Category:Letter
MONTHYEARIR 05000443/20240032024-10-30030 October 2024 Integrated Inspection Report 05000443/2024003 L-2024-176, Annual 10 CFR 140.21 Licensee Guarantees of Payment of Deferred Premiums2024-10-30030 October 2024 Annual 10 CFR 140.21 Licensee Guarantees of Payment of Deferred Premiums ML24303A0352024-10-29029 October 2024 Operator Licensing Examination Approval IR 05000443/20244022024-10-17017 October 2024 Material Control and Accounting Program Inspection Report 05000443/2024402 (Cover Letter Only) L-2024-159, Core Operating Limits Report for Reload Cycle 242024-10-15015 October 2024 Core Operating Limits Report for Reload Cycle 24 L-2024-169, Supplement to License Amendment Request to Adopt Common Emergency Plan with Site- Specific Annexes2024-10-15015 October 2024 Supplement to License Amendment Request to Adopt Common Emergency Plan with Site- Specific Annexes ML24254A2552024-09-25025 September 2024 Alternative Request No. 4A-01 for the Fourth 10-Year Inservice Inspection Interval L-2024-158, Supplemental Information to License Amendment Request to Adopt Common Emergency Plan with Site-Specific Annexes2024-09-25025 September 2024 Supplemental Information to License Amendment Request to Adopt Common Emergency Plan with Site-Specific Annexes ML24239A5382024-09-20020 September 2024 Issuance of Amendment No. 175 One-Time Allowable Outage Time Extension to the Technical Specification 3.8.1.1, A.C. Sources – Operating, Limiting Condition for Operation L-2024-136, Supplement to License Amendment Request to Adopt Common Emergency Plan with Site-Specific Annexes2024-09-16016 September 2024 Supplement to License Amendment Request to Adopt Common Emergency Plan with Site-Specific Annexes IR 05000443/20240052024-08-29029 August 2024 Updated Inspection Plan for Seabrook Station (Report 05000443/2024005) ML24232A1142024-08-21021 August 2024 Correction to Amendment No. 174 to Update the Period of Applicability (Poa) for the Pressure-Temperature Limits (PTL) and Low Temperature Overpressure Protection (LTOP) Curves L-2024-141, Third Supplement to NextEra Energy Seabrook, LLC, Letter L-2024-108, Response to Request for Additional Information (RAI) Regarding One Time Extension to Technical Specification 3.8.1.1.a, Allowed Outage Time with One Independent Circuit2024-08-15015 August 2024 Third Supplement to NextEra Energy Seabrook, LLC, Letter L-2024-108, Response to Request for Additional Information (RAI) Regarding One Time Extension to Technical Specification 3.8.1.1.a, Allowed Outage Time with One Independent Circuit Be L-2024-137, Second Supplement to NextEra Energy Seabrook, LLC, Letter L-2024-108, Response to Request for Additional Information (RAI) Regarding One Time Extension to Technical Specification 3.8.1.1.a, Allowed Outage Time with One Independent .2024-08-12012 August 2024 Second Supplement to NextEra Energy Seabrook, LLC, Letter L-2024-108, Response to Request for Additional Information (RAI) Regarding One Time Extension to Technical Specification 3.8.1.1.a, Allowed Outage Time with One Independent . IR 05000443/20240022024-08-0606 August 2024 Integrated Inspection Report 05000443/2024002 and Independent Spent Fuel Storage Installation Inspection Report 07200063/2024001 L-2024-127, Supplement to Letter L-2024-108, Response to Request for Additional Information (RAI) Regarding One Time Extension to Technical Specification 3.8.1.1.a, Allowed Outage Time with One Independent2024-08-0505 August 2024 Supplement to Letter L-2024-108, Response to Request for Additional Information (RAI) Regarding One Time Extension to Technical Specification 3.8.1.1.a, Allowed Outage Time with One Independent ML24163A0012024-08-0505 August 2024 LTR-24-0119-1-1 Response to Nh Letter Regarding Review of NextEras Emergency Preparedness Amendment Review L-2024-125, Notice of Intent to Provide Supplemental Information to License Amendment Request to Adopt Common Emergency Plan with Site-Specific Annexes2024-07-24024 July 2024 Notice of Intent to Provide Supplemental Information to License Amendment Request to Adopt Common Emergency Plan with Site-Specific Annexes L-2024-108, Response to Request for Additional Information (RAI) Regarding One Time Extension to Technical Specification 3.8.1.1.a, Allowed Outage Time with One Independent Circuit Between the Offsite.2024-07-16016 July 2024 Response to Request for Additional Information (RAI) Regarding One Time Extension to Technical Specification 3.8.1.1.a, Allowed Outage Time with One Independent Circuit Between the Offsite. ML24193A2432024-07-12012 July 2024 – Interim Audit Summary Report in Support of Review of License Amendment Requests Regarding Fleet Emergency Plan L-2024-114, Quality Assurance Topical Report (FPL-1 Revision 31 Annual Submittal2024-07-10010 July 2024 Quality Assurance Topical Report (FPL-1 Revision 31 Annual Submittal L-2024-102, Official Service List Update2024-06-19019 June 2024 Official Service List Update ML24149A2862024-06-12012 June 2024 NextEra Fleet - Proposed Alternative Frr 23-01 to Use ASME Code Case N-752-1, Risk-Informed Categorization and Treatment for Repair/Replacement Activities in Class 2 and 3 Systems Section X1, Division 