Insurance - 10 CFR 50.54(w)(3) ML24022A0652024-01-22022 January 2024 Senior Reactor and Reactor Operator Initial License Examinations L-2024-003, NextEra Energy Seabrook, LLC - 10 CFR 50.46 - Emergency Core Cooling System LBLOCA 30-Day Report2024-01-11011 January 2024 NextEra Energy Seabrook, LLC - 10 CFR 50.46 - Emergency Core Cooling System LBLOCA 30-Day Report ML23312A1822023-12-22022 December 2023 Issuance of Amendment No. 172 Revision to Cooling Tower Service Water Loop or Cell Requirements L-2023-173, Quality Assurance Topical Report (FPL-1) Revision 30 Update2023-12-15015 December 2023 Quality Assurance Topical Report (FPL-1) Revision 30 Update L-2023-180, Submittal of Changes to the Technical Specification Bases2023-12-13013 December 2023 Submittal of Changes to the Technical Specification Bases L-2023-177, Supplement to Seabrook Exemption Request Regarding Enhanced Weapons, Firearms Background Checks, and Security Event Notifications Final Rule2023-11-29029 November 2023 Supplement to Seabrook Exemption Request Regarding Enhanced Weapons, Firearms Background Checks, and Security Event Notifications Final Rule L-2023-155, Supplement to Response to Request for Additional Information, Revised NextEra Common Emergency Plan, and Revised Site-Specific Emergency Plan Annexes Regarding License Amendment Request for Common Emergency Plan Consistent with NUREG-06542023-11-28028 November 2023 Supplement to Response to Request for Additional Information, Revised NextEra Common Emergency Plan, and Revised Site-Specific Emergency Plan Annexes Regarding License Amendment Request for Common Emergency Plan Consistent with NUREG-0654, L-2023-160, Part 73 Exemption Request Regarding Enhanced Weapons, Firearms, Background Checks, and Security Event Notifications Final Rule2023-11-16016 November 2023 Part 73 Exemption Request Regarding Enhanced Weapons, Firearms, Background Checks, and Security Event Notifications Final Rule ML23318A0772023-11-14014 November 2023 Request for Information and Notification of Conduct of IP 71111.21.N.04, Age-Related Degradation, Reference Inspection Report 05000443/2024011 IR 05000443/20234032023-11-0707 November 2023 Security Baseline Inspection Report 05000443/2023403 and Independent Spent Fuel Storage Installation 07200063/2023401 IR 05000443/20230032023-11-0606 November 2023 Integrated Inspection Report 05000443/2023003 IR 05000443/20230102023-10-19019 October 2023 Triennial Fire Protection Inspection Report 05000443/2023010 ML23346A1322023-10-0606 October 2023 Communication from C-10 Research & Education Foundation Regarding NextEra Common Emergency Fleet Plan License Amendment Request and Related Documents Subsequently Published ML23275A0522023-10-0202 October 2023 Requalification Program Inspection IR 05000443/20234012023-09-0808 September 2023 Cybersecurity Inspection Report 05000443/2023401 (Cover Letter Only) IR 05000443/20234202023-09-0505 September 2023 Security Baseline Inspection Report 05000443/2023420 IR 05000443/20230052023-08-31031 August 2023 Updated Inspection Plan for Seabrook Station (Report 05000443/2023005) L-2023-114, Proposed Turkey Point Units 6 and 7; Seabrook Station; Point Beach Units 1 and 2 - Official Service List Update2023-08-17017 August 2023 Proposed Turkey Point Units 6 and 7; Seabrook Station; Point Beach Units 1 and 2 - Official Service List Update IR 05000443/20233022023-08-16016 August 2023 Operator Licensing Retake Examination Report 05000443/2023302 IR 05000443/20230022023-08-0808 August 2023 Integrated Inspection Report 05000443/2023002 L-2023-098, and Point Beach Units 1 and 2 - Response to Request for Additional Information Regarding License Amendment Request for Common Emergency Plan Consistent with NUREG-0654, Revision 22023-08-0707 August 2023 and Point Beach Units 1 and 2 - Response to Request for Additional Information Regarding License Amendment Request for Common Emergency Plan Consistent with NUREG-0654, Revision 2 ML23201A0872023-08-0303 August 2023 Audit Plan in Support of Review of License Amendment L-2023-104, Preparation and Scheduling of Operator Licensing Examinations2023-08-0303 August 2023 Preparation and Scheduling of Operator Licensing Examinations L-2023-103, Inservice Inspection Examination Report2023-08-0303 August 2023 Inservice Inspection Examination Report ML23192A0782023-07-11011 July 2023 Operator Licensing Retake Examination Approval L-2023-087, Florida Power & Light/Nextera Energy, Results of the Safety Culture Program Effectiveness Review, March 20, 2023 (ADAMS Accession No. ML22340A452)2023-06-29029 June 2023 Florida Power & Light/Nextera Energy, Results of the Safety Culture Program Effectiveness Review, March 20, 2023 (ADAMS Accession No. ML22340A452) SBK-L-23053, Radiological Emergency Plan (Ssrep), Revision 802023-06-22022 June 2023 Radiological Emergency Plan (Ssrep), Revision 80 ML23157A0722023-06-0606 June 2023 Notification of Conduct of a Fire Protection Team Inspection L-2023-074, Addendum to 2021 Decommissioning Funding