Letter Sequence Approval |
---|
|
Results
Other: ML11255A032, ML11258A109, ML11342A205, ML12018A332, ML12139A066, ML12139A071, ML12139A074, ML12164A800, ML12256A929, ML12286A325, ML13053A374, ML13171A064, ML14071A378, ML14073A117, RS-14-319, Cancellation of Parent Company Guarantee
|
MONTHYEARML11209B7092011-07-22022 July 2011 Submittal of Summary Report for Inservice Inspections (2R11) Project stage: Request ML11255A0322011-09-15015 September 2011 Plan for the Scoping and Screening Regulatory Audit Regarding the Limerick Generating Station, Units 1 and 2 License Renewal Application Review (TAC Nos. ME6555, ME6556) Project stage: Other ML11258A1092011-09-20020 September 2011 Plan for the Aging Management Program Regulatory Audit Regarding the Limerick Generating Station, Units 1 and 2 License Renewal Application Review Project stage: Other ML1134101442011-12-0707 December 2011 Response to NRC Request for Additional Information, Dated November 18, 2011 Project stage: Response to RAI ML11342A2052011-12-0909 December 2011 Scoping and Screening Methodology Audit Report Regarding the Limerick Generating Station, Units 1 and 2 Project stage: Other ML1133402312011-12-12012 December 2011 Request for Additional Information for Limerick Generating Station, Units 1 and 2 License Renewal Application-Scoping and Screening (TAC Nos. ME6555 and ME6556) Project stage: RAI ML11343A4382011-12-15015 December 2011 Requests for Additional Information for the Review of the Limerick Generating Station License Renewal Application (TAC ME6555, ME6556) Project stage: RAI ML11335A3172012-01-0505 January 2012 RAI for the Review of the Limerick Generating Station License Renewal Application (TAC Nos. ME6555, ME6556) Project stage: RAI ML11347A3602012-01-17017 January 2012 Requests for Additional Information for the Review of the Limerick Generating Station License Renewal Application (TAC Nos. ME6555, ME6556) Project stage: RAI ML11361A0832012-01-18018 January 2012 Requests for Additional Information for the Review of the Limerick Generating Station, Units 1 and 2, License Renewal Application (TAC Nos. ME6555, ME6556) Project stage: RAI ML11361A0792012-01-24024 January 2012 Requests for Additional Information for the Review of the Limerick Generating Station, Units 1 and 2, License Renewal Application (TAC Nos. ME6555, ME6556) Project stage: RAI ML11364A0992012-01-30030 January 2012 Requests for Additional Information for the Review of the Limerick Generating Station, Units 1 and 2, License Renewal Application (TAC Nos. ME6555, ME6556) Project stage: RAI ML12163A7532012-01-31031 January 2012 2012/01/31 Limerick Lr - FW: Request for Additional Information for the Review of the Limerick Generation Station, Units 1 and 2 License Renewal Application (TAC Nos. ME6555 and ME6556) Project stage: Request ML12005A2512012-01-31031 January 2012 Request for Additional Information for the Review of the Limerick Generating Station Units 1 and 2 License Renewal Application (TAC Nos. ME6555, ME6556) TLAA 43 and 468 RAIs Project stage: RAI ML12018A0332012-02-14014 February 2012 Request for Additional Information for the Review of the Limerick Generating Station, Units 1 and 2, License Renewal Application (TAC Nos. ME6555, ME6556) Rapb AMR2 RAIs Project stage: RAI ML12017A1592012-02-16016 February 2012 Request for Additional Information for the Review of the Limerick Generating Station, Units 1 and 2, License Renewal Application (TAC Nos. ME6555 and ME6556) Project stage: RAI ML12024A2312012-02-16016 February 2012 Requests for Additional Information for the Review of the Limerick Generating Station, Units 1 and 2, License Renewal Application (TAC Nos. ME6555 and ME6556) OE and Other RAIs Project stage: RAI ML1204703722012-02-16016 February 2012 Response to NRC Request for Additional Information, Dated January 17, 2012 Project stage: Response to RAI ML12019A1562012-02-17017 February 2012 Requests for Additional Information for the Review of the Limerick Generating Station, Units 1 and 2, License Renewal Application (TAC ME6555 and ME6556) Project stage: RAI ML12018A0352012-02-23023 February 2012 Requests for Addtional Information for the Review of the Limerick Generating Station, Units 1 & 2, License Renewal Application (TAC ME6555 and ME6556) Project stage: Approval ML12059A3452012-02-28028 February 2012 Response to NRC Request for Additional Information, Dated January 30, 2012, Related to License Renewal Application Project stage: Response to RAI ML12018A3322012-02-28028 February 2012 Letter Aging Management Programs Audit Report Regarding the Limerick Generating Station, Units 1 and 2 (TAC NO.ME6555 & ME6556) Project stage: Other ML12065A2062012-03-0505 March 2012 Response to NRC Requests for Additional Information, Dated February 16, 2012, and February 17, 2012, Related to Renewal Application Project stage: Response to RAI ML12046A8992012-03-0909 March 2012 Request for Additional Information for the Review of the Limerick Generating Station, Units 1 and 2, License Renewal Application (TAC Nos. ME6555 and ME6556) Limerick App J RAIs Project stage: RAI ML12009A1352012-03-0909 March 2012 Summary of the Telephone Conference Call Held on December 14, 2011, Between the U.S. Nuclear Regulatory Commission and Exelon on Generation Company, LLC, Concerning Requests for Additional Information Pertaining to the Limerick 12-14-11 Tel Project stage: RAI ML1207303612012-03-13013 March 2012 Response to NRC Requests for Additional Information, Dated February 14 and February 16, 2012, Related to the Limerick Generating Station License Renewal Application Project stage: Response to RAI ML12080A1182012-03-20020 March 2012 Response to NRC Requests for Additional