1 (EPID L-2023-LLR-0009) - Letter L-2024-098, Preparation and Scheduling of Operator Licensing Examinations2024-06-12012 June 2024 Preparation and Scheduling of Operator Licensing Examinations L-2024-084, Relief Request 4A-01, Rev 1 - Revision to Relief Request for Examination of Control Rod Drive Mechanism (Rod) Housing H-4 Canopy Seal Weld2024-05-30030 May 2024 Relief Request 4A-01, Rev 1 - Revision to Relief Request for Examination of Control Rod Drive Mechanism (Rod) Housing H-4 Canopy Seal Weld IR 05000443/20240102024-05-29029 May 2024 Biennial Problem Identification and Resolution Inspection Report 05000443/2024010 IR 05000443/20240112024-05-24024 May 2024 Age-Related Degradation Inspection Report 05000443/2024011 IR 05000443/20240012024-05-13013 May 2024 Integrated Inspection Report 05000443/2024001 L-2024-061, NextEra Energy Seabrook, LLC, License Amendment Request - One Time Extension to Technical Specification 3.8.1.1.a, Allowed Outage Time with One Independent Circuit Between the Offsite Transmission Network and the Onsite Class 1E Distribut2024-05-10010 May 2024 NextEra Energy Seabrook, LLC, License Amendment Request - One Time Extension to Technical Specification 3.8.1.1.a, Allowed Outage Time with One Independent Circuit Between the Offsite Transmission Network and the Onsite Class 1E Distributio ML24046A0512024-05-0707 May 2024 Issuance of Amendment No. 174 to Update the Period of Applicability (Poa) for the Pressure-Temperature Limits (PTL) and Low Temperature Overpressure Protection (LTOP) Curves ML24127A0632024-05-0606 May 2024 Supplemental Information to License Amendment Request to Adopt Common Emergency Plan with Site-Specific Annexes L-2024-078, 2023 Annual Radioactive Effluent Release Report2024-05-0101 May 2024 2023 Annual Radioactive Effluent Release Report L-2024-077, 2023 Annual Radiological Environmental Operating Report2024-04-30030 April 2024 2023 Annual Radiological Environmental Operating Report IR 05000443/20245012024-04-22022 April 2024 Emergency Preparedness Biennial Exercise Inspection Report 05000443/2024501 05000443/LER-2024-001, Condition Prohibited by Technical Specifications - Transformer Bushing Failure - Offsite AC Sources2024-04-19019 April 2024 Condition Prohibited by Technical Specifications - Transformer Bushing Failure - Offsite AC Sources SBK-L-24030, 2023 Annual Environmental Operating Report2024-04-12012 April 2024 2023 Annual Environmental Operating Report L-2024-011, And Point Beach, Units 1 and 2 - 10 CFR 50.46 Annual Reporting of Changes to, or Errors in Emergency Core Cooling System Models or Applications2024-03-13013 March 2024 And Point Beach, Units 1 and 2 - 10 CFR 50.46 Annual Reporting of Changes to, or Errors in Emergency Core Cooling System Models or Applications L-2024-038, To Seabrook Emergency License Amendment Request - One Time Extension to Technical Specifications (TS) 3/4.8.1 Action a.3 Allowed Outage Time for an Inoperable Offsite Source2024-03-0808 March 2024 To Seabrook Emergency License Amendment Request - One Time Extension to Technical Specifications (TS) 3/4.8.1 Action a.3 Allowed Outage Time for an Inoperable Offsite Source ML24067A2622024-03-0808 March 2024 Issuance of Amendment No. 173 Revise Technical Specification 3/4.8.1 to Allow Replacement of Reserve Auxiliary Transformer (Emergency Circumstances) L-2024-037, To Seabrook Emergency License Amendment Request - One Time Extension to Technical Specifications (TS) 3/4.8.1 Action a.3 Allowed Outage Time for an Inoperable Offsite Source2024-03-0606 March 2024 To Seabrook Emergency License Amendment Request - One Time Extension to Technical Specifications (TS) 3/4.8.1 Action a.3 Allowed Outage Time for an Inoperable Offsite Source ML24065A2522024-03-0505 March 2024 Notice of Enforcement Discretion for Seabrook Station, Unit No. 1 (EPID: L-2024-033) L-2024-035, Supplement to Seabrook Emergency License Amendment Request - One Time Extension to Technical Specifications (TS) 3/4.8.1 Action a.3 Allowed Outage Time for an Inoperable Offsite Source2024-03-0505 March 2024 Supplement to Seabrook Emergency License Amendment Request - One Time Extension to Technical Specifications (TS) 3/4.8.1 Action a.3 Allowed Outage Time for an Inoperable Offsite Source L-2024-033, Request for Enforcement Discretion - Technical Specification (TS) 3/4.8.1.1 Ac. Sources Required Action Completion Time to Replace ED-X-3-B2024-03-0404 March 2024 Request for Enforcement Discretion - Technical Specification (TS) 3/4.8.1.1 Ac. Sources Required Action Completion Time to Replace ED-X-3-B L-2024-032, Emergency License Amendment Request- One Time Extension to Technical Specifications (TS) 3/4.8.1 Action a.3 Allowed Outage Time for an Inoperable Offsite Source2024-03-0404 March 2024 Emergency License Amendment Request- One Time Extension to Technical Specifications (TS) 3/4.8.1 Action a.3 Allowed Outage Time for an Inoperable Offsite Source IR 05000443/20230062024-02-28028 February 2024 Annual Assessment Letter for Seabrook Station (Report 05000443/2023006) L-2024-019, Relief Request 4A-01- Request for an Alternative to the Requirements of the ASME Code for Examination of Control Rod Drive