EOC Assessment Letter, Inspection/Activity Plan
ML100610484
Person / Time
Site: Point Beach  NextEra Energy icon.png
Issue date: 03/03/2010
From: Stephanie West
Division Reactor Projects III
To: Meyer L
Point Beach
References
EA-06-178, FOIA/PA-2010-0209
Download: ML100610484 (7)


Text

UNITED STATES NUCLEAR REGULATORY COMMISSION REGION III 2443 WARRENVILLE ROAD, SUITE 210 LISLE, IL 60532-4352 March 3, 2010 EA-06-178 Mr. Larry Meyer Site Vice-President NextEra Energy Point Beach, LLC 6610 Nuclear Road Two Rivers, WI 54241

SUBJECT:

ANNUAL ASSESSMENT LETTER - POINT BEACH NUCLEAR PLANT, UNITS 1 AND 2 (05000266/2010001; 05000301/2010001)

Dear Mr. Meyer:

On February 10, 2010, the NRC staff completed its performance review of Point Beach Nuclear Plant, Units 1 and 2. Our technical staff reviewed performance indicators (PIs) for the most recent quarter and inspection results for the period from January 1 through December 31, 2009.

The purpose of this letter is to inform you of our assessment of your safety performance during this period and our plans for future inspections at your facility.

This performance review and enclosed inspection plan do not include security information.

A separate letter designated and marked as "Official Use Only -- Security Information" will include the Security Cornerstone review and resultant inspection plan.

Overall, Point Beach Nuclear Plant operated in a manner that preserved public health and safety and fully met all cornerstone objectives. Plant performance for the most recent quarter, as well as for the first three quarters of the assessment cycle, was within the Licensee Response column of the NRCs Action Matrix, based on all inspection findings being classified as having very low safety significance (Green) and all PIs indicating performance at a level requiring no additional NRC oversight (Green). Therefore, we plan to conduct reactor oversight process (ROP) baseline inspections at your facility.

In our March 4, 2009, Annual Assessment Letter for 2008 (ADAMS Accession Number ML090630351), we requested that you perform an independent assessment of the corrective actions taken in response to the 2004, 2006, and 2008 independent safety culture surveys referenced in our January 2007 Confirmatory Order EA-06-178 (ML063630336). At that time, we requested this independent assessment because you had exceeded three assessment periods with a substantive cross-cutting issue in human performance and problem identification and resolution, and had seen only nominal improvements in your overall nuclear safety culture assessment conducted in 2008.

L. Meyer In our September 1, 2009, Mid-Cycle Performance Review letter (ML092440297), we noted that you had completed the requested independent assessment and that the corrective actions you had planned and taken for the 2008 safety culture survey were more effective than those taken for the 2004 and 2006 safety culture surveys and provided reasonable assurance that progress could be sustained. In December 2009, we conducted our final review of actions you have taken in response to the Order. Our review corroborated your independent assessment and we concluded that your continuing focus on safety culture corrective actions will sustain and further improve performance in this area. Finally, we completed our review of your actions required by the Confirmatory Order (EA-06-178) for Point Beach. The results of our review were documented in the fourth quarter 2009 Integrated Inspection Report 05000266/2009005; 05000301/2009005 (ML100410106 and ML100431371).

Additionally, on June 24, 2009, the staff issued a Severity Level III Notice of Violation accordance with the NRC's Enforcement Policy. The violation was discussed in NRC Inspection Report 05000266/2009008; 05000301/2009008 (ML091030350), dated April 8, 2009, and pertained to failing to notify the NRC when licensed operators develop a permanent disability or illness. A follow-up inspection was completed in the third quarter of 2009 with no concerns noted.

The enclosed inspection plan details the inspections, less those related to security, scheduled through June 30, 2011. In addition to the baseline inspections, some infrequently conducted inspections, such as Inspection Procedure 71004, "Power Uprate," are scheduled during this period. The inspection plan is provided to allow for the resolution of any scheduling conflicts and personnel availability issues well in advance of inspector arrival onsite. Routine resident inspections are not listed due to their ongoing and continuous nature. The inspections in the last 9 months of the inspection plan are tentative and may be revised at the mid-cycle review.