Information, Dated February 23 and March 9, 2012, Related to License Renewal Application Project stage: Response to RAI ML12074A0372012-03-22022 March 2012 Letter Request for Additional Information for the Review of the Limerick Generating Station, Units 1 and 2, License Renewal Application (TAC Nos. ME6555, ME6556) Buried Piping and FP Follow Up Project stage: RAI ML12090A4892012-03-30030 March 2012 Response to NRC Request for Additional Information, Dated March 22, 2012 and Information Addressing Minor Errors or Omissions Related to License Renewal Application Project stage: Response to RAI ML12080A1902012-04-0505 April 2012 Request for Additional Information for the Review of the Limerick Generating Station, Units 1 and 2, License Renewal Application (TAC Nos. ME6555 and ME6556) BWR SCC Smp and Ctws Follow Up Project stage: RAI ML12066A0262012-04-0909 April 2012 February 9, 2012, Summary of Telephone Conference Call Held Between the U.S. Nuclear Regulatory Commission and Exelon Generation Company, Llc. Concerning Request for Additional Information Pertaining to the Limerick Project stage: RAI ML12089A3772012-04-13013 April 2012 Request for Additional Information for the Review of the Limerick Generating Station, Units 1 and 2, License Renewal Application (TAC Nos. ME6556 and ME6555) Fluence and FP Followup RAIs Project stage: RAI ML12104A1182012-04-13013 April 2012 Response to NRC Requests for Additional Information, Dated April 5, 2012, Related to License Renewal Application Project stage: Response to RAI ML12082A1552012-04-16016 April 2012 Requests for Additional Information for the Review of the Limerick Generating Station, Units 1 and 2, License Renewal Application (TAC Nos. ME6555 and ME6556) Project stage: RAI ML12095A3982012-04-17017 April 2012 Request for Additional Information for the Review of the Limerick Generating Station, Units 1 and 2, License Renewal Application (TAC Nos ME6555 and ME6556)TLAA Follow-up RAIs Project stage: RAI ML12025A0512012-04-20020 April 2012 Summary of Telephone Conference Call Held on January 18, 2012, Between the U.S. Nuclear Regulatory Commission and Exelon Generation Company, LLC, Concerning Request for Additional Information Pertaining to the Limerick Generation 1-18-12 Te Project stage: RAI ML12059A0802012-04-20020 April 2012 February 17, 2012, Summary of Telephone Conference Call Held Between U.S. Nuclear Regulatory Commission and Exelon Generation Company, LLC, Concerning Request for Additional Information Pertaining to the Limerick 2-17-12 Telecon Summary Project stage: RAI ML12018A0232012-04-26026 April 2012 1/12/2012 Telecon Summary Between the U.S. Nuclear Regulatory Commission and Exelon Generation Company, LLC, Concerning Requests for Additional Information Pertaining to the Limerick Generating Station, License Renewal Application Project stage: RAI ML12111A0342012-04-30030 April 2012 Request for Additional Information for the Review of the Limerick Generating Station, Units 1 and 2, License Renewal Application (TAC Nos. ME6555 and ME6556)SCC RAIs Project stage: RAI ML12125A3342012-05-0404 May 2012 Responses to NRC Requests for Additional Information, Dated April 17, 2012, Related to the License Renewal Application Project stage: Response to RAI ML12128A4382012-05-0707 May 2012 Responses to NRC Requests for Additional Information, Dated April 30, 2012, Related to the License Renewal Application Project stage: Response to RAI ML12152A3092012-05-31031 May 2012 Responses to NRC Requests for Additional Information, Dated May 18, 2012, Related to the License Renewal Application Project stage: Response to RAI ML12139A0662012-06-0707 June 2012 4-30-12 Telecon Summary Project stage: Other ML12157A2122012-06-12012 June 2012 Requests for Additional Information for the Review of the Limerick Generating Stations, Units 1 and 2, License Renewal Application (TAC Nos. ME6555 and ME6556) Ope Follow-up RAI Project stage: RAI ML12152A3052012-06-12012 June 2012 Request for Additional Information for the Review of the Limerick Generating Station, Units 1 and 2, License Renewal Application (TAC Nos. ME6555, ME6556) Project stage: RAI ML12171A4872012-06-19019 June 2012 Responses to NRC Requests for Additional Information, Dated June 12, 2012, Related to the Limerick Generating Station License Renewal Application Project stage: Response to RAI ML12174A3292012-06-22022 June 2012 Response to NRC Request for Additional Information, Dated June 21, 2012, Related to License Renewal Application Project stage: Response to RAI ML12139A0612012-06-25025 June 2012 Summary of Telephone Conference Call Held on May 16, 2012, Between the U.S. Nuclear Regulatory Commission and Exelon Generation Company, LLC, Concerning Requests for Additional Information Pertaining to the Limerick Generating Station, Lice Project stage: RAI ML12193A1282012-07-10010 July 2012 2012/07/10 Limerick Lr - FW: Limerick: Request for Additional Information for the Review of the Limerick Generating Station, Units 1 and 2, License Renewal Application (TAC Nos. ME6555 and ME6556) Project stage: Request ML12181A4412012-07-10010 July 2012 RAI for the Review of the Limerick Generating Station, Units 1 and 2, License Renewal Application (TAC No. ME6555 and ME6556) Project stage: RAI 2012-03-22
[Table View] |
|
---|
Category:Request for Additional Information (RAI)