Mechanism (Rod) Housing H-4 Canopy Seal Weld2024-02-28028 February 2024 Relief Request 4A-01- Request for an Alternative to the Requirements of the ASME Code for Examination of Control Rod Drive Mechanism (Rod) Housing H-4 Canopy Seal Weld L-2024-016, Radiological Emergency Plan (Ssrep), Revision 822024-02-13013 February 2024 Radiological Emergency Plan (Ssrep), Revision 82 IR 05000443/20230042024-02-12012 February 2024 Integrated Inspection Report 05000443/2023004 ML24009A1152024-01-29029 January 2024 – Exemption from Select Requirements of 10 CFR Part 73 (EPID L 2023 LLE-0043 (Security Notifications, Reports, and Recordkeeping and Suspicious Activity Reporting)) L-2024-010, Point Units 3 and 4, Seabrook, Duane Arnold, and Point Beach Units 1 and 2, Nuclear Property Insurance - 10 CFR 50.54(w)(3)2024-01-25025 January 2024 Point Units 3 and 4, Seabrook, Duane Arnold, and Point Beach Units 1 and 2, Nuclear Property Insurance - 10 CFR 50.54(w)(3) 2024-09-25
[Table view] Category:Code Relief or Alternative
MONTHYEARML22262A3142022-10-0404 October 2022 Relief Requests 3IR-18 and 3IR-19, Relief from the Requirements of the ASME Code ML22116A2442022-04-26026 April 2022 Acceptance of Requested Licensing Action Relief Request 3IR-18 and 3IR-19 for End of Third 10-Year ISI Interval for Examinations with Limited Coverage ML20237F3442020-09-21021 September 2020 Authorization of Alternative (Relief Request 3IIR-7) from Certain Requirements of the American Society of Mechanical Engineers Boiler and Pressure Vessel Code (EPIDs L-2020-LLR-0055, L-2020-LLR-0056, and L-2020-LLR-0057) ML20101L0402020-04-10010 April 2020 Acceptance of Requested Licensing Action Relief Request to Use Code Case OMN-13 with 2012 Edition of the OM Code ML20101H3912020-04-0808 April 2020 Verbal Authorization for Seabrook Relief Request 3IIR-7 SBK-L-20049, Relief Request 3IIR-7, Proposed Alternative to Deter Examinations Beyond the 1 Year Code Allowable2020-04-0505 April 2020 Relief Request 3IIR-7, Proposed Alternative to Deter Examinations Beyond the 1 Year Code Allowable SBK-L-20017, Relief Request SG-1 Proposed Alternative in Accordance with 10 CFR 50.55a(z)(l), Use of Code Case OMN-13 with 2012 Edition of the OM Code2020-03-20020 March 2020 Relief Request SG-1 Proposed Alternative in Accordance with 10 CFR 50.55a(z)(l), Use of Code Case OMN-13 with 2012 Edition of the OM Code ML20076D2812020-03-17017 March 2020 Relief from the Requirements of the American Society of Mechanical Engineers Boiler and Pressure Vessel Code ML19340A1282019-12-13013 December 2019 Relief from the Requirements of the American Society of Mechanical Engineers Boiler and Pressure Vessel Code ML19249B1012019-09-30030 September 2019 Relief from the Requirements of the American Society of Mechanical Engineers Boiler and Pressure Vessel Code; Relief Request RA-19-001 ML18106B1212018-04-25025 April 2018 Proposed Alternative to Use Encoded Phased Array Ultrasonic Examination Techniques L-2017-121, Proposed Alternative for the Use of Encoded Phased Array Ultrasonic Examination Techniques in Lieu of Radiography2017-07-24024 July 2017 Proposed Alternative for the Use of Encoded Phased Array Ultrasonic Examination Techniques in Lieu of Radiography ML17065A1482017-03-27027 March 2017 Relief from the Requirements of the ASME Code ML17080A0382017-03-27027 March 2017 Relief from the Requirements of the American Society of Mechanical Engineers Boiler and Pressure Vessel Code SBK-L-17027, Relief Request RA-17-002, Proposed Alternative in Accordance with 10 CFR 50.55a(z)(2)2017-02-0606 February 2017 Relief Request RA-17-002, Proposed Alternative in Accordance with 10 CFR 50.55a(z)(2) ML16330A1182016-12-15015 December 2016 NextEra Fleet - Safety Evaluation for Proposed Alternative to the American Society of Mechanical Engineers Operation and Maintenance Code by Adoption of Approved Code Case OMN-20, Inservice Test Frequency (CAC Nos. MF8195 Through MF8201) ML14071A4102014-04-10010 April 2014 Request for Relief RA-14-001 from American Society of Mechanical Engineers Boiler and Pressure Vessel Code, Section XI Requirements Regarding the Reactor Vessel Head Flange Seal Leak Detection Piping (TAC No. Mfxxxx) ML12144A2402012-06-0404 June 2012 Second 10-Year Interval Inservice Inspection Program Plan Request for Relief No. 2lR-17 ML12145A1702012-06-0404 June 2012 Second 10-Year Interval Inservice Inspection Program Plan Request for Relief No. 2lR-20 SBK-L-11192, Request for Relief from ASME Code Case N-729-1 Requirements for Examination of Reactor Vessel Head Penetration Welds2011-10-27027 October 2011 Request for Relief from ASME Code Case N-729-1 Requirements for Examination of Reactor Vessel Head Penetration Welds ML1031901392010-11-22022 November 2010 Relief Request for Use of Alternate Depth Sizing Qualification, Third 10-Year Interval ML1023503412010-10-15015 October 2010 Relief Request for System Pressure Test Examinations on Class 1 Component Pressure Boundaries, Third 10-Year Interval ML1013801662010-06-0303 June 2010 Relief Request for Containment Building Spray Pump Bearing Vibration Alert Range Limit, Third 10-Year Interval SBK-L-09038, Supplement to Request for Relief from