Status Reports / Independent Spent Fuel Storage Installation Ctsfsi) Financial Assurance Update2023-06-0202 June 2023 Addendum to 2021 Decommissioning Funding Status Reports / Independent Spent Fuel Storage Installation Ctsfsi) Financial Assurance Update L-2023-071, NextEra Energy Quality Assurance Topical Report (FPL-1) Revision 29 and Florida Power and Light Company Quality Assurance Program Description for 10 CFR Part 52 Licenses (FPL-2) Revision 11, Annual Submittal2023-05-22022 May 2023 NextEra Energy Quality Assurance Topical Report (FPL-1) Revision 29 and Florida Power and Light Company Quality Assurance Program Description for 10 CFR Part 52 Licenses (FPL-2) Revision 11, Annual Submittal IR 05000443/20233012023-05-15015 May 2023 Initial Operator Licensing Examination Report 05000443/2023301 L-2023-064, License Amendment Request 23-01, Revision 1, Update the Period of Applicability (Poa) for the Pressure-Temperature Limits (PTL) and Low Temperature Overpressure Protection (L Top) Curves2023-05-11011 May 2023 License Amendment Request 23-01, Revision 1, Update the Period of Applicability (Poa) for the Pressure-Temperature Limits (PTL) and Low Temperature Overpressure Protection (L Top) Curves IR 05000443/20230012023-05-11011 May 2023 Integrated Inspection Report 05000443/2023001 ML23129A0312023-05-0909 May 2023 Reactor Operator Retake License Examination ML23117A3652023-05-0404 May 2023 Supplemental Information Needed for Acceptance of Requested Licensing Action Amendment Request to Remove Period of Applicability from PTL and Low Temperature Over Pressure Protection Curves SBK-L-23044, 2022 Annual Radiological Environmental Operating Report2023-04-28028 April 2023 2022 Annual Radiological Environmental Operating Report SBK-L-23031, 2022 Annual Radioactive Effluent Release Report2023-04-28028 April 2023 2022 Annual Radioactive Effluent Release Report SBK-L-23033, 2022 Annual Environmental Operating Report2023-04-11011 April 2023 2022 Annual Environmental Operating Report L-2023-053, Core Operating Limits Report for Cycle 232023-04-0505 April 2023 Core Operating Limits Report for Cycle 23 ML23088A1522023-03-29029 March 2023 Summary of Meeting Between Nrc/Region I and C-10 - Questions Regarding Seabrook 4Q2022 Inspection Report L-2023-021, Units, 1 and 2, Turkey Point, Units 3 and 4, Seabrook Station and Point Beach, Units 1 and 2 - Decommissioning Funding Status Reports / Independent Spent Fuel Storage Installation (ISFSI) Financial Assurance Update2023-03-28028 March 2023 Units, 1 and 2, Turkey Point, Units 3 and 4, Seabrook Station and Point Beach, Units 1 and 2 - Decommissioning Funding Status Reports / Independent Spent Fuel Storage Installation (ISFSI) Financial Assurance Update L-2023-028, and Point Beach Units 1 and 2, 10 CFR 50.46 Annual Reporting of Changes to, or Errors in Emergency Core Cooling System Models or Applications2023-03-27027 March 2023 and Point Beach Units 1 and 2, 10 CFR 50.46 Annual Reporting of Changes to, or Errors in Emergency Core Cooling System Models or Applications ML23073A1562023-03-23023 March 2023 Relief Request 4RA-22-01, Relief from the Requirements of the ASME Code L-2023-012, License Amendment Request 23-01, Remove Period of Applicability (Poa) from Pressure Temperature Limits (PTL) and Low Temperature Overpressure Protection (L Top) Curves2023-03-15015 March 2023 License Amendment Request 23-01, Remove Period of Applicability (Poa) from Pressure Temperature Limits (PTL) and Low Temperature Overpressure Protection (L Top) Curves L-2023-025, Fleet Relief Request (Frr) 23-01, Proposed Alternative to ASME Section XI Authorizing Implementation of ASME Code Case N-752-12023-03-15015 March 2023 Fleet Relief Request (Frr) 23-01, Proposed Alternative to ASME Section XI Authorizing Implementation of ASME Code Case N-752-1 L-2023-029, and Point Beach Units 1 and 2 Nuclear Property Insurance - 10 CFR 50.54(w)(3)2023-03-10010 March 2023 and Point Beach Units 1 and 2 Nuclear Property Insurance - 10 CFR 50.54(w)(3) L-2023-023, Revised Steam Generator Tube Inspection Report2023-03-0303 March 2023 Revised Steam Generator Tube Inspection Report ML23020A1002023-03-0303 March 2023 OEDO-22-00419 - 2.206 Petition for Seabrook Station Structure Concrete Concerns (EPID L-2022-CRS-0000)- Closure Letter 2024-01-29
[Table view] Category:Code Relief or Alternative