MONTHYEARML23276B4642023-10-0303 October 2023 NRR E-mail Capture - NRC Request for Additional Information Limerick TSTF-477 LAR ML23269A0522023-09-26026 September 2023 Request for Information and Notification of Conduct of IP 71111.21.N.04, Age-Related Degradation, Reference Inspection Report 05000352/2023010 and 05000353/2023010 ML23208A1942023-07-27027 July 2023 NRR E-mail Capture - Limerick Generating Station - Audit Plan for TSTF-477 LAR Review (L-2022-LLA-0174) ML23202A0682023-07-21021 July 2023 NRR E-mail Capture - NRC Request for Additional Information Re. TSTF-477 LAR ML23201A1262023-07-18018 July 2023 Additional RAIs for Limerick Generation Station, Units 1 and 2 - LAR and Exemption Request for Digital I&C Installation Support ML23173A0632023-06-20020 June 2023 RAIs for Limerick Generation Station, Units 1 and 2 - LAR and Exemption Request for Digital I&C Installation Support ML22320A1132022-11-21021 November 2022 Generation Station, Units 1 and 2 - Supplemental Information Needed for Acceptance of Digital Instrumentation and Controls License Amendment Requests ML22172A0752022-06-17017 June 2022 Response: Review and Feedback on Draft Limerick Digital License Amendment Request (L-2020-LRM-0041) ML22136A0032022-05-13013 May 2022 NRR E-mail Capture - NRC Request for Additional Information - Limerick License Amendment Request (L-2021-LLA-0042) ML22124A2862022-05-0404 May 2022 Information Needed to Provide Substantive Feedback on Human Factors Engineering Supporting the Planned Limerick Digital I&C License Amendment Request ML22103A2542022-04-19019 April 2022 Draft Request for Additional Information ML22089A1172022-03-30030 March 2022 Additional Comments and Questions on Constellation'S March 31st Presentation ML22045A4822022-02-14014 February 2022 Notification of Conduct of a Fire Protection Team Inspection ML22041B5362022-02-10010 February 2022 NRR E-mail Capture - Constellation Energy Generation, LLC - Request for Additional Information Regarding Fleet License Amendment Request to Adopt TSTF-541 ML22020A0642022-01-13013 January 2022 NRR E-mail Capture - Exelon Generation Company, LLC - Request for Additional Information Regarding Proposed Fleet Alternative for Repair of Water Level Instrumentation Partial Penetration Nozzles ML21256A1902021-09-10010 September 2021 NRR E-mail Capture - Exelon Generation Company, LLC - Request for Additional Information Regarding License Transfer Application ML21144A2132021-05-24024 May 2021 NRR E-mail Capture - Exelon Generation Company, LLC - Request for Additional Information Regarding License Transfer Application ML21117A0342021-05-0505 May 2021 Request for Additional Information Regarding Proposed Alternative to Use ASME Code Case N-893 ML21062A0652021-03-0101 March 2021 NRR E-mail Capture - Exelon Generation Company, LLC - Request for Additional Information Regarding Proposed Fleet Alternative to Documentation Requirements for Pressure Retaining Bolting ML21049A2572021-02-18018 February 2021 Request for Additional Information Byron/Dresden Proposed Changes to Site Emergency Plans to Support Post-Shutdown and Permanently Defueled Conditions (EPID-2020-LLA-0240 & EPID-2020-LLA-0237) ML21048A3402021-02-11011 February 2021 Request for Information for Relief Request I4R-24 Associated with Residual Heat Removal Heat Exchanger Category C-A and C-B Examinations ML21015A1852021-01-15015 January 2021 Temporary Instruction 2515/194 Inspection Documentation Request ML20239A7982020-08-25025 August 2020 NRR E-mail Capture - Exelon Generation Company, LLC - Fleet License Amendment Request to Adopt TSTF-568, Revision 2 ML20156A2992020-06-0404 June 2020 RAI for RR to Use Inservice Testing Program Safety Relief Valve Testing ML20153A7042020-06-0101 June 2020 NRR E-mail Capture - Preliminary RAI for Fleet Request to Use Alternative OMN-26 ML20149K7012020-05-28028 May 2020 Request for Additional Information for License Amendment Request to Use Inservice Testing Program Safety Relief Valve Testing ML20098C4342020-04-0606 April 2020 Draft Request for Additional Information - Limerick Generating Station, Unit 1 - Emergency LAR to Increase Allowable MSIV Leakage ML19344A0332019-12-10010 December 2019 Request for Additional Information License Amendment Request to Adopt TSTF-505, Revision 2 Risk Informed Completion Times Exelon Generation Company Limerick Generating Station, Units 1 and 2 Docket Nos. 50-352 and 50-353 ML19344A0242019-12-0909 December 2019 Request for Additional Information (RAI) - Limerick Units 1 and 2: TSTF-505, Use of Risk Informed Completion Times (Ricts) for Actions to Be Taken When Limiting Conditions for Operation (Lcos) Are Not Met ML19275H1362019-10-0202 October 2019 NRR E-mail Capture - Exelon Generation Company, LLC - Request for Additional Information Regarding Request to Use ASME Code Case N-879 ML19179A0612019-07-19019 July 2019 Three Mile Point 1 - Supplemental Information Needed to Proposed Alternative to Use ASME Code Case N-879 ML19192A0312019-07-10010 July 2019 NRR E-mail Capture - LIMERICK-REQUEST for Additional Information: Risk Informed Completion Times TSTF-505, Revison 2, Provide RISK-INFORMED Completion Times - RITSTF Initiative 4B ML19168A0882019-06-17017 June 2019 Letter to R. W. Libra Alternative Request Pertaining to Dry Shielded Canisters Equipped with Boral Neutron Absorber Plates - Supplemental Information Needed (W/Enclosursi) ML18276A0202018-10-0202 October 2018 NRR E-mail Capture - Exelon Generation Company, LLC - Request for Additional Information Regarding License Amendment Request to Revise Emergency Plan for Limerick and Peach Bottom ML18081B0682018-03-26026 March 2018 Second Round RAI for Limerick, 10 CFR 50.69 ML18067A1482018-03-0808 March 2018 Enclosurequest for Additional Information (Letter to P. R. Simpson Request for Additional Information Regarding Exelon Generating Company, Llc'S Decommissioning Funding Plan Update for Independent Spent Fuel Storage Installation) ML17354A0182017-12-19019 December 2017 E-mail Request for Information (Rai): Relief Request I3R-23 Regarding Limited Examination