Letter Sequence Supplement |
---|
TAC:ME3589, Clarify Application of Setpoint Methodology for LSSS Functions (Approved, Closed) |
Initiation
- Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request
- Acceptance, Acceptance
- Supplement, Supplement, Supplement
|
MONTHYEARML1008503912010-03-18018 March 2010 GE-Hitachi Nuclear Energy Americas, LLC Affidavit Requesting That GEH Proprietary Report, NEDC-33484P Be Withheld from Public Disclosure Project stage: Request ML1008503922010-03-19019 March 2010 Application for Withholding Proprietary Information from Public Disclosure Project stage: Request RS-10-002, Request for License Amendment Re Measurement Uncertainty Recapture Power Uprate2010-03-25025 March 2010 Request for License Amendment Re Measurement Uncertainty Recapture Power Uprate Project stage: Request ML1008504032010-03-31031 March 2010 NEDO-33484, Rev. 0, Safety Analysis Report for Limerick Generating Station Units 1 & 2 Thermal Power Optimization Project stage: Request ML1010310792010-04-19019 April 2010 Supplemental Information Needed for Acceptance of Requested Licensing Action Request for License Amendment Regarding Measurement Uncertainty Recapture Power Uprate Project stage: Acceptance Review RS-10-085, Supplement to License Amendment Request for Measurement Uncertainty Recapture Power Uprate2010-04-26026 April 2010 Supplement to License Amendment Request for Measurement Uncertainty Recapture Power Uprate Project stage: Supplement ML1012409982010-05-0606 May 2010 Acceptance of Requested Licensing Action Measurement Uncertainty Recapture Power Uprate Request and Standby Liquid Control System Modification Project stage: Acceptance Review ML1013303752010-05-24024 May 2010 Electronic Transmission, Draft Request for Additional Information Regarding Measurement Uncertainty Recapture Power Uprate Project stage: Draft RAI ML1014700892010-06-0303 June 2010 Request for Additional Information Regarding Measurement Uncertainty Recapture Power Uprate Project stage: RAI ML1015802912010-06-0707 June 2010 Electronic Transmission, Draft Request for Additional Information Regarding Measurement Uncertainty Recapture Power Uprate Project stage: Draft RAI ML1015906292010-06-15015 June 2010 Request for Withholding Information from Public Disclosure Project stage: Withholding Request Acceptance ML1016804402010-06-21021 June 2010 Electronic Transmission, Draft Request for Additional Information Regarding Measurement Uncertainty Recapture Power Uprate Project stage: Draft RAI ML1015803382010-06-25025 June 2010 Request for Additional Information Regarding Measurement Uncertainty Recapture Power Uprate Project stage: RAI ML1016901212010-07-0202 July 2010 Request for Additional Information Regarding Measurement Uncertainty Recapture Power Uprate Project stage: RAI ML1018800202010-07-0808 July 2010 Electronic Transmission, Draft Request for Additional Information Regarding Measurement Uncertainty Recapture Power Uprate Project stage: Draft RAI ML1019400532010-07-15015 July 2010 Request for Additional Information Regarding Measurement Uncertainty Recapture Power Uprate Project stage: RAI ML1018700242010-07-15015 July 2010 Electronic Transmission, Draft Request for Additional Information Regarding Measurement Uncertainty Recapture Power Uprate Project stage: Draft RAI ML1018700082010-07-15015 July 2010 Request for Additional Information Regarding Measurement Uncertainty Recapture Power Uprate Project stage: RAI RS-10-116, Additional Information Supporting Request for License Amendment Regarding Measurement Uncertainty Recapture Power Uprate2010-07-22022 July 2010 Additional Information Supporting Request for License Amendment Regarding Measurement Uncertainty Recapture Power Uprate Project stage: Request RS-10-127, Additional Information Supporting Request for License Amendment Regarding Measurement Uncertainty Recapture Power Uprate2010-07-28028 July 2010 