MONTHYEARML22262A3142022-10-0404 October 2022 Relief Requests 3IR-18 and 3IR-19, Relief from the Requirements of the ASME Code ML22116A2442022-04-26026 April 2022 Acceptance of Requested Licensing Action Relief Request 3IR-18 and 3IR-19 for End of Third 10-Year ISI Interval for Examinations with Limited Coverage ML20237F3442020-09-21021 September 2020 Authorization of Alternative (Relief Request 3IIR-7) from Certain Requirements of the American Society of Mechanical Engineers Boiler and Pressure Vessel Code (EPIDs L-2020-LLR-0055, L-2020-LLR-0056, and L-2020-LLR-0057) ML20101L0402020-04-10010 April 2020 Acceptance of Requested Licensing Action Relief Request to Use Code Case OMN-13 with 2012 Edition of the OM Code ML20101H3912020-04-0808 April 2020 Verbal Authorization for Seabrook Relief Request 3IIR-7 SBK-L-20049, Relief Request 3IIR-7, Proposed Alternative to Deter Examinations Beyond the 1 Year Code Allowable2020-04-0505 April 2020 Relief Request 3IIR-7, Proposed Alternative to Deter Examinations Beyond the 1 Year Code Allowable SBK-L-20017, Relief Request SG-1 Proposed Alternative in Accordance with 10 CFR 50.55a(z)(l), Use of Code Case OMN-13 with 2012 Edition of the OM Code2020-03-20020 March 2020 Relief Request SG-1 Proposed Alternative in Accordance with 10 CFR 50.55a(z)(l), Use of Code Case OMN-13 with 2012 Edition of the OM Code ML20076D2812020-03-17017 March 2020 Relief from the Requirements of the American Society of Mechanical Engineers Boiler and Pressure Vessel Code ML19340A1282019-12-13013 December 2019 Relief from the Requirements of the American Society of Mechanical Engineers Boiler and Pressure Vessel Code ML19249B1012019-09-30030 September 2019 Relief from the Requirements of the American Society of Mechanical Engineers Boiler and Pressure Vessel Code; Relief Request RA-19-001 ML18106B1212018-04-25025 April 2018 Proposed Alternative to Use Encoded Phased Array Ultrasonic Examination Techniques L-2017-121, Proposed Alternative for the Use of Encoded Phased Array Ultrasonic Examination Techniques in Lieu of Radiography2017-07-24024 July 2017 Proposed Alternative for the Use of Encoded Phased Array Ultrasonic Examination Techniques in Lieu of Radiography ML17065A1482017-03-27027 March 2017 Relief from the Requirements of the ASME Code ML17080A0382017-03-27027 March 2017 Relief from the Requirements of the American Society of Mechanical Engineers Boiler and Pressure Vessel Code SBK-L-17027, Relief Request RA-17-002, Proposed Alternative in Accordance with 10 CFR 50.55a(z)(2)2017-02-0606 February 2017 Relief Request RA-17-002, Proposed Alternative in Accordance with 10 CFR 50.55a(z)(2) ML16330A1182016-12-15015 December 2016 NextEra Fleet - Safety Evaluation for Proposed Alternative to the American Society of Mechanical Engineers Operation and Maintenance Code by Adoption of Approved Code Case OMN-20, Inservice Test Frequency (CAC Nos. MF8195 Through MF8201) ML14071A4102014-04-10010 April 2014 Request for Relief RA-14-001 from American Society of Mechanical Engineers Boiler and Pressure Vessel Code, Section XI Requirements Regarding the Reactor Vessel Head Flange Seal Leak Detection Piping (TAC No. Mfxxxx) ML12144A2402012-06-0404 June 2012 Second 10-Year Interval Inservice Inspection Program Plan Request for Relief No. 2lR-17 ML12145A1702012-06-0404 June 2012 Second 10-Year Interval Inservice Inspection Program Plan Request for Relief No. 2lR-20 SBK-L-11192, Request for Relief from ASME Code Case N-729-1 Requirements for Examination of Reactor Vessel Head Penetration Welds2011-10-27027 October 2011 Request for Relief from ASME Code Case N-729-1 Requirements for Examination of Reactor Vessel Head Penetration Welds ML1031901392010-11-22022 November 2010 Relief Request for Use of Alternate Depth Sizing Qualification, Third 10-Year Interval ML1023503412010-10-15015 October 2010 Relief Request for System Pressure Test Examinations on Class 1 Component Pressure Boundaries, Third 10-Year Interval ML1013801662010-06-0303 June 2010 Relief Request for Containment Building Spray Pump Bearing Vibration Alert Range Limit, Third 10-Year Interval SBK-L-09038, Supplement to Request for Relief from Inservice Inspection Requirements2009-02-24024 February 2009 Supplement to Request for Relief from Inservice Inspection Requirements SBK-L-08204, CFR 50-55a Request for Alternative Requirements for ASME Class 1 Upper Level Instrumentation Lines on the Pressurizer2008-12-11011 December 2008 CFR 50-55a Request for Alternative Requirements for ASME Class 1 Upper Level Instrumentation Lines on the Pressurizer SBK-L-08174, Request for Relief to Use of an Alternate Depth Sizing Qualification Requirement for Coordinated Implementation of ASME Section XI, Supplements 2 and 10 for Piping Examinations Performed from Inside Surface2008-09-30030 September 2008 Request for Relief to Use of an Alternate Depth Sizing Qualification Requirement for Coordinated Implementation of ASME Section XI, Supplements 2 and 10 for Piping Examinations Performed from Inside Surface SBK-L-08175, Request for Relief from Inservice Inspection Requirements2008-09-30030 September 2008 Request for Relief from Inservice Inspection Requirements ML0422603122004-10-12012 October 2004 Relief, American Society of Mechanical Engineers Boiler and Pressure Vessel Code - Relief for Class 3 Service Water Piping System ML0334400092004-02-0404 February 2004 Relief Inservice Testing Program Relief Request PR-3 ML0310705102003-05-30030 May 2003 Relief, from ASME Code Operations and Maintenance Code Istb 4.3(e)(1) Ten-Year Interval Inservice Test for Containment Spray Pumps CBS-P9A and CBS-P9B (Tac No. MB6676) ML0314100182003-05-0909 May 2003 Inservice Test Program Relief Request PR-3 ML0134603962002-01-28028 January 2002 Inservice Inspection Program Relief Requests 2AR-03, 2AR-04, 2AR-05, and 2IR-14 2022-04-26