Coverage ML18040A9212017-11-0707 November 2017 Attachment - Limerick Generating Station, Units 1 and 2, Request for Additional Information Application to Revise TSs to Adopt TSTF-542, Revision 2 ML17207A0772017-07-31031 July 2017 Supplemental Information Needed for Acceptance of Requested Licensing Action Adoption of Title 10 of the Code of Federal Regulations Section 50.69 ML17137A1652017-05-16016 May 2017 Request for Additional Information for Relief Request Associated with Reactor Pressure Vessel Nozzle Repairs ML17062A4912017-03-0303 March 2017 NRR E-mail Capture - Exelon Generation Company, LLC - Request for Additional Information Regarding Fleet Alternative to RPV Threads in Flange Examination (CAC Nos. MF8712-MF8729) ML17018A1932016-12-0909 December 2016 NRR E-mail Capture - (External_Sender) Limerick Flood MSA Question ML16221A6712016-08-0808 August 2016 Draft Request for Additional Information ML16221A6122016-08-0808 August 2016 Draft Request for Additional Information ML16174A2982016-06-22022 June 2016 Draft Request for Additional Information ML16166A0862016-06-14014 June 2016 Draft Request for Additional Information ML16085A0252016-03-24024 March 2016 Draft Request for Additional Information ML15202A3782015-07-21021 July 2015 Draft Request for Additional Information ML14324A8102014-11-18018 November 2014 Emails from ACE and NRC Response Re Limerick Higher Radiation Readings on Nov 18, 2014 ML14210A5762014-07-29029 July 2014 Draft Request for Additional Information (Tac Nos. MF3198 and MF3199) 2023-09-26
[Table view] Category:Letter
MONTHYEARIR 05000352/20243012024-02-0202 February 2024 Initial Operator Licensing Examination Report 05000352/2024301 and 05000353/2024301 IR 05000352/20230042024-01-31031 January 2024 Integrated Inspection Report 05000352/2023004 and 05000353/2023004 IR 05000352/20240112024-01-31031 January 2024 Information Request to Support Post-Approval Site Inspection for License Renewal; Inspection Report 05000352/2024011 ML24026A2962024-01-26026 January 2024 Supplement to License Amendment Request to Revise the Licensing and Design Basis to Incorporate the Replacement of Existing Safety-Related Analog Control Systems with a Single Digital Plant Protection System (PPS)- Syrs, . ML24004A0342024-01-17017 January 2024 Exemption from Select Requirements of 10 CFR Part 73 (EPID L-2023-LLE-0026 (Security Notifications, Reports, and Recordkeeping and Suspicious Activity Reporting)) IR 05000352/20230102024-01-11011 January 2024 Age-Related Degradation Report 05000352/2023010 and 05000353/2023010 IR 05000352/20234012023-12-21021 December 2023 Cybersecurity Inspection Report 05000352/2023401 and 05000353/2023401 ML23321A2362023-12-14014 December 2023 Issuance of Amendment Nos. 262 and 224 Adoption of TSTF-477, Revision 3 and Associated Technical Specification Changes ML23278A1292023-12-14014 December 2023 Units 1 & 2; Limerick, Units 1 & 2; Nine Mile Point, Units 1 & 2; and Peach Bottom, Units 2 & 3 -Revision to Approved Alternatives to Use Boiling Water Reactor Vessel and Internals Project Guidelines ML23333A2182023-11-29029 November 2023 Operator Licensing Examination Approval ML23325A2062023-11-21021 November 2023 Supplement to License Amendment Request to Revise the Licensing and Design Basis to Incorporate the Replacement of Existing Safety-Related Analog Control Systems with a Single Digital Plant Protection System ML23313A0432023-11-13013 November 2023 Summary of Regulatory Audit in Support of Amendment Request for Control Room Air Conditioning Technical Specifications ML23317A1192023-11-10010 November 2023 Constellation Energy Generation, LLC - 2023 Annual Report - Guarantees of Payment of Deferred Premiums IR 05000352/20230032023-10-27027 October 2023 Integrated Inspection Report 05000352/2023003 and 05000353/2023003 and Independent Spent Fuel Storage Installation Inspection 07200065/2023001 ML23297A1722023-10-24024 October 2023 Request for Information for a Biennial Problem Identification and Resolution Inspection; Inspection Report 05000352/2024010 and 05000353/2024010 IR 05000352/20235012023-10-17017 October 2023 Emergency Preparedness Biennial Exercise Inspection Report 05000352/2023501 and 05000353/2023501 RS-23-097, Constellation Energy Generation, LLC, Advisement of Leadership Changes and Submittal of Updated Standard Practice Procedures Plans2023-10-12012 October 2023 Constellation Energy Generation, LLC, Advisement of Leadership Changes and Submittal of Updated Standard Practice Procedures Plans ML23279A0612023-10-0505 October 2023 Paragon Energy Solutions LLC, Part 21 Final Report Re Potential Defect with Eaton Jd and Hjd Series Molded Case Circuit Breakers (Mccbs) ML23276A5162023-10-0303 October 2023 Federal Emergency Management Agency Level 1 Finding from 2023 Evaluated Emergency Preparedness Exercise ML23275A1082023-09-29029 September 2023 FEMA Level 1 Findings Limerick NPP- Boyertown/Colebrookdale ML23241A9452023-09-27027 September 2023 Generation Station, Units 1 and 2 Regulatory Audit Plan Supporting Review of the Equipment Qualification Portion of Limerick Digital Instrumentation and Controls License Amendment Request ML23269A0522023-09-26026 September 2023 Request for Information and Notification of Conduct of IP 71111.21.N.04, Age-Related Degradation, Reference Inspection Report 05000352/2023010 and 05000353/2023010 ML23255A0952023-09-12012 September 2023 Resubmittal of License Amendment Request to Revise the Licensing and Design Basis to Incorporate the Replacement of Existing Safety-Related Analog Control Systems with a Single Digital Plant Protection System (PPS) to Address ML23254A0242023-09-0606 September 2023 Paragon Energy Solutions LLC, Potential