Inservice Inspection Requirements2009-02-24024 February 2009 Supplement to Request for Relief from Inservice Inspection Requirements SBK-L-08204, CFR 50-55a Request for Alternative Requirements for ASME Class 1 Upper Level Instrumentation Lines on the Pressurizer2008-12-11011 December 2008 CFR 50-55a Request for Alternative Requirements for ASME Class 1 Upper Level Instrumentation Lines on the Pressurizer SBK-L-08174, Request for Relief to Use of an Alternate Depth Sizing Qualification Requirement for Coordinated Implementation of ASME Section XI, Supplements 2 and 10 for Piping Examinations Performed from Inside Surface2008-09-30030 September 2008 Request for Relief to Use of an Alternate Depth Sizing Qualification Requirement for Coordinated Implementation of ASME Section XI, Supplements 2 and 10 for Piping Examinations Performed from Inside Surface SBK-L-08175, Request for Relief from Inservice Inspection Requirements2008-09-30030 September 2008 Request for Relief from Inservice Inspection Requirements ML0422603122004-10-12012 October 2004 Relief, American Society of Mechanical Engineers Boiler and Pressure Vessel Code - Relief for Class 3 Service Water Piping System ML0334400092004-02-0404 February 2004 Relief Inservice Testing Program Relief Request PR-3 ML0310705102003-05-30030 May 2003 Relief, from ASME Code Operations and Maintenance Code Istb 4.3(e)(1) Ten-Year Interval Inservice Test for Containment Spray Pumps CBS-P9A and CBS-P9B (Tac No. MB6676) ML0314100182003-05-0909 May 2003 Inservice Test Program Relief Request PR-3 ML0134603962002-01-28028 January 2002 Inservice Inspection Program Relief Requests 2AR-03, 2AR-04, 2AR-05, and 2IR-14 2022-04-26
[Table view] Category:Safety Evaluation
MONTHYEARML24254A2552024-09-25025 September 2024 Alternative Request No. 4A-01 for the Fourth 10-Year Inservice Inspection Interval ML24239A5382024-09-20020 September 2024 Issuance of Amendment No. 175 One-Time Allowable Outage Time Extension to the Technical Specification 3.8.1.1, A.C. Sources – Operating, Limiting Condition for Operation ML24149A2862024-06-12012 June 2024 NextEra Fleet - Proposed Alternative Frr 23-01 to Use ASME Code Case N-752-1, Risk-Informed Categorization and Treatment for Repair/Replacement Activities in Class 2 and 3 Systems Section X1, Division 1 (EPID L-2023-LLR-0009) - Letter ML24046A0512024-05-0707 May 2024 Issuance of Amendment No. 174 to Update the Period of Applicability (Poa) for the Pressure-Temperature Limits (PTL) and Low Temperature Overpressure Protection (LTOP) Curves ML24067A2622024-03-0808 March 2024 Issuance of Amendment No. 173 Revise Technical Specification 3/4.8.1 to Allow Replacement of Reserve Auxiliary Transformer (Emergency Circumstances) ML23312A1822023-12-22022 December 2023 Issuance of Amendment No. 172 Revision to Cooling Tower Service Water Loop or Cell Requirements ML23073A1562023-03-23023 March 2023 Relief Request 4RA-22-01, Relief from the Requirements of the ASME Code ML22287A1572022-12-0505 December 2022 Issuance of Amendment No. 171 Revision to Technical Specifications to Adopt TSTF-577, Revised Frequencies for Steam Generator Tube Inspections ML22262A3142022-10-0404 October 2022 Relief Requests 3IR-18 and 3IR-19, Relief from the Requirements of the ASME Code ML22230C9242022-09-30030 September 2022 Issuance of Amendment No. 170 Revision of 120-Volt AC Vital Instrument Panel Requirements ML21008A0142021-02-25025 February 2021 Issuance of Amendment No. 168 Revise Technical Specification Table 3.3.4 to Change Time Delay Setpoints for Degraded Voltage Relays ML20293A1572020-12-28028 December 2020 Issuance of Amendment No. 167 Reactor Trip System Instrumentation Technical Specification Changes to Implement WCAP-14333 and WCAP-15376 ML20298A2532020-11-24024 November 2020 Issuance of Amendment No. 166 Revise Technical Specification 3/4.8.1, A.C. Sources Operating ML20070Q0712020-03-27027 March 2020 Issuance of Amendment No. 165 Emergency Core Cooling System Accumulator Technical Specification Changes ML20073E4342020-03-17017 March 2020 Relief from the Requirements of the American Society of Mechanical Engineers Boiler and Pressure Vessel Code ML20076D2812020-03-17017 March 2020 Relief from the Requirements of the American Society of Mechanical Engineers Boiler and Pressure Vessel Code ML19357A1952020-02-10010 February 2020 Unit No.1; & Turkey Point Nuclear Generating Unit Nos. 3 & 4 - Issuance of Amendments Nos. 265, 268, 164, 290, and 284 Revise Technical Specifications to Adopt TSTF-563 ML20015A1232020-02-0606 February 2020 Proposed Alternative to Use Encoded Phased Array Ultrasonic Examination Techniques ML19340A1282019-12-13013 December 2019 Relief from the Requirements of the American Society of Mechanical Engineers Boiler and Pressure Vessel Code ML19326C4802019-12-0505 December 2019 Issuance of Amendment No. 163 One-Time Change to the Onsite Power Distribution Requirements ML19224A5632019-11-18018 November 2019 Issuance of Amendment No. 162 Revisions to Technical Specifications Associated with Movable Control Rods ML19249B1012019-09-30030 September 2019 Relief from the Requirements of the American Society of Mechanical Engineers Boiler