ML100620885

From kanterella
Jump to navigation Jump to search
Inspection/Activity Plan, 03/01/2010 - 06/30/2010, Enclosure - Report 22
ML100620885
Person / Time
Site: Farley  Southern Nuclear icon.png
Issue date: 03/03/2010
From:
Division Reactor Projects II
To:
Southern Nuclear Operating Co
Shared Package
ML100620881 List:
References
IR-10-001
Download: ML100620885 (2)


Text

Page 1 of 2 Farley 03/03/2010 07:08:07 Inspection / Activity Plan Report 22 03/01/2010 - 06/30/2011 Unit Planned Dates No. of Staff Number Start End Inspection Activity Title on Site PB2-SPI - SPECIAL INSPECTION - 2E SW PUMP FAILURE 2 1, 2 02/23/2010 03/26/2010 IP 93812 Special Inspection INIT - INITIAL EXAM PREP 6 1 03/15/2010 03/19/2010 V23323 FARLEY/MARCH 2010 EXAM AT POWER FACILITIES OL EXAM - INITIAL EXAM WEEK 7 1 04/05/2010 04/16/2010 V23323 FARLEY/MARCH 2010 EXAM AT POWER FACILITIES EB3ISI - UNIT 2 ISI 1 2 04/12/2010 04/16/2010 IP 7111108P Inservice Inspection Activities - PWR EB3TI172 - EB3 RCS DM BUTT WELDS 1 1, 2 04/12/2010 04/16/2010 IP 2515/172 Reactor Coolant System Dissimiliar Metal Butt Welds TI-177 - TI-177 GAS INTRUSION 3 1, 2 05/24/2010 05/28/2010 IP 2515/177 Managing Gas Accumulation In Emergency Core Cooling, Decay Heat Removal & Containment Spray System OL RQ - REQUAL INSPECTION 4 1, 2 09/20/2010 09/24/2010 IP 7111111B Licensed Operator Requalification Program EB3ISI - UNIT 1 INSERVICE INSPECTION 1 1 10/18/2010 10/22/2010 IP 7111108P Inservice Inspection Activities - PWR EB3TI172 - EB3 RX COOLANT SYS DM BUTT WELDS 1 1 10/18/2010 10/22/2010 IP 2515/172 Reactor Coolant System Dissimiliar Metal Butt Welds PSB1-RP - RP OCCUPATIONAL BASELINE WEEK1 2 1, 2 10/18/2010 10/22/2010 IP 71124.01 Radiological Hazard Assessment and Exposure Controls 1, 2 10/18/2010 10/22/2010 IP 71124.02 Occupational ALARA Planning and Controls 1, 2 10/18/2010 10/22/2010 IP 71124.03 In-Plant Airborne Radioactivity Control and Mitigation 1, 2 10/18/2010 10/22/2010 IP 71124.04 Occupational Dose Assessment 1, 2 10/18/2010 10/22/2010 IP 71124.05 Radiation Monitoring Instrumentation 1, 2 10/18/2010 10/22/2010 IP 71151 Performance Indicator Verification EB3SGISI - UNIT 1 SG INSERVICE INSPECTION 1 1 10/25/2010 10/29/2010 IP 7111108P Inservice Inspection Activities - PWR PSB1-RP - RP OCCUPATIONAL BASELINE WEEK 2 2 1, 2 11/01/2010 11/05/2010 IP 71124.01 Radiological Hazard Assessment and Exposure Controls 1, 2 11/01/2010 11/05/2010 IP 71124.02 Occupational ALARA Planning and Controls 1, 2 11/01/2010 11/05/2010 IP 71124.03 In-Plant Airborne Radioactivity Control and Mitigation 1, 2 11/01/2010 11/05/2010 IP 71124.04 Occupational Dose Assessment 1, 2 11/01/2010 11/05/2010 IP 71124.05 Radiation Monitoring Instrumentation 1, 2 11/01/2010 11/05/2010 IP 71151 Performance Indicator Verification This report does not include INPO and OUTAGE activities.

This report shows only on-site and announced inspection procedures. Enclosure

Page 2 of 2 Farley 03/03/2010 07:08:07 Inspection / Activity Plan Report 22 03/01/2010 - 06/30/2011 Unit Planned Dates No. of Staff Number Start End Inspection Activity Title on Site PSB1EP - EMERGENCY PREPAREDNESS EXERCISE 3 1, 2 12/06/2010 12/10/2010 IP 7111401 Exercise Evaluation 1, 2 12/06/2010 12/10/2010 IP 7111404 Emergency Action Level and Emergency Plan Changes 1, 2 12/06/2010 12/10/2010 IP 71151 Performance Indicator Verification EB3HS - HEAT SINK 1 1, 2 01/31/2011 02/04/2011 IP 7111107T Heat Sink Performance TFPI - TRIENNIAL FIRE PROTECTION INSPECTION 2 1, 2 03/07/2011 03/11/2011 IP 7111105T Fire Protection [Triennial]

1, 2 03/07/2011 03/25/2011 IP 7111105T Fire Protection [Triennial]

OL EXAM - INITIAL EXAM PREP 4 1 04/18/2011 04/22/2011 V23349 FARLEY/MAY 2011 EXAM AT POWER FACILITIES PSB1EP - EMERGENCY PREPAREDNESS INSPECTION 1 1, 2 05/02/2011 05/06/2011 IP 7111402 Alert and Notification System Evaluation 1, 2 05/02/2011 05/06/2011 IP 7111403 Emergency Response Organization Augmentation Testing 1, 2 05/02/2011 05/06/2011 IP 7111404 Emergency Action Level and Emergency Plan Changes 1, 2 05/02/2011 05/06/2011 IP 7111405 Correction of Emergency Preparedness Weaknesses and Deficiencies 1, 2 05/02/2011 05/06/2011 IP 71151-EP01 Drill/Exercise Performance 1, 2 05/02/2011 05/06/2011 IP 71151-EP02 ERO Drill Participation 1, 2 05/02/2011 05/06/2011 IP 71151-EP03 Alert & Notification System OL EXAM - INITIAL EXAM - WEEK 1 3 1 05/09/2011 05/14/2011 V23349 FARLEY/MAY 2011 EXAM AT POWER FACILITIES OL EXAM - INITIAL EXAM - WEEK 2 3 1 05/16/2011 05/27/2011 V23349 FARLEY/MAY 2011 EXAM AT POWER FACILITIES This report does not include INPO and OUTAGE activities.

This report shows only on-site and announced inspection procedures. Enclosure