Additional Information Supporting Request for License Amendment Regarding Measurement Uncertainty Recapture Power Uprate Project stage: Request RS-10-129, Schedule for Responding to Request for Additional Information2010-07-28028 July 2010 Schedule for Responding to Request for Additional Information Project stage: Request RS-10-126, Additional Information and Supplement Supporting Request for License Amendment Regarding Measurement Uncertainty Recapture Power Uprate2010-08-10010 August 2010 Additional Information and Supplement Supporting Request for License Amendment Regarding Measurement Uncertainty Recapture Power Uprate Project stage: Supplement RS-10-132, Additional Information Supporting Request for License Amendment Regarding Measurement Uncertainty Recapture Power Uprate2010-08-12012 August 2010 Additional Information Supporting Request for License Amendment Regarding Measurement Uncertainty Recapture Power Uprate Project stage: Request RS-10-133, Limerick, Units 1 and 2 - Additional Information Supporting Request for License Amendment Regarding Measurement Uncertainty Recapture Power Uprate2010-08-12012 August 2010 Limerick, Units 1 and 2 - Additional Information Supporting Request for License Amendment Regarding Measurement Uncertainty Recapture Power Uprate Project stage: Request RS-10-144, Additional Information Supporting Request for License Amendment Regarding Measurement Uncertainty Recapture Power Uprate2010-08-30030 August 2010 Additional Information Supporting Request for License Amendment Regarding Measurement Uncertainty Recapture Power Uprate Project stage: Request ML1024402642010-08-31031 August 2010 0000-0114-0580-RO-NP, Rev. 0, Limerick Generating Station, Units 1 & 2, Upper Shelf Energy Evaluation for LPCI Nozzle Forging Material Project stage: Request ML1028005382010-10-19019 October 2010 Request for Withholding Information from Public Disclosure Project stage: Withholding Request Acceptance RS-10-212, Additional Information Supporting Request for License Amendment Regarding Measurement Uncertainty Recapture Power Uprate2010-12-17017 December 2010 Additional Information Supporting Request for License Amendment Regarding Measurement Uncertainty Recapture Power Uprate Project stage: Request RS-11-003, Supplement to License Amendment Request for Measurement Uncertainty Recapture Power Uprate2011-01-0707 January 2011 Supplement to License Amendment Request for Measurement Uncertainty Recapture Power Uprate Project stage: Supplement ML1100606332011-01-18018 January 2011 Request for Withholding Information from Public Disclosure Project stage: Withholding Request Acceptance ML1106910952011-04-0808 April 2011 Issuance of Amendments 201 & 163 Measurement Uncertainty Recapture Power Uprate and Standby Liquid Control System Changes Project stage: Approval ML1110400892011-04-20020 April 2011 Correction Letter for Limerick Generating Station, Units 1 and 2 - Safety Evaluation Regarding Measurement Uncertainty Recapture Power Uprate and Standby Liquid Control System Changes Project stage: Approval 2010-06-03
[Table View] |
|
---|
Category:Letter type:RS
MONTHYEARRS-24-093, Response to Request for Additional Information - Alternative Request to Utilize Code Case OMN-32, Alternative Requirements for Range and Accuracy of Pressure, Flow, and Differential Pressure Instruments Used in Pump Tests2024-10-10010 October 2024 Response to Request for Additional Information - Alternative Request to Utilize Code Case OMN-32, Alternative Requirements for Range and Accuracy of Pressure, Flow, and Differential Pressure Instruments Used in Pump Tests RS-24-090, Response to Request for Additional Information - Relief Request Concerning Extension of Permanent Relief from Ultrasonic Examination of Reactor Pressure Vessel Circumferential Shell Welds2024-09-12012 September 2024 Response to Request for Additional Information - Relief Request Concerning Extension