and Pressure Vessel Code; Relief Request RA-19-001 ML19148A7442019-07-31031 July 2019 Issuance of Amendment Nos. 161, 249, 200, 287, and 281 to Add Technical Specification Limiting Condition for Operation 3.0.6 ML19065A2152019-03-29029 March 2019 Issuance of Amendment No. 160 Measurement and Assessment Frequency for Technical Specification 6.7.6.l, Control Room Envelope Habitability Program ML18204A2912019-03-11011 March 2019 Issuance of Amendment No. 159 Methodology for Analysis of Seismic Category I Structures with Concrete Affected by Alkali-Silica Reaction ML18247A5382018-11-27027 November 2018 Issuance of Amendment No. 158 Removing Requirement to Perform Certain Surveillance Requirements During Shutdown and Changes to Administrative Technical Specifications ML18199A6092018-08-0707 August 2018 Issuance of Amendment No. 157 Changes to the Technical Specifications Requirements for DC Batteries (CAC No. MG0046; EPID L-2017-LLA-0289) ML18106B1212018-04-25025 April 2018 Proposed Alternative to Use Encoded Phased Array Ultrasonic Examination Techniques ML17102A8892017-04-13013 April 2017 Issuance of Amendment Licensing Basis Change for Service Water Cooling Tower ML17027A0782017-04-0707 April 2017 Issuance of Amendments Regarding Technical Specifications for Inservice Testing Programs (CAC Nos. MF8202 Through MF8209) ML17080A0382017-03-27027 March 2017 Relief from the Requirements of the American Society of Mechanical Engineers Boiler and Pressure Vessel Code ML17046A4432017-03-15015 March 2017 Issuance of Amendment Extension of Containment Leakage Rate Test Frequency ML16330A1182016-12-15015 December 2016 NextEra Fleet - Safety Evaluation for Proposed Alternative to the American Society of Mechanical Engineers Operation and Maintenance Code by Adoption of Approved Code Case OMN-20, Inservice Test Frequency (CAC Nos. MF8195 Through MF8201) ML16321A4182016-12-0101 December 2016 Safety Evaluation Regarding Implementation of Mitigating Strategies and Reliable Spent Fuel Pool Instrumentation Related to Orders EA-12-049 and EA-12-051 (CAC Nos. MF0836 and MF0837) ML15096A2552015-11-0202 November 2015 Issuance of Amendment Regarding License Amendment Request 14-04, Revised Reactor Coolant System Pressure-Temperature Limits Applicable for 44 Effective Full Power Years ML15231A1442015-10-0606 October 2015 Issuance of Amendment No. 150 Regarding Note for Reactor Coolant System Surveillance Requirements ML15205A3332015-07-28028 July 2015 Safety Evaluation by the Office of Nuclear Reactor Regulation Related to Request for Exemption from Table 1 of 10 CFR Part 50, Appendix G NextEra Energy Seabrook, LLC Seabrook Station, Unit 1 Docket No. 50-443 ML15096A1432015-07-28028 July 2015 Exemption from Specific Requirements of 10 CFR Part 50, Appendix G, and 10 CFR 50.60 ML15096A1312015-07-17017 July 2015 Issuance of Amendment Regarding Changes to Technical Specification 3.3.3.1, Radiation Monitoring for Plant Operations ML15118A6322015-05-18018 May 2015 Issuance of Amendment Regarding License Amendment Request Regarding New Fuel Valut ML15082A2332015-04-24024 April 2015 Issuance of Amendment Regarding Increase Voltage Limit for Diesel Generator Load Rejection Surveillance Requirement ML15058A7062015-04-22022 April 2015 Issuance of Amendment No. 146 Regarding the Cyber Security Plan Implementation Schedule ML15002A2512015-03-31031 March 2015 Unit No.1 - Issuance of Amendment Regarding License Amendment Request 14-06, Application Regarding the Removal of the Cold Leg Injection Permissive from Technical Specifications ML14345A2882015-02-0606 February 2015 Issuance of Amendment Regarding Technical Specifications Task Force Traveler-523, Generic Letter 2008-01, Managing Gas Accumulation Using the Consolidated Line Item Improvement Process ML14363A2752015-02-0404 February 2015 Non-Proprietary SE for Issuance of Amendment Regarding License Amendment Request Regarding Fixed Incore Detector System Analysis ML14184A7952014-09-0303 September 2014 Issuance of Amendment Regarding License Amendment Request Regarding Fuel Storage Changes ML13212A0692014-07-24024 July 2014 Issuance of Amendment Regarding the Risk-Informed Justifications for the Relocation of Specific Surveillance Frequency Requirements to a Licensee Controlled Program ML14071A4102014-04-10010 April 2014 Request for Relief RA-14-001 from American Society of Mechanical Engineers Boiler and Pressure Vessel Code, Section XI Requirements Regarding the Reactor Vessel Head Flange Seal Leak Detection Piping (TAC No. Mfxxxx) ML14029A4452014-03-0606 March 2014 Issuance of Amendment Regarding License Amendment Request 12-04, Application Regarding Cold Leg Injection Permissive ML13213A1432014-03-0505 March 2014 Issuance of Amendment Regarding the Use of Optimized Zirlo Fuel Rod Cladding Material 2024-09-25
[Table view] |
Text
UNITED STATES NUCLEAR REGULATORY COMMISSION WASHINGTON, D.C. 20555-0001 June 4,2012 Mr. Paul Freeman Site Vice President clo Michael O'Keefe Seabrook Station NextEra Energy Seabrook, LLC P.O. Box 300 Seabrook, NH 03874
SUBJECT:
SEABROOK STATION, UNIT 1 - SECOND 10-YEAR INTERVAL INSERVICE INSPECTION PROGRAM PLAN REQUEST FOR RELIEF NO. 21R-17 (TAC NO.
