ML100600683

From kanterella
Jump to navigation Jump to search
Technical Requirements Manual
ML100600683
Person / Time
Site: Susquehanna Talen Energy icon.png
Issue date: 02/15/2010
From: Gerlach R
Susquehanna
To:
Document Control Desk, Office of Nuclear Reactor Regulation
References
028401, 2010-5516
Download: ML100600683 (37)


Text

Feb. 15, 2010 Page 1

of 2

MANUAL HARD COPY DISTRIBUTION DOCUMENT TRANSMITTAL 2010-5516 USER INFORMATION:

GERLACH*ROSE M EMPL#:028401 CA#:

0363 Address: NUCSA2 Phone#:

254-3194 TPANTMTTTAIT TNFCYRMATTONT TO:

GERLACH*ROSE M 02/15/2010 LOCATION:

USNRC FROM:

NUCLEAR RECORDS DOCUMENT CONTROL CENTER (NUCSA-2)

THE FOLLOWING CHANGES HAVE OCCURRED TO THE HARDCOPY OR ELECTRONIC MANUAL ASSIGNED TO YOU.

HARDCOPY USERS MUST ENSURE THE DOCUMENTS PROVIDED MATCH THE INFORMATION ON THIS TRANSMITTAL.

WHEN REPLACING THIS MATERIAL IN YOUR HARDCOPY MANUAL, ENSURE THE UPDATE DOCUMENT ID IS THE SAME DOCUMENT ID YOU'RE REMOVING FROM YOUR MANUAL.

TOOLS FROM THE HUMAN PERFORMANCE TOOL BAG SHOULD BE UTILIZED TO ELIMINATE THE CHANCE OF ERRORS.

ATTENTION:

"REPLACE" directions do not affect the Table of Contents, Therefore no TOC will be issued with the updated material.

TRM2 TECHNICAL REQUIREMENTS MANUAL UNIT 2 REMOVE MANUAL TABLE OF CONTENTS DATE: 01/29/2010 ADD MANUAL TABLE OF CONTENTS DATE: 02/12/2010 CATEGORY:

DOCUMENTS TYPE: TRM2 Aeoo

Feb.

15, 2010 Page 2

of 2

ID:

TEXT 2.2 ADD:

REV:

9 REMOVE:

REV:8 CATEGORY:

DOCUMENTS TYPE:

TRM2 ID:

TEXT LOES ADD:

REV:

56 REMOVE:

REV:55 ANY DISCREPANCIES WITH THE MATERIAL PROVIDED, CONTACT DCS @ X3107 OR X3136 FOR ASSISTANCE.

UPDATES FOR HARDCOPY MANUALS WILL BE DISTRIBUTED WITHIN 3 DAYS IN ACCORDANCE WITH DEPARTMENT-PROCEDURES.

PLEASE MAKE ALL CHANGES AND ACKNOWLEDGE COMPLETE IN YOUR NIMS INBOX UPON COMPLETION OF UPDATES.

FOR ELECTRONIC MANUAL

USERS, ELECTRONICALLY REVIEW THE APPROPRIATE DOCUMENTS AND ACKNOWLEDGE COMPLETE IN YOUR NIMS INBOX.

SSES MANUAL Manual Name:

TRM2 Manual

Title:

TECHNICAL REQUIREMENTS MANUAL UNIT 2 Table Of Contents Issue Date:

02/12/2010 Procedure Name Rev Issue Date TEXT LOES 56 02/12/2010

Title:

LIST OF EFFECTIVE SECTIONS Change ID Change Number TEXT TOC

Title:

TABLE OF CONTENTS 16 09/16/2009 TEXT 1.1 0

11/19/2002

Title:

USE AND APPLICATION DEFINITIONS TEXT 2.1 1

02/04/2005 -,

Title:

PLANT PROGRAMS AND SETPOINTS PLANT-PROGRAMS TEXT 2.2 9

< 02/12/2010

Title:

PLANT PROGRAMS AND SETPOINTS INSTRUMENT TRIP SETPOINT TABLE LDCN 4444 TEXT 3.0 4

05/23/2008

Title:

APPLICABILITY TECHNICAL REQUIREMENT FOR OPERATION (TRO)

APPLICABILITY TEXT 3.1.1

\\

1 11/09/2007

Title:

REACTIVITY CONTROL SYSTEMS ANTICIPATED TRANSIENT WITHOUT SCRAM ALTERNATE ROD INJECTION, \\(ATWSLARI)

INSTRUMENTATION TEXT 3.1.2 X

0 11/19/2002

Title:

REACTIVITY CONTROL SYSTEMS CONTROL ROD DRIVE (CRD)

HOUSING SUPPORT TEXT 3.1.3 4

05/14/2009

Title:

REACTIVITY CONTROL SYSTEMS CONTROL ROD BLOCK INSTRUMENTATION TEXT 3.1.4 0

11/19/2002

Title:

REACTIVITY CONTROL SYSTEMS CONTROL ROD SCRAM ACCUMULATORS INSTRUMENTATION AND CHECK VALVE TEXT 3.2.1 8

05/14/2009

Title:

CORE OPERATING LIMITS CORE OPERATING LIMITS REPORT (COLR)

LDCN 4712 Page 1 of 15 Report Date: 02/16/10 Page 1 of

.15 Report Date: 02/16/10

SSES MANUAL Manual Name:

TRM2 Manual

Title:

TECHNICAL REQUIREMENTS MANUAL UNIT 2 TEXT 3.3.1

Title:

INSTRUMENTATION TEXT 3.3.2

Title:

INSTRUMENTATION TEXT 3.3.3

Title:

INSTRUMENTATION TEXT 3.3.4

Title:

INSTRUMENTATION TEXT 3.3.5

Title:

INSTRUMENTATION TEXT 3.3.6

Title:

INSTRUMENTATION TEXT 3.3.7

Title:

INSTRUMENTATION TEXT 3.3.8

Title:

INSTRUMENTATION TEXT 3.3.9

Title:

INSTRUMENTATION TEXT 3.3.10

Title:

INSTRUMENTATION TEXT 3.3.11

Title:

INSTRUMENTATION TEXT 3.3.12 0

11/19/2002 RADIATION MONITORING INSTRUMENTATION 2

11/09/2007 SEISMIC MONITORING INSTRUMENTATION 2

11/09/2007 METEOROLOGICAL MONITORING INSTRUMENTATION 5

05/23/2008 TRM POST-ACCIDENT MONITORING INSTRUMENTATION 0

11/1.9/2002 THIS PAGE INTENTIONALLY LEFT BLANK 2

10/19/2005 TRM ISOLATION ACTUATION INSTRUMENTATION 1

11/09/2007 MAIN TURBINE OVERSPEED PROTECTION SYSTEM 1

10/22/2003 TRM RPS INSTRUMENTATION 3

05/14/2009 LPRM UPSCALE ALARM INSTRUMENTATION 1

12/14/2004 REACTOR RECIRCULATION PUMP MG SET STOPS 1

10/22/2003 MVP ISOLATION INSTRUMENTATION 0

04/16/2009

Title:

WATER MONITORING INSTRUMENTATION PageZ of 15 Report Date: 02/16/10

.Page 2 of

.15 Report Date: 02/16/10

SSERS MANAL Manual Name:

TRM2 Manual

Title:

TECHNICAL REQUIREMENTS-MANUAL UNIT 2 TEXT 3. 4.1

Title:

REACTOR TEXT 3.4.2

Title:

REACTOR TEXT 3.4.3

Title:

REACTOR TEXT 3.4.4

Title:

REACTOR TEXT 3.4.5

Title:

REACTOR TEXT 3.5.1 1

04/26/2006 COOLANT SYSTEM REACTOR COOLANT SYSTEM CHEMISTRY 1

04/16/2009 COOLANT SYSTEM STRUCTURAL INTEGRITY 1

11/09/2007 COOLANT SYSTEM REACTOR COOLANT SYSTEM (RCS) 2 05/14/2009 COOLANT SYSTEM REACTOR RECIRCULATION FLOW AND ROD LINE LIMIT 1

04/26/2006 COOLANT SYSTEM REACTOR VESSEL MATERIALS 1

02/04/2005

Title:

ECCS AND RCIC ADS MANUAL INHIBIT TEXT 3.5.2 1

11/09/2007

Title:

ECCS AND RCIC ECCS AND RCIC SYSTEM MONITORING INSTRUMENTATION TEXT 3.5.3 0

11/19/2002

Title:

ECCS AND RCIC LONG TERM NITROGEN SUPPLY-TO ADS TEXT 3.6.1 0

11/19/2002

Title:

CONTAINMENT VENTING.OR PURGING TEXT 3.6.2 0

11/19/2002

Title:

CONTAINMENT SUPPRESSION CHAMBER-TO-DRYWELL VACUUM BREAKER POSITION INDICATION TEXT 3.6.3 0

11/19/2002

Title:

CONTAINMENT SUPPRESSION POOL ALARM INSTRUMENTATION TEXT 3.6.4 0

11/19/2002

Title:

CONTAINMENT PRIMARY CONTAINMENT CLOSED SYSTEM BOUNDARIES Page3 of

.15 Report Date: 02/16/10

SSES MANUJAL Manual Name:

TRM2 Manual

Title:

TECHNICAL REQUIREMENTS MANUAL UNIT 2 TEXT 3.7.1

Title:

PLANT TEXT 3.7.2

Title:

PLANT TEXT 3.7.3.1

Title:

PLANT TEXT 3.7.3.2

Title:

PLANT TEXT 3.7.3.3

Title:

PLANT

\\K TEXT 3.7.3.4

Title:

PLANT TEXT 3.7.3.5

Title:

PLANT TEXT 3.7.3.6

Title:

PLANT TEXT 3.7.3.7

Title:

PLANT TEXT 3.7.3.8

Title:

PLANT TEXT 3.7.4

Title:

PLANT 0

, 11/19/2002 SYSTEMS EMERGENCY SERVICEWATER SYSTEM,(ESW)

SHUTDOWN 0

11/19/2002 SYSTEMS ULTIMATE HEAT SINK (UHS)

AND GROUND WATER LEVEL 2

04/16/2009 SYSTEMS FIRE SUPPRESSIONWATER SUPPLY SYSTEM 3

04/16/2009 SYSTEMS SPRAY AND SPRINKLER SYSTEMS 3

-Q4/16/2009 SYSTEMS C02 SYSTEMS 2

04/16/2009 SYSTEMS HALON SYSTEMS' 2

0,4/16/2009 SYSTEMS FIRE HOSE STATIONS 2

04/16/2009 SYSTEMS YARD FIRE HYDRANTS AND HYDRANT HOSE HOUSES 1

04/26/2006 SYSTEMS FIRE RATED ASSEMBLIES 8

01/20/2010 SYSTEMS FIRE DETECTION INSTRUMENTATION 1

04/26/2006 SYSTEMS SOLID RADWASTE SYSTEM

'TEXT 3.7.5.1 0

11/19/2002

Title:

PLANT SYSTEMS MAIN CONDENSER OFFGAS HYDROGEN MONITOR Page 4 of 15 Report Date: 02/16/10 Page 4 of

.15 Report Date: 02/16/10

',*SSES MANUAL Manual Name:

TRM2 Manual

Title:

TECHNICAL REQUIREMENTS MANUAL UNIT:2 TEXT 3.7.5.2 0

11/19/2002

Title:

PLANT SYSTEMS MAIN CONDENSER OFFGAS EXPLOSIVE GAS, MIXTURE TEXT 3.7.5.3 1

04/26/2006

Title:

PLANT SYSTEMS LIQUID HOLDUP TANKS TEXT 3.7.6 2

06/27/2008

Title:

PLANT SYSTEMS ESSW PUMPHOUSE VENTILATION TEXT 3.7.7 2

09/05/2008

Title:

PLANT SYSTEMS MAIN CONDENSER OFFGAS PRETREATMENT LOGARITHMIC RADIATION MONITORING INSTRUMENTATION TEXT 3.7.8 6

0-6/21/2007

Title:

PLANT SYSTEMS SNUBBERS TEXT 3.7.9 1

08/28/2006

Title:

PLANT SYSTEMS CONTROL STRUCTURE HVAC TEXT 3.7.10 1

12/14/2004

Title:

PLANT SYSTEMS SPENT FUEL STORAGE POOLS (SFSPS)

TEXT 3.7.11 1

10/02/2009

Title:

PLANT SYSTEMS TEXT 3. 8.1

Title:

ELECTRICAL PROTECTIVE TEXT 3.8.2.1

Title:

ELECTRICAL CONTINUOUS TEXT 3.8.2.2

Title:

ELECTRICAL AUTOMATIC TEXT 3.8.3

Title:

ELECTRICAL 2

02/04/2005 POWER PRIMARY CONTAINMENT PENETRATION CONDUCTOR OVERCURRENT DEVICES 2

11/09/2007 POWER MOTOR OPERATED VALVES (MOV)

THERMAL OVERLOAD PROTECTION -

2 12/14/2004 POWER MOTOR OPERATED VALVES (MOV)

THERMAL OVERLOAD PROTECTION -

0 11/19/2002 POWER DIESEL GENERATOR (DG)- MAINTENANCE ACTIVITIES Page 5 of 15 Report Date: 02/16/10 Page 5 of

.15 Report Date: 02/16/10

SSES MANUAL Manual Name:

TRM2 Manual

Title:

TECHNICAL REQUIREMENTS MANUAL UNIT 2 TEXT 3.8.4 1

02/04/2005

Title:

ELECTRICAL POWER 24 VDCELECTRICAL SUBSYSTEM TEXT 3.8.5 0

11/19/2002

Title:

ELECTRICAL POWER DEGRADED VOLTAGE PROTECTION TEXT 3.8.6 0

11/19/2002

Title:

ELECTRICAL POWER EMERGENCY SWITCHGEAR ROOM COOLING TEXT 3.8.7 2

10/22/2009

Title:

BATTERY MAINTENANCE AND MONITORING PROGRAM TEXT 3.9.1 0

1-1/19/2002

Title:

REFUELING OPERATIONS DECAY TIME.

TEXT 3.9.2 0

11/19/2002

Title:

REFUELING OPERATIONS COMMUNICATIONS TEXT 3.9.3 0

11/19/2002

Title:

REFUELING OPERATIONS REFUELING PLATFORM TEXT 3.10.1 1

04/26/2006

Title:

MISCELLANEOUS SEALED SOURCE CONTAMINATION TEXT 3.10.2 1

04/09/2007

Title:

MISCELLANEOUS SHUTDOWN MARGIN TEST RPS INSTRUMENTATION TEXT 3.10.3 1

04/26/2006

Title:

MISCELLANEOUS INDEPENDENT SPENT FUEL STORAGE INSTALLATION (ISFSI)

TEXT 3.11.1.1 1

04/26/2006

Title:

RADIOACTIVE EFFLUENTS LIQUID EFFLUENTS CONCENTRATION TEXT 3.11.1.2 1

04/26/2006

Title:

RADIOACTIVE EFFLUENTS LIQUID EFFLUENTS DOSE Page 6 of

.15 Report Date: 02/16/10

SSES MANUAL Manual Name:

TRM2 Manual

Title:

TECHNICAL REQUIREMENTS MANUAL UNIT 2 TEXT 3.11.1.3

Title:

RADIOACTIVE TEXT 3.11.1.4

Title:

RADIOACTIVE TEXT 3.11.1.5

Title:

RADIOACTIVE TEXT 3.11.2.1

Title:

RADIOACTIVE TEXT 3.11.2.2

Title:

RADIOACTIVE TEXT 3.11.2.3

Title:

RADIOACTIVE FORM TEXT 3.11.2.4

Title:

RADIOACTIVE TEXT 3.11.2.5

Title:

RADIOACTIVE TEXT 3.11.2.6

Title:

RADIOACTIVE`

EFFLUENTS EFFLUENTS EFFLUENTS EFFLUENTS EFFLUENTS EFFLUENTS EFFLUENTS 1

'04/26/2006 LIQUID WASTE TREATMENT SYSTEM 1

12/14/2004 LIQUID RADWASTE EFFLUENT MONITORING INSTRUMENTATION 2

05/02/2007 RADIOACTIVE LIQUID PROCESS MONITORING INSTRUMENTATION 3

04/26/2006 DOSE RATE.

1 04/.26/2006 DOSE NOBLE GASES 1

04/26/2006 DOSE -

IODINE, TRITIUM, AND RADIONUCLIDES IN PARTICULATE 0

11/19/2002 GASEOUS RADWASTE TREATMENT SYSTEM EFFLUENTS EFFLUENTS 3

11/14/2006 VENTILATION EXHAUST 4

09/16/2009 RADIOACTIVE GASEOUS 1

04/26/2006 TOTAL DOSE

'TREATMENT SYSTEM EFFLUENT MONITORING INSTRUMENTATION TEXT 3.11.3

Title:

RADIOACTIVE EFFLUENTS TEXT 3.11.4.1 3

04/26/2006

Title:

RADIOACTIVE EFFLUENTS MONITORING PROGRAM TEXT 3.11.4.2

Title:

RADIOACTIVE EFFLUENTS 2

04/26/2006 LAND USE CENSUS..

Page 2 of 15 Report Date: 02/16/10 Page 7 of 15 Report Date: 02/16/10

SSES MANUAL Manual Name:

TRM2 Manual

Title:

TECHNICAL REQUIREMENTS MANUAL UNIT 2 TEXT 3.11.4.3 1

04/26/2006

Title:

RADIOACTIVE EFFLUENTS INTERLABORATORY COMPARISON PROGRAM TEXT 3.12.1 0

11/19/2002

Title:

LOADS CONTROL PROGRAM CRANE TRAVEL-SPENT FUEL STORAGE POOL TEXT 3.12.2 4

04/17/2008

Title:

LOADS CONTROL PROGRAM HEAVY LOADS REQUIREMENTS TEXT 3.12.3 0

11/19/2002

Title:

LOADS CONTROL PROGRAM LIGHT LOADS REQUIREMENTS TEXT 4.1

Title:

TEXT 4.2

Title:

TEXT 4.3

Title:

TEXT 4.4

Title:

TEXT 4.5

Title:

TEXT 4.6

Title:

TEXT 4.7

Title:

TEXT B3.0 0

C.ONTROLS 09/27/2003 ORGANIZATION ADMINISTRATIVE ADMINISTRATIVE ADMINISTRATIVE ADMINISTRATIVE ADMINISTRATIVE ADMINISTRATIVE ADMINISTRATIVE 0

09/27/2003 CONTROLS REPORTABLE EVENT ACTION 0

CONTROLS 1

CONTROLS 0

CONTROLS 0

CONTROLS 0

CONTROLS 09/27/2003 SAFETY LIMIT VIOLATION 12/18/2008 PROCEDURES & PROGRAMS S09/27/2003 REPORTING REQUIREMENTS 09/27/2003 RADIATION PROTECTION PROGRAM 09/27/2003 TRAINING 4

05/23/2008

Title:

APPLICABILITY BASES TECHNICAL REQUIREMENT FOR OPERATION (TRO)

APPLICABILITY N

Page8 of.15 Report Date: 02/16/10

SSES MANUAL Manual Name:

TRM2 Manual

Title:

TECHNICAL REQUIREMENTS MANUAL UNIT 2 TEXT B3.1.1 1

11/09/2007

Title:

REACTIVITY -CONTROL SYSTEM BASES ANTICIPATED ROD INJECTION (ATWS-ARI)

INSTRUMENTATION TEXT B3.1.2 0

11/19/2002

Title:

REACTIVITY CONTROL SYSTEM BASES CONTROL ROD TEXT B3.1.3 3

04/10/2007

Title:

REACTIVITY CONTROL SYSTEM BASES CONTROL ROD TEXT B3.1.4 0

11/19/,2002

Title:

REACTIVITY CONTROL SYSTEM BASES CONTROL ROD AND CHECK VALVE TEXT B3.2.1 0

11/19/2002

Title:

CORE OPERATING LIMITS BASES CORE OPERATING I TRANSIENT WITHOUT SCRAM ALTERNATE DRIVE (CRD)

HOUSING SUPPORT BLOCK INSTRUMENTATION SCRAM ACCUMULATORS INSTRUMENTATION LIMITS REPORT (COLR)

TEXT B3.3.1 0

11/19/2002

Title:

INSTRUMENTATION.BASES RADIATION MONITORING INSTRUMENTATION TEXT B3.3.2

Title:

INSTRUMENTATION TEXT B3.3.3

Title:

INSTRUMENTATION TEXT B3.3.4

Title:

INSTRUMENTATION TEXT B3.3.5

Title:

INSTRUMENTATION TEXT B3.3.6

Title:

INSTRUMENTATION TEXT B3.3.7

Title:

INSTRUMENTATION 1

11/09/2007 BASES SEISMIC MONITORING INSTRUMENTATION 2

11/09/2007 BASES METEOROLOGICAL MONITORING INSTRUMENTATION 3

11/09/2007 BASES TRM.POST ACCIDENT MONITORING (PAM)

INSTRUMENTATION 2

11/09/2007 BASES THIS PAGE INTENTIONALLY LEFT BLANK 3

.10/19/2005 BASES TRM ISOLATION ACTUATION INSTRUMENTATION 1

11/09/2007 BASES MAIN TURBINE OVERSPEED PROTECTION SYSTEM Page ~.

of 15 Report 'Date: 02/16/10 Page 9 of

.15 Report Date: 02/16/10

SSES, MANUAL Manual Name:

TRM2 Manual

Title:

TECHNICAL REQUIREMENTS MANUAL UNIT 2 TEXT B3.3.8

Title:

INSTRUMENTATION TEXT B3.3.9

Title:

INSTRUMENTATION TEXT B3.3.10

Title:

INSTRUMENTATION TEXT B3.3.11

Title:

INSTRUMENTATION 1

1. 10/22/2003 BASES TRM RPS INSTRUMENTATION 3

05/14/2009 BASES LPRM UPSCALE ALARM INSTRUMENTATION 1

12/18/2008 BASES REACTOR RECIRCULATION PUMP MG SET STOPS 1

10/22/2003 BASES MVP ISOLATION INSTRUMENTATION TEXT B3.3.12 0

.04/16/2009

Title:

WATER MONITORING INSTRUMENTATION TEXT B3.4.1

Title:

REACTOR TEXT B3.4.2

Title:

REACTOR TEXT B3.4.3

Title:

REACTOR TEXT B3.4.4

Title:

REACTOR TEXT B3.4.5

Title:

REACTOR 0

COOLANT SYSTEM BASES 1

COOLANT SYSTEM BASES 1

COOLANT SYSTEM BASES 11/19/2002 REACTOR COOLANT SYSTEM CHEMISTRY 04/16/2009 STRUCTURAL INTEGRITY 11/09/2007 HIGH/LOW PRESSURE INTERFACE LEAKAGE MONITOR 0

11/19/2002 COOLANT SYSTEM BASES REACTOR RECIRCULATION FLOW AND ROD LINE LIMIT 0

COOLANT SYSTEM BASES 11/19/2002 REACTOR VESSEL MATERIALS TEXT B3.5.1 0

11/19/2002

Title:

ECCS AND RCIC BASES ADS MANUAL INHIBIT

/

TEXT B3.5.2 1

11/09/2007

Title:

ECCS AND RCIC BASES ECCS AND RCIC SYSTEM MONITORING INSTRUMENTATION Page 10 of 15 Report Date: 02/16/10

SSES MANAL Manual Name:

TRM2 Manual

Title:

TECHNICAL REQUIREMENTS MANUAL UNIT 2 TEXT B3.5.3 1

11/09/2007

Title:

ECCS AND RCIC BASES LONG TERM NITROGEN SUPPLY TO ADS TEXT B3.6.1

Title:

CONTAINMENT TEXT B3.6.2

Title:

CONTAINMENT INDICATION 0

11/19/2002 BASES VENTING OR PURGING 0

11/19/2002 BASES SUPPRESSION CHAMBER-TO-DRYWELL VACUUM BREAKER POSITION TEXT B3.6.3 1

04/19/2007

Title:

.CONTAINMENT BASES SUPPRESSION POOLALARM INSTRUMENTATION TEXT B3.6.4 1

12/14/2004

Title:

CONTAINMENT BASES PRIMARY CONTAINMENT CLOSED SYSTEM BOUNDARIES TEXT B3.7.1

Title:

PLANT TEXT B3.7.2

Title:

PLANT TEXT B3.7.3.1

Title:

PLANT TEXT B3.7.3.2

Title:

PLANT TEXT B3.7.3.3

Title:

PLANT TEXT B3.7.3.4

Title:

PLANT TEXT B3.7.3.5

Title:

PLANT 0

11/19/2002 SYSTEMS BASES EMERGENCY SERVICE WATER SYSTEM (SHUTDOWN)

SYSTEMS BASES SYSTEMS BASES SYSTEMS BASES 0

11/19/2002 ULTIMATE HEAT SINK (UHS)

GROUND WATER LEVEL 2

01/07/2008 FIRE SUPPRESSION WATER SUPPLY SYSTEM 2

04/26/2006 SPRAY AND SPRINKLER SYSTEMS SYSTEMS BASES 0

11/19/2002 C02 SYSTEMS 1

04/26/2006 HALON SYSTEMS SYSTEMSBASES 1

04/26/2006 SYSTEMS BASES FIRE HOSE STATIONS Page.i~i of 15 Report Date: 02/16/10 Page 11 of

.15 Report Date: 02/16/10

SSES MANUAL Manual Name:

TRM2 Manual

Title:

TECHNICAL REQUIREMENTS MANUAL UNIT 2 TEXT B3.7.3.6

Title:

PLANT TEXT B3.7.3.7

Title:

PLANT TEXT B3.7.3.8

Title:

PLANT TEXT B3.7.4

Title:

PLANT TEXT B3.7.5.1

Title:

PLANT TEXT B3.7.5.2

Title:

PLANT TEXT B3.7.5.3

Title:

PLANT TEXT B3.7.6

Title:

PLANT SYSTEMS BASES SYSTEMS BASES SYSTEMS BASES SYSTEMS BASES SYSTEMS BASES SYSTEMS BASES SYSTEMS BASES SYSTEMS BASES 1

04/26/2006 YARD FIRE HYDRANTS AND HYDRANT HOSE HOUSES 0

11/19/2002 FIRE RATED ASSEMBLIES 1

01/12/2004 FIRE DETECTION INSTRUMENTATION 0

.11/19/2002 SOLID RADWASTE SYSTEM 0

11/19/2002 MAIN CONDENSER OFFGAS HYDROGEN MONITOR 0

11/19/2002 MAIN CONDENSER OFFGAS EXPLOSIVE GAS MIXTURE 0

11/19/2002 LIQUID HOLDUP TANKS 2

'06/27/2008 ESSW PUMPHOUSE VENTILATION 2

01/31/2008 TEXT B3.7.7

Title:

PLANT SYSTEMS BASES MAIN CONDENSER OFFGAS PRETREATMENT LOGARITHMIC RADIATION MONITORING INSTRUMENTATION TEXT B3.7.8 3

06/21/2007

Title:

PLANT SYSTEMS BASES SNUBBERS TEXT B3.7.9 1

12/14/2004

Title:

PLANT SYSTEMS BASES CONTROL STRUCTURE HVAC TEXT B3.7.10 1

12/14/2004

Title:

PLANT SYSTEMS BASES SPENT FUEL STORAGE POOLS Page 12 of 15 Report Date: 02/16/10

SSES MANUAL Manual Name:

TRM2 Manual

Title:

TECHNICAL REQUIREMENTS MANUAL UNIT 2.