Defect with Eaton Jd and Hjd Series Molded Case Circuit Breakers (Mccbs) ML23249A1002023-09-0606 September 2023 Requalification Program Inspection IR 05000352/20230052023-08-31031 August 2023 Updated Inspection Plan for Limerick Generating Station, Units 1 and 2 (Report 05000352/2023005 and 05000353/2023005) ML23248A2082023-08-31031 August 2023 UFSAR Cover Page ML23242A2172023-08-30030 August 2023 Response to Request for Additional Information for Application to Adopt TSTF-477, Revision 3, Add Action for Two Inoperable Control Room AC Subsystems and Associated Technical Specification Changes NMP2L2851, Relief Request Associated with Successive Inspections for Generic Letter 88-01 / BWRVIP-75-A Augmented Examinations2023-08-25025 August 2023 Relief Request Associated with Successive Inspections for Generic Letter 88-01 / BWRVIP-75-A Augmented Examinations ML23228A0942023-08-16016 August 2023 Response to Request for Additional Information for Supplemental License Amendment Request to Revise Technical Specifications and Exemption Request from Requirements of 10CFR50.62 ATWS Rule to Support the . IR 05000352/20230022023-08-14014 August 2023 Integrated Inspection Report 05000352/2023002 and 05000353/2023002 ML23220A0182023-08-0808 August 2023 Information Request for the Cybersecurity Baseline Inspection, Notification to Perform Inspection 05000352/2023401 and 05000353/2023401 RS-23-087, Revision to Approved Alternatives Associated with the Use of the BWRVIP Guidelines in Lieu of Specific ASME Code Requirements on Reactor2023-08-0404 August 2023 Revision to Approved Alternatives Associated with the Use of the BWRVIP Guidelines in Lieu of Specific ASME Code Requirements on Reactor ML23212B2362023-07-31031 July 2023 Supplement to License Amendment Request to Revise the Licensing and Design Basis to Incorporate the Replacement of Existing Safety-Related Analog Control Systems with a Single Digital Plant Protection System - WEC Documents ML23212B1052023-07-31031 July 2023 Supplement to License Amendment Request to Revise Technical Specifications and Exemption Request from Requirements of 10CFR50.62 ATWS Rule to Support the Digital Modernization Project Installation - Revise ML23202A2192023-07-21021 July 2023 Response to Request for Additional Information for Supplemental License Amendment Request to Revise Technical Specifications and Exemption Request from Requirements of 10CFR50.62 ATWS Rule to Support the . ML23193B0122023-07-20020 July 2023 Audit Plan in Support of Review of License Amendment Request and Exemption Request for Digital Instrumentation and Controls Installation Support (Epids L-2023-LLA-0025 and L-2023-LLE-0005) ML23187A0962023-07-19019 July 2023 Generation Station, Unit Nos. 1 and 2 - Revised Estimated Review Completion Date Concerning License Amendment Request to Replace Existing Safety-Related Analog Control Systems with a Single Digital Plant Protection System ML23208A1522023-07-0606 July 2023 PEMA Letter Dated 7-6-23 Re Limerick Exercise 9-26-23 ML23177A2242023-06-26026 June 2023 Supplement to License Amendment Request to Revise the Licensing and Design Basis to Incorporate the Replacement of Existing Safety-Related Analog Control Systems with a Single Digital Plant Protection . ML23145A1972023-06-23023 June 2023 Correction to the Renewed Facility Operating License Pages in Amendment Nos. 255, 256, 257, 258, 259, and 260 2024-02-02
[Table view] |
Text
UNITED STATES NUCLEAR REGULATORY COMMISSION WASHINGTON, D.C. 20555*0001 February 23,2012 Mr. Michael P. Gallagher Vice President License Renewal Projects Exelon Generation Company, LLC 200 Exelon Way Kennett Square, PA 19348
SUBJECT:
REQUESTS FOR ADDITIONAL INFORMATION FOR THE REVIEW OF THE LIMERICK GENERATING STATION, UNITS 1 AND 2, LICENSE RENEWAL APPLICATION (TAC NOS. ME6555 AND ME6556)
Dear Mr. Gallagher:
By letter dated June 22, 2011, Exelon Generation Company, LLC submitted an application pursuant to Title 10 of the Code of Federal Regulations Part 54 (10 CFR Part 54), to renew the operating licenses for Limerick Generating Station, for review by the U.S. Nuclear Regulatory Commission (NRC or the staff). The staff is reviewing the information contained in the license renewal application and has identified, in the enclosure, areas where additional information is needed to complete the review.
These requests for additional information were discussed with Christopher Wilson, and a mutually agreeable date for the response is within 45 days from the date of this letter. If you have any questions, please contact me at 301-415-3733 or bye-mail at Robert.Kuntz@nrc.gov.
Sincerely,
~enior Projects Branch 1 Project Manager Division of License Renewal Office of Nuclear Reactor Regulation Docket Nos. 50-352 and 50-353
Enclosure:
Requests for Additional Information cc w/encl: Listserv
LIMERICK GENERATING STATION LICENSE RENEWAL APPLICATION REQUESTS FOR ADDITIONAL INFORMATION The scoping criteria are described in Section 2.1 of license renewal application (LRA). LRA Section 2.2, Table 2.2-1, "Scoping Results," provides the results of applying the license renewal scoping criteria to systems, structures, and components (SSCs). The following systems, as described in the Updated Final Safety Analysis Report (UFSAR), could not be located in LRA Table 2.2-1.
UFSAR Section System 1.2.4.3.1.7 Plant Monitoring System (PMS) Plant Monitoring System 7.1.2.1.12 Area Radiation Monitoring Area Radiation Monitoring System System 7.1.2.1.46 Emergency Response Facility Emergency Response Facility Data System Data System
-_.
Chemistry Laboratory Air Supply and Exhaust 9.4.3.2.4 Chemistry Laboratory Expansion Systems Justify the exclusion of the above systems from Table 2.2-1.
