IR 05000395/2011405
| ML11308A655 | |
| Person / Time | |
|---|---|
| Site: | Summer |
| Issue date: | 11/03/2011 |
| From: | Ernstes M NRC/RGN-II/DRS/PSB2 |
| To: | Douglass G Nuclear Protection Services |
| ALONZO RICHARDSON | |
| References | |
| IR-11-405 | |
| Download: ML11308A655 (4) | |
Text
November 3, 2011
SUBJECT:
VIRGIL C. SUMMER NUCLEAR STATION - NRC PHYSICAL SECURITY INSPECTION REPORT 05000395/2011405
Dear Mr. Douglass:
On October 6, 2011, the U.S. Nuclear Regulatory Commission (NRC) completed an inspection at your V. C. Summer Nuclear Station. The inspection covered one or more of the key attributes of the security cornerstone of the NRCs Reactor Oversight Process. The enclosed inspection report documents the inspection results, which were discussed on October 6, 2011, with you and members of your staff.
The inspection examined activities conducted under your license as they relate to security and compliance with the Commissions rules and regulations, and with the conditions of your license. The inspectors reviewed selected procedures and records, observed activities, and interviewed personnel.
Based on the results of this inspection, no findings were identified.
In accordance with 10 CFR 2.390 of the NRC's "Rules of Practice," a copy of this letter will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of NRC's document system, ADAMS.
ADAMS is accessible from the NRC Website at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room). However, because of the security-related concerns contained in the enclosure, and in accordance with 10 CFR 2.390, a copy of this letters enclosure will not be available for public inspection.
In accordance with 10 CFR 2.390(b)(1)(ii), the NRC is waiving the affidavit requirements for your response, if any. This practice will ensure that your response will not be made available electronically for public inspection in the NRC Public Document Room ADAMS or from the SCE&G
2 NRCs document system, ADAMS. If Safeguards Information is necessary to provide an acceptable response, please provide the level of protection described in 10 CFR 73.21.
Otherwise, mark your entire response ASecurity-Related InformationBWithhold Under 10 CFR 2.390@ and follow the instructions for withholding in 10 CFR 2.390(b)(1).
Should you have any questions concerning this letter, please contact us.
Sincerely,
/RA/
Michael E. Ernstes, Chief Plant Support Branch 2 Division of Reactor Safety
Docket No.: 50-395 License No.: NPF-12
Enclosure:
Inspection Report 05000395/2011405 w/Attachment: Supplemental Information (OUO)
cc w/encl.: (See page 3)
X SUNSI REVIEW COMPLETE X FORM 665 ATTACHED OFFICE RII: DRS/PS2 RII: DRS/PSB2 RII: DRS/PSB2 RII: DRP/BR5B RII: DRS/PSB2
SIGNATURE RA/AR RA/MP RA ME For JG RA SW For GM RA/ME
NAME A. Richardson R. Patterson J. Graham G. McCoy M. Ernstes
DATE 11/03/2011 11/03/2011 11/03/2011 11/02/2011 11/03/2011
E-MAIL COPY?
YES NO YES NO YES NO YES NO YES NO YES NO YES NO SCE&G
3 cc w/Encl:
Robin R. Haselden General Manager Organizational Development & Effectiveness South Carolina Electric & Gas Company Virgil C. Summer Nuclear Station P.O. Box 88 Jenkinsville, SC 29065
Bruce L. Thompson Manager Nuclear Licensing (Mail Code 830)
South Carolina Electric & Gas Company Virgil C. Summer Nuclear Station P.O. Box 88 Jenkinsville, SC 29065
Cory M. Lasseigne Licensing Specialist Nuclear Licensing, Mail Code 830 South Carolina Electric & Gas Company Virgil C. Summer Nuclear Station P.O. Box 88 Jenkinsville, SC 29065
NRC Senior Resident Inspector Virgil C. Summer Nuclear Station U.S. NRC 576 Stairway Road Jenkinsville, SC 29065