TEXT B3.7.11

Title:

STRUCTURAL TEXT B3.8.1

Title:

ELECTRICAL PROTECTIVE TEXT B3.8.2.1

Title:

ELECTRICAL CONTINUOUS TEXT B3.8.2.2

Title:

ELECTRICAL AUTOMATIC TEXT B3.8.3

Title:

ELECTRICAL TEXT B3.8.4

Title:

ELECTRICAL TEXT B3.8.5

Title:

ELECTRICAL TEXT B3.8.6

Title:

ELECTRICAL TEXT B3.8.7 1

10/02/2009 INTEGRITY 1

02/04/2005 POWER BASES PRIMARY CONTAINMENT PENETRATION CONDUCTOR OVERCURRENT DEVICES 0

11/19/2002 POWER BASES MOTOR OPERATED VALVES (MOV)

THERMAL OVERLOAD PROTECTION -

1

. 09/17/2004 POWER BASES MOTOR OPERATED.VALVES (MOV)

THERMAL OVERLOAD PROTECTION -

0 11/19/2002 POWER BASES DIESEL GENERATOR (DG)

MAINTENANCE ACTIVITIES 0

11/19/2002 POWER BASES 24 VDC ELECTRICAL POWER SUBSYSTEM 0

11/19/2002 POWER BASES DEGRADED VOLTAGE PROTECTION 1

02/04/2005 POWER BASES EMERGENCY SWITCHGEAR ROOM COOLING 1

06/15,/2009

Title:

BATTERY MAINTENANCE AND MONITORING'PROGRAM TEXT B3.9.1 0

11/19/2002

Title:

REFUELING OPERATIONS BASES DECAY TIME TEXT B3.9.2 0

11/19/2002

Title:

REFUELING OPERATIONS BASES COMMUNICATIONS TEXT B3.9.3 0

11/19/2002

Title:

REFUELING OPERATIONS BASES REFUELING PLATFORM Page i3~

of 15 Report Date: 02/16/10 Page 13 1 of

.15 Report Date: 02/16/10

SSES' MANUAL Manual Name:

TRM2 Manual

Title:

TECHNICAL REQUIREMENTS MANUAL UNIT 2 TEXT B3.10.1

Title:

MISCELLANEOUS TEXT B3.10.2

Title:

MISCELLANEOUS TEXT B3.10.3

Title:

MISCELLANEOUS 0

11/19/2002 BASES SEALED SOURCE CONTAMINATION 1

04/10/2007 BASES SHUTDOWN MARGIN TEST RPS INSTRUMENTATION 0

11/19/2002 BASES INDEPENDENT SPENT FUEL STORAGE INSTALLATION (ISFSI)

TEXT B3.11.1.1

Title:

RADIOACTIVE TEXT B3.11.1.2

Title:

RADIOACTIVE TEXT B3.11.1.3

Title:

RADIOACTIVE TEXT B3.11.1.4

Title:

RADIOACTIVE TEXT B3.11.1.5

Title:

RADIOACTIVE 0

11/19/2002 BASES LIQUID EFFLUENTS CONCENTRATION EFFLUENTS 0

'11/19/2002 EFFLUENTS BASES LIQUID EFFLUENTS DOSE 0

11/19/2002 I

EFFLUENTS BASES LIQUID WASTE TREATMENT SYSTEM 0

11/19/2002 EFFLUENTS BASES LIQUID RADWASTE EFFLUENT MONITORING INSTRUMENTATION 0

BASES 11/19/2002 RADIOACTIVE LIQUID PROCESS MONITORING EFFLUENTS INSTRUMENTATION TEXT B3.11.2.1 1

Title:

RADIOACTIVE EFFLUENTS BASES

.12/14/2004 DOSE RATE TEXT B3.11.2.2 0

11/19/2002

Title:

RADIOACTIVE EFFLUENTS BASES DOSE -

NOBLE GASES TEXT B3.11.2.3

Title:

RADIOACTIVE EFFLUENTS PARTICULATES FORM TEXT B3.11.2.4

Title:

RADIOACTIVE EFFLUENTS 0

11/19/2002 BASES DOSE -

IODINE, TRITIUM, AND RADIONUCLIDES IN 0

11/19/2002 BASES GASEOUS RADWASTE TREATMENT SYSTEM Page.14 of 15 Report Date: 02/16/10 Page 14 of 15 Report Date: 02/16/10

SSES MANUAL Manual Name:

TRM2 Manual

Title:

TECHNICAL REQUIREMENTS MANUAL UNIT..2 TEXT B3.11.2.5

Title:

RADIOACTIVE EFFLUENTS TEXT B3.11.2.6

Title:

RADIOACTIVE EFFLUENTS INSTRUMENTATION TEXT B3.11.3

Title:

RADIOACTIVE EFFLUENTS TEXT B3.11.4.1

Title:

RADIOACTIVE EFFLUENTS TEXT B3.11.4.2

Title:

RADIOACTIVE EFFLUENTS TEXT B3.11.4.3

Title:

RADIOACTIVE EFFLUENTS TEXT B3.12.1

Title:

LOADS CONTROL PROGRAM TEXT B3.12.2

Title:

LOADS CONTROL PROGRAM TEXT B3.12.3

Title:

LOADS CONTROL PROGRAM 4

BASES 1

BASES 0

BASES 2

BASES 0

,BASES 0

BASES 1

BASES 0

BASES 0

BASES 11/14/2006 VENTILATION EXHAUST TREATMENT SYSTEM 01/27/2004 RADIOACTIVE GASEOUS EFFLUENT MONITORING 11/19/2002 TOTAL DOSE 01/06/2006 MONITORING PROGRAM 11/19/2002 LAND USE CENSUS 11/19/2002 INTERLABORATORY COMPARISON PROGRAM 10/04/2007 CRANETRAVEL-SPENT FUEL STORAGE POOL 11/19/2002 HEAVY LOADS REQUIREMENTS 11/19/2002 LIGHT'LOADS REQUIREMENTS Page 2~

of 15 Report Date: 02/16/10 Page 15 of

.15 Report Date: 02/16/10

SUSQUEHANNA STEAM ELECTRIC STATION PPL Rev. 56 LIST OF EFFECTIVE SECTIONS (TECHNICAL REQUIREMENTS MANUAL)

Section Title TOC 1.0 TABLE OF CONTENTS USE AND APPLICATION Page TRM / 1.0-1 Page TRM / 1.0-2 Page TRM / 1.0-3 2.0 3.0 PLANT PROGRAMS Page 2.0-1 Pages TRM / 2.0-2 and TRM 2.0-3 Page TRM / 2.0-4 Page TRM / 2.0-5 Page TRM / 2.0-6 Page TRM / 2.0-7 Page TRM / 2.0-8 Page TRM / 2.0-9 Page TRM / 2.0-10 Page TRM / 2.0-11 Page TRM / 2.0-12 Pages TRM / 2.0-13 and TRM / 2.0-14 Page TRM / 2.0-15 APPLICABILITY Pages TRM I 3.0-1 and TRM / 3.0-2 Page TRM / 3.0-3 Page TRM / 3.0-4 REACTIVITY CONTROL SYSTEMS Page TRM / 3.1-1 Pages TRM / 3.1-2 through TRM 3.1-5 Page TRM / 3.1-6 Page TRM / 3.1-7 Page TRM / 3.1-8 Pages TRM / 3.1-9 and TRM / 3.1-9a Page TRM / 3.1-10 CORE OPERATING LIMITS REPORT Page TRM / 3.2-1 Pages TRM / 3.2-2 through TRM / 3.2-54 INSTRUMENTATION Pages TRM / 3.3-1 through TRM / 3.3-3 Pages TRM / 3.3-4 and TRM / 3.3-5 Page 3.3-6 Page TRM 3.3-7 Page 3.3-8 Effective Date 09/08/2009 08/31/1998 10/04/2002 08/31/1998 08/31/1998 01/28/2005 06/25/2002 04/12/1999 04/15/2009 05/15/2008 04/15/2009 11/15/2004 02/02/2010 11/15/2004 04/15/2009 11/15/2004 11/15/2005 3.1 04/14/2008 03/15/2002 11/30/2005 10/31/2007 08/31/1998 03/27/2007 04/15/2009 03/27/2007 02/18/1999 02/18/1999 08/31/1998 04/17/2009 07/16/1999 10/31/2007 08/31/1998 10/31/2007 08/31/1998 3.2 3.3 SUSQUEHANNA - UNIT 2 TRM / LOES-1 EFFECTIVE DATE 02/02/2010

SUSQUEHANNA STEAM ELECTRIC STATION PPL Rev. 56 LIST OF EFFECTIVE SECTIONS (TECHNICAL REQUIREMENTS MANUAL)

Section Title Effective Date Page TRM / 3.3-9 Page TRM / 3.3-9a Page TRM / 3.3-10 Page TRM / 3.3-11 Page TRM / 3.3-1 la Page TRM / 3.3-12 Page TRM / 3.3-13 Page TRM / 3.3-14 Page TRM / 3.3-15 Page TRM / 3.3-16 Page TRM / 3.3-17 Page TRM / 3.3-18 Pages TRM / 3.3-19 and TRM / 3.3-20 Page TRM / 3.3-21 Page TRM / 3.3-21a Pages TRM /3.3-21b through TRM / 3.3-21d Page TRM / 3.3-22 Pages TRM / 3.3-23 and TRM / 3.3-24 Page TRM / 3.3-25 Pages TRM / 3.3-26 and TRM / 3.3-27 REACTOR COOLANT SYSTEM Page TRM / 3.4-1 Pages 3.4-2 through 3.4-5 Pages TRM / 3.4-6 through TRM / 3.4-8 Page 3.4-9 Page 3.4-10 Page 3.4-11 Page TRM / 3.4-12' Page TRM / 3.4-13 EMERGENCY CORE COOLING AND RCIC Page TRM / 3.5-1 Pages 3.5-2 and 3.5-3 Page TRM / 3.5-4 Pages 3.5-5 through 3.5-7 CONTAINMENT Pages 3.6-1 through 3.6-4 Page TRM / 3.6-5 Page 3.6-6 Pages TRM / 3.6-7 through TRM / 3.6-9 04/12/2007 12/17/1998 10/31/2007 06/02/2005 04/14/2008 03/30/2001 09/13/2005 12/14/1998 10/22/2003 06/27/2001 06/14/2002 10/31/2007 10/22/2003 04/15/2009 11/15/2004 03/27/2007 12/03/2004 05/16/2003 10/22/2003 04/07/2009 03/31/2006 10/23/1998 04/01/2009 08/31/1998 10/31/2007 08/31/1998 04/17/2009 03/31/2006 01/28/2005 08/31/1998 10/31/2007 08/31/1998 08/31/1998 01/07/2002 08/31/1998 12/31/2002 3.4 3.5 3.6 SUSQUEHANNA - UNIT 2 TRM I LOES-2 EFFECTIVE DATE 02/02/2010

SUSQUEHANNA STEAM ELECTRIC STATION PPL Rev. 56 LIST OF EFFECTIVE SECTIONS (TECHNICAL REQUIREMENTS MANUAL)