RAI2.3.3-1 For the license renewal boundary drawing locations identified in the table below, the staff could not determine the basis for the change in scoping criteria from 10 CFR 54.4 (a)(1) to 10 CFR 54.4 (a){2).
Nonsafety-related/Safety- I License Renewal Boundary Explanation of Issue Related Interface Item
~~~--~~----~--~--------------------~
2.3.3.17 Process Radiation Monitoring System
~mm* a ILR--M---2-6--"'s'---~e-'e'-t-4-,-lo-c-a-tio-n--H--6---.-----------------------1 2.3.3.4
(-m Containment Enclosure
_ _.....
Ventilation System
_ _ _ _ _ _ _ _--=-__________- - - - - ______
. At valves 0001A, 0002A, a LR-M-78 Sheet 1, locations 0-5 I 0003A, 0005A and 00018, thru D_-7_a_nd ___ F-:t_hr_u_F-7 _ _ .* 00028, 00038,00058.
LR-M-90 Sheet 1, locations 0- Several %" lines to vent and 1" b
~.~
2, 0-4, 0-7, E-3, G-4, I drain lines.
-2 LR-M-90 Sheet 2, Multiple All capped %" vent and drain c
locations lines.
2.3.3.8 Emergency Diesel Generator System LR-M-20 Sheets 7 and 13, At valves 1430A, 1406A, locations C-3, E-3. E-5, D-5 1415A, 1437A, 1413A 1154A, a
and E-8 2430A,2406A,2415A,2437A, 2413A and 2154A.
LR-M-20 Sheets 4 and 10, At valves 1511A. 1510A, b locations C-3 and C-4 1509A, 2511 A, 2510A and 2509A.
LR-M-20 Sheets 5 and 11, valves 1608A, 1604A, c
locations F-3 and E-5 OBA, and 2604A.
2.3.3.19 Radwaste System a ~~d~~1Sheet 1, locati~~~5~~mvalves 1081 and 1082.
2.3.3.21 Reactor Water Cleanup System
- LR-M-44 Sheet 1, Multiple Several (12 locations) 1" a
locations capped lines.
2.3.3.22 Safety Related Service Water System a
- LR-M-51 Sheet 8, location D-5 At valve 214B.
At valve 1141 Band %" GBB-LR-M-51 Sheet 4, locations D-4 b 123 line at valve HV-C
& D-5 1F103B.
c LR-M-13 Sheet 2, location G-5 At valve 2066A.
LR-M-12 Sheet 1, Multiple Multiple 1" flush, drain and d
locations (35 locations) capped lines.
LR-M-11 Sheet 2, Multiple Multiple %" flush, drain and e
locations (16 locations) capped lines.
LR-M-11 Sheet 3, Multiple Multiple %" flush, drain and f
locations (17 locations) capped lines.
LR-M-11 Sheet 4, Multiple Multiple %" and 1" flush. drain g
locations (32 locations)
LR-M-11 Sheet 5, Multiple Multiple %" and 1" flush, drain h
I 100;ations {34 locations} and ca~~ed lines.
-3 Water Treatment and Distribution (WTD) System A, 0002A, 0003A, 0005A and 00018, LR-M-78 Sheet 1, locations 0-5 a 00028, 00038, 00058 without thru 0-7 and F-5 thru F-7 classification break at SR-NSR interface.
Several %" lines to vent and 1" lines to Orain without LR-M-90 Sheet 1, Locations 0 b classification break at the 2, 0-4, 0-7, E-3, F-4, G-4 valves where there is a SR I NSR interface.
All capped %" lines to vent and 1 n lines to Orain without LR-M-90 Sheet 2, Several c locations
. classification break at the
- valves where there is a SR NSR interface.
Clarify the scoping classification of the pipe lines identified in the above table as within the scope of license renewal based on the criteria in 10 CFR 54.4(a)(2).
RAJ 2.3.3.8-1 License renewal boundary drawings LR-M-20 Sheets 8 and 14, location F-5, depict ejector casings that are within the scope of license renewal for 10 CFR 54.4(a)(1). However, the ejector casing is not listed in Table 2.3.3-8 as a component type subject to an aging management review (AMR).
Justify the exclusion of the ejector casing component type from LRA Table 2.3.3-8.
RAJ 2.3.3.8-2 License renewal boundary drawings LR-M-20 Sheets 8 and 14, locations 8-4 and 0-4, depict turbo charger casings that are within the scope of license renewal for 10 CFR 54.4(a)(1).
However, the turbo charger casing is not listed in Table 2.3.3-8 as a component type subject to an AMR.
Justify the exclusion of the turbo charger casing as component types from LRA Table 2.3.3-8.
RAJ 2.3.3.8-3 License renewal boundary drawings LR-M-20 Sheets 8 and 14, location F-3, depict exhaust silencer housings that are within the scope of license renewal for 10 CFR 54.4(a)(1). However,
- 4 the exhaust silencer housing is not listed in Table 2.3.3-8 as a component type subject to an AMR.
Justify the exclusion of the exhaust silencer component type from LRA Table 2.3.3-8.
RAI 2.3.3.8-4 License renewal boundary drawings LR-M-20 Sheets 3 and 9, locations 0-3 and 0-7, depict flame arrestor housings that are within the scope of license renewal for 10 CFR 54.4(a)(1).
However, the flame arrestor housing that is not listed in Table 2.3.3-8 as a component type subject to an AMR.
Justify the exclusion of the flame arrestor housing component type from LRA Table 2.3.3-8.
RAI2.3.3.8-5 LRA Section 2.1.1 states that the in-scope portions of mechanical systems and structures are highlighted in color on the license renewal boundary drawings. For the Emergency Diesel Generator System, the applicant includes the diesel engines within the license renewal scoping boundary.