[Table view] Category:Safety Evaluation
MONTHYEARML23312A1822023-12-22022 December 2023 Issuance of Amendment No. 172 Revision to Cooling Tower Service Water Loop or Cell Requirements ML23073A1562023-03-23023 March 2023 Relief Request 4RA-22-01, Relief from the Requirements of the ASME Code ML22287A1572022-12-0505 December 2022 Issuance of Amendment No. 171 Revision to Technical Specifications to Adopt TSTF-577, Revised Frequencies for Steam Generator Tube Inspections ML22262A3142022-10-0404 October 2022 Relief Requests 3IR-18 and 3IR-19, Relief from the Requirements of the ASME Code ML22230C9242022-09-30030 September 2022 Issuance of Amendment No. 170 Revision of 120-Volt AC Vital Instrument Panel Requirements ML21008A0142021-02-25025 February 2021 Issuance of Amendment No. 168 Revise Technical Specification Table 3.3.4 to Change Time Delay Setpoints for Degraded Voltage Relays ML20293A1572020-12-28028 December 2020 Issuance of Amendment No. 167 Reactor Trip System Instrumentation Technical Specification Changes to Implement WCAP-14333 and WCAP-15376 ML20298A2532020-11-24024 November 2020 Issuance of Amendment No. 166 Revise Technical Specification 3/4.8.1, A.C. Sources Operating ML20070Q0712020-03-27027 March 2020 Issuance of Amendment No. 165 Emergency Core Cooling System Accumulator Technical Specification Changes ML20076D2812020-03-17017 March 2020 Relief from the Requirements of the American Society of Mechanical Engineers Boiler and Pressure Vessel Code ML20073E4342020-03-17017 March 2020 Relief from the Requirements of the American Society of Mechanical Engineers Boiler and Pressure Vessel Code ML19357A1952020-02-10010 February 2020 Unit No.1; & Turkey Point Nuclear Generating Unit Nos. 3 & 4 - Issuance of Amendments Nos. 265, 268, 164, 290, and 284 Revise Technical Specifications to Adopt TSTF-563 ML20015A1232020-02-0606 February 2020 Proposed Alternative to Use Encoded Phased Array Ultrasonic Examination Techniques ML19340A1282019-12-13013 December 2019 Relief from the Requirements of the American Society of Mechanical Engineers Boiler and Pressure Vessel Code ML19326C4802019-12-0505 December 2019 Issuance of Amendment No. 163 One-Time Change to the Onsite Power Distribution Requirements ML19224A5632019-11-18018 November 2019 Issuance of Amendment No. 162 Revisions to Technical Specifications Associated with Movable Control Rods ML19249B1012019-09-30030 September 2019 Relief from the Requirements of the American Society of Mechanical Engineers Boiler and Pressure Vessel Code; Relief Request RA-19-001 ML19148A7442019-07-31031 July 2019 Issuance of Amendment Nos. 161, 249, 200, 287, and 281 to Add Technical Specification Limiting Condition for Operation 3.0.6 ML19065A2152019-03-29029 March 2019 Issuance of Amendment No. 160 Measurement and Assessment Frequency for Technical Specification 6.7.6.l, Control Room Envelope Habitability Program ML18204A2912019-03-11011 March 2019 Issuance of Amendment No. 159 Methodology for Analysis of Seismic Category I Structures with Concrete Affected by Alkali-Silica Reaction ML18247A5382018-11-27027 November 2018 Issuance of Amendment No. 158 Removing Requirement to Perform Certain Surveillance Requirements During Shutdown and Changes to Administrative Technical Specifications ML18199A6092018-08-0707 August 2018 Issuance of Amendment No. 157 Changes to the Technical Specifications Requirements for DC Batteries (CAC No. MG0046; EPID L-2017-LLA-0289) ML18106B1212018-04-25025 April 2018 Proposed Alternative to Use Encoded Phased Array Ultrasonic Examination Techniques ML17102A8892017-04-13013 April 2017 Issuance of Amendment Licensing Basis Change for Service Water Cooling Tower ML17027A0782017-04-0707 April 2017 Issuance of Amendments Regarding Technical Specifications for Inservice Testing Programs (CAC Nos. MF8202 Through MF8209) ML17080A0382017-03-27027 March 2017 Relief from the Requirements of the American Society of Mechanical Engineers Boiler and Pressure Vessel Code ML17046A4432017-03-15015 March 2017 Issuance of Amendment Extension of Containment Leakage Rate Test Frequency ML16330A1182016-12-15015 December 2016 NextEra Fleet - Safety Evaluation for Proposed Alternative to the American Society of Mechanical Engineers Operation and Maintenance Code by Adoption of Approved Code Case OMN-20, Inservice Test Frequency (CAC Nos. MF8195 Through MF8201) ML16321A4182016-12-0101 December 2016 Safety Evaluation Regarding Implementation of Mitigating Strategies and Reliable Spent Fuel Pool Instrumentation Related to Orders EA-12-049 and EA-12-051 (CAC Nos. MF0836 and MF0837) ML15096A2552015-11-0202 November 2015 Issuance of Amendment Regarding License Amendment Request 14-04, Revised Reactor Coolant System Pressure-Temperature Limits Applicable for 44 Effective Full Power Years