of Permanent Relief from Ultrasonic Examination of Reactor Pressure Vessel Circumferential Shell Welds RS-24-070, Independent Spent Fuel Storage Installation, Nine Mile Point, Units 1 and 2, Quad Cities, Units 1 and 2, R. E. Ginna - Nuclear Radiological Emergency Plan Document Revisions2024-07-12012 July 2024 Independent Spent Fuel Storage Installation, Nine Mile Point, Units 1 and 2, Quad Cities, Units 1 and 2, R. E. Ginna - Nuclear Radiological Emergency Plan Document Revisions RS-24-061, Constellation Energy Generation, LLC, Response to NRC Regulatory Issue Summary 2024-01, Preparation and Scheduling of Operator Licensing Examinations2024-06-14014 June 2024 Constellation Energy Generation, LLC, Response to NRC Regulatory Issue Summary 2024-01, Preparation and Scheduling of Operator Licensing Examinations RS-24-055, 2023 Corporate Regulatory Commitment Change Summary Report2024-05-17017 May 2024 2023 Corporate Regulatory Commitment Change Summary Report RS-24-038, Relief Request Concerning Extension of Permanent Relief from Ultrasonic Examination of Reactor Pressure Vessel Circumferential Shell Welds2024-05-0202 May 2024 Relief Request Concerning Extension of Permanent Relief from Ultrasonic Examination of Reactor Pressure Vessel Circumferential Shell Welds RS-24-041, Alternative Request to Utilize Code Case OMN-32, Alternative Requirements for Range and Accuracy of Pressure, Flow, and Differential Pressure Instruments Used in Pump Tests2024-04-30030 April 2024 Alternative Request to Utilize Code Case OMN-32, Alternative Requirements for Range and Accuracy of Pressure, Flow, and Differential Pressure Instruments Used in Pump Tests RS-24-002, Constellation Energy Generation, LLC - Annual Property Insurance Status Report2024-04-0101 April 2024 Constellation Energy Generation, LLC - Annual Property Insurance Status Report RS-23-097, Constellation Energy Generation, LLC, Advisement of Leadership Changes and Submittal of Updated Standard Practice Procedures Plans2023-10-12012 October 2023 Constellation Energy Generation, LLC, Advisement of Leadership Changes and Submittal of Updated Standard Practice Procedures Plans RS-23-087, Revision to Approved Alternatives Associated with the Use of the BWRVIP Guidelines in Lieu of Specific ASME Code Requirements on Reactor2023-08-0404 August 2023 Revision to Approved Alternatives Associated with the Use of the BWRVIP Guidelines in Lieu of Specific ASME Code Requirements on Reactor RS-23-077, Response to NRC Regulatory Issue Summary 2023-01, Preparation and Scheduling of Operator Licensing Examinations2023-06-16016 June 2023 Response to NRC Regulatory Issue Summary 2023-01, Preparation and Scheduling of Operator Licensing Examinations RS-23-049, Constellation Energy Generation, LLC, Report on Status of Decommissioning Funding for Reactors and Independent Spent Fuel Storage Installations2023-03-23023 March 2023 Constellation Energy Generation, LLC, Report on Status of Decommissioning Funding for Reactors and Independent Spent Fuel Storage Installations RS-23-045, Constellation Energy Generation, LLC Submittal of Fitness for Duty Performance Data Reports for 2022 Per 10 CFR 26.717(c) & 10 CFR 26.2032023-02-28028 February 2023 Constellation Energy Generation, LLC Submittal of Fitness for Duty Performance Data Reports for 2022 Per 10 CFR 26.717(c) & 10 CFR 26.203 RS-23-003, Constellation Energy Generation, LLC, Summary of Changes to Quality Assurance Topical Report, NO-AA-10, and Decommissioning Quality Assurance Program, NO-DC-102023-01-31031 January 2023 Constellation Energy Generation, LLC, Summary of Changes to Quality Assurance Topical Report, NO-AA-10, and Decommissioning Quality Assurance Program, NO-DC-10 RS-22-126, Constellation Energy Generation, LLC - Request to Use Provisions of a Later Edition of the ASME Boiler and Pressure Vessel Code, Section XI2022-11-30030 November 2022 Constellation Energy