ME6904)
Dear Mr. Freeman:
By letter dated August 17, 2011, as supplemented March 13, 2012, NextEra Energy Seabrook, LLC (NextEra or licensee) submitted request for relief 21R-17 for the second 1O-year inservice inspection (lSI) interval program at the Seabrook Station, Unit 1 (Seabrook) from certain examination requirements of the American Society of Mechanical Engineers (ASME) Boiler and Pressure Vessel Code (Code). Specifically, the licensee requested relief from the ASME Code,Section XI requirements for examination Category C-A, Items C1.10 and C1.30, pressure retaining welds in pressure vessels. The request is for the risk-informed examination for the second 1O-year lSI interval, which ended August 18, 2010.
The U.S. Nuclear Regulatory Commission (NRC) staff with technical assistance from its contractor, the Pacific Northwest National Laboratory (PNNL), has reviewed the subject request, and concludes that NexEra has adequately addressed all of the regulatory requirements set forth in 10 CFR 50.55a(g)(6)(i). Therefore, the NRC staff grants relief from the specified ASME Code,Section XI, examination coverage requirements of the subject welds contained in relief request 21R-17 for the Seabrook second 10-year lSI interval.
All other ASME Code,Section XI requirements for which relief was not specifically requested and approved in the subject requests for relief remain applicable, including third-party review by the Authorized Nuclear Inservice Inspector.
The NRC staff's safety evaluation is enclosed. If you have any questions, please contact John G. Lamb at 301-415-3100 or via e-mail at John.Lamb@nrc.gov.
Sincerely, Meena Khanna, Chief Plant Licensing Branch 1-2 Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation Docket No. 50-443
Enclosure:
Safety Evaluation cc w/encl: Distribution via Listserv
,<-",R RfG£I{ UNITED STATES
~"", -<I),
~ 0.,. NUCLEAR REGULATORY COMMISSION
<r
~0 WASHINGTON, D.C. 20555-0001 Iii ;
~
~ ~
co
'to" ...0
+***-It SAFETY EVALUATION BY THE OFFICE OF NUCLEAR REACTOR REGULATION SECOND 10-YEAR INTERVAL REQUEST FOR RELIEF NO. 2IR-17 NEXTERA ENERGY SEABROOK, LLC.
SEABROOK STATION, UNIT 1 DOCKET NUMBER 50-443
1.0 INTRODUCTION
By letter dated August 17, 2011, as supplemented March 13, 2012, 1 NextEra Energy Seabrook, LLC (NextEra or licensee) submitted request for relief 2IR-17 for the second 10-year inservice inspection (lSI) interval program at the Seabrook Station, Unit 1 (Seabrook) from certain examination requirements of the American Society of Mechanical Engineers (ASME) Boiler and Pressure Vessel Code (Code). Specifically, the licensee requested relief from the ASME Code,Section XI requirements for examination Category C-A, Items C1.10 and C1.30, pressure retaining welds in pressure vessels. The request is for the risk-informed examination for the second 10-year lSI interval, which ended August 18, 2010.
2.0 REGULATORY EVALUATION
Pursuant to Title 10 of the Code of Federal Regulations (10 CFR) 50.55a(g)(4), American Society of Mechanical Engineers (ASME) Code Class 1, 2, and 3 components (including supports) shall meet the requirements, except the design and access provisions and the preservice examination requirements, set forth in the ASME Code,Section XI to the extent practical within the limitations of design, geometry, and materials of construction of the components. The regulations require that inservice examination of components and system pressure tests conducted during the first 10-year interval and subsequent intervals comply with the requirements in the latest edition and addenda of Section XI of the ASME Code, which was incorporated by reference in 10 CFR 50.55a(b) 12 months prior to the start of the 120-month interval, subject to the limitations and modifications listed therein.
10 CFR 50.55a(g)(5)(iii), states, in part, that licensees may determine that conformance with certain code requirements is impractical and that the licensee shall notify the Commission and submit information in support of the determination. Determination of impracticality in accordance with this section must be based on the demonstrated limitations experienced when attempting to comply with the code requirements during the inservice inspection interval for which the request is being submitted. Requests for relief made in accordance with this Agencywide Documents Access and Management System Accession Numbers ML11234A185 and ML120790313, respectively.
Enclosure
-2 section must be submitted to the NRC no later than 12 months after the expiration of the initial 120-month inspection interval or subsequent 120-month inspection interval for which relief is sought.
10 CFR 50.55a(g)(6)(i), states that the Commission will evaluate determinations under paragraph (g)(5) of this section that code requirements are impractical. The Commission may grant such relief and may impose such alternative requirements as it determines is authorized by law and will not endanger life or property or the common defense and security and is otherwise in the public interest giving due consideration to the burden upon the licensee that could result if the requirements were imposed on the facility.
The licensee has requested relief from ASME Code requirements pursuant to 10 CFR 50.55a(g)(6)(i). The ASME Code of Record for Seabrook second 10-year interval inservice inspection program, which ended on August 18, 2010, is the 1995 Edition through the 1996 Addenda of Section XI of the ASME Boiler and Pressure Vessel Code, Based on the above, and subject to the following technical evaluation, the NRC staff finds that regulatory authority exists for the licensee to request and the Commission to grant the relief requested by the licensee.