ML15231A1442015-10-0606 October 2015 Issuance of Amendment No. 150 Regarding Note for Reactor Coolant System Surveillance Requirements ML15096A1432015-07-28028 July 2015 Exemption from Specific Requirements of 10 CFR Part 50, Appendix G, and 10 CFR 50.60 ML15205A3332015-07-28028 July 2015 Safety Evaluation by the Office of Nuclear Reactor Regulation Related to Request for Exemption from Table 1 of 10 CFR Part 50, Appendix G NextEra Energy Seabrook, LLC Seabrook Station, Unit 1 Docket No. 50-443 ML15096A1312015-07-17017 July 2015 Issuance of Amendment Regarding Changes to Technical Specification 3.3.3.1, Radiation Monitoring for Plant Operations ML15118A6322015-05-18018 May 2015 Issuance of Amendment Regarding License Amendment Request Regarding New Fuel Valut ML15082A2332015-04-24024 April 2015 Issuance of Amendment Regarding Increase Voltage Limit for Diesel Generator Load Rejection Surveillance Requirement ML15058A7062015-04-22022 April 2015 Issuance of Amendment No. 146 Regarding the Cyber Security Plan Implementation Schedule ML15002A2512015-03-31031 March 2015 Unit No.1 - Issuance of Amendment Regarding License Amendment Request 14-06, Application Regarding the Removal of the Cold Leg Injection Permissive from Technical Specifications ML14345A2882015-02-0606 February 2015 Issuance of Amendment Regarding Technical Specifications Task Force Traveler-523, Generic Letter 2008-01, Managing Gas Accumulation Using the Consolidated Line Item Improvement Process ML14363A2752015-02-0404 February 2015 Non-Proprietary SE for Issuance of Amendment Regarding License Amendment Request Regarding Fixed Incore Detector System Analysis ML14184A7952014-09-0303 September 2014 Issuance of Amendment Regarding License Amendment Request Regarding Fuel Storage Changes ML13212A0692014-07-24024 July 2014 Issuance of Amendment Regarding the Risk-Informed Justifications for the Relocation of Specific Surveillance Frequency Requirements to a Licensee Controlled Program ML14071A4102014-04-10010 April 2014 Request for Relief RA-14-001 from American Society of Mechanical Engineers Boiler and Pressure Vessel Code, Section XI Requirements Regarding the Reactor Vessel Head Flange Seal Leak Detection Piping (TAC No. Mfxxxx) ML14029A4452014-03-0606 March 2014 Issuance of Amendment Regarding License Amendment Request 12-04, Application Regarding Cold Leg Injection Permissive ML13213A1432014-03-0505 March 2014 Issuance of Amendment Regarding the Use of Optimized Zirlo Fuel Rod Cladding Material ML13247A7772014-02-0909 February 2014 Request for Relief to Use an Alternative to the Requirements of the American Society of Mechanical Engineers Boiler and Pressure Vessel Code, Section XI ML13107A0162013-10-25025 October 2013 Issuance of Amendment Regarding the License Amendment Request 13-02, Application to Revise Technical Specifications to Adopt TSTSF-510, Revision to Steam Generator Program Inspection Frequencies and Tube Sample Selection.. ML13074A7602013-06-17017 June 2013 Issuance of Amendment Regarding the Administrative Changes and Corrections to the Technical Specifications ML13050A1382013-06-13013 June 2013 Revision to Reactor Vessel Surveillance Capsule Withdrawal Schedule ML1130000632013-04-23023 April 2013 Issuance of Amendment Addition of Action Statement to Limiting Condition for Operation 3.6.5.1, Containment Enclosure Emergency Air Cleanup System 2023-03-23
[Table view] |
Text
UNITED STATES NUCLEAR REGULATORY COMMISSION WASHINGTON, D.C. 20555*0001 June 4,2012 Mr. Paul Freeman Site Vice President clo Michael O'Keefe Seabrook Station NextEra Energy Seabrook, LLC P.O. Box 300 Seabrook, NH 03874
SUBJECT:
SEABROOK STATION, UNIT 1 - SECOND 10-YEAR INTERVAL INSERVICE INSPECTION PROGRAM PLAN REQUEST FOR RELIEF NO. 21R-20 (TAC NO.
ME6901)
Dear Mr. Freeman:
By letter dated August 17, 2011, as supplemented March 13, 2012, NextEra Energy Seabrook, LLC (NextEra or licensee) submitted request for relief 21R-20 for the second 10-year inservice inspection (lSI) interval program at the Seabrook Station, Unit 1 (Seabrook) from certain examination requirements of the American Society of Mechanical Engineers (ASME) Boiler and Pressure Vessel Code (Code). Specifically, the licensee requested relief from the ASME Code,Section XI requirements for the risk-informed, examination Category R-A, Items R1.11, R1.16, and R1.20, risk-informed piping examinations. The request is for the risk-informed examination for the second 10-year lSI interval, which ended August 18,2010.
The U.S. Nuclear Regulatory Commission (NRC) staff, with technical assistance from its contractor, the Pacific Northwest National Laboratory (PNNL), has reviewed the subject request and concludes that NexEra has adequately addressed all of the regulatory requirements set forth in 10 CFR 50.55a(g)(6)(i). Therefore, the NRC staff grants relief from the specified ASME Code,Section XI, examination coverage requirements of the subject welds contained in relief request 21R-20 for the Seabrook second 10-year lSI interval.