Generation, LLC - Request to Use Provisions of a Later Edition of the ASME Boiler and Pressure Vessel Code, Section XI RS-22-093, Advisement of Leadership Changes for Constellation Energy Generation, LLC and Submittal of Updated Standard Practice Procedures Plans2022-08-18018 August 2022 Advisement of Leadership Changes for Constellation Energy Generation, LLC and Submittal of Updated Standard Practice Procedures Plans RS-22-051, Constellation Energy Generation, LLC - Update to Correspondence Addressees and Service Lists2022-04-12012 April 2022 Constellation Energy Generation, LLC - Update to Correspondence Addressees and Service Lists RS-22-049, Constellation Energy Generation, LLC, Supplemental Information to Correct Typographical Errors in Constellation'S Application to Revise Technical Specifications to Adopt TSTF-541 Revision 2, Add Exceptions to Surveillance Requirements for2022-04-0404 April 2022 Constellation Energy Generation, LLC, Supplemental Information to Correct Typographical Errors in Constellation'S Application to Revise Technical Specifications to Adopt TSTF-541 Revision 2, Add Exceptions to Surveillance Requirements for V RS-22-045, Constellation Energy Generation, LLC, Response to NRC Regulatory Issue Summary 2022-01, Preparation and Scheduling of Operator Licensing Examinations2022-03-25025 March 2022 Constellation Energy Generation, LLC, Response to NRC Regulatory Issue Summary 2022-01, Preparation and Scheduling of Operator Licensing Examinations RS-22-023, Constellation Energy Generation, LLC, Executed Trust Fund Agreement Amendment and Subordinate Trust Agreement2022-02-23023 February 2022 Constellation Energy Generation, LLC, Executed Trust Fund Agreement Amendment and Subordinate Trust Agreement RS-22-027, Constellation, Response to Request for Additional Information Regarding Application to Revise Technical Specifications to Adopt TSTF-541 Revision 2, Add Exceptions to Surveillance Requirements for Valves and Dampers Locked in the Actuated2022-02-23023 February 2022 Constellation, Response to Request for Additional Information Regarding Application to Revise Technical Specifications to Adopt TSTF-541 Revision 2, Add Exceptions to Surveillance Requirements for Valves and Dampers Locked in the Actuated P RS-22-019, Constellation Energy Generation, LLC - Update to Correspondence Addressees and Service Lists2022-02-16016 February 2022 Constellation Energy Generation, LLC - Update to Correspondence Addressees and Service Lists RS-22-015, Notification of Completion of License Transfer and Request to Continue Processing Pending NRC Actions Previously Requested by Exelon Generation Company, LLC2022-02-0101 February 2022 Notification of Completion of License Transfer and Request to Continue Processing Pending NRC Actions Previously Requested by Exelon Generation Company, LLC RS-22-004, Supplement to Application to Adopt TSTF-554, Revision 1, Revise Reactor Coolant Leakage Requirements2022-01-0404 January 2022 Supplement to Application to Adopt TSTF-554, Revision 1, Revise Reactor Coolant Leakage Requirements RS-21-121, Proposed Changes to Decommissioning Trust Agreements and Master Terms2021-12-15015 December 2021 Proposed Changes to Decommissioning Trust Agreements and Master Terms RS-21-091, Implementation of Insider Threat Program Requirements Associated with the Voluntary Security Clearance Program and Advisement of Leadership Changes2021-09-13013 September 2021 Implementation of Insider Threat Program Requirements Associated with the Voluntary Security Clearance Program and Advisement of Leadership Changes RS-21-063, Application to Adopt TSTF-554, Revision 1, Revise Reactor Coolant Leakage Requirements2021-06-30030 June 2021 Application to Adopt TSTF-554, Revision 1, Revise Reactor Coolant Leakage Requirements RS-21-070, Proposed Alternative to Utilize Code Case N-8932021-06-30030 June 2021 Proposed Alternative to Utilize Code Case