In accordance with 10 CFR 2.390 of the NRC=s ARules of Practice,@ a copy of this letter and its enclosure will be made available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of NRC's Agencywide Documents Access and Management System (ADAMS). ADAMS is accessible from the NRC Website at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).

L. Meyer If circumstances arise which cause us to change this inspection plan, we will contact you to discuss the change as soon as possible. Please contact Michael Kunowski at (630) 829-9618 with any questions you may have regarding this letter or the inspection plan.

Sincerely,

/RA/

Steven West, Director Division of Reactor Projects Docket Nos. 50-266; 50-301 License Nos. DPR-24; DPR-27

Enclosure:

Point Beach Inspection/Activity Plan cc w/encl: Distribution via ListServ

L. Meyer If circumstances arise which cause us to change this inspection plan, we will contact you to discuss the change as soon as possible. Please contact Michael Kunowski at (630) 829-9618 with any questions you may have regarding this letter or the inspection plan.

Sincerely,

/RA/

Steven West, Director Division of Reactor Projects Docket Nos. 50-266; 50-301 License Nos. DPR-24; DPR-27

Enclosure:

Point Beach Inspection/Activity Plan cc w/encl: Distribution via ListServ DOCUMENT NAME: G:\1-SECY\1-WORK IN PROGRESS\POINT BEACH 2009 EOC LETTER.DOC G Publicly Available G Non-Publicly Available G Sensitive G Non-Sensitive To receive a copy of this document, indicate in the concurrence box "C" = Copy without attach/encl "E" = Copy with attach/encl "N" = No copy OFFICE RIII RIII RIII RIII NAME JJandovitz:cms MKunowski SWest DATE 02/19/10 02/23/10 03/03/10 OFFICIAL RECORD COPY

Letter to L. Meyer from S. West dated March 3, 2010

SUBJECT:

ANNUAL ASSESSMENT LETTER - POINT BEACH NUCLEAR PLANT, UNITS 1 AND 2 (05000266/2010001; 05000301/2010001)

DISTRIBUTION:

Susan Bagley RidsNrrDorlLpl3-1 Resource RidsNrrPMPointBeach RidsNrrDirsIrib Resource Cynthia Pederson Steven Orth Jared Heck Allan Barker Carole Ariano Linda Linn DRPIII DRSIII Patricia Buckley Tammy Tomczak ROPreports Resource

Point Beach Inspection / Activity Plan 03/01/2010 - 06/30/2011 Planned Dates No. of Staff Start End Inspection Activity Title on Site BI ENG - ENGINEERING INSERVICE INSPECTION - U1 1 03/01/2010 03/26/2010 IP 2515/172 Reactor Coolant System Dissimiliar Metal Butt Welds 03/01/2010 03/26/2010 IP 7111108P Inservice Inspection Activities - PWR RENEWAL - LICENSE RENEWAL 71003 PHASE 1 - U1 3 03/01/2010 03/26/2010 IP 71003 Post-Approval Site Inspection for License Renewal BI RP - RADIATION PROTECTION BASELINE INSPECTION 1 03/15/2010 03/19/2010 IP 71124.01 Radiological Hazard Assessment and Exposure Controls BI ENG - TRIENNIAL FIRE PROTECTION INSPECTION 3 05/10/2010 05/28/2010 IP 7111105T Fire Protection [Triennial]

BI ENG - TRIENNIAL FIRE INS INFO GATHERING TRIP 3 04/26/2010 04/30/2010 IP 7111105T Fire Protection [Triennial]

TI - TI 2515/177 1 06/21/2010 06/25/2010 IP 2515/177 Managing Gas Accumulation In Emergency Core Cooling, Decay Heat Removal & Containment Spray System STRIKE - STRIKE CONTINGENCY - OPS/MAINT/RP/ 1 07/16/2010 08/15/2010 IP 92709 Licensee Strike Contingency Plans RENEWAL - LICENSE RENEWAL 71003 - PHASE 2 - U1 6 08/09/2010 08/27/2010 IP 71003 Post-Approval Site Inspection for License Renewal BI RP - RADIATION PROTECTION BASELINE INSPECTION 1 08/16/2010 08/20/2010 IP 2515/173 Review of the Implementation of the Industry Ground Water Protection Voluntary Initiative 08/16/2010 08/20/2010 IP 71151-BI01 Reactor Coolant System Activity 08/16/2010 08/20/2010 IP 71151-OR01 Occupational Exposure Control Effectiveness 08/16/2010 08/20/2010 IP 71151-PR01 RETS/ODCM Radiological Effluent BI RP - RADIATION PROTECTION BASELINE INSPECTION 1 08/30/2010 09/03/2010 IP 71124.05 Radiation Monitoring Instrumentation BI EP - EP EXERCISE INSPECTION / PI VERIFICATION 3 10/25/2010 10/29/2010 IP 7111401 Exercise Evaluation 10/25/2010 10/29/2010 IP 71151-EP01 Drill/Exercise Performance 10/25/2010 10/29/2010 IP 71151-EP02 ERO Drill Participation 10/25/2010 10/29/2010 IP 71151-EP03 Alert & Notification System BI RP - RADIATION PROTECTION BASELINE INSPECTION 1 11/15/2010 11/19/2010 IP 71124.02 Occupational ALARA Planning and Controls BI RP - RADIATION PROTECTION BASELINE INSPECTION 1 01/10/2011 01/14/2011 IP 2515/179 Verification of Licensee Responses to NRC Requirement for Inventories of Materials Tracked in NSTS 01/10/2011 01/14/2011 IP 71124.01 Radiological Hazard Assessment and Exposure Controls

Point Beach Inspection / Activity Plan 03/01/2010 - 06/30/2011 Planned Dates No. of Staff Start End Inspection Activity Title on Site UPRATE - POWER UPRATE - FAC/EC NON-OUTAGE PORTION 1 01/24/2011 01/28/2011 IP 71004 Power Uprate RENEWAL - LICENSE RENEWAL 71003-PHASE 1 - U2 1 03/01/2011 05/15/2011 IP 71003 Post-Approval Site Inspection for License Renewal BI ENG - ENGINEERING INSERVICE INSPECTION - U2 1 03/01/2011 04/04/2011 IP 7111108P Inservice Inspection Activities - PWR UPRATE - POWER UPRATE FAC/EC OUTAGE PORTION 1 03/01/2011 04/04/2011 IP 71004 Power Uprate BI RP - RADIATION PROTECTION BASELINE INSPECTION 1 04/04/2011 04/08/2011 IP 71124.03 In-Plant Airborne Radioactivity Control and Mitigation 04/04/2011 04/08/2011 IP 71124.04 Occupational Dose Assessment OL PREP - POINT BEACH INIT PREP - 02/2011 3 04/04/2011 04/08/2011 W90233 OL - INITIAL EXAM - MAR 2011 - POIN OL EXAM - POINT BEACH INIT EXAM - 03/2011 3 04/25/2011 05/06/2011 W90233 OL - INITIAL EXAM - MAR 2011 - POIN BI RP - RADIATION PROTECTION BASELINE INSPECTION 1 05/16/2011 05/20/2011 IP 71124.06 Radioactive Gaseous and Liquid Effluent Treatment 05/16/2011 05/20/2011 IP 71124.07 Public Radiation Safety BI RP - RADIATION PROTECTION BASELINE INSPECTION 1 06/06/2011 06/10/2011 IP 71124.08 Radioactive Solid Waste Processing and Radioactive Material Handling, Storage, and Transportation BI ENG - COMPONENT DESIGN BASIS INSPECTION 5 06/13/2011 07/15/2011 IP 7111121 Component Design Bases Inspection BI PI&R - BIENNIAL PI&R INSPECTION 3 06/27/2011 07/15/2011 IP 71152B Identification and Resolution of Problems