All other ASME Code,Section XI requirements for which relief was not specifically requested and approved in the subject requests for relief remain applicable, including third-party review by the Authorized Nuclear Inservice Inspector.
P. Freeman -2 The NRC staffs safety evaluation is enclosed. If you have any questions, please contact John G. lamb at 301-415-3100 or via e-mail at John.lamb@nrc.gov.
Sincerely, Meena Khanna, Chief Plant licensing Branch 1-2 Division of Operating Reactor licensing Office of Nuclear Reactor Regulation Docket No. 50-443
Enclosure:
Safety Evaluation cc w/encl: Distribution via listserv
UNITED STATES NUCLEAR REGULATORY COMMISSION WASHINGTON, D.C. 20555-0001 SAFETY EVALUATION BY THE OFFICE OF NUCLEAR REACTOR REGULATION SECOND 10-YEAR INTERVAL REQUEST FOR RELIEF NO. 21R-20 NEXTERA ENERGY SEABROOK, LLC.
SEABROOK STATION, UNIT 1 DOCKET NUMBER 50-443
1.0 INTRODUCTION
By letter dated August 17, 2011, as supplemented March 13, 2012,1 NextEra Energy Seabrook, LLC (NextEra or licensee) submitted request for relief 21R-20 for the second 1O-year inservice inspection (lSI) interval program at the Seabrook Station, Unit 1 (Seabrook) from certain examination requirements of the American Society of Mechanical Engineers (ASME) Boiler and Pressure Vessel Code (Code). Specifically, the licensee requested relief from the ASME Code,Section XI requirements for the risk-informed, examination Category R-A, Items R1.11, R1.16, and R 1.20, risk-informed piping examinations. The request is for the risk-informed examination for the second 10-year lSI interval, which ended August 18, 2010.
2.0 REGULATORY EVALUATION
Pursuant to Title 10 of the Code of Federal Regulations (10 CFR) 50.55a(g)(4), American Society of Mechanical Engineers (ASME) Code Class 1, 2, and 3 components (including supports) shall meet the requirements, except the design and access provisions and the preservice examination requirements, set forth in the ASME Code,Section XI to the extent practical within the limitations of design, geometry, and materials of construction of the components. The regulations require that inservice examination of components and system pressure tests conducted during the first 10-year interval and subsequent intervals comply with the requirements in the latest edition and addenda of Section XI of the ASME Code, which was incorporated by reference in 10 CFR 50.55a(b) 12 months prior to the start of the 120-month interval, subject to the limitations and modifications listed therein.
10 CFR 50.55a(g)(5)(iii), states, in part, that licensees may determine that conformance with certain code requirements is impractical and that the licensee shall notify the Commission and submit information in support of the determination. Determination of impracticality in accordance with this section must be based on the demonstrated limitations experienced when attempting to comply with the code requirements during the inservice inspection interval for Agencywide Documents Access and Management System Accession Numbers ML11234A185 and ML120790313, respectively.
Enclosure
- 2 which the request is being submitted. Requests for relief made in accordance with this section must be submitted to the NRC no later than 12 months after the expiration of the initial 120 month inspection interval or subsequent 120-month inspection interval for which relief is sought.
10 CFR 50.55a(g)(6)(i), states that the Commission will evaluate determinations under paragraph (g)(5) of this section that code requirements are impractical. The Commission may grant such relief and may impose such alternative requirements as it determines is authorized by law and will not endanger life or property or the common defense and security and is otherwise in the public interest giving due consideration to the burden upon the licensee that could result if the requirements were imposed on the facility.
The licensee has requested relief from ASME Code requirements pursuant to 10 CFR 50.55a(g)(6)(i). The ASME Code of Record for Seabrook second 10-year interval inservice inspection program, which ended on August 18, 2010, is the 1995 Edition through the 1996 Addenda of Section XI of the ASME Boiler and Pressure Vessel Code.
Based on the above, and subject to the following technical evaluation, the NRC staff finds that regulatory authority exists for the licensee to request and the Commission to grant the relief requested by the licensee.
3.0 TECHNICAL EVALUATION
The information provided by the licensee in support of the request for relief to ASME Code requirements has been evaluated and the bases for disposition are documented below.
3.1 Request for Relief 21R-20, Risk Informed, Examination Category R-A, Items R1.11 ,
R1.16 and R1.20, Risk Informed Piping Examinations ASME Code Requirement The examination requirements for the subject piping welds at Seabrook are governed by a Risk Informed Inservice Inspection (RI-ISI) program that was approved by the NRC in a Safety Evaluation (SE) dated February 7, 2002.2 The RI-ISI program was developed in accordance with the Electric Power Research Institute (EPRI) Topical Report TR-112657, Rev. B-A, Revised Risk-Informed Inservice Inspection Evaluation Procedure. As part of the NRC-approved pro~ram, the licensee has implemented inspection requirements listed in ASME Code Case N 578 , Risk-Informed Requirements for Class 1, 2 or 3 Piping, Method B,Section XI, Division 1, with more detailed provisions contained in TR-112657. The topical report includes a provision for requesting relief from volumetric examinations if 100 percent of the required volumes cannot be examined.