N-893 RS-21-054, Response to NRC Regulatory Issue Summary 2021-01, Preparation and Scheduling of Operator Licensing Examinations2021-04-29029 April 2021 Response to NRC Regulatory Issue Summary 2021-01, Preparation and Scheduling of Operator Licensing Examinations RS-21-039, Supplemental Information Regarding Application for Order Approving Transfers and Proposed Conforming License Amendments2021-03-25025 March 2021 Supplemental Information Regarding Application for Order Approving Transfers and Proposed Conforming License Amendments RS-21-028, Fitness for Duty Performance Data Reports - Annual 20202021-02-26026 February 2021 Fitness for Duty Performance Data Reports - Annual 2020 RS-21-030, Report on Status of Decommissioning Funding for Reactors and Independent Spent Fuel Storage Installations2021-02-24024 February 2021 Report on Status of Decommissioning Funding for Reactors and Independent Spent Fuel Storage Installations RS-21-001, Revised Proposed Alternative to Utilize Code Cases N-878 and N-880 for Carbon Steel Piping2021-01-0404 January 2021 Revised Proposed Alternative to Utilize Code Cases N-878 and N-880 for Carbon Steel Piping RS-21-002, Company - Update to Correspondence Addressees and Service Lists2021-01-0404 January 2021 Company - Update to Correspondence Addressees and Service Lists RS-20-142, Proposed Alternative to Utilize Code Case N-8932020-11-16016 November 2020 Proposed Alternative to Utilize Code Case N-893 RS-20-140, Proposed Changes to Decommissioning Trust Agreements2020-10-30030 October 2020 Proposed Changes to Decommissioning Trust Agreements RS-20-112, Response to Request for Additional Information Related to License Amendment Request to Adopt TSTF-5682020-09-0303 September 2020 Response to Request for Additional Information Related to License Amendment Request to Adopt TSTF-568 RS-20-111, Request to Use Provisions of a Later Edition of the ASME Boiler and Pressure Vessel Code, Section XI2020-09-0202 September 2020 Request to Use Provisions of a Later Edition of the ASME Boiler and Pressure Vessel Code, Section XI RS-20-031, License Amendment Request - Application to Adopt Technical Specification Task Force (TSTF) Traveler TSTF-568, Revision 2, Revise Applicability of BWR/4 TS 3.6.2 .5 and TS 3.6 .3.2, Using the Consolidated Line Item Improvement Process2020-04-30030 April 2020 License Amendment Request - Application to Adopt Technical Specification Task Force (TSTF) Traveler TSTF-568, Revision 2, Revise Applicability of BWR/4 TS 3.6.2 .5 and TS 3.6 .3.2, Using the Consolidated Line Item Improvement Process RS-20-056, Re. Ginna, Withdrawal of Relief Request for Alternative Frequency to Supplemental Indication2020-04-10010 April 2020 Re. Ginna, Withdrawal of Relief Request for Alternative Frequency to Supplemental Indication RS-20-037, Annual Property Insurance Status Report2020-04-0101 April 2020 Annual Property Insurance Status Report RS-20-041, Response to NRC Regulatory Issue Summary 2020-01, Preparation and Scheduling of Operator Licensing Examinations2020-03-20020 March 2020 Response to NRC Regulatory Issue Summary 2020-01, Preparation and Scheduling of Operator Licensing Examinations RS-20-027, Advisement of Leadership Changes2020-03-0202 March 2020 Advisement of Leadership Changes RS-20-020, Relief Request for Alternative Frequency to Supplemental Indication Requirements of 10 CFR 50.55a(b)(3)(xi)2020-02-28028 February 2020 Relief Request for Alternative Frequency to Supplemental Indication Requirements of 10 CFR 50.55a(b)(3)(xi) RS-20-023, Additional Information Regarding Request for Approval of Change to Exelon Generation Company, LLC, Quality Assurance Topical Report2020-02-24024 February 2020 Additional Information Regarding Request for Approval of Change to Exelon Generation Company, LLC, Quality Assurance Topical Report RS-19-075, Request for Approval of Change to Quality Assurance Topical Report2019-12-0505 