Section Title Effective Date 3.7 PLANT SYSTEMS Pages TRM / 3.7-1 and TRM / 3.7-2 Page 3.7-3 Page TRM / 3.7-4 Page TRM / 3.7-5 Pages TRM / 3.7-6 through TRM / 3.7-8 Pages TRM / 3.7-9 and TRM / 3.7-10 Page TRM / 3.7-11 Page TRM / 3.7-12 Page TRM / 3.7-13 Page TRM / 3.7-14 Pages TRM / 3.7-15 and TRM / 3.7-16 Page TRM / 3.7-17 Page TRM / 3.7-18 Page TRM / 3.7-19 Pages TRM / 3.7-20 through TRM / 3.7-22 Page TRM / 3.7-23 Page TRM / 3.7-24 Pages TRM / 3.7-25 and TRM / 3.7-26 Page TRM / 3.7-27 Page TRM / 3.7-28 Page TRM / 3.7-29 Page TRM / 3.7-30 Page TRM / 3.7-31 Page TRM / 3.7-32 Page TRM / 3.7-33 Page TRM / 3.7-34 Pages TRM / 3.7-35 and TRM / 3.7-36 Pages 3.7-37 through 3.7-38 Page TRM / 3.7-39 Page TRM / 3.7-40 Page TRM / 3.7-40a Page TRM / 3.7-41 Page TRM / 3.7-42 Pages TRM / 3.7-43 through TRM / 3.7-45 Page TRM / 3.7-46 Page TRM / 3.7-47 Page TRM / 3.7-48 Page TRM / 3.7-49 Page TRM / 3.7-50 Page TRM / 3.7-51 Page TRM / 3.7-52 Page TRM / 3.7-53 Page TRM / 3.7-54 Page TRM / 3.7-55 Page TRM / 3.7-56 07/29/1999 08/31/1998 03/31/2006 04/07/2009 08/02/1999 04/07/2009 01/21/2000 08/02/1999 04/07/2009 08/09/2005 08/02/1999 04/07/2009 08/02/1999 04/07/2009 08/02/1999 04/07/2009 03/31/2006 08/02/1999 10/31/2007 11/29/2006 01/13/2010 11/30/2005 11/16/2001 01/09/2004 10/05/2002 03/31/2006 02/01/1999 08/31/1998 03/31/2006 02/14/2005 06/20/2008 09/04/2008 08/31/1998 10/05/2006 06/07/2007 10/05/2006 06/07/2007 03/09/2001 08/16/2006 12/03/2004 04/15/2003 07/29/1999 04/01/2009 09/25/2009 04/01/2009 SUSQUEHANNA - UNIT 2 TRM / LOES-3 EFFECTIVE DATE 02/02/2010

SUSQUEHANNA STEAM ELECTRIC STATION PPL Rev. 56 LIST OF EFFECTIVE SECTIONS (TECHNICAL REQUIREMENTS MANUAL)

Section Title Effective Date 3.8 ELECTRICAL POWER Page TRM / 3.8-1 Pages TRM / 3.8-2 and TRM / 3.8-3 Page TRM / 3.8-4 Pages TRM / 3.8-5 and TRM / 3.8-6 Pages TRM / 3.8-7 through TRM / 3.8-10 Page TRM / 3.8-11 Page TRM / 3.8-12 Pages 3.8-13 and 3.8-14 Page TRM / 3.8-15 Pages TRM / 3.8-16 and TRM / 3.8-17 Page 3.8-18 Page TRM / 3.8-19 Page TRM / 3.8-20 Pages TRM / 3.8-21 through TRM / 3.8-23 Pages 3.8-24 and 3.8-25 Page TRM / 3.8-26 Page TRM / 3.8-27 Page TRM / 3.8-28 Page TRM / 3.8-29 REFUELING OPERATIONS Pages 3.9-1 through 3.9-3 MISCELLANEOUS Page TRM / 3.10-1 Pages 3.10-2 through 3.10-4 Pages TRM / 3.10-5 and TRM / 3.10-6 Page TRM / 3.10-7 04/02/2002 01/28/2005 01/31/2005 04/02/2002 10/31/2007 08/10/2004 12/03/2004 08/31/1998 01/28/2005 04/02/2002 02/01/1999 04/02/2002 02/01/1999 06/06/1999 08/31/1998 05/28/2009 11/29/2006 05/28/2009 10/20/2009 08/31/1998 03/31/2006 08/30/1998 03/27/2007 03/31/2006 3.9 3.10 3.11 RADIOACTIVE EFFLUENTS Page TRM / 3.11-1 Pages 3.11-2 through 3.11-3 Page TRM / 3.11-4 Page 3.11-5 Page TRM / 3.11-6 Pages 3.11-7 through 3.11-9 Page TRM / 3.11-10 Pages 3.11-11 and 3.11-12 Page TRM / 3.11-13 Page TRM /3.11-14 Pages 3.11-15 and 3.11-16 Page TRM / 3.11-17 03/31/2006 08/31/1998 03/31/2006 08/31/1998 03/31/2006 08/31/1998 12/03/2004

  • 08/31/1998 04/12/2007 12/03/1004 09/01/1998 03/31/2006 SUSQUEHANNA

- UNIT 2 TRM / LOES-4 EFFECTIVE DATE 02/02/2010 SUSQUEHANNA - UNIT 2 TRM / LOES-4 EFFECTIVE DATE 02/02/2010

SUSQUEHANNA STEAM ELECTRIC STATION PPL Rev. 56 LIST OF EFFECTIVE SECTIONS (TECHNICAL REQUIREMENTS MANUAL)

Section Title Effective Date Page 3.11-18 Page TRM / 3.11-19 Pages TRM / 3.11-20 and TRM / 3.11-21 Page TRM / 3.11-22 Page TRM / 3.11-23 Page TRM / 3.11-24 Page TRM / 3.11-25 Pages TRM / 3.11-26 and TRM / 3.11-27 Page TRM / 3.11-28 Page TRM / 3.11-29 Pages TRM 3.11-30 through TRM / 3.11-32 Page TRM / 3.11-33 Page 3.11-34 Page TRM / 3.11-35 Pages TRM / 3.11-36 through TRM / 3.11-39 Pages 3.11-40 through 3.11-44 Page TRM / 3.11-45 Page 3.11-46 Page TRM / 3.11-47 LOADS CONTROL PROGRAM Pages TRM / 3.12-1 through TRM /.3.12-3 Page TRM / 3.12-4 Page TRM / 3.12-5 ADMINISTRATIVE CONTROLS Pages TRM / 4.0-1 through TRM / 4.0-3 Page TRM / 4.0-4 Pages TRM / 4.0-5 through TRM / 4.0-8 08/31/1998 08/15/2005 03/31/2006 04/02/2002 11/14/2006 05/13/2005 04/12/2007 01/21/2004 09/08/2009 12/03/2004 01/21/2004 03/31/2006 08/31/1998 03/31/2006 11/30/2005 08/31/1998 03/31/2006 08/31/1998 03/31/2006 02/05/1999 03/14/2008 02/05/1999 08/31/1998 12/11/2008 08/31/1998 3.12 4.0 SUSQUEHANNA - UNIT 2 TRM / LOES-5 EFFECTIVE DATE 02/02/2010

SUSQUEHANNA STEAM ELECTRIC STATION PPL Rev. 56 LIST OF EFFECTIVE SECTIONS (TECHNICAL REQUIREMENTS MANUAL)

Section Title B 3.0 APPLICABILITY BASES Pages TRM / B 3.0-1 through TRM / B 3.0-3 Page TRM / B 3.0-4 Page TRM / B 3.0-5 Page TRM / B 3.0-6 Page TRM / B 3.0-7 Pages TRM / B 3.0-8 through TRM / B 3.0-10 Pages TRM / B 3.0-11 and TRM / B 3.0-12 Pages TRM / B 3.0-13 and TRM / B 3.0-14 Page TRM / B 3.0-15 B 3.1 B 3.2 B 3.3 REACTIVITY CONTROL SYSTEMS BASES Page TRM / B 3.1-1 Pages TRM / B 3.1-2 and TRM / B 3.1-3 Page B 3.1-4 Pages TRM / B 3.1-5 through TRM / B 3.1-7 Page TRM / B 3.1-8 CORE OPERATING LIMITS BASES Page B 3.2-1 INSTRUMENTATION BASES Page TRM / B 3.3-1 Pages TRM / B 3.3-2 and TRM / B-3.3-2a Pages TRM / B 3.3-3 and TRM / B 3.3-3a Pages TRM / B 3.3-4 and TRM / B 3.3-5 Pages TRM / B 3.3-6 through TRM / B 3.3-9 Page B 3.3-10 Pages TRM / B 3.3-11 and TRM / B 3.3-12 Page TRM / B 3.3-13 Page TRM / B 3.3-14 Page TRM / B 3.3-14a Page TRM / B 3.3-14b Pages TRM / B 3.3-15 through TRM / B 3.3-17 Pages TRM / B 3.3-18 and TRM / B 3.3-19 Pages TRM / B 3.3-19a and TRM I B 3.3-19b Page TRM / B 3.3-19c Pages TRM / B 3.3'19d and TRM / B 3.3-19e Page TRM / B 3.3-20 Page TRM / B 3.3-21 Page TRM / B 3.3-22 Page TRM / B 3.3-23 Pages TRM / B 3.3-24 and TRM / B 3.3-25 Effective Date 08/31/1998 01/10/2007 04/14/2008 08/31/1998 04/12/2007 08/31/1998 03/15/2002 11/30/2005 03/15/2002 07/13/1999 10/31/2007 08/31/1998 03/27/2007 02/18/1999 08/31/1998 04/07/2000 10/31/2007 10/31/2007 05/30/2006 10/31/2007 08/31/1998 09/13/2005 12/03/2004 06/25/2002 10/31/2007 06/14/2002 10/22/2003 03/27/2007 03/2712007 04/17/2009 03/27/2007 12/11/2008 05/16/2003 10/22/2003 05/16/2003 04/07/2009 SUSQUEHANNA - UNIT 2 TRM I LOES-6 EFFECTIVE DATE 02/02/2010