Table 1 of ASME Code Case N-578 assigns Examination Category R-A, Items R1.11, R1.16, and R1.20, to piping inspection elements subject to thermal fatigue, intergranular stress corrosion cracking (IGSCC), and elements not subject to a known damage mechanism, 2 ADAMS Accession Number ML020250222.
3 ASME Code Case N-578 has not been approved for use in RG-1.147, Revision 16. Licensees base their RI-ISI inspection sample size and examination methodology on Table 1 of ASME Code Case N-578.
-3 respectively. Table 1 of Code Case N-578 requires 100 percent of the examination location volume, as described in Figures IWB-2500-8(c), 9, 10, or 11, as applicable, including an additional %-inch of base metal adjacent to the ASME Code volume, be completed for selected Class 1 piping welds. ASME Code Case N-460, as an alternative approved for use by the NRC in RG 1.147, Revision 16, states that a reduction in examination coverage due to part geometry or interference for any Class 1 and 2 weld is acceptable provided that the reduction is less than 10 percent, i.e., greater than 90 percent examination coverage is obtained.
Licensee's ASME Code Relief Request In accordance with 10 CFR 50.55a(g)(5)(iii), the licensee requested relief from 100 percent volumetric examination of Risk-Informed Class 1 piping welds shown in Table 3.4.1 below.
Id Table Code Item R1.11 CS 0366-02 04 3" Valve-ta-Pipe 50.0 R1.11 CS 0368-02 04 3" Valve-ta-Pipe 50.0 R1.11 RC 0013-01 08 12" Pipe-ta-Tee 50.0 R1.11 RC 0013-01 09 12" Tee-ta-Pipe 50.0 R1.11 RC 0048-03 01 4" Reducer-ta-Pipe 50.0 R1.11 RC 0080-06 10 3" Pipe-ta-Valve 50.0 R1.11 RH 0180-05 02 12" Pipe-ta-T ee 50.0 R1.11 SI 0202-02 17 10" Valve-ta-Pipe 50.0 R1.11 RC 0048-03 06 4" Pipe-ta-Safe end 50.0 R1.11 RC 0080-0210 3" Pipe-ta-Valve 50.0 R1.16 SI 0251-0704 6" Pipe-to-Valve 50,0 R1,20 CS 0329-04 04 2" Valve-ta-Pipe 50.0 R1.20 RC 0097-01 08 3" Valve-to-Pipe 50.0 R1,20 RC 0097-01 11 3" Pipe-to-Valve 50.0 R1.20 SI 0251-07 05 6" Valve-ta-Pipe 50.0 Note: In the licensee's response to the NRC Request for Additional Information (RAI),
Seabrook withdrew pipe-to-safe end Weld RC 0048-03 06 and valve-to-pipe Weld CS 0329-0404 from Request for Relief 2IR-20, Examination Category R-A, Items R1.11 and R1.20. Pipe-to-safe end Weld RC 0048-03 06 received a full structural weld overlay and the overlay examination was not limited during the interval, Valve-to-pipe Weld CS 0329-04 04 was removed from this relief request and lSI program selection as this weld was not needed to meet the ASME Code minimum inspection requirements.
- 4 Licensee's Basis for Relief Request (as stated)
There are currently no [POI (performance demonstration initiative>>) qualified single side examination procedures that demonstrate equivalency to two-sided examination procedures on austenitic piping welds. Current technology is not capable of reliably detecting or sizing flaws on the far side of an austenitic weld.
[pOOS (performance demonstration qualification summary>>) certificates for austenitic piping list the limitation that single side examination is performed on a best effort basis. The best effort qualification is provided in place of a complete single side qualification to demonstrate that the examiners qualification and the subsequent weld examination is based on application of the best available technology.
Relief is requested from compliance with the 100 percent required examination coverage for piping welds listed in Table [3.4.1 above] based on configurations limited to single side access. Examination coverage listed was obtained during examination with no credit taken for the far side of each weld.
Compliance would require extensive modification or replacement of components with a design that allows examination from both sides of the weld. This option to meet the 100 percent examination coverage requirement is considered impractical.
Licensee's Proposed Alternative Examination:
The licensee did not propose any alternative examinations for the subject welds. However, the licensee's examinations were performed to the maximum extent practical.
NRC Staff Evaluation
Examination requirements for the subject piping welds at Seabrook are governed by an RI-ISI program that was approved by the NRC in an SE dated February 7,2002. This program assigns Examination Category R-A, Items R 1.11, R 1.16 and R 1.20 to piping inspection elements subject to thermal fatigue, IGSCC, and piping elements not subject to a known damage mechanism, respectively_ The program requires inspection of 100 percent of the defined examination volumes for Class 1 circumferential piping welds. However, the design configurations of the subject welds limit volumetric examinations. In order to increase coverage, the welds would have to be re-designed and modified. This would place a burden on the licensee; therefore, the ASME Code-required volumetric examinations are considered impractical.
As shown in the technical descriptions and sketches provided in the licensee's submittals, examinations of the subject welds have been performed to the extent practical, with the licensee obtaining volumetric coverage of approximately 50 percent of the required volumes of the welds, as applied from one accessible side of the welds. The limitations encountered during the performance of the UT examinations were caused by austenitic stainless steel materials and existing tapers in the valve-to-pipe, pipe-to-tee, reducer-to-pipe, and pipe-to-safe end weld configurations (see Table 3.4.1 above for specific weld configurations). These configurations
- S limit UT scan access primarily to the pipe side of the welds. The licensee stated that selection of one-sided examinations (e.g., pipe-to-valve welds) would normally be avoided for these risk-informed piping examinations, but in some cases, no other choices were available.