December 2019 Request for Approval of Change to Quality Assurance Topical Report RS-19-111, Notice of Disbursement from Decommissioning Trusts2019-11-20020 November 2019 Notice of Disbursement from Decommissioning Trusts RS-19-102, Amended Nuclear Decommissioning Trust Agreements2019-10-0808 October 2019 Amended Nuclear Decommissioning Trust Agreements RS-19-044, License Amendment Request - Deletion of Facility Operating License Conditions Related to Decommissioning Trust Provisions2019-08-28028 August 2019 License Amendment Request - Deletion of Facility Operating License Conditions Related to Decommissioning Trust Provisions RS-19-085, Additional Information Regarding Application to Remove the Table of Contents from Technical Specifications and Place It Under Licensee Control for R.E. Ginna Nuclear Power Plant2019-08-22022 August 2019 Additional Information Regarding Application to Remove the Table of Contents from Technical Specifications and Place It Under Licensee Control for R.E. Ginna Nuclear Power Plant 2024-09-12
[Table view] |
Text
~Exeltno Exelon Nuclear www.exeloncorp.com 200 Exelon Way Nuclear Kennett Square, PA 19348 10 CFR 50.90 10 CFR 50, Appendix K RS-10-085 April 26, 2010 U. S. Nuclear Regulatory Commission ATTN: Document Control Desk Washington, DC 20555-0001 Limerick Generating Station, Units 1 and 2 Facility Operating License Nos. NPF-39 and NPF-85 NRC Docket Nos. 50-352 and 50-353
Subject:
Supplement to License Amendment Request for Measurement Uncertainty Recapture Power Uprate
References:
- 1. Letter from M. D. Jesse (Exelon Generation Company, LLC) to U. S. NRC, "Request for License Amendment Regarding Measurement Uncertainty Recapture Power Uprate," dated March 25, 2010
- 2. Letter from U. S. NRC to C. G. Pardee (Exelon Generation Company, LLC),
"Supplemental Information Needed for Acceptance of Requested Licensing Action RE: Request for License Amendment Regarding Measurement Uncertainty Recapture Power Uprate," dated April 19, 2010 In Reference 1, Exelon Generation Company, LLC (Exelon) submitted a license amendment request for Limerick Generating Station, Units 1 and 2. The proposed license amendment request would implement a power uprate of approximately 1.65% for each LGS unit by utilizing increased accuracy of feedwater flow measurement. The proposed amendment also includes a related modification to the Standby Liquid Control System that is needed to support Anticipated Transient Without Scram response at the proposed uprated conditions. In Reference 2, the NRC staff requested that Exelon supplement the application for the amendment request to include information necessary for the NRC staff to make an independent assessment regarding the acceptability of the proposed amendment.
The NRC staff's supplemental information requests and the Exelon response for each request are provided in Attachment 1 to this letter.
U. S. Nuclear Regulatory Commission Supplement to LAR for Measurement Uncertainty Recapture Power Uprate April 26, 2010 Page 2 Exelon has reviewed the information supporting a finding of no significant hazards consideration, and the environmental consideration provided to the NRC in Reference 1. The additional information provided in this submittal does not affect the bases for concluding that the proposed license amendment does not involve a significant hazards consideration. In addition, the additional information provided in this submittal does not affect the bases for concluding that neither an environmental impact statement nor an environmental assessment needs to be prepared in connection with the proposed amendment.
There are no regulatory commitments contained in this letter.
Should you have any questions concerning this request, please contact Mr. Kevin F. Borton at (610) 765-5615.
I declare under penalty of perjury that the foregoing is true and correct. Executed on the 26th day of April 2010.