License renewal boundary drawings LR-M-20 Sheets 3 and 9, location F-5, depict diesel engines 1AG501 and 2AG501 as not being within the scope of license renewal. Although the applicant states in Note 7 that the in-scope fuel oil supply system boundary stops at the fuel injectors of the diesel generator due to the fuel injectors being excluded from aging management review, the license renewal boundary drawings appear to contradict the applicant's methodology for highlighting the in-scope components (the diesel engines) as described in LRA Section 2.1.1.
Justify why the diesel engines depicted on license renewal boundary drawings LR-M-20 Sheets 3 and 9 are indicated as not being within the scope of license renewal.
RAI 2.3.3.12-1 License renewal boundary drawings LR-M-10 Sheets 5 and 10, locations H-2 and H-4, depict the 6" JBO-107/207 and 6" JBO-132/232 lines as being within the scope of license renewal based on the criteria in 10 CFR 54.4(a)(2) with continuations to and from license renewal boundary drawings LR-M-10 Sheets 3 and 8. However, the continuations of these lines on license renewal boundary drawings, LR-M-10 Sheets 3 and 8, are depicted as not being within the scope of license renewal.
Clarify the correct scoping classification of these pipe lines.
-5 RAI 2.3.3.13-1 On license renewal boundary drawing, LR-M-64 Sheet 1, location G-8, the continuation of the pipe line depicted within the scope of license renewal could not be found in any other license renewal boundary drawings.
Locate the continuation line for the above location. If the continuation line cannot be shown on license renewal boundary drawings, then provide additional information describing the extent of the scoping boundary and verify whether or not there are additional AMR component types between the continuation and the termination of the scoping boundary. If the scoping classification of a section of the piping changes over the continuation, provide additional information to clarify the change in scoping classification.
RAI 2.3.3.14-1 LRA Section 2.1 describes the applicant's scoping methodology, which specifies how systems or components were determined to be included in scope of license renewal. The staff confirms the inclusion of all components subject to AMR by reviewing the results of the screening of components within the license renewal boundary.
On license renewal boundary drawing LR-M-59 Sheet 1, location C-6, the applicant depicts Note 5, which states "This piping is included in scope out to the seismic anchor credited for structural support of the safety-related piping located as shown. The nonsafety-related piping beyond this anchor location is not in scope." However, the 1" JCD-109 pipe continues in red, designating the piping as being within the scope of license renewal for 10 CFR 54.4(a)(2), from Note 5 to the end of the pipe and including the drawing continuation marker to drawing LR-M-59 Sheet 2, at location F-1. The continuation marker on Sheet 2 also shows the pipe still in scope for 10 CFR 54.4(a)(2) and has another Note 5, the same as Sheet 1, where the transition is actually made from red to black to indicate the 1" JCD-109 pipe continuation changed to not being in scope for license renewal. For LGS, Unit 2, LRA drawing LR-M-59 Sheet 3, location C-6, the 1" JCD-209 pipe has the same Note 5 and there is an immediate transition from red to black, so the remainder of the pipe up to and including the continuation marker is no longer in scope as the Note 5 indicates. There also is no duplicate Note 5 on Sheet 4.
Clarify why the 1" JCD-109 pipe scope does not agree with Note 5 on LRA drawing LR-M-59 Sheet 1. Also clarify why there are differences in scoping between the 1" JCD-1 09 pipeline on Sheets 1 and 2 and the 1" JCD-209 pipeline on Sheets 3 and 4.
RAI 2.3.3.14-2 License renewal boundary drawing LR-M-59 Sheet 3, location H-6, depicts a line not highlighted within the scope of license renewal. However, the line is connected to a continuation marker from drawing LR-M-42 Sheet 3, location A-3, which depicts the continuation marker to be highlighted green and in scope for 10 CFR 54.4(a)(1).
Clarify the scoping classification of the pipe line.
-6 RAI 2.3.3.17-1 License renewal boundary drawings LR-M-26' Sheets 1 and 7, location C-2, and LR-M-26 Sheet 4, location B-7, depict sample chambers in Detail K that are within the scope of license renewal for 10 CFR 54.4(a)(2), but are not listed in Table 2.3.3-17 as a component type subject to an AMR.
Justify the exclusion of the sample chamber component type from LRA Table 2.3.3-17 RAI 2.3.3.17-2 License renewal boundary drawing LR-M-26 Sheet 5, location E-3, depicts filter and detector housings in Detail G that are within the scope of license renewal for 10 CFR 54.4(a)(1), but are not listed in Table 2.3.3-17 as a component type subject to an AMR.
Justify the exclusion of the filter and detector housing component types from LRA Table 2.3.3-17.
RAI 2.3.3.18-1 License renewal boundary drawings LR-M-23 Sheets 4 and 7, location H-4, depict a continuation line from the feedwater to reactor 10 CFR 54.4{a)(2) pipelines respectively to license renewal boundary drawings LR-M-06 Sheets 3 and 6, location G-8, where the pipeline continuations are shown excluded from scope of license renewal.
Clarify the scoping classification of these pipe lines.
RAI 2.3.3.22-1 License renewal boundary drawing LR-M-13 Sheet 2, locations D-2 and E-7,depicts 1'X!"
JBD-419 lines as being within the scope of license renewal based on the criteria in 10 CFR 54.4(a){2), with continuations to license renewal boundary drawing LR-M-23, Sheet 7.
However, the continuations of these lines on license renewal boundary drawing LR-M-23, Sheet 7 are shown as not within the scope of license renewal.
Clarify the scopil1g classification of these pipe lines.
RAI 2.3.3.22-2 License renewal boundary drawing LR-M-13, Sheet 1, locations D-2 and D-4, shows the 1'X!"
JBD-319 lines to be within the scope of license renewal for 10 CFR 54.4{a){2), with continuations to and from the license renewal boundary drawing LR-M-23, Sheet 4. However the continuations of these lines on drawing LR-M-23, Sheet 4 are shown as not within the scope of license renewal.
Clarify the scoping classification of these pipe lines.