The licensee also noted that only the subject 1S of the total 72 welds in the risk-informed program had limited examinations due to their configurations; the remaining S7 welds were examined essentially 100 percent of the ASME Code-required examination coverage.
Volumetric examinations on the subject welds were conducted with equipment, procedures and personnel that were qualified to the process outlined in ASME Code Section XI, Appendix VIII.
These techniques have been qualified for flaws located on the near-side of the welds; far-side detection of flaws is considered to be a "best effort." For this reason, the licensee has taken credit for completing only SO percent of the ASME Code-required inspection volumes on the subject piping welds. The licensee's UT techniques included 4S-, 60- and 70-degree shear waves and 60- and 70-degree refracted longitudinal waves (L-waves), as applicable. For piping equal to or less than O.SO-inches thick, procedures that include a 70-degree shear wave are the PDI approved techniques for flaw detection in piping welds. For piping greater than O.SO-inches thick, longitudinal wave search units that provide supplemental coverage of the far-side of the weld are included in PDI approved techniques for detection in austenitic stainless steel welds.
L-waves have been shown to provide enhanced detection on the far-side of austenitic stainless steel welds. 4 5 6While the licensee has only taken credit for obtaining SO percent volumetric coverage, it is expected that the techniques employed would have provided coverage beyond the near-side of the welds. The UT examinations did not reveal any unacceptable flaws.
The licensee has shown that it is impractical to meet the ASME Code-required volumetric examination coverage for the subject welds due to their design configurations and materials of construction. Based on the UT results and coverage obtained, in addition to the full examination of other piping welds in the same risk segments, it is reasonable to conclude that, if significant service-induced degradation had occurred in the subject welds, evidence of it would have been detected by the examinations performed. Furthermore, the NRC staff determined that the examinations performed to the extent practical on the subject welds provide reasonable assurance of structural integrity of the subject welds.
4.0 CONCLUSION
S As set forth above, the NRC staff has determined that granting relief pursuant to 10 CFR SO.SSa(g)(6)(i) is authorized by law and will not endanger life or property, or the common defense and security, and is otherwise in the public interest given due consideration to the burden upon the licensee that could result if the requirements were imposed on the facility.
Accordingly, the NRC staff concludes that the licensee has adequately addressed all of the regulatory requirements set forth in 10 CFR SO.SSa(g)(6)(i). Therefore, the NRC staff grants 4
F.V. Ammirato, X. Edelmann, and S.M. Walker, Examination of Dissimilar Metal Welds in BWR Nozzle-to Safe End Joints, 8th International Conference on NDE in the Nuclear Industry, ASM International, 1987.
P. lemaitre, T.D. Koble, and S.R. Doctor, PISC 111 Capability Study on Wrought-to-Wrought Austenitic Steel Welds: Evaluation at the Level of Procedures and Techniques, Effectiveness of Nondestructive Examination Systems and Performance Demonstration, PVP-Volume 317, NDE-Volume 14, ASME, 1995.
6 M. T. Anderson, A.A. Diaz, A.D. Cinson, S.l. Crawford, S.E. Cumblidge, S.R Doctor, K.M. Denslow, and S.
Ahmed, 2011. An Assessment of Ultrasonic Techniques for Far-Side Examinations of Austenitic Stainless Steel Piping WeldS, NUREG/CR-7113, PNNl-19353, U. S. Nuclear Regulatory Commission, Washington, DC.
- 6 relief from the specified ASME Code,Section XI, examination coverage requirements of the subject welds contained in relief request 21R-20 for the Seabrook second 10-year lSI interval.
All other ASME Code,Section XI requirements for which relief was not specifically requested and approved in the sUbject requests for relief remain applicable, including third-party review by the Authorized Nuclear Inservice Inspector.
Principal Contributors: Tom McLellan and Steve Cumblidge Date: June 4, 2012
SEABROOK STATION, UNIT 1 Second 10-Year lSI Interval TABLE 1
SUMMARY
OF RELIEF REQUEST ASME ASME Relief TLR Code Code, Request RR Exam. Item Required Licensee Proposed Relief Request Number Sec. System or Component Category No. Volume or Area to be Examined Method Alternative Disposition 21R-20 3.1 Risk Informed Piping R-A R1.11 100% of ASME Code, Class 1 Volumetric Use volumetric coverage Granted Examinations R1.16 piping subject to specified achieved 10 CFR 50.55a(g)(6)(i)
R1.20 .. damage mechanisms
-~
ATTACHMENT 1
P. Freeman -2 The NRC staff's safety evaluation is enclosed. If you have any questions, please contact John G. Lamb at 301-415-3100 or via e-mail at John.Lamb@nrc.gov.
Sincerely, Iral Meena Khanna, Chief Plant Licensing Branch 1-2 Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation Docket No. 50-443
Enclosure:
Safety Evaluation cc w/encl: Distribution via Listserv DISTRIBUTION:
PUBLIC LPLI-2 rlt RidsAcrsAcnw_ MailCTR Resource RidsNrrDeEvib Resource RidsNrrDorlDpr Resource RidsNrrDorlLpll-2 Resource RidsNrrLAABaxter Resource RidsNrrPMSeabrook Resource RidsOgcRp Resource RidsRgn1 MailCenter Resource MMcCoppin. EDO RI CSyndor. NRR/DE/EVIB