3,0 TECHNICAL EVALUATION The information provided by the licensee in support of the request for relief to ASME Code requirements has been evaluated and the bases for disposition are documented below.
3.1 Request for Relief 2IR-17, ASME Code,Section XI, Examination Category C-A, Items C1.10 and C1.30, Pressure Retaining Welds in Pressure Vessels ASME Code Requirement ASME Code,Section XI, Examination Category C-A, Items C1.10 and C1.30, require essentially 100 percent volumetric examination, as defined by Figures IWC-2500-1 and -2, of the length of Class 2 pressure vessel circumferential shell and tubesheet-to-shell welds, respectively.
"Essentially 100 percent," as clarified by ASME Code Case N-460, Alternative Examination Coverage for Class 1 and Class 2 Welds, is greater than 90 percent coverage of the examination volume, or surface area, as applicable. AS ME Code Case N-460 has been approved for use by the NRC in Regulatory Guide 1.147, Revision 16, Inservice Inspection Code Case Acceptability (RG 1.147, Revision 16).
Licensee's ASME Code Relief Request In accordance with 10 CFR 50.55a(g)(5)(lii), the licensee requested relief from the ASME Code required volumetric examination of Residual Heat Removal (RHR) heat exchanger circumferential shell Weld RH E-9B 01 B and Containment Building Spray (CBS) Heat Exchanger Tubesheet-To-Shel/ Weld CBS E-16B 01.
-3 Licensee's Basis for Relief Reguest (as stated)
Residual Heat Removal Heat Exchanger The "B" Residual Heat Removal (RHR) heat exchanger shell circumferential weld was examined with a manual ultrasonic (UT) technique using most recent technology available to achieve maximum examination coverage practical. Due to original design of the heat exchanger, the lower shell circumferential weld is in close proximity to the flange joining the lower heat exchanger shell-to-the upper shell, thereby limiting rUT] examination coverage from the tubesheet side of the weld.
To increase examination coverage on the RHR heat exchanger lower shell circumferential weld, the heat exchanger would require replacement with a design that would allow for complete examination coverage of the subject weld.
This option to meet the 100 percent examination requirement is considered impractical.
Containment Building Spray Heat Exchanger The "B" Containment Building Spray (CBS) heat exchanger tubesheet-to-shell weld was examined with a manual rUT] technique using most recent technology available to achieve maximum examination coverage practical. Due to original design of the heat exchanger, the tubesheet-to-shell weld is in close proximity to the flange joining the heat exchanger shell side to the tubesheet side, thereby limiting rUT] examination coverage from the tubesheet side of the weld. Further examination limitations exist from support gusset plates welded on each side of the tubesheet shell.
To increase examination coverage on the CBS heat exchanger tubesheet-to shell weld, removal of the permanently welded support gusset plates that are part of the original heat exchanger design or replacement of the heat exchanger with a design that would allow for complete examination coverage of the subject weld would be required. These options to meet the 100 percent examination coverage requirement are considered impractical.
Licensee's Proposed Alternative Examination The licensee did not propose any alternative examinations for the subject welds. However, the licensee's examinations were performed to the maximum extent practical.
NRC Staff Evaluation
The ASME Code requires essentially 100 percent volumetric examination of circumferential shell and tubesheet-to-shell welds on selected ASME Code, Class 2 pressure vessels.
However, for the subject welds on the Seabrook RHR and CBS heat exchangers, complete examinations are limited due to the design configuration of these components and adjacent appurtenances. In order to achieve greater volumetric coverage, the RHR and CBS heat exchangers and/or adjacent components would have to be redesigned and modified. This would place a burden on the licensee; therefore, the ASME Code examinations are considered impractical.
-4 As shown in the sketches and technical descriptions included in the licensee's submittals, examinations of the "B" RHR Heat Exchanger Shell Circumferential Weld RH E-9B 01 Band "B" CBS Heat Exchanger Tubesheet-to-Shell Weld CBS E-16B 01 have been performed to the extent practical, with the licensee obtaining approximately 50.0 and 19.0 percent of the required ASME Code examination volumes, respectively. The RHR and CBS heat exchanger shells are fabricated of Type 304 austenitic stainless steel. Due to their geometrical deSign and close proximity to bolted flanges, UT scan access is limited to the shell side only for these welds.
Additionally, welded support attachments limit access on the shell side of the CBS heat exchanger tubesheet-to-shell weld.
The licensee examined these welds from one accessible side using 45-degree shear and 60 degree longitudinal (L-waves) waves to achieve the maximum possible coverage along the weld length. L-wave techniques have been shown to provide enhanced detection on the far-side of austenitic stainless steel welds. 2,3.4 Thus, while the licensee has only taken credit for obtaining volumetric coverage of the near-side of the subject welds, the techniques employed would have provided some coverage on the far-side of the welds. No inservice related flaws were detected.
The licensee has shown that it is impractical to meet the ASME Code-required volumetric examination coverage for the subject weld due to the design geometry of the weld, materials, and proximity of welded supports. However, based on the volumetric coverage obtained, and the UT techniques employed, it is reasonable to conclude that, if significant service-induced degradation had occurred in the subject welds, evidence of it would have been detected by the examinations performed. Furthermore, the NRC staff determined that the examinations performed to the extent practical on the subject welds provide reasonable assurance of structural integrity of the subject welds.
4.0 CONCLUSION
S As set forth above, the NRC staff has determined that granting relief pursuant to 10 CFR 50.55a(g)(6)(i) is authorized by law and will not endanger life or property, or the common defense and security, and is otherwise in the public interest given due consideration to the burden upon the licensee that could result if the requirements were imposed on the facility.