Respectfully, Manager, Lice ng - Power Uprate Exelon Generation Company, LLC - Supplemental Information cc: NRC Regional Administrator, Region I NRC Senior Resident Inspector - Limerick Generating Station NRC Project Manager, NRR - Limerick Generating Station Pennsylvania Department of Environmental Protection - Bureau of Radiation Protection
Attachment 1 Supplemental Information NRC Request 1 The NRC staff is assessing two-pump standby liquid control system (SLCS) operation for conformance to Title 10 of the Code of FederalRegulations (10 CFR),
paragraph 50.62(c)(4), which requires a system capable of injecting the equivalent of 86-gallons per minute of 13 weight-percent sodium pentaborate decahydrate solution at the natural boron-1 0 isotope abundance into a 251-inch inside diameter reactor pressure vessel for a given core design. To establish this equivalency, the reactor vessel inside diameter is required. Please provide the reactor vessel inside diameter for LGS, Units 1 and 2.
Response
Limerick Units 1 and 2 have 251 inch inside diameter vessels.
NRC Request 2 Criterion 4 of 10 CFR 50.36(c)(2)(ii) requires the establishment of a Limiting Condition for Operation (LCO) for structures, systems or components which operating experience or probabilistic risk assessment has shown to be significant to public health and safety. This requirement applies to the SLCS, as reflected in the current LGS Unit 1 and 2 Technical Specifications. Because the proposed changes result in an LCO that allows any two pumps to remain operable to meet the LCO, the same degree of assurance should be provided that each pump can meet the specified requirements. Verify that system surveillance, testing, inspection, and maintenance requirements for the 'C' SLCS pump will remain the same as those for the 'A' and 'B' pumps, thereby providing the same degree of assurance exists regarding the operability of the 'C' pump, should it need to be placed in service.
Response
The Limerick Units 1 and 2 SLCS system surveillance, testing, inspection, and maintenance requirements for the 'C' SLCS pump will remain the same as those for the 'A' and 'B' pumps, should it need to be placed in service.
NRC Request 3 The Anticipated Transient Without Scram (ATWS) definition in 10 CFR 50.62(b) describes an anticipated operational occurrence followed by a failure of the reactor trip system, for which systems must be in place to mitigate. In this case, the SLCS is demonstrated to perform its reactivity control function under the conditions of a postulated main steamline isolation valve closure. Although injection against the predicted peak pressure is not necessary, the system must perform its function when required. Please provide additional details regarding the selection of the required injection pressure:
- a. Confirm that the selected pressure corresponds to the pressure predicted at an appropriate time after receipt of an injection signal to account for the system automatic initiation delay.
Attachment 1 Supplemental Information
Response
Based on the results of the Limerick ATWS analysis, the maximum reactor upper plenum pressure following the limiting ATWS event is 1224 psig (1239 psia) during the time the SLCS is analyzed to be in operation (SLCS pumps automatically start when the high pressure ATWS set point is reached plus a 120 second delay as shown in Table 9-6, and Table 9-7 of NEDC-33484P). This peak upper plenum pressure, shown in Table 9-5 of NEDC-33484P, was used in the SLCS pump analysis.
- b. Under conditions indicative of the limiting ATWS pressurization event, what is the average operator time to initiate the SLCS manually?
Response
Limerick is equipped with a Redundant Reactivity Control System which will automatically initiate SLCS (start of 2 pumps) if ATWS conditions are present after a time delay. There is no assumed manual start of SLCS pumps for the limiting ATWS event.
- c. How many pumps would the operator be instructed to start under ATWS conditions?
Response
Following the proposed modification, controls will be in place to ensure only two SLCS pumps will be started. Operating procedures will be revised to direct the operators to ensure only two pumps are started (assuming the automatic initiation fails). In addition, operator training and physical controls will ensure that the third pump will not be inadvertently initiated (i.e., key removed from third SLCS pump key lock control switch).
- d. What is the pressurization effect of an operator initiating a single pump, followed by an automatic initiation?
Response
Based on response 3c above, starting more than two SLCS pumps will be prohibited.
Therefore, there is no pressurization effect of an operator initiating a single pump, followed by an automatic initiation.
- e. Is the possibility described in Item d, above, included in the evaluation of SLCS injection pressures presented in the LAR? If not, why not?
Response
Based on response 3c and 3d above, starting more than two SLCS pumps will be prohibited. Therefore, there was no evaluation required to be performed.