- 5 RAI2.3.4-1 For the license renewal boundary drawing locations identified in the table below, the staff could not determine the basis for the change in scoping criteria from 10 CFR 54.4 (a)(1) to 10 CFR 54.4 (a)(2).
Nonsafety-related/Safety- License Renewal Boundary Related Interlace Item Drawing Number & Explanation of I s s u e l location 2.3.4.2 Condensate System LR-M-51 Sheet 1, Multiple a At all test connections.
locations At valves 1F041A, 1F041 8,
- LR-M-52 Sheet 1, Multiple b 10218, 1075A, 10758, 1076A I locations I and 10768.
LR-M-52 Sheet 2, locations %u S80-152 drain out of pumps c I i
F-3 and G-3 1AP256 and 18P256.
i LR-M-52 Sheet 3, locations d At valves 2F041A and 2F0418.
E-7 and F-7 At valves 2004, 2023A, 20238, 20278,2027C,20270,20320, LR-M-52 Sheet 4, Multiple e 2066, 2069,2075A, 20758, locations 2076,2082,2083,2084,2085, I
?086, 2087 and 2088.
2.3.4.6 Main Steam System LR-M-01 Sheet 1, location a At valve 1030.
I C-6 LR-M-01 Sheet 3, location I
b At valve 2030.
A-6 LR-M-41 Sheet 1, location
- c At valves 1038 and 1051.
A-6 At valves 1066A, 1067A, 1068A, LR-M-41 Sheet 2, locations d 1069A, 1070A, 1071A, 1072A, E-4, 0-3, 0-1 and G-8 1073A, 1037, 1040, and 1034E.
LR-M-41 Sheet 4, locations At valves 2038, 2F0828, 2063 e
A-6 & 8-5 thru 0-5 and 2F083A.
LR-M-41 Sheet 5, locations f At valves, 2037, 2070, 2034E.
E-4, 0-3, 0-1 and G-8 At valves 1F053, 1F082, 1F083, 1F085, 1004, 1005, 1020, 1026, LR-M-49 Sheet 1, Multiple g 1042, 1043, 1048A, 10488, I locations
- 10488, 10480, 10498, 10498 10498, 10490, and 1055.
- 6 LR-M-50 Sheet 1, location G-h At valve 1043.
6 LR-M-50 Sheet 2, location H i At valve 2043.
6 At valves 1F013, 1F015, 1F044, 1F056, 1F065, 1F090, 1F091, 1F092, 1030, 1034, 1036, 1037, LR-M-55 Sheet 1, Multiple 1040,1041,1050,1053,1054, j
locations 1056, 1057, 1066, 1067, 1070A, 1070B, 1070C, 10700, 1071A, 1071B, 1071C, and 10710, 1045. I Clarify the scoping classification of the 10 CFR 54.4(a){2) pipe lines identified in the above table.
RAI 2.3.4.3-1 License renewal boundary drawings LR-M-07 Sheets 1 and 3, location H-2, depict air inlets with screens that are within the scope of license renewal for 10 CFR 54.4(a)(2), but are not listed in Table 2.3.4-3 as a component type subject to an AMR.
Justify the exclusion of the air inlet with screen component type from LRA Table 2.3.4-3.
RAI 2.3.4.6-1 On license renewal boundary drawing, LR-M-05 Sheet 1, locations G-3, G-4 and G-6, the continuation of the 1 ~n "Bearing Drain to Oily Waste" pipe from the condenser could not be found on the following license renewal boundary drawings because the drawings were not included in the license renewal boundary drawings package:
- M-19 Sheet 6 Provide the license renewal boundary for the 1 ~I! "Bearing Drain to Oily Waste" pipe for the license renewal boundary drawings described above. If the continuation line cannot be shown on these license renewal boundary drawings, then provide additional information describill9 the extent of the scoping boundary and verify whether or not there are additional AMR component types between the continuation and the termination of the scoping boundary. If the scoping classification of a section of the piping changes over the continuation, provide additional information to clarify the change in scoping classification.
-7 RAI 2.3.4.7-1 Drawing LR-M-07 Sheet 2, location F-6, shows in scope pipeline 1 HBD-359, however the II continuation on this same drawing at location B-4 shows this pipeline as not in scope.
Clarify the scoping boundary of this pipe section.
RAI 2.3.4.7-2 License renewal boundary drawings LR-M-07 Sheets 2 and 4, location E-7, depict drain pipelines 1" HBD-359, and 1" HBD-459 within the scope of license renewal for 10 CFR 54.4(a)(2}. However, license renewal boundary drawings LR-M-06 Sheets 2 and 5, location 0-8, depict the continuation lines as not being within the scope of license renewal.
Clarify the scoping boundaries for the pipe lines.
Letter to M. Gallagher from R. Kuntz dated February 23, 2012
SUBJECT:
REQUESTS FOR ADDITIONAL INFORMATION FOR THE REVIEW OF THE LIMERICK GENERATING STATION, UNITS 1 AND 2, LICENSE RENEWAL APPLICATION (TAC NOS. ME6555 AND ME6556)
DISTRI BUTION:
HARD COPY:
DLRRF E-MAIL:
PUBLIC RidsNrrDlr Resource RidsNrrDlrRpb1 Resource RidsNrrDlrRpb2 Resource RidsNrrDlrRerb Resource RidsNrrDlrRarb Resource RidsNrrDlrRasb Resource RidsNrrDlrRapb Resource RidsNrrDlrRpob Resource RidsNrrPMLimerick Resource RidsOgcMailCenter Resource RKuntz DMorey LPerkins MSmith,OGC RConte, RI MModes, RI GDiPaolo, RI NSieller, RI
..'ML12018A035 OFFICE LA:RPB1 :DLR PM:RPB1 :DLR BC: RPB1: DLR PM:RPB1 :DLR NAME Y. Edmonds R. Kuntz D. Morey R. Kuntz DATE 02/06/12 02/09/12 02/09/12 02/23/12