Accordingly, the NRC staff concludes that the licensee has adequately addressed all of the regulatory requirements set forth in 10 CFR 50.55a(g)(6)(i). Therefore, the NRC staff grants relief from the specified ASME Code,Section XI, examination coverage requirements of the subject welds contained in relief request 21R-17 for the Seabrook second 10-year lSI interval.
2 FV. Ammirato. X. Edelmann. and S.M. Walker. Examination of Dissimilar Metal Welds in BWR Nozzle-to-Safe th End Joints. 8 International Conference on NDE in the Nuclear Industry. ASM International. 1987.
3 P. Lemaitre. T.D. Koble. and S.R. Doctor. PISC 1// Capability Study on Wrought-to-Wrought Austenitic Steel Welds: Evaluation at the Level of Procedures and Techniques. Effectiveness of Nondestructive Examination Systems and Performance Demonstration, PVP-Volume 317, NDE-Volume 14. ASME, 1995.
4 M. T. Anderson, AA Diaz, AD. Cinson, S.L. Crawford. S.E. Cumblidge, S.R Doctor. K.M. Denslow. and S. Ahmed, 2011. An Assessment of Ultrasonic Techniques for Far-Side Examinations of Austenitic Stainless Steel Piping Welds, NUREG/CR-7113. PNNL-19353. U. S. Nuclear Regulatory Commission, Washington, DC.
- 5 All other ASME Code,Section XI requirements for which relief was not specifically requested and approved in the subject requests for relief remain applicable, including third-party review by the Authorized Nuclear Inservice Inspector.
Principal Contributors: Tom McLellan and Steve Cumblidge Date: June 4,2012
SEABROOK STATION, UNIT 1 Second 10-Year lSI Interval TABLE 1
SUMMARY
OF RELIEF REQUEST ASME ASME Relief TLR Code Code, Request RR Exam. Item Required Licensee Proposed Relief Request Number Sec. System or Component Category No. Volume or Area to be Examined Method Alternative Disposition 21R-17 3.1 Pressure Retaining C-A C1.10 100% of ASME Code, Class 2 Volumetric Use volumetric coverage Granted Welds in Pressure C1.30 circumferential shell and achieved 10 CFR SO.SSa(g}(6)(i)
Vessels tubesheet-to-shell weld ATTACHMENT 1
June 4,2012 Mr. Paul Freeman Site Vice President clo Michael O'Keefe Seabrook Station NextEra Energy Seabrook, LLC P.O. Box 300 Seabrook, NH 03874 SUB.JECT: SEABROOK STATION, UNIT 1 SECOND 10-YEAR INTERVAL INSERVICE INSPECTION PROGRAM PLAN REQUEST FOR RELIEF NO. 21R-17 (TAC NO.
ME6904)
Dear Mr. Freeman:
By letter dated August 17, 2011, as supplemented March 13, 2012, NextEra Energy Seabrook, LL C (NextEra or licensee) submitted request for relief 21 R-17 for the second 10-year inservice inspection (lSI) interval program at the Seabrook Station, Unit 1 (Seabrook) from certain examination requirements of the American Society of Mechanical Engineers (ASME) Boiler and Pressure Vessel Code (Code). Specifically, the licensee requested relief from the ASME Code,Section XI requirements for examination Category C-A, Items C1.10 and C1.30, pressure retaining welds in pressure vessels. The request is for the risk-informed examination for the second 10-year lSI interval, which ended August 18, 2010.
The U.S. Nuclear Regulatory Commission (NRC) staff with technical assistance from its contractor, the Pacific Northwest National Laboratory (PNNL), has reviewed the subject request, and concludes that NexEra has adequately addressed all of the regulatory requirements set forth in 10 CFR 50.55a(g)(6)(i). Therefore, the NRC staff grants relief from the specified ASME Code,Section XI, examination coverage requirements of the subject welds contained in relief request 21R-17 for the Seabrook second 10-year lSI interval.
All other ASME Code,Section XI requirements for which relief was not specifically requested and approved in the subject requests for relief remain applicable, including third-party review by the Authorized Nuclear Inservice Inspector.
The NRC staff's safety evaluation is enclosed. If you have any questions, please contact John G. Lamb at 301-415-3100 or via e-mail at John.Lamb@nrc.gov.
Sincerely,
/raj Meena Khanna, Chief Plant Licensing Branch 1-2 Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation Docket No. 50-443
Enclosure:
Safety Evaluation cc w/encl: Distribution via Listserv DISTRIBUTION:
PUBLIC LPLI-2 rlf RidsAcrsAcnw_MailCTR Resource RidsNrrDeEvib Resource RidsNrrDorlDpr Resource RidsNrrDorlLpll-2 Resource RidsNrrLAABaxter Resource RidsNrrPMSeabrook Resource RidsOgcRp Resource RidsRgn1 MailCenter Resource MMcCoppin, EDO RI TMcLellan, NRR/DE SCumblidge, NRR/DE ADAMS Accession No. ML12144A240 *via memorandum **via email
~
OFFiCEI.NNRR/LPlI-21PM- i N<<R/LPlI-21LA ==+_"'R/OE/E. p. NB/BC I NRR/DE/EVI~~~~ ~_=r~!'l.r::PLi-2/BC_J NAME -=DLamb i ABaxter ** . JTsao* for TL~~ld i IS~_~!,berg* I MKhanna _
i.. DATE. jO~/01/12 .-l~~~9/12. . 105/18/12.. .. __.105/18/12 106/04/12 OFFICIAL AGENCY RECORD