SUSQUEHANNA STEAM ELECTRIC STATION PPL Rev. 56 LIST OF EFFECTIVE SECTIONS (TECHNICAL REQUIREMENTS MANUAL)

Section Title B 3.4 B 3.5 B 3.6 B 3.7 REACTOR COOLANT SYSTEM BASES Page TRM / B 3.4-1 Pages TRM / B 3.4-2 and TRM / B3.4-3 Pages TRM / B 3.4-4 and TRM / B 3.4-4a Page TRM / B 3.4-5 Page B 3.4-6 ECCS AND RCIC BASES Pages B 3.5-1 and B 3.5-2 Pages TRM / B 3.5-3 and TRM / B 3.5-3a Page B 3.5-4 Page TRM / B 3.5-5 CONTAINMENT BASES Page TRM / B 3.6-1 Page TRM / B 3.6-2 Page B 3.6-3 Page TRM / B 3.6-4 Page TRM / B 3.6-5 Page TRM / B 3.6-6 Pages TRM / B 3.6-7 through TRM / B 3.6-11 PLANT SYSTEMS BASES Pages B 3.7-1 and B 3.7-2 Pages TRM / B 3.7-3 and TRM / B 3.7-3a Page TRM / B 3.7-4 Page TRM / B 3.7-5 Pages TRM / B 3.7-6 and TRM / B 3.7-6a Pages TRM / B 3.7-7 and TRM / B 3.7-7a Page TRM / B 3.7-8 Page TRM / B 3.7-9 Page TRM / B 3.7-10 Pages TRM / B 3.7-1Oa through TRM / B 3.7-11a Pages TRM / B 3.7-12 through TRM / B 3.7-14 Pages TRM / B 3.7-14a and TRM / B 3.7-14b Pages TRM / B 3.7-15 and TRM / B 3.7-16 Pages B 3.7-17 through B 3.7-20 Page TRM / B 3.7-21 Page TRM / B 3.7-21a Pages TRM / B 3.7-22 and TRM / B 3.7-23 Pages TRM / B 3.7-24 through TRM / B 3.7-29 Page TRM / B 3.7-30 Pages TRM / B 3.7-30a and TRM / B 3.7-30b Page TRM / B 3.7-32 Page TRM / B 3.7-33 Effective Date 08/31/1998 04/01/2009 10/31/2007 10/15/1999 08/31/1998 08/31/1998 10/31/2007 08/31/1998 10/31/2007 07/26/2001 02/01/1999 08/31/1998 03/29/2007 04/04/2007 12/03/2004 12/31/2002 08/31/1998 12/27/2007 03/31/2006 08/02/1999 03/31/2006 08/02/1999 08/02/1999 03/31/2006 08/02/1999 03/31/2006 08/02/1999 01/09/2004 02/01/1999 08/31/1998 02/14/2005 06/20/2008 01/30/2008 10/05/2006 06/07/2007 10/05/2006 03/09/2001 04/15/2003 SUSQUEHANNA-UNIT2 TRM / LOES-7 EFFECTIVE DATE 02/02/2010 SUSQUEHANNA - UNIT 2 TRM / LOES-7 EFFECTIVE DATE 02/02/2010

SUSQUEHANNA STEAM ELECTRIC STATION PPL Rev. 56 LIST OF EFFECTIVE SECTIONS (TECHN ICAL REQUIREMENTS MANUAL)

Section Title B 3.8 B.3.9 Page TRM / B 3.7-34 Page TRM / B 3.7-35 Pages TRM / B 3.7-36 and TRM / B 3.7-37 Page TRM / B 3.7-38 Pages TRM / B 3.7-39 and TRM / B 3.7-40 ELECTRICAL POWER BASES Page TRM / B 3.8-1 Pages TRM / B 3.8-2 and TRM / B 3.8-2a Page TRM / B 3.8-3 Page TRM / B 3.8-3a Page TRM I B 3.8-4 Page TRM / B 3.8-4a Page TRM / B 3.8-5 Pages TRM / B 3.8-6 through TRM / B 3.8-16 Page TRM / B 3.8-17 Pages TRM / B 3.8-18 through TRM / B 3.8-20 Pages TRM / B 3.8-21 through TRM / B 3.8-24 REFUELING OPERATIONS BASES Pages B 3.9-1 and B 3.9-2 Pages B 3.9-3 through B 3.9-7 Effective Date 12/03/2004 07/05/2000 04/01/2009 09/25/2009 04/01/2009 04/02/2002 01/28/2005 04/02/2002 04/02/2002 04/02/2002 08/10/2004 08/31/1998 04/02/2002 01/28/2005 11/29/2006 05/28/2009 08/31/1998 10/23/1998 B 3.10 MISCELLANEOUS BASES Page B 3.10-1 Pages TRM / B 3.10-2 and TRM / B 3.10-3 Pages TRM / B 3.10-4 and TRM / B 3.10-5 B 3.11 RADIOACTIVE EFFLUENTS BASES Pages B 3.11-1 through B 3.11-9 Page TRM / B 3.11-10 Pages TRM/B 3.11-11 and TRM/B 3.11-11 a Pages TRM/B 3.11-12 and TRM/B 3.11-13 Page TRM / B 3.11-14 Page TRM / B 3.11-15 Pages B 3.11-16 through B 3.11-19 Page TRM / B 3.11-20 Page TRM / B 3.11-20a Page TRM / B 3.11-21 Pages TRM / B 3.11-22 and TRM / B 3.11-23 Page TRM / B 3.11-23a Pages TRM / B 3.11-24 and TRM / B 3.11-25 Pages B 3.11-26 through B 3.11-27 08/31/1998 03/27/2007 08/23/1999 08/31/1998 02/01/1999 04/07/2000 02/01/1999 12/03/2004 02/01/1999 08/31/1998 04/02/2002 04/02/2002 05/13/2005 11/14/2006 05/13/2005 01/21/2004 08/31/1998 SUSQUEHANNA - UNIT 2 TRM / LOES-8 EFFECTIVE DATE 02/02/2010

SUSQUEHANNA STEAM ELECTRIC STATION PPL Rev. 56 LIST OF EFFECTIVE SECTIONS (TECHNICAL REQUIREMENTS MANUAL)

Section Title Effective Date Pages TRM / B 3.11-28 and TRM / B 3.11-29 Page TRM / B 3.11-30 Pages B 3.11-31 through B 3.11-35 Page TRM / B 3.11-36 11/30/2005 12/03/2004 08/31/1998 02/12/1999 09/19/2007 02/05/1999 B.3.12 LOADS CONTROL PROGRAM BASES Page TRM / B 3.12-1 Pages TRM / B 3.12-2 and TRM / B 3.12-3 TRM2 text LOES.doc 2/4/2010 SUSQUEHANNA - UNIT 2 TRM / LOES-9 EFFECTIVE DATE 02/02/2010

Instrument Trip Setpoint Program PPL Rev. 9 2.2 2.0 PLANT PROGRAMS AND SETPOINTS 2.2 Instrument Trip Setpoint Table The Instrument Trip Setpoint Limits in Table 2.2-1 are the Trip Setpoint value limits that were contained in the Instrumentation Setpoint tables for protection systems and other functions important to safety that were included in the scope of the original Standard Technical Specifications. Actual instrument setpoints are established utilizing the Allowable Values specified in the Technical Specifications and Technical Requirements. Allowable Values are established in the Reference LCOs and TROs identified in this Table. TRO references are enclosed in square brackets.

Instrumentation process setpoints for the listed subsystems and trip functions are set consistent with the Trip Setpoint Limit Column of Table 2.2-1. Actual setpoints are established in accordance with engineering procedures.

Alarm setpoints and other non-protection system trip settings as may be found in the Technical Specifications or in the Technical Requirements are not included in this table.

Reference NDAP-QA-1104 Setpoint Change Control SUSQUEHANNA - UNIT 2 TRM / 2.0-5 EFFECTIVE DATE 04/02/1999

Instrument Trip Setpoint Program 2.2 PPL Rev. 9 TABLE 2.2-1 (Page 1 of 8)

INSTRUMENTATION SETPOINTS SYSTEM/REFERENCE LCO [TRO]

TRIP FUNCTION TRIP SETPOINT 2.2.1 Reactor Protection 2.2.1.1 3.3.1.1 Intermediate Range Monitor, Neutron Flux-

  • 120/125 divisions of full scale High 2.2.1.2 3.3.1.1 Average Power Range Monitor, Neutron Flux -
  • 18% of RATED THERMAL POWER High (Setdown) 2.2.1.3 3.3.1.1 Average Power Range Monitor, Simulated 0.55 W + 58.7%

Thermal Power - High Two Loop Operation 2.2.1.4 3.3.1.1 Average Power Range Monitor, Simulated 0.55 (W-AW) + 5 8.7%(b)

Thermal Power - High Single Loop Operation 2.2.1.5 3.3.1.1 Average Power Range Monitor, Simulated

  • 113.5% of RATED THERMAL Thermal Power - High Flow Clamp POWER 2.2.1.6 3.3.1.1 Average Power Range Monitor, Neutron Flux-
  • 118% of RATED THERMAL High POWER 2.2.1.7 3.3.1.1 Reactor Vessel Steam Dome Pressure - High

<_ 1087 psig 2.2.1.8 3.3.1.1 Reactor Vessel Water Level - Low, Level 3

> 13.0 inches(a) 2.2.1.9 3.3.1.1 Main Steam Isolation Valve - Closure

_ 10% closed 2.2.1.10 This Section Not Used 2.2.1.11 3.3.1.1 Drywell Pressure-High

< 1.72 psig 2.2.1.12 3.3.1.1 Scram Discharge Volume Water Level - High -

< 61 gallons Float Switch 2.2.1.14 3.3.1.1 Turbine Stop Valve - Closure

< 5.5% closed 2.2.1.15 3.3.1.1 Turbine Control Valve Fast Closure, Trip Oil

> 500 psig Pressure - Low (continued)

(a) See Figure 2.2-1.

(b) For single loop operation, the value of AW = 8.7.

SUSQUEHANNA - UNIT 2 TRM /12.0-6 EFFECTIVE DATE 04/15/2009

Instrument Trip Setpoint Program 2.2 PPL Rev. 9 TABLE 2.2-1 (Page 2 of 8)

INSTRUMENTATION SETPOINTS SYSTEM/REFERENCE LCO [TRO]

TRIP FUNCTION TRIP SETPOINT 2.2.1.16 OPRM Instrumentation 2.2.1.16.1 3.3.1.1 Sp PBA Amplitude Trip See COLR - TRO 3.2 2.2.1.16.2 3.3.1.1 Np PBA Successive Confirmation Count Trip See COLR - TRO 3.2 2.2.1.16.3

[3.3.9]

TOL (E) Period Tolerance 0.10 sec 2.2.1.16.4

[3.3.9]

fc Conditioning Filter Cutoff Frequency 1.50 Hz 2.2.1.16.5

[3.3.9]

Tmin Oscillation Period Lower Time Limit 1.00 sec 2.2.1.16.6

[3.3.9]

Tmax Oscillation Period Upper. Time Limit 3.50 sec 2.2.1.16.7

[3.3.9]

LPRMmin Minimum LRPMs/Cell Required for 2

Cell Operability 2.2.1.16.8

[3.3.9]

S1 Peak Threshold Setpoint/ABA & GRBA 1.20 2.2.1.16.9

[3.3.9]

S2 Valley Threshold Setpoint/ABA & GRBA 0.85 2.2.1.16.10

[3.3.9]

Smax Amplitude Trip Setpoint/ABA 1.50 2.2.1.16.11

[3.3.9]

DR3 Growth Rate Factor Setpoint/GRBA 1.60 2.2.2 Isolation Actuation Instrumentation 2.2.2.1 Primary Containment Isolation

-2.2.2.1.1 3.3.6.1 Reactor Vessel Water Level Low, Level 3

> 13.0 inchesca) 2.2.2.1.2 3.3.6.1 Reactor Vessel Water Level Low Low, Level 2

> -38.0 inches(a) 2.2.2.1.3 3.3.6.1 Reactor Vessel Water Level Low Low Low,

>_ -129 inches(a)

Level I 2.2.2.1.4 3.3.6.1 Drywell Pressure-High

< 1.72 psig 2.2.2.1.5 3.3.6.1 SGTS Exhaust Radiation - High

_< 23.0 mR/hr 2.2.2.1.6

[3.3.6]

Main Steam Line Radiation - High High

_ 15 x full power background without hydrogen injection (continued)

(a).See Figure 2.2-1.

SUSQUEHANNA - UNIT 2 TRM / 2.0-7 EFFECTIVE DATE 05/15/2008

Instrument Trip Setpoint Program 2.2 PPL Rev. 9 TABLE 2.2-1 (Page 3 of 8)

INSTRUMENTATION SETPOINTS SYSTEM/REFERENCE LCO

[TRO]

TRIP FUNCTION TRIP SETPOINT 2.2.2.2 Secondary Containment Isolation 2.2.2.2.1 2.2.2.2.2 2.2.2.2.3 2.2.2.2.4 2.2.2.2.5 3.3.6.2 3.3.6.2 3.3.6.2 3.3.6.2 3.3.6.2 2.2.2.3 Main Steam Line Isolation 2.2.2.3.1 2:2.2.3.2 2.2.2.3.3 2.2.2.3.4 2.2.2.3.5 2.2.2.3.6 2.2.2.3.7 2.2.2.3.8 3.3.6.1 3.3.6.1 3.3.6.1 3.3.6.1 3.3.6.1

[3.3.6]

[3.3.6]

Reactor Vessel Water Level - Low Low, Level 2 Drywell Pressure - High Refuel Floor High Exhaust Duct Radiation -

High Railroad Access Shaft Exhaust Duct Radiation - High Refuel FloorWall Exhaust Duct Radiation -

High Reactor Vessel Water Level - Low Low Low, Level 1 Main Steam Line Pressure - Low Main Steam Line Flow-High Condenser Vacuum - Low Reactor Building Main Steam Line Tunnel Temperature - High This Section Not Used Reactor Building Main Steam Line Tunnel A Temperature - High Turbine Building Main Steam Tunnel Temperature - High

> -38.0 inches(a)

< 1.72 psig

< 18 mR/hr

< 5 mR/hr

< 21 mR/hr

>_-129 inches(a)

> 861 psig

_ 173 psid

> 9.0 inches Hg vacuum

< 177°F

< 990F

< 197 0F 2.2.2.4 Reactor Water Cleanup System Isolation 2.2.2.4.1 2.2.2.4.2 2.2.2.4.3 2.2.2.4.4 2.2.2.4.5 2.2.2.4.6 2.2.2.4.7 2.2.2.4.8 2.2.2.4.9 3.3.6.1 3.3.6.1 3.3.6.1 3.3.6.1

[3.3.6]

3.3.6.1

[3.3.6]

3.3.6.1

[3.3.6]

Reactor Vessel Water Level - Low Low, Level 2 RWCU A Flow - High RWCU Flow - High RWCU Penetration Area Temperature - High RWCU Penetration Room Area A Temperature - High RWCU Pump Area Temperature - High RWCU Pump Room Area A Temperature -

High RWCU Heat Exchanger Area Temperature -

High RWCU Heat Exchanger Room Area A Temperature - High

> -38 inches(a)

_< 59 gpm

< 462 gpm

< 131°F

< 691F

_ 147°F

_ 69°F

< 1470F

< 691F (continued)

(a) See Figure 2.2-1.

SUSQUEHANNA - UNIT 2 TRM / 2.0-8 EFFECTIVE DATE 04/15/2009

Instrument Trip Setpoint Program 2.2 PPL Rev. 9 TABLE 2.2-1 (Page 4 of 8)

INSTRUMENTATION SETPOINTS SYSTEM/REFERENCE LCO

[TRO]

TRIP FUNCTION TRIP SETPOINT 2.2.2.5 Reactor Core Isolation Cooling System Isolation 2.2.2.5.1 3.3.6.1 RCIC Steam Line A Pressure - High 2.2.2.5.2 3.3.6.1 RCIC Steam Supply Line Pressure - Low 2.2.2.5.3 3.3.6.1 RCIC Turbine Exhaust Diaphragm Pressure

- High 2.2.2.5.4 3.3.6.1 RCIC Equipment Room Temperature - High 2.2.2.5.5 3.3.6.1 RCIC Pipe Routing Area Temperature - High 2.2.2.5.6 3.3.6.1 RCIC Emergency Area Cooler Temperature -

High 2.2.2.5.7 3.3.6.1 Drywell Pressure - High 2.2.2.5.8

[3.3.6]

RCIC Equipment Room A Temperature - High 2.2.2.5.9

[3.3.6]

RCIC Pipe Routing Area A Temperature -

High 2.2.2.6 High Pressure Coolant Injection System Isolation 2.2.2.6.1 2.2.2.6.2 2.2.2.6.3 2.2.2.6.4 2.2.2.6.5 2.2.2.6.6 2.2.2.6.7 2.2.2.6.8 2.2.2.6.9 3.3.6.1 3.3.6.1 3.3.6.1 3.3.6.1 3.3.6.1 3.3.6.1 3.3.6.1

[3.3.6]

[3.3.6]

2.2.2.7 Shutdown Cooling/System IsolE 2.2.2.7.1 3.3.6.1 2.2.2.7.2 3.3.6.1 2.2.2.7.3

[3.3.6]

2.2.3 ECCS Actuation HPCI Steam Line A Pressure - High HPCI Steam Supply Line Pressure - Low HPCI Turbine Exhaust Diaphragm Pressure -

High HPCI Equipment Room Temperature - High HPCI Emergency Area Cooler Temperature -

High HPCI Pipe Routing Area Temperature - High Drywell Pressure - High HPCI Equipment Room A Temperature - High HPCI Pipe Routing Area A Temperature -

High ition Reactor Vessel Water Level - Low, Level 3 Reactor Vessel Steam Dome Pressure - High RHR Flow - High Reactor Vessel Water Level - Low Low Low, Level 1 Drywell Pressure - High Reactor Vessel Steam Dome Pressure - Low injection permissive

< 138 inches H 2 0

> 60 psig

_10.0 psig

< 1671F

< 167OF

_ 167°F

< 1.72 psig

< 891F

< 891F

< 370 inches H 20

>104 psig

  • 10 psig

< 167OF

_ 1670F

< 167OF

_< 1.72 psig

< 89OF

< 890F

> 13.0 inches(a)

< 98 psig

<25,000 gpm

>-129 inches(a)

< 1.72 psig

>_413, *427 psig 2.2.3.1 2.2.3.1.1 2.2.3.1.2 2.2.3.1.3 Core Spray System 3.3.5.1 3.3.5.1 3.3.5.1 (continued)

(a) See Figure 2.2-1 SUSQUEHANNA - UNIT 2 TRM / 2.0-9 EFFECTIVE DATE 11/15/2004

Instrument Trip Setpoint Program 2.2 PPL Rev. 9 TABLE 2.2-1 (Page 5 of 8)

INSTRUMENTATION SETPOINTS SYSTEM/REFERENCE LCO

[TRO]

TRIP FUNCTION TRIP SETPOINT 2.2.3.2 LPCI Mode of RHR System 2.2.3.2.1 3.3.5.1 Reactor Vessel Water Level - Low Low Low,

> -129 inches(a)

Level 1 2.2.3.2.2 3.3.5.1 Drywell Pressure - High

< 1.72 psig 2.2.3.2.3 3.3.5.1 Reactor Vessel Steam Dome Pressure -

> 413,

  • 427 psig Low, injection permissive 2.2.3.2.4 3.3.5.1 Reactor Vessel Steam Dome Pressure -

>_236 psig, decreasing Low, Recirculation Discharge Valve permissive 2.2.3.3 HPCI System 2.2.3.3.1 3.3.5.1 Reactor Vessel Water Level - Low Low,

> -38 inches(a)

Level 2 2.2.3.3.2 3.3.5.1 Drywell Pressure - High

_ 1.72 psig 2.2.3.3.3 3.3.5.1 Condensate Storage Tank Level - Low

Ž40.5 inches above tank bottom 2.2.3.3.4 3.3.5.1 Reactor Vessel Water Level - High, Level 8

< 54 inches 2.2.3.4 Automatic Depressurization System (ADS) 2.2.3.4.1 3.3.5.1 Reactor Vessel Water Level - Low Low Low,

> -129 inches Level 1 2.2.3.4.2 3.3.5.1 Drywell Pressure - High

< 1.72 psig 2.2.3.4.3 3.3.5.1 ADS Timer

<102 seconds 2.2.3.4.4 3.3.5.1 Core Spray Pump Discharge Pressure - High

> 135, < 155 psig 2.2.3.4.5 3.3.5.1 Low Pressure Coolant Injection Pump

_ 121, _< 129 psig Discharge Pressure - High 2.2.3.4.6 3.3.5.1 Reactor Vessel Water Level - Low, Level 3

_> 13 inches Confirmatory 2.2.3.4.7 3.3.5.1 ADS DryWell Pressure Bypass Timer

<420 seconds 2.2.3.5 Loss of Power - ECCS Actuation 2.2.3.5.1 4.16kv ESS Bus Undervoltage (Loss of Voltage < 20%)

2.2.3.5.1.1 3.3.8.1 Bus Undervoltage

Ž823.2, < 856.8 Volts 2.2.3.5.1.2 3.3.8.1 Time delay

>0.4, _< 0.6 seconds (continued)

(a) See Figure 2.2-1.

SUSQUEHANNA - UNIT 2 TRM / 2 0-10 EFFECTIVE DATE 02/02/2010

Instrument Trip Setpoint Program 2.2 PPL Rev. 9 TABLE 2.2-1 (Page 6 of 8)

INSTRUMENTATION SETPOINTS 2.2.3.5.2 2.2.3.5.2.1 2.2.3.5.2.2 2.2.3.5.3 2.2.3.5.3.1 2.2.3.5.3.2 2.2.3.5.3.4 2.2.3.5.4 2.2.3.5.4.1 2.2.3.5.4.2 2.2.3.5.5 2.2.3.5.5.1 2.2.3.5.5.2 2.2.4 SYSTEM/REFERENCE LCO

[TRO]

TRIP FUNCTION 4.16kV ESS Bus Undervoltage (Degraded Voltage < 65%)

3.3.8.1 Bus Undervoltage 3.3.8.1 Time delay 4.16kV ESS Bus Undervoltage (Degraded Voltage, < 93%)

3.3.8.1 Bus Undervoltage 3.3.8.1 Time Delay (Non-LOCA) 3.3.8.1 Time Delay (LOCA) 480V ESS Bus 0B565 Undervoltage (Degraded Voltage, < 65%)

[3.8.5]

480V Basis

[3.8.5]

Time Delay 480V ESS Bus 0B565 Undervoltage (Degraded Voltage, < 92%)

[3.8.5]

480V Basis

[3.8.5]

Time Delay ATWS Alternate Rod Injection and Recirculation Pump Trip TRIP.SETPOINT

Ž2641.1, < 2748.9 Volts

Ž2.7, <3.3 seconds

> 3829.3, <3906.7 Volts

Ž4 minute, 30 seconds

_< 5 minute, 30 seconds "9, < 11 seconds

Ž308.9, < 315.1 Volts

Ž4.5, < 5.5 seconds

> 437.6, < 446.4 Volts

>_ 9, < 11 seconds 2.2.4.1 2.2.4.1 2.2.5 2.2.5.1 2.2.5.2 2.2.6 2.2.6.1 2.2.6.2 2.2.6.3 3.3.4.2J3.1.1]

3.3.4.2J3.1.1]

Reactor Vessel, Water Level - Low Low, Level 2 Reactor Vessel Steam Dome Pressure - High

> -38 inches(a)

< 5.5% closed

> 500 psig

> -38 inches(a) 54 inches(a)

> 36.0 inches above tank bottom (continued)

(a) See Figure 2.2-1.

SUSQUEHANNA - UNIT 2 TRM / 2.0-11 EFFECTIVE DATE 11/15/2004

Instrument Trip Setpoint Program 2.2 PPL Rev. 9 TABLE 2.2-1 (Page 7 of 8)

INSTRUMENTATION SETPOINTS SYSTEM/REFERENCE LCO

[TRO]

TRIP FUNCTION TRIP SETPOINT 2.2.7 Control Rod Block 2.2.7.1 Rod Block Monitor 2.2.7.1.1 3.3.2 Low Power Range - Upscale See COLR - TRO 3.2 3.3.2 Intermediate Power Range - Upscale See COLR - TRO 3.2 3.3.2 High Power Range - Upscale See COLR - TRO 3.2 2.2.7.1.2 3.3.2 Low Power Range Setpoint See COLR - TRO 3.2 3.3.2 Intermediate Power Range Setpoint See COLR - TRO 3.2 3.3.2 High Power Range Setpoint See COLR - TRO 3.2 2.2.7.2 APRM 2.2.7.2.1

[3.1.3]

Simulated Thermal Power-High -Two Loop 0.55 W + 54.2%

Operation 2.2.7.2.2

[3.1.3]

Simulated Thermal Power-High - Single 0.55 (W-AW) + 54.2%(c)

Loop Operation 2.2.7.2.3

[3.1.3]

Simulated Thermal Power-High Clamp

!5 108% of RATED THERMAL POWER 2.2.7.2.4

[3.1.3.]

Downscale

> 5% of RATED THERMAL POWER 2.2.7.2.5

- [3.1.3.]

Neutron Flux - High (Setdown)

_ 12% of RATED THERMAL POWER 2.2.7.3 Source Range Monitors 2.2.7.3.1

[3.1.3]

Upscale

< 2E5 'cps 2.2.7.3.2

[3.1.3]

Downscale

> 3.0 cps(b) 2.2.7.4 Intermediate Range Monitors 2.2.7.4.1

[3.1.3]

Upscale

_< 108/125 divisions of full scale 2.2.7.4.2

[3.1.3]

Downscale

> 5/125 divisions of full scale 2.2.7.5 Scram Discharge Volume 2.2.7.5.1

[3.1.3]

Water Level - High

< 35.9 gallons 2.2.7.6 Reactor Coolant System Recirculation Flow 2.2.7.6.1

[3.1.3]

Upscale 114%

(continued)

(b) With a signal-to-noise ratio >_ 2, or within the limits of Figure 2.2-2.

(c) For single loop operation, the valve of AW = 8.7.

SUSQUEHANNA - UNIT 2 TRM / 2.0-12 EFFECTIVE DATE 04/15/2009

Instrument Trip Setpoint Program 2.2 PPL Rev. 9 TABLE 2.2-1 (Page 8 of 8)

INSTRUMENTATION SETPOINTS SYSTEM/REFERENCE LCO

[TRO]

TRIP FUNCTION TRIP SETPOINT 2.2.8 CREOASS 2.2.8.1 3.3.7.1 Main Control Room Outside Air Intake

> -38.0 inches(a)

Level 2 2.2.8.1.2 3.3.7.1 Drywell Pressure - High

< 1.72 psig 2.2.8.1.3 3.3.7.1 Refuel Floor High Exhaust Duct Radiation -

< 18 mR/hr High 2.2.8.1.4 3.3.7.1 Railroad Access Shaft Exhaust Duct

  • 5 mR/hr Radiation - High 2.2.8.1.5 3.3.7.1 Refuel Floor Wall Exhaust Duct Radiation -
  • 21 mR/hr High 2.2.9 Feedwater/Main Turbine Trip System Actuation 2.2.9.1 3.3.2.2 Reactor Vessel Level - High

<54.0 inches(a) 2.2.10 MVP Isolation 2.2.10.1

[3.3.11]

Main Steam Line Radiation - High High

< 15 x full power background without hydrogen injection

(') See Figure 2.2-1 SUSQUEHANNA - UNIT 2 TRM 12.0-13 EFFECTIVE DATE 11/15/2004

PPL Rev. 9 Instrument Trip Setpoint Table 2.2 FIGURE 2.2-i REACTOR VESSEL WATER LEVEL SUSQUEHANNA - UNIT 2 TRM / 2.0-14 EFFECTIVE DATE 11/15/2004

Instrument Trip Setpoint Table 2.2 PPL Rev. 9 Instrument Trip Setpoint Table 2.2 3

2.8 2.6 2.4 2.2 2

u*

1.8 1.6 I-l

!ý 1.4 z-1.2

D 0o 1

V) 0.8 0.6 0.4 0.2 0

Acceptable Not Acceptable 2

6 10 14 18 22 26 30 Signal-to-Noise Ratio Figure 2.2-2 Minimum SRM Trip Setpoint Versus Signal-to-Noise Ratio SUSQUEHANNA - UNIT 2 TRM / 2.0-15 EFFECTIVE DATE 11/15/2005