Report 22 - 2010 Mid-Cycle Inspection/Activity Plan
ML102440562
Person / Time
Site: Harris Duke Energy icon.png
Issue date: 09/01/2010
From:
NRC/RGN-II
To:
Carolina Power & Light Co
Shared Package
ML102440560 List:
References
Download: ML102440562 (2)


Text

Inspection / Activity Plan Page 1 of 2 09/01/2010 07:58:45 Report 22 09/01/2010 - 12/31/2011 Unit Number Planned Dates Start End Inspection Activity Title No. of Staff on Site Harris EB3ISI

- INSERVICE INSPECTION 1

1 IP Inservice Inspection Activities - PWR 7111108P 10/11/2010 10/15/2010 EB3TI172

- EB3 RX COOLANT DM BUTT WELDS 1

1 IP Reactor Coolant System Dissimiliar Metal Butt Welds 2515/172 10/11/2010 10/15/2010 EB3SGISI

- SG INSERVICE INSPECTION 1

1 IP Inservice Inspection Activities - PWR 7111108P 10/18/2010 10/22/2010 PSB1-RP

- RP OCCUPATIONAL BASELINE 3

1 IP Radiological Hazard Assessment and Exposure Controls 71124.01 10/25/2010 10/29/2010 1

IP Occupational ALARA Planning and Controls 71124.02 10/25/2010 10/29/2010 1

IP Performance Indicator Verification 71151 10/25/2010 10/29/2010 PSB1-TI

- TI-179 NSTS VERIFICATION 3

1 IP Verification of Licensee Responses to NRC Requirement for Inventories of Materials Tracked in NSTS 2515/179 10/25/2010 10/29/2010 EB1-MODS

- MODIFICATION - 10 CFR50.59 4

1 IP Evaluations of Changes, Tests, or Experiments and Permanent Plant Modifications 7111117T 11/29/2010 12/03/2010 1

IP Evaluations of Changes, Tests, or Experiments and Permanent Plant Modifications 7111117T 12/13/2010 12/17/2010 PSB1-RP

- RP OCCUPATIONAL--TRANSPORTATION 1

1 IP Radioactive Solid Waste Processing and Radioactive Material Handling, Storage, and Transportation 71124.08 12/06/2010 12/10/2010 OL RQ

- REQUAL INSPECTION 2

1 IP Licensed Operator Requalification Program 7111111B 01/24/2011 01/28/2011 CDBI

- COMPONENT DESIGN BASES INSPECTION 8

1 IP Component Design Bases Inspection 7111121 03/07/2011 03/11/2011 1

IP Component Design Bases Inspection 7111121 03/21/2011 03/25/2011 1

IP Component Design Bases Inspection 7111121 04/04/2011 04/08/2011 1

IP Component Design Bases Inspection 7111121 04/18/2011 04/22/2011 EB1/DRS

- TI-177 GAS ACCUMULATION 3

1 IP Managing Gas Accumulation In Emergency Core Cooling, Decay Heat Removal & Containment Spray System 2515/177 03/28/2011 04/01/2011 PSB1EP

- EMERGENCY PREPAREDNESS EXERCISE 3

1 IP Exercise Evaluation 7111401 04/25/2011 04/29/2011 1

IP Emergency Action Level and Emergency Plan Changes 7111404 04/25/2011 04/29/2011 1

IP Performance Indicator Verification 71151 04/25/2011 04/29/2011 OL EXAM

- INITIAL EXAM PREP 3

1 HARRIS/JULY 2011 EXAM AT POWER FACILITIES V23352 06/20/2011 06/24/2011 OL EXAM

- INITIAL EXAM - WEEK 1 3

1 HARRIS/JULY 2011 EXAM AT POWER FACILITIES V23352 07/11/2011 07/15/2011 This report does not include INPO and OUTAGE activities.

This report shows only on-site and announced inspection procedures.

Enclosure

Inspection / Activity Plan Page 2 of 2 09/01/2010 07:58:45 Report 22 09/01/2010 - 12/31/2011 Unit Number Planned Dates Start End Inspection Activity Title No. of Staff on Site Harris PI&R

- PROBLEM IDENTIFICATION AND RESOLUTION 6

1 IP Identification and Resolution of Problems 71152B 07/11/2011 07/15/2011 1

IP Identification and Resolution of Problems 71152B 07/25/2011 07/29/2011 OL EXAM

- INITIAL EXAM - WEEK 2 3

1 HARRIS/JULY 2011 EXAM AT POWER FACILITIES V23352 07/18/2011 07/22/2011 PSB1-RP

- RP PUBLIC RADIATION PROTECTION INSP 6

1 IP Radiological Hazard Assessment and Exposure Controls 71124.01 07/18/2011 07/22/2011 1

IP In-Plant Airborne Radioactivity Control and Mitigation 71124.03 07/18/2011 07/22/2011 1

IP Occupational Dose Assessment 71124.04 07/18/2011 07/22/2011 1

IP Radiation Monitoring Instrumentation 71124.05 07/18/2011 07/22/2011 1

IP Radioactive Gaseous and Liquid Effluent Treatment 71124.06 07/18/2011 07/22/2011 1

IP Radiological Environmental Monitoring Program 71124.07 07/18/2011 07/22/2011 1

IP Performance Indicator Verification 71151 07/18/2011 07/22/2011 TFPI

- TFPI 805 7

1 IP Fire Protection [Triennial]

7111105T 08/29/2011 09/02/2011 1

IP Fire Protection [Triennial]

7111105T 09/12/2011 09/16/2011 This report does not include INPO and OUTAGE activities.

This report shows only on-site and announced inspection procedures.

Enclosure