ML11181A284

From kanterella
Jump to navigation Jump to search
Lr Hearing - Schedule for Bo (Revised Proposal)
ML11181A284
Person / Time
Site: Indian Point  Entergy icon.png
Issue date: 06/29/2011
From:
- No Known Affiliation
To:
Division of License Renewal
References
Download: ML11181A284 (4)


Text

IPRenewal NPEmails From: Julie.Crocker@Noaa.Gov Sent: Wednesday, June 29, 2011 6:06 PM To: Stuyvenberg, Andrew Cc: Gray, Dara F; Julie.Williams@Noaa.Gov; Zoli, Elise N; Sutton, Kathryn M.; Dacimo, Fred R.;

Mark Mattson; Imboden, Andy; BUCKLEY, RICKY N; Dowell, Kelli; pbessette@morganlewis.com; IPRenewal NPEmails; Turk, Sherwin; Balsam, Briana; Logan, Dennis

Subject:

Re: RE: Schedule for BO (revised proposal)

This is consistent with my understanding of what was agreed to on the phone today.

Julie Original Message From: "Stuyvenberg, Andrew" <Andrew.Stuyvenberg@nrc.gov>

Date: Wednesday, June 29, 2011 5:32 pm

Subject:

RE: Schedule for BO (revised proposal)

To: "Gray, Dara F" <DGray@entergy.com>

Cc: "Julie.Williams@Noaa.Gov" <Julie.Williams@noaa.gov>, "Zoli, Elise N"

<EZoli@goodwinprocter.com>, "Sutton, Kathryn M." <ksutton@morganlewis.com>, "Dacimo, Fred R."

<FDacimo@entergy.com>, Mark Mattson <mmattson@normandeau.com>, "Imboden, Andy"

<Andy.Imboden@nrc.gov>, "BUCKLEY, RICKY N" <RBUCKLE@entergy.com>, "Dowell, Kelli"

<kdowell@entergy.com>, "pbessette@morganlewis.com" <pbessette@morganlewis.com>, IPRenewal NPEmails <IPRenewal.NPEmails@nrc.gov>, Julie Crocker <Julie.Crocker@Noaa.Gov>, "Turk, Sherwin" <Sherwin.Turk@nrc.gov>, "Balsam, Briana" <Briana.Balsam@nrc.gov>, "Logan, Dennis"

<Dennis.Logan@nrc.gov>

> Dara, others

> The following summarizes my understanding of the schedule for the

> ongoing ESA Section 7 consultation as agreedto by NRC, NMFS, and

> Entergy on this afternoon's teleconference.

> T (likely July 5; not before July 5) Entergy submits

> information on benthic resources in the action area as discussed on

> the June 22 teleconference (i.e., information on the biofouling

> community at the IP intakes, information on the entrainment of

> amphipods and published studies related to the distribution of the

> benthic community in the Hudson River). Entergy is also to provide to

> NRC any relevant thermal information for NRC's revised BA

> T+20 calendar days (likely July 25, depending on T) NRC

> staff submits BA supplement to NMFS focusing on the assessment of the

> thermal discharge on shortnose sturgeon.

> One month after NRC submits BA supplement to NMFS (likely

> August 25) NMFS provides a draft Biological Opinion (BO) to NRC. In 1

> completing its BO, NMFS will: (a) review the information provided in

> the supplemental BA, (b) incorporate the new information on the

> thermal plume (Swanson et al. 2011, and other sources of information

> as appropriate) into the draft Opinion, (c) incorporate additional

> technical information provided by Entergy on the June 22 conference

> call, (d) make a draft determination as to whether the proposed action

> is likely to jeopardize the continued existence of shortnose sturgeon

> and provide justification for this determination, (e) prepare a draft

> Incidental Take Statement with draft Terms and Conditions and

> Reasonable and Prudent Measures, as appropriate. Following receipt of

> the BO, it is NMFS understanding that NRC will distribute the draft BO

> to Entergy and request that Entergy's comments be submitted to NRC for

> transmittal to NMFS pursuant to 50 CFR 402.14(g)(5).

> Ten calendar days after NMFS provides a draft BO to NRC

> (likely September 6 first working day after Labor Day) NRC

> provides comments from NRC and from Entergy, if any, on the draft BO

> to NMFS at the end of this 10calendar day period.

> If there are no substantive comments, then NMFS prepares the

> final BO within several days of September 6. If NRC or Entergy submit

> substantive comments, then NMFS will either prepare a final BO within

> ten working days (September 20) or NMFS will notify NRC and Entergy of

> a need for additional time.

> I believe that captures our agreedupon timeline, but please reply if

> I've missed or misconstrued anything.

> Best regards,

> Drew 2

Hearing Identifier: IndianPointUnits2and3NonPublic_EX Email Number: 2703 Mail Envelope Properties (e432f3c237e0ae1c.4e0b6986)

Subject:

Re: RE: Schedule for BO (revised proposal)

Sent Date: 6/29/2011 6:05:58 PM Received Date: 6/29/2011 6:05:59 PM From: Julie.Crocker@Noaa.Gov Created By: Julie.Crocker@Noaa.Gov Recipients:

"Gray, Dara F" <DGray@entergy.com>

Tracking Status: None "Julie.Williams@Noaa.Gov" <Julie.Williams@noaa.gov>

Tracking Status: None "Zoli, Elise N" <EZoli@goodwinprocter.com>

Tracking Status: None "Sutton, Kathryn M." <ksutton@morganlewis.com>

Tracking Status: None "Dacimo, Fred R." <FDacimo@entergy.com>

Tracking Status: None "Mark Mattson" <mmattson@normandeau.com>

Tracking Status: None "Imboden, Andy" <Andy.Imboden@nrc.gov>

Tracking Status: None "BUCKLEY, RICKY N" <RBUCKLE@entergy.com>

Tracking Status: None "Dowell, Kelli" <kdowell@entergy.com>

Tracking Status: None "pbessette@morganlewis.com" <pbessette@morganlewis.com>

Tracking Status: None "IPRenewal NPEmails" <IPRenewal.NPEmails@nrc.gov>

Tracking Status: None "Turk, Sherwin" <Sherwin.Turk@nrc.gov>

Tracking Status: None "Balsam, Briana" <Briana.Balsam@nrc.gov>

Tracking Status: None "Logan, Dennis" <Dennis.Logan@nrc.gov>

Tracking Status: None "Stuyvenberg, Andrew" <Andrew.Stuyvenberg@nrc.gov>

Tracking Status: None Post Office: noaa.gov Files Size Date & Time MESSAGE 3688 6/29/2011 6:05:59 PM Options Priority: Standard Return Notification: No Reply Requested: No Sensitivity: Normal